CN112016166A - 一种地铁设计三维模型差异化对比方法 - Google Patents
一种地铁设计三维模型差异化对比方法 Download PDFInfo
- Publication number
- CN112016166A CN112016166A CN202011028619.5A CN202011028619A CN112016166A CN 112016166 A CN112016166 A CN 112016166A CN 202011028619 A CN202011028619 A CN 202011028619A CN 112016166 A CN112016166 A CN 112016166A
- Authority
- CN
- China
- Prior art keywords
- model
- attributes
- component
- version
- attribute
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000004069 differentiation Effects 0.000 title claims abstract description 19
- 238000000034 method Methods 0.000 title claims abstract description 18
- 238000010276 construction Methods 0.000 claims description 4
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000012217 deletion Methods 0.000 description 1
- 230000037430 deletion Effects 0.000 description 1
- 238000012938 design process Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/15—Vehicle, aircraft or watercraft design
Abstract
本发明提供了一种地铁设计三维模型差异化对比方法,包括以下步骤:上传初始版本模型信息及属性,系统获取初始模型构件编码清单及属性,并保存至数据库;上传新版本模型信息及属性;系统读取数据库中前一版本的模型构件编码清单及属性,对比、判定此版本模型构件编码及属性是否发生变化;如版本模型构件编码及属性有变化,则根据变化类型变更构件信息,然后系统获取新版本模型构建编码清单及属性;将新版本模型构建编码清单及属性保存至数据库;基于系统选择不同对比版本,二三维关联展示不同三维模型差异化构件。本发明实现了地铁设计三维模型差异化对比,可以更加直观的展示不同版本三维模型的差异化构件及属性,提高地铁设计效率。
Description
技术领域
本发明属于地铁三维设计领域,特别涉及一种地铁设计三维模型差异化对比方法。
背景技术
在地铁设计过程中,随着设计进度的不断推进,按照现有的设计审图流程,设计内容将会不断的被优化变更,因此同一BIM(建筑信息模型)模型将会产生不同BIM版本,在这个过程中,在现有的管理模式下,虽然不同修改版本都有相应的文字记录说明,但是在后期进行版本变更对比时,需要设计人员投入大量的精力去翻阅相关版本纸质材料以及图纸,工作效率低下。
发明内容
本发明针对现有技术中存在的技术问题,提供一种地铁设计三维模型差异化对比方法,解决了原有版本对比工作效率低下问题,实现了地铁设计三维模型差异化对比,使设计人员通过BIM平台更加直观的展示不同版本二三维模型的差异化构件及属性,提高地铁设计效率。
本发明采用的技术方案是:一种地铁设计三维模型差异化对比方法,包括以下步骤:
步骤一:上传初始版本模型信息及属性,系统获取初始模型构件编码清单及属性,并保存至数据库;
步骤二:上传新版本模型信息及属性;
步骤三:系统读取数据库中前一版本的模型构件编码清单及属性,对比、判定此版本模型构件编码及属性是否发生变化;其中:
如版本模型构件编码及属性无变化,则系统获取新版本模型构建编码清单及属性;
如版本模型构件编码及属性有变化,则根据变化类型变更构件信息,然后系统获取新版本模型构建编码清单及属性;
步骤四:将新版本模型构建编码清单及属性保存至数据库;
步骤五:模型每次出现变更,生成一个新版本,新版本上传系统时,重复步骤二至步骤四;所有版本的模型构建编码清单及属性都会保存在数据库中;
步骤六:基于系统选择不同对比版本,二三维关联展示不同三维模型差异化构件。
作为优选,步骤三中,如构件编码无变化、属性变更,则基于系统标识变更构件属性;
如构件新增,则记录新增构建编码并展示;
如构件删除,则记录删除构件编码。
作为优选,版本模型信息及属性中包含构件的二三维模型。
作为优选,步骤六中,二三维关联展示不同三维模型差异化构件时,展示差异化构件的信息列表和二三维模型。
与现有技术相比,本发明所具有的有益效果是:本发明实现了地铁设计二三维模型差异化对比,基于模型位置进行模型的二维和三维对比展示,使设计人员通过BIM平台更加直观的展示不同版本二三维模型的差异化构件及属性,提高地铁BIM模型设计效率的有益效果。
附图说明
图1为本发明实施例的流程示意图。
具体实施方式
为使本领域技术人员更好的理解本发明的技术方案,下面结合附图和具体实施例对本发明作详细说明。
本发明的实施例提供了一种地铁设计三维模型差异化对比方法,如图1所示,其包括以下步骤:
步骤一:上传初始版本模型信息及属性,系统获取初始模型构件编码清单及属性,并保存至数据库,标记为V0.1版本,其具有的其中一个管片,管片编码GP001-3,管片上的三个螺栓分别编码为LS001-3-1、LS001-3-2、LS001-3-3,螺栓属性为长度15厘米;
步骤二:管片模型变更,形成新版本,上传新版本模型信息及属性;
步骤三:系统读取数据库中V0.1版本的模型构件编码清单及属性,对比、判定此版本模型构件编码及属性是否发生变化;判断出编码GP001-3的管片上有三个螺栓的属性变更为长度20厘米;
此变化属于构件编码无变化、属性变更,基于系统标识变更构件属性;
然后系统获取新版本模型构建编码清单及属性;
步骤四:将新版本模型构建编码清单及属性保存至数据库,标记为V0.2版本。
此时,设计人员在BIM平台系统中勾选V0.1版本(原始版本)与V0.2版本(变更后版本)进行差异化对比,平台将两个版本的模型同时进行展示,并在前端展示出两个版本模型差异化构件清单,设计人员点击差异化构件清单中螺栓属性,平台前端进行二三维关联展示差异化构件。
管片模型出现新的变更,重复上述步骤二至步骤四:
上传新版本模型信息及属性;
系统读取数据库中V0.2版本的模型构件编码清单及属性,对比、判定此版本模型构件编码及属性是否发生变化;判断出编码GP001-3的管片上有四个螺栓,螺栓属性不变;
此变化属于构件新增,系统记录新增构建编码并展示,将新版本管片编号GP001-3,螺栓编号LS001-3-1、LS001-3-2、LS001-3-3、LS001-3-4,螺栓属性为长度20厘米;
然后系统获取新版本模型构建编码清单及属性;
将新版本模型构建编码清单及属性保存至数据库,标记为V0.3版本。
管片模型又出现新的变更,重复上述步骤二至步骤四:
上传新版本模型信息及属性;
系统读取数据库中V0.3版本的模型构件编码清单及属性,对比、判定此版本模型构件编码及属性是否发生变化;判断出编码GP001-3的管片上有二个螺栓,螺栓属性不变,
此变化属于构件删除,系统记录删除构件编码,螺栓编号LS001-3-3、LS001-3-4被删除;将新版本管片编号GP001-3,螺栓编号LS001-3-1、LS001-3-2,螺栓属性为长度20厘米;
然后系统获取新版本模型构建编码清单及属性;
将新版本模型构建编码清单及属性保存至数据库,标记为V0.4版本。
此时,设计人员可根据需要在BIM平台勾选V0.1版本至V0.4版本中的任意版本(两个或两个以上的版本)进行差异化对比,平台将不同版本的模型同时进行展示,并在前端展示出不同版本模型差异化构件清单,设计人员点击差异化构件清单中螺栓属性,平台前端进行二三维关联展示差异化构件。
以上通过实施例对本发明进行了详细说明,但所述内容仅为本发明的示例性实施例,不能被认为用于限定本发明的实施范围。本发明的保护范围由权利要求书限定。凡利用本发明所述的技术方案,或本领域的技术人员在本发明技术方案的启发下,在本发明的实质和保护范围内,设计出类似的技术方案而达到上述技术效果的,或者对申请范围所作的均等变化与改进等,均应仍归属于本发明的专利涵盖保护范围之内。
Claims (4)
1.一种地铁设计三维模型差异化对比方法,其特征在于:包括以下步骤:
步骤一:上传初始版本模型信息及属性,系统获取初始模型构件编码清单及属性,并保存至数据库;
步骤二:上传新版本模型信息及属性;
步骤三:系统读取数据库中前一版本的模型构件编码清单及属性,对比、判定此版本模型构件编码及属性是否发生变化;其中:
如版本模型构件编码及属性无变化,则系统获取新版本模型构建编码清单及属性;
如版本模型构件编码及属性有变化,则根据变化类型变更构件信息,然后系统获取新版本模型构建编码清单及属性;
步骤四:将新版本模型构建编码清单及属性保存至数据库;
步骤五:每有一个新版本,重复步骤二至步骤四;
步骤六:基于系统选择不同对比版本,二三维关联展示不同三维模型差异化构件。
2.如权利要求1所述的地铁设计三维模型差异化对比方法,其特征在于:步骤三中,如构件编码无变化、属性变更,则基于系统标识变更构件属性;
如构件新增,则记录新增构建编码并展示;
如构件删除,则记录删除构件编码。
3.如权利要求1所述的地铁设计三维模型差异化对比方法,其特征在于:版本模型信息及属性中包含构件的二三维模型。
4.如权利要求1或3所述的地铁设计三维模型差异化对比方法,其特征在于:步骤六中,二三维关联展示不同三维模型差异化构件时,展示差异化构件的信息列表和二三维模型。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011028619.5A CN112016166A (zh) | 2020-09-25 | 2020-09-25 | 一种地铁设计三维模型差异化对比方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011028619.5A CN112016166A (zh) | 2020-09-25 | 2020-09-25 | 一种地铁设计三维模型差异化对比方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112016166A true CN112016166A (zh) | 2020-12-01 |
Family
ID=73528382
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011028619.5A Pending CN112016166A (zh) | 2020-09-25 | 2020-09-25 | 一种地铁设计三维模型差异化对比方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112016166A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113535727A (zh) * | 2021-07-19 | 2021-10-22 | 北京数码大方科技股份有限公司 | 信息系统的数据输出方法及数据输出装置、电子设备 |
CN117149921A (zh) * | 2023-10-30 | 2023-12-01 | 苏州元脑智能科技有限公司 | 一种组件管理方法、系统、设备以及存储介质 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107944101A (zh) * | 2017-11-13 | 2018-04-20 | 北京宇航系统工程研究所 | 一种基于Creo软件的三维零件模型版本比对系统 |
CN108108962A (zh) * | 2018-02-02 | 2018-06-01 | 联合建管(北京)国际工程科技有限责任公司 | 建筑信息模型bim版本差异的在线展示方法及装置 |
CN108694158A (zh) * | 2017-04-08 | 2018-10-23 | 大连万达集团股份有限公司 | 用于检查bim模型文件是否变化的方法 |
CN108875181A (zh) * | 2018-06-07 | 2018-11-23 | 南京骐骏软件有限公司 | 一种三维模型的三维标注修订变更追踪方法 |
CN109446372A (zh) * | 2018-11-16 | 2019-03-08 | 中铁投资集团有限公司 | 基于bim模型在协同设计过程中方案差异对比方法 |
CN109493006A (zh) * | 2018-11-15 | 2019-03-19 | 中铁第六勘察设计院集团有限公司 | 基于bim平台对项目进度对比展示的方法 |
-
2020
- 2020-09-25 CN CN202011028619.5A patent/CN112016166A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108694158A (zh) * | 2017-04-08 | 2018-10-23 | 大连万达集团股份有限公司 | 用于检查bim模型文件是否变化的方法 |
CN107944101A (zh) * | 2017-11-13 | 2018-04-20 | 北京宇航系统工程研究所 | 一种基于Creo软件的三维零件模型版本比对系统 |
CN108108962A (zh) * | 2018-02-02 | 2018-06-01 | 联合建管(北京)国际工程科技有限责任公司 | 建筑信息模型bim版本差异的在线展示方法及装置 |
CN108875181A (zh) * | 2018-06-07 | 2018-11-23 | 南京骐骏软件有限公司 | 一种三维模型的三维标注修订变更追踪方法 |
CN109493006A (zh) * | 2018-11-15 | 2019-03-19 | 中铁第六勘察设计院集团有限公司 | 基于bim平台对项目进度对比展示的方法 |
CN109446372A (zh) * | 2018-11-16 | 2019-03-08 | 中铁投资集团有限公司 | 基于bim模型在协同设计过程中方案差异对比方法 |
Non-Patent Citations (1)
Title |
---|
乔实等: "地铁站管网三维辅助设计参数化建模", 《现代商贸工业》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113535727A (zh) * | 2021-07-19 | 2021-10-22 | 北京数码大方科技股份有限公司 | 信息系统的数据输出方法及数据输出装置、电子设备 |
CN113535727B (zh) * | 2021-07-19 | 2024-04-09 | 北京数码大方科技股份有限公司 | 信息系统的数据输出方法及数据输出装置、电子设备 |
CN117149921A (zh) * | 2023-10-30 | 2023-12-01 | 苏州元脑智能科技有限公司 | 一种组件管理方法、系统、设备以及存储介质 |
CN117149921B (zh) * | 2023-10-30 | 2024-02-09 | 苏州元脑智能科技有限公司 | 一种组件管理方法、系统、设备以及存储介质 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110245368B (zh) | 一种bim数据的结构化处理与存储方法 | |
CN111709235B (zh) | 一种基于自然语言处理的文本数据统计分析系统及方法 | |
Liu et al. | Storyflow: Tracking the evolution of stories | |
CN104965886B (zh) | 数据维度处理方法 | |
CN111950066B (zh) | 一种基于bim和gis技术的数字孪生数据驱动系统 | |
CN112016166A (zh) | 一种地铁设计三维模型差异化对比方法 | |
CN103106188A (zh) | 数据模型的图形化分析系统和图形化分析方法 | |
CN109472446B (zh) | 基于bim模型的工程概预算编制方法 | |
Khan et al. | Data tweening: incremental visualization of data transforms | |
CN101236550B (zh) | 一种处理树型结构数据的方法及系统 | |
CN110413681A (zh) | 一款Web端基于大数据技术的可视化数据处理方法 | |
CN116126809B (zh) | 一种基于国标的建筑信息模型数据存储转换方法 | |
Zhang et al. | A survey of key technologies for high utility patterns mining | |
CN104899340A (zh) | 一种基于最紧致片段的ietm技术信息片段检索装置及其检索方法 | |
Dai et al. | Skeletal animation based on BVH motion data | |
CN106709985A (zh) | 一种虚拟祭祀三维场景的生成方法及装置 | |
CN109086515B (zh) | 基于svg的智能变电站ssd中一次设备绘图信息的建模方法 | |
CN114254238A (zh) | 一种基于数字孪生的三维Web建模平台 | |
US7730388B2 (en) | Converting an enhanced metafile into a chronologically independent object property list for conversion into a PDF document | |
CN111815746B (zh) | 一种基于usd系统生成毛发数据方法 | |
CN112969035A (zh) | 一种可视化视频制作方法及制作系统 | |
CN103544338B (zh) | 一种面向三维装配指令发布的工艺信息建模方法 | |
CN105488146B (zh) | 一种计算机辅助训练系统课件素材管理方法及系统 | |
US20040205657A1 (en) | Method and system for linking project information | |
CN112560131A (zh) | 一种交通标志牌快速参数化bim动态建模方法及交通标志牌bim建模系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20201201 |
|
RJ01 | Rejection of invention patent application after publication |