CN111997346A - Construction hanging basket for constructional engineering - Google Patents
Construction hanging basket for constructional engineering Download PDFInfo
- Publication number
- CN111997346A CN111997346A CN202010791996.8A CN202010791996A CN111997346A CN 111997346 A CN111997346 A CN 111997346A CN 202010791996 A CN202010791996 A CN 202010791996A CN 111997346 A CN111997346 A CN 111997346A
- Authority
- CN
- China
- Prior art keywords
- hanging basket
- baffle
- frame
- bottom plate
- screw rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G3/30—Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G3/30—Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
- E04G3/32—Hoisting devices; Safety devices
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G2003/283—Mobile scaffolds; Scaffolds with mobile platforms mobile horizontally
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G2003/286—Mobile scaffolds; Scaffolds with mobile platforms mobile vertically
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The application relates to a construction hanging basket for constructional engineering, and relates to a construction auxiliary tool; the device comprises a fixed frame, wherein a sliding frame is connected to the fixed frame in a sliding manner along the length direction of the fixed frame, and a first driving piece for driving the sliding frame to move along the length direction of the fixed frame is arranged on the sliding frame; a hanging basket body is arranged below the sliding frame far away from the fixed frame, and a hoisting assembly used for fixing the hanging basket body is arranged on the lower surface of the sliding frame; this application has the effect that improves the efficiency of construction.
Description
Technical Field
The application relates to a building appurtenance especially relates to a basket is hung in construction for building engineering.
Background
The construction hanging basket is a main device for sectional construction of the prestressed concrete continuous beam, the T-shaped steel structure and the cantilever beam.
The prior Chinese patent with the publication number of CN210032536U discloses a safety construction hanging basket for building construction, which comprises two rectangular plate-shaped supporting beams with the same size, wherein the bottoms of the two supporting beams are vertically provided with a rectangular plate-shaped wall pasting plate, the bottoms of the two supporting beams are vertically provided with a plurality of bearing sleeve frames with the same size and U-shaped cross sections, the bottoms of the bearing sleeve frames are paved with a rectangular plate-shaped bearing bottom plate, the side surfaces of the bearing sleeve frames are fixedly provided with a reticular protective net, and the bearing sleeve frame closest to the wall pasting plate is vertically connected with the wall pasting plate through a plurality of straight rod-shaped supporting rods; when the wall hanging basket is installed, a bearing bottom plate is fixedly installed on a bearing sleeve frame through screws, a number protective net is fixedly installed on the side face of the bearing sleeve frame through screws, two supporting beams are horizontally placed on the top of a house, a wall flitch is tightly attached to the wall face of a building, the supporting beams penetrate through foundation bolts and are fixed to the top of the building, and then the hanging basket construction is carried out.
In view of the above-mentioned related technologies, the inventor believes that when the construction hanging basket is used to perform operations such as tiling or painting on the outer surface of a building, since the construction hanging basket has a limited working surface for the building, a constructor needs to frequently adjust the position of the construction hanging basket relative to the building to perform construction on the whole outer surface of the building, and thus the construction efficiency is low.
Disclosure of Invention
In order to improve the lower problem of efficiency of construction that the basket exists is hung in the construction of correlation technique, this application provides a basket is hung in construction for building engineering.
The application provides a basket is hung in construction for building engineering with following technical scheme:
a construction hanging basket for constructional engineering comprises a fixed frame, wherein a sliding frame is connected to the fixed frame in a sliding mode along the length direction of the fixed frame, and a first driving piece used for driving the sliding frame to move along the length direction of the fixed frame is arranged on the sliding frame; the lower part of the sliding frame, which is far away from the fixed frame, is provided with a hanging basket body, and the lower surface of the sliding frame is provided with a hoisting assembly for fixing the hanging basket body.
Through adopting above-mentioned technical scheme, the setting of first driving piece can make the frame that slides drive and hang the basket body and remove along mount length direction to realized the nimble adjustment to the operation position, in order to improve the efficiency of construction.
Preferably, the lower fixed surface that the frame that slides is close to mount department is provided with the triangular supports frame, one of them right angle face of triangular supports frame is fixed to support tightly in the frame surface that slides, another right angle face of triangular supports frame supports tightly in the mount lateral wall.
Through adopting above-mentioned technical scheme, triangular supports frame has stable triangular structure, and triangular supports frame's setting can play the supporting role to the frame that slides, prevents to slide the condition that the frame is emptyd towards the direction of keeping away from the mount, also can prevent simultaneously that the frame that slides receives the pulling force effect of hanging the basket body and the phenomenon of buckling appears, has realized the stable support of the frame that slides to hanging the basket body.
Preferably, the hoisting assembly comprises a winch fixed on the lower surface of the sliding frame, a fixed rope wound on the winch and a fixed ring fixedly mounted on the upper surface of the basket body, and one end, far away from the winch, of the fixed rope is fixedly connected to the fixed ring.
Through adopting above-mentioned technical scheme, the ascending and descending of hanging flower basket body direction of height has been realized in the setting of hoist and mount subassembly, and the collocation of fixed rope and hoist engine is used the high lift scope that has enlarged the hanging flower basket body to further realize the nimble adjustment to the operation position, improve the efficiency of construction.
Preferably, the hanging basket body comprises a top plate connected with the hoisting assembly, a bottom plate positioned right below the top plate and two side baffles vertically arranged on the upper surface of the bottom plate; the end baffles are connected to the two ends of the bottom plate in a sliding mode along the length direction of the bottom plate, and the sliding assembly used for driving the end baffles to slide is arranged inside the bottom plate.
Through adopting above-mentioned technical scheme, move towards the direction of keeping away from the side shield respectively through two end baffles of subassembly drive that slide, constructor can move this moment and stand and carry out the operation in end baffle bottom to under the condition of not adjusting the removal frame position, further widen the operation face, reduce the removal number of times of operating position, improved work efficiency.
Preferably, the sliding assembly comprises a butt joint rod, a first screw rod and a second screw rod, wherein the first screw rod and the second screw rod are fixedly connected to two ends of the butt joint rod, and the rotating directions of the first screw rod and the second screw rod are opposite; one of the end baffle is in threaded sleeve joint with the outer side wall of the first screw rod, the other end baffle is in threaded sleeve joint with the outer side wall of the second screw rod, and the outer side wall of the butt joint rod is provided with a bevel gear set for driving the butt joint rod to rotate circumferentially.
Through adopting above-mentioned technical scheme, organize through bevel gear and rotate the butt joint pole to drive first lead screw and the synchronous rotation of second lead screw, the user only need rotate the butt joint pole through bevel gear and can make two end baffles can move towards the direction of keeping away from the side shield simultaneously, has improved the efficiency that the user expanded the end baffle.
Preferably, the end walls of the first screw rod and the second screw rod, which are far away from the butt joint rod, are provided with limiting blocks.
Through adopting above-mentioned technical scheme, the setting of stopper can play limiting displacement, prevents that the end baffle from breaking away from the first lead screw or the second lead screw of corresponding position to stabilize the drive end baffle through first lead screw and second lead screw and remove along bottom plate length direction, also can realize first lead screw and the firm support of second lead screw end baffle simultaneously.
Preferably, the end baffle includes extension baffle and the butt joint baffle that sets up perpendicularly in extension baffle upper surface, extend the baffle and laminate in the bottom plate lower surface, the lateral wall that the side shield is close to bottom plate department is provided with a plurality of dead lever, the dead lever is evenly arranged along the length direction of bottom plate, it is located between dead lever and the bottom plate to extend the baffle.
Through adopting above-mentioned technical scheme, the setting of dead lever can play the supporting role to the end shield to alleviate the bearing capacity of lead screw group to the end shield.
Preferably, two lateral walls of the side baffles are respectively provided with a first protection plate, two ends of the butt joint baffle are respectively provided with a second protection plate in an extending mode, and a protection net is arranged between the first protection plate and the second protection plate.
Through adopting above-mentioned technical scheme, when the butt joint baffle removed towards the direction of keeping away from the bottom plate, there was the breach between butt joint baffle and the side shield, and the accessible expandes the protection network this moment, lays the protection network in breach department to play the guard action to constructor's operation, improve the construction security.
Preferably, the first protection plate is connected with the net pole that winds that is used for rolling up the protection net towards the lateral wall rotation of second protection plate department, first protection plate upper surface is provided with the second bolt that is used for the fixed net pole pivoted position that winds.
Through adopting above-mentioned technical scheme, when need not to expand end baffle, circumferential direction rotates the wire winding pole to make the protection network rolling in around net pole lateral wall, realize accomodating the stability of protection network, the life of extension protection network.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the arrangement of the first driving piece can enable the sliding frame to drive the hanging basket body to move along the length direction of the fixing frame, so that the flexible adjustment of the operation position is realized, and the construction efficiency is improved; the lifting assembly is arranged to realize the lifting of the hanging basket body in the height direction, so that the flexible adjustment of the operation position is further realized, and the construction efficiency is improved;
2. the two end baffles are driven by the sliding assembly to move towards the direction far away from the side baffles respectively, and at the moment, a constructor can stand at the bottoms of the end baffles to operate, so that the operation surface is further widened, the working efficiency is improved, and the movement of an operation position is reduced under the condition that the position of the moving frame is not adjusted;
3. the setting of net pole can realize accomodating the stability of protection network under the condition that need not to expand end shield, prolongs the life of protection network.
Drawings
FIG. 1 is a schematic structural diagram of a construction hanging basket for constructional engineering in an embodiment;
FIG. 2 is a partial schematic view of a basket body structure according to an embodiment;
FIG. 3 is a sectional view of the embodiment for showing the internal structure of the basket body;
fig. 4 is an enlarged view of a portion a of fig. 3.
Description of reference numerals: 1. a hanging basket body; 11. a top plate; 12. a base plate; 121. a cavity; 22. fixing the rod; 13. a side dam; 131. a first guard plate; 1311. a winding frame; 1312. a net winding rod; 1313. a second bolt; 132. a support bar; 14. an end baffle; 141. an extension baffle; 142. butting the baffle plates; 1421. a second guard plate; 143. a protective net; 15. a slipping component; 151. a docking rod; 1521. a first lead screw; 1522. a second lead screw; 1523. a limiting block; 153. a bevel gear set; 1531. a first bevel gear; 1532. a second bevel gear; 154. a handle; 1541. a first bolt; 2. a moving assembly; 21. a fixed mount; 211. a sliding groove; 212. a first driving member; 2121. driving the screw rod; 2122. a drive motor; 22. a sliding frame; 221. a sliding block; 222. a triangular support frame; 3. hoisting the assembly; 31. a winch; 32. fixing a rope; 33. and (4) fixing the ring.
Detailed Description
The present application is described in further detail below with reference to figures 1-4.
The embodiment of the application discloses a construction hanging basket for building engineering. Referring to fig. 1, the construction hanging basket comprises a hanging basket body 1, a hoisting assembly 3 for supporting the hanging basket body 1 and a moving assembly 2 for driving the hanging basket body 1 to move so as to adjust the operation position.
Referring to fig. 1, the moving assembly 2 includes a fixed frame 21 and a sliding frame 22, the fixed frame 21 is fixedly connected to the upper surface of the building roof through bolts, the sliding frame 22 is located above the fixed frame 21, a sliding groove 211 is formed through the end wall of the fixed frame 21, and a sliding block 221 inserted in the sliding groove 211 is integrally formed at one end of the sliding frame 22 away from the basket body 1; one end of the fixed frame 21 is provided with a first driving element 212 for driving the sliding frame 22 to slide along the length direction of the fixed frame 21, and the first driving element 212 includes a driving screw rod 2121 inserted in the sliding block 221 in a threaded manner and a driving motor 2122 for driving the driving screw rod 2121 to rotate in the circumferential direction.
Referring to fig. 1, a triangular support 222 is fixedly connected to a side wall of the sliding frame 22 close to the fixed frame 21 through a bolt, a cross section of the triangular support 222 is triangular, one of right-angle surfaces of the triangular support 222 is fixedly attached to an outer side wall of the sliding frame 22, and the other right-angle surface of the triangular support 222 is attached to an outer side wall of the fixed frame 21.
Referring to fig. 1, the hoisting assembly 3 includes a winch 31, a fixing rope 32 and a fixing ring 33, the winch 31 is fixedly connected to the outer side wall of the sliding frame 22 through a bolt, one end of the fixing rope 32 is wound on the winch 31, the other end of the fixing rope 32 is fixedly wound on the fixing ring 33, and the fixing ring 33 is fixedly connected to the basket body 1.
Referring to fig. 2 and 3, the hanging basket body 1 comprises a top plate 11, a bottom plate 12, two side baffles 13 and two end baffles 14; the fixing ring 33 is fixedly welded on the top plate 11, the bottom plate 12 is positioned under the top plate 11, the side baffle 13 is vertically welded on the upper surface of the bottom plate 12 and positioned at two sides of the bottom plate, the support rods 132 are respectively and vertically welded on the upper surface of the side baffle 13 and positioned at two ends of the side baffle 13, and one end of each support rod 132, which is far away from the side baffle 13, is fixedly welded on the top plate 11; each end baffle 14 comprises an extension baffle 141 and a butt baffle 142 vertically and integrally formed on the end wall of the extension baffle 141, a plurality of fixing rods 22 are uniformly arranged below the bottom plate 12 along the length direction of the bottom plate, two ends of each fixing rod 22 are welded on the outer side walls of the two side baffles 13, and the extension baffle 141 is inserted between the fixing rods 22 and the bottom plate 12.
Referring to fig. 3 and 4, a cavity 121 is formed in the bottom plate 12, and a sliding assembly 15 for driving the end baffle 14 to slide along the length direction of the bottom plate 12 is arranged in the cavity 121; the sliding assembly 15 comprises a butt joint rod 151, a first screw rod 1521 and a second screw rod 1522 which are fixedly connected to two ends of the butt joint rod 151; one of the butt baffles 142 is in threaded sleeve joint with the first screw rod 1521, and the other butt baffle 142 is in threaded sleeve joint with the second screw rod 1522; the rotation directions of the first screw rod 1521 and the second screw rod 1522 are opposite, and a limiting block 1523 is fixedly welded at one end of the first screw rod 1521 and one end of the second screw rod 1522 far away from the butt joint rod 151; the docking rod 151 is externally provided with a bevel gear set 153 for driving the docking rod 151 to rotate in a circumferential direction.
Referring to fig. 3 and 4, the bevel gear set 153 includes a first bevel gear 1531 fixedly secured to an outer side wall of the docking rod 151 and a second bevel gear 1532 engaged with the first bevel gear 1531, a hand lever 154 is fixedly inserted into an inner wall of the second bevel gear 1532, the hand lever 154 penetrates through the bottom plate 12, and a first bolt 1541 for fixing a rotation position of the hand lever 154 is disposed on a bottom wall of the bottom plate 12 near the hand lever 154.
Referring to fig. 2, a first protection plate 131 is fixedly welded to the middle of the outer side wall of each side baffle 13, the first protection plate 131 is arranged along the height direction of the side baffle 13, second protection plates 1421 are respectively integrally formed at two ends of the butt baffle 142, a protection net 143 is commonly connected between the first protection plate 131 and the second protection plates 1421, and the protection net 143 may be a net-shaped structure woven by nylon ropes; the upper end and the lower end of the first protection plate 131 are integrally formed with winding frames 1311, a net winding rod 1312 is connected between two adjacent winding frames 1311 in a rotating manner, one end of the protection net 143 is fixedly adhered to the outer side wall of the net winding rod 1312, and the other end of the protection net 143 is fixedly adhered to the side wall of the second protection plate 1421; a second bolt 1313 for fixing a rotation position of the net rod 1312 is threadedly coupled to an outer surface of the winding frame 1311.
The implementation principle of the construction hanging basket for the building engineering is as follows: before the construction operation, firstly, the fixed frame 21 is fixed on the upper surface of the roof of the building through bolts, so that one end of the sliding frame 22, which is far away from the fixed frame 21, is positioned outside the building; after constructor got into inside the basket body 1, constructor rotated hand lever 154 to through bevel gear set 153 drive butt joint pole 151 rotation, then drive lead screw group 152 circumferential direction, and then make two end baffles 14 move towards the direction of keeping away from side shield 13 under the drive of first lead screw 1521 and second lead screw 1522, at the in-process that end baffle 14 removed, expand under butt joint baffle 142's pulling around the protection network 143 of rolling on net pole 1312, in order to play the guard action.
In the construction process, a constructor can stand on the bottom plate 12 or on the extension baffle 141 for operation, and can extend or wind the fixed rope 32 by driving the winch 31 to realize the lifting of the cradle body 1, thereby adjusting the construction position; the driving motor 2122 can drive the sliding frame 22 to slide along the length direction of the fixed frame 21 to adjust the construction position, so that the construction position can be flexibly adjusted.
After the construction is completed, the hand lever 154 is rotated to move the docking flap 142 toward the side flap 13, so that the extension flap 141 is completely located below the bottom plate 12, and at this time, the constructor can rotate the net winding rod 1312 to wind the end of the protection net 143 away from the docking flap 142 on the net winding rod 1312, thereby storing the protection net 143.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.
Claims (9)
1. The utility model provides a basket is hung in construction for building engineering which characterized in that: the device comprises a fixed frame (21), wherein a sliding frame (22) is connected to the fixed frame (21) in a sliding manner along the length direction of the fixed frame, and a first driving piece (212) for driving the sliding frame (22) to move along the length direction of the fixed frame (21) is arranged on the sliding frame; the lower part of the sliding frame (22) far away from the fixed frame (21) is provided with a hanging basket body (1), and the lower surface of the sliding frame (22) is provided with a hoisting assembly (3) for fixing the hanging basket body (1).
2. The construction hanging basket for constructional engineering according to claim 1, wherein: the lower surface of the sliding frame (22) close to the fixed frame (21) is fixedly provided with a triangular support frame (222), one right-angle surface of the triangular support frame (222) is fixedly abutted against the outer surface of the sliding frame (22), and the other right-angle surface of the triangular support frame (222) is abutted against the side wall of the fixed frame (21).
3. The construction hanging basket for constructional engineering according to claim 1, wherein: the hoisting assembly (3) comprises a winch (31) fixed on the lower surface of the sliding frame (22), a fixed rope (32) wound on the winch (31) and a fixed ring (33) fixedly mounted on the upper surface of the basket body (1), and one end, far away from the winch (31), of the fixed rope (32) is fixedly connected to the fixed ring (33).
4. The construction hanging basket for constructional engineering according to claim 3, wherein: the hanging basket body (1) comprises a top plate (11) connected with the hoisting assembly (3), a bottom plate (12) positioned right below the top plate (11) and two side baffles (13) vertically arranged on the upper surface of the bottom plate (12); the end baffle (14) is connected with at bottom plate (12) both ends along its length direction slide, bottom plate (12) inside is provided with and is used for driving slip subassembly (15) that end baffle (14) slided.
5. The construction hanging basket for constructional engineering according to claim 4, wherein: the sliding assembly (15) comprises a butt joint rod (151), a first screw rod (1521) and a second screw rod (1522) which are fixedly connected to two ends of the butt joint rod (151), and the rotating directions of the first screw rod (1521) and the second screw rod (1522) are opposite; one of the end baffle (14) is sleeved on the outer side wall of the first screw rod (1521) in a threaded manner, the other end baffle (14) is sleeved on the outer side wall of the second screw rod (1522) in a threaded manner, and the outer side wall of the butt joint rod (151) is provided with a bevel gear set (153) for driving the butt joint rod to rotate circumferentially.
6. The construction hanging basket for constructional engineering according to claim 5, wherein: the end walls of the first screw rod (1521) and the second screw rod (1522) far away from the butt joint rod (151) are provided with limit blocks (1523).
7. The construction hanging basket for constructional engineering according to claim 1, wherein: the end baffle (14) comprises an extension baffle (141) and a butt baffle (142) vertically arranged on the upper surface of the extension baffle (141), and the extension baffle (141) is attached to the lower surface of the bottom plate (12); the outer side wall of the side baffle (13) close to the bottom plate (12) is provided with a plurality of fixing rods (22), the fixing rods (22) are evenly distributed along the length direction of the bottom plate (12), and the extending baffle (141) is located between the fixing rods (22) and the bottom plate (12).
8. The construction hanging basket for constructional engineering according to claim 7, wherein: the outer side walls of the two side baffles (13) are respectively provided with a first protection plate (131), two ends of the butt joint baffle (142) are respectively provided with a second protection plate (1421) in an extending mode, and a protection net (143) is arranged between the first protection plate (131) and the second protection plate (1421).
9. The construction hanging basket for constructional engineering according to claim 8, wherein: the side wall of the first protection plate (131) facing the second protection plate (1421) is rotatably connected with a net winding rod (1312) for winding the protection net (143), and the upper surface of the first protection plate (131) is provided with a second bolt (1313) for fixing the rotating position of the net winding rod (1312).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010791996.8A CN111997346A (en) | 2020-08-08 | 2020-08-08 | Construction hanging basket for constructional engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010791996.8A CN111997346A (en) | 2020-08-08 | 2020-08-08 | Construction hanging basket for constructional engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111997346A true CN111997346A (en) | 2020-11-27 |
Family
ID=73463879
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010791996.8A Pending CN111997346A (en) | 2020-08-08 | 2020-08-08 | Construction hanging basket for constructional engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111997346A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113818674A (en) * | 2021-08-18 | 2021-12-21 | 中交二公局第三工程有限公司 | Protective device for erecting steel support |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN209760764U (en) * | 2019-03-26 | 2019-12-10 | 中建二局第二建筑工程有限公司 | building external climbing type building construction operation platform |
CN210032551U (en) * | 2019-05-15 | 2020-02-07 | 山东科技大学 | Hanging flower basket is used in construction of building outer wall |
CN111395195A (en) * | 2020-04-24 | 2020-07-10 | 贵州路桥集团有限公司 | Operation hanging basket for bolted connection of steel-concrete composite beam segments based on bridge girder erection machine |
CN211173026U (en) * | 2019-09-04 | 2020-08-04 | 江苏中南建设装饰有限公司 | Hanging basket capable of moving in horizontal plane |
-
2020
- 2020-08-08 CN CN202010791996.8A patent/CN111997346A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN209760764U (en) * | 2019-03-26 | 2019-12-10 | 中建二局第二建筑工程有限公司 | building external climbing type building construction operation platform |
CN210032551U (en) * | 2019-05-15 | 2020-02-07 | 山东科技大学 | Hanging flower basket is used in construction of building outer wall |
CN211173026U (en) * | 2019-09-04 | 2020-08-04 | 江苏中南建设装饰有限公司 | Hanging basket capable of moving in horizontal plane |
CN111395195A (en) * | 2020-04-24 | 2020-07-10 | 贵州路桥集团有限公司 | Operation hanging basket for bolted connection of steel-concrete composite beam segments based on bridge girder erection machine |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113818674A (en) * | 2021-08-18 | 2021-12-21 | 中交二公局第三工程有限公司 | Protective device for erecting steel support |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105121327B (en) | For the apparatus and method for the rotor blade for placing wind turbine | |
CN211974225U (en) | Assembly type structure ALC wallboard installation device | |
CN210177926U (en) | Sliding telescopic hanging basket for building external wall construction | |
CN218375124U (en) | Scaffold frame that building engineering used | |
CN219117026U (en) | Lifting device for assembled building | |
CN114560385A (en) | Industrial factory building steel structure hoisting device and construction method thereof | |
CN211500022U (en) | Pole burying device for electric pole | |
CN210480669U (en) | Auxiliary steel bar hoisting device for assembly type columns in constructional engineering | |
CN111997346A (en) | Construction hanging basket for constructional engineering | |
CN214527783U (en) | Position-adjustable assembled building hoisting device | |
CN112459073B (en) | Anti-alignment offset mechanism for installing pile foundation engineering reinforcement cage for building | |
CN216034591U (en) | Simple hoisting trolley for constructional engineering | |
CN214570286U (en) | Convenient type slat wall installation assists utensil | |
CN214989862U (en) | Balcony crane of portable lightweight design | |
CN212866952U (en) | Low-rise floor is protector for concrete placement | |
CN114014182A (en) | Auxiliary transportation device for loader | |
CN210795540U (en) | Detachable movable door-shaped object hanging bracket | |
CN110700604B (en) | Assembly type laminated slab mounting trolley and using method thereof | |
CN210457242U (en) | Detachable hoist engine hoist device | |
CN210048418U (en) | Portable hoisting support is built to bridge | |
CN110271975B (en) | Steel platform demolishs device in narrow and small space offal | |
CN215711332U (en) | Wall panel hoisting frame | |
CN215516375U (en) | Manhole hoisting device for foundation reinforcement cage | |
CN216428951U (en) | A over-and-under type construction platform for housing construction engineering | |
CN219098618U (en) | Pile foundation construction is with a section of thick bamboo installation hoist that protects against |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20201127 |