CN111967755A - Ship management system accident rescue scheduling method - Google Patents

Ship management system accident rescue scheduling method Download PDF

Info

Publication number
CN111967755A
CN111967755A CN202010801481.1A CN202010801481A CN111967755A CN 111967755 A CN111967755 A CN 111967755A CN 202010801481 A CN202010801481 A CN 202010801481A CN 111967755 A CN111967755 A CN 111967755A
Authority
CN
China
Prior art keywords
ship
rescue
management system
information
ships
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010801481.1A
Other languages
Chinese (zh)
Inventor
孙海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Tongbo Technology Development Co ltd
Original Assignee
Zhejiang Tongbo Technology Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Tongbo Technology Development Co ltd filed Critical Zhejiang Tongbo Technology Development Co ltd
Priority to CN202010801481.1A priority Critical patent/CN111967755A/en
Publication of CN111967755A publication Critical patent/CN111967755A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services

Abstract

The invention discloses an accident rescue scheduling method for a ship management system, which comprises the following steps: inputting ship information in a ship management system in advance, and acquiring position information of all ships input into the system in real time; after receiving the ship alarm rescue information, the ship management system establishes a record set and a rescue group according to the ship alarm rescue information, and ships within a preset distance near the ship sending the ship alarm rescue information are added to the rescue group; and sending the ship alarm rescue information and the ship information which sends the ship alarm rescue information to a rescue group. The ship rescue method has the advantages that in the emergency rescue process, the time for searching ships which accord with rescue implementation is shortened, related ships are contacted in time, the details of rescue are informed, and ship rescue is coordinated.

Description

Ship management system accident rescue scheduling method
Technical Field
The invention relates to an accident rescue scheduling method for a ship management system.
Background
Ships, a collective term for various ships. A ship is a vehicle which can be sailed or moored in a water area for transportation or operation, and has different technical performances, equipment and structural types according to different use requirements.
The existing ship rescue method is to manually search for ships capable of implementing rescue, and the method consumes longer time and has higher accident loss risk in the emergency rescue process.
Disclosure of Invention
In order to solve the defects of the prior art, the invention provides an accident rescue scheduling method for a ship management system, which shortens the time for searching ships meeting rescue implementation in an emergency rescue process, contacts related ships in time, informs rescue details and coordinates ship rescue.
In order to achieve the above object, the present invention adopts the following technical solutions:
an accident rescue scheduling method for a ship management system comprises the following steps:
inputting ship information in a ship management system in advance, and acquiring position information of all ships input into the system in real time;
after receiving the ship alarm rescue information, the ship management system establishes a record set and a rescue group according to the ship alarm rescue information, and ships within a preset distance near the ship sending the ship alarm rescue information are added to the rescue group;
and sending the ship alarm rescue information and the ship information which sends the ship alarm rescue information to a rescue group.
Further, the ship information pre-entered in the ship management system includes: the name of the ship, the speed of the ship and the contact information of the ship.
Further, the accident rescue scheduling method for the ship management system further comprises the following steps:
the ship management system calculates theoretical time of all ships in the rescue group reaching the ship sending the ship alarm rescue information according to the distance between all the ships in the rescue group and the ship speed of the ship in the rescue group;
the ship management system sequences the theoretical time of all ships in the rescue group reaching the ship sending the ship alarm rescue information from short to long;
and the ship management system automatically contacts ships in the rescue group to send requests to assist rescue according to the sequencing sequence.
Further, the accident rescue scheduling method for the ship management system further comprises the following steps:
after receiving the ship alarm rescue information, the ship management system sends out a rescue alarm prompt to inform a manager of the ship management system.
Further, the accident rescue scheduling method for the ship management system further comprises the following steps:
the ship management system adds the feedback information of the ships in the rescue group after receiving the rescue assistance to the record and sends a feedback alarm prompt to inform a manager of the ship management system.
Further, the feedback information sent by the ships in the rescue group comprises whether the ships sending the feedback information have rescue conditions and actual expected time.
Further, the accident rescue scheduling method for the ship management system further comprises the following steps:
and the ship management system reorders the ship according to the actual expected time for installing the ship with the rescue condition.
Further, the accident rescue scheduling method for the ship management system further comprises the following steps:
the ship management system selects a preset number of ships from short to long according to the sequence of the actual expected time to form a recommended scheme as an actual rescue ship, and sends out a recommended scheme alarm prompt to inform a manager of the ship management system.
Further, the accident rescue scheduling method for the ship management system further comprises the following steps:
and if the ship management system does not receive the rescue scheduling instruction of the administrator within the preset time, executing the recommended scheme as an actual rescue scheme.
Further, the accident rescue scheduling method for the ship management system further comprises the following steps:
and if the ship management system receives the rescue scheduling instruction of the administrator, executing the rescue scheduling instruction as an actual rescue scheme.
The ship rescue method has the advantages that in the emergency rescue process, the time for searching ships which accord with rescue implementation is shortened, related ships are contacted in time, the details of rescue are informed, and ship rescue is coordinated.
Drawings
Fig. 1 is a flowchart of an accident rescue scheduling method for a ship management system according to the present invention.
Detailed Description
The invention is described in detail below with reference to the figures and the embodiments.
As shown in fig. 1, an accident rescue scheduling method for a ship management system includes the following steps:
step 1, inputting ship information in a ship management system in advance, and acquiring position information of all ships input into the system in real time, wherein the ship information input in the ship management system in advance comprises: the name of the ship, the navigational speed of the ship and the contact way of the ship;
step 2, after receiving the ship alarm rescue information, the ship management system establishes a record set and a rescue group according to the ship alarm rescue information, a ship in a preset distance near the ship sending the ship alarm rescue information is added to the rescue group, and after receiving the ship alarm rescue information, the ship management system sends a rescue alarm prompt to inform a manager of the ship management system;
step 3, sending the ship alarm rescue information and the ship information which sends the ship alarm rescue information to a rescue group;
step 4, the ship management system calculates theoretical time of all ships in the rescue group reaching the ship sending the ship alarm rescue information according to the distance between all the ships in the rescue group and the ship speed of the ship in the rescue group;
step 5, sequencing theoretical time of all ships in the rescue group reaching the ship sending the ship alarm rescue information from short to long by the ship management system;
step 6, automatically contacting ships in the rescue group to send requests to assist rescue according to the sequencing sequence by the ship management system;
step 7, the ship management system adds the feedback information of the ships in the rescue group after receiving the rescue assistance into the record and sends a feedback alarm prompt to inform a manager of the ship management system, wherein the feedback information sent by the ships in the rescue group comprises whether the ships sending the feedback information have rescue conditions and actual expected time;
8, the ship management system reorders the actual expected time for installing the ships with the rescue conditions;
step 9, the ship management system selects a preset number of ships from short to long according to the sequence of the actual expected time as an actual rescue ship to form a recommended scheme, and sends out a recommended scheme alarm prompt to inform a manager of the ship management system;
step 10, if the ship management system does not receive the rescue scheduling instruction of the administrator within the preset time, executing the recommended scheme as an actual rescue scheme;
and 11, if the ship management system receives a rescue scheduling instruction of an administrator, executing the rescue scheduling instruction as an actual rescue scheme.
The accident rescue scheduling method for the ship management system can shorten the time for searching ships which accord with rescue implementation in the emergency rescue process, timely contact related ships, inform rescue details and coordinate ship rescue.
After receiving the ship alarm rescue information, the ship management system establishes a rescue group according to the information in the database, and sorts according to the theoretical time of the members in the rescue group reaching the rescue place, and preferentially contacts the ship with the shortest theoretical time. As the operation of the ship is influenced by various uncertain factors such as cargo capacity, oil storage capacity and the like, whether rescue conditions exist and the possible arrival time deviates from the theoretical time. And according to the feedback information of the ships, the ship management system reorders the ships in the rescue group. And (4) arranging the ship with the rescue condition and short actual expected time in the front, and generating a rescue scheme by the ship management system. The preset number of the rescue ships in the rescue scheme can be preset in the system and can also be temporarily adjusted by an administrator in the actual operation.
If the ship management system does not receive the rescue scheduling instruction of the administrator within a certain time, judging that the administrator is off-line, and executing and contacting related ships to rescue by the ship management system according to the generated rescue scheme. After receiving the recommended rescue scheme of the ship management system, the administrator can adjust and issue a rescue scheduling instruction according to actual conditions. And if the rescue scheduling instruction of the administrator is received, executing the rescue scheduling instruction of the administrator as an actual rescue scheme.
The foregoing illustrates and describes the principles, general features, and advantages of the present invention. It should be understood by those skilled in the art that the above embodiments do not limit the present invention in any way, and all technical solutions obtained by using equivalent alternatives or equivalent variations fall within the scope of the present invention.

Claims (10)

1. An accident rescue scheduling method for a ship management system is characterized by comprising the following steps:
inputting ship information in a ship management system in advance, and acquiring position information of all ships input into the system in real time;
after receiving the ship alarm rescue information, the ship management system establishes a record set and a rescue group according to the ship alarm rescue information, and ships within a preset distance near the ship sending the ship alarm rescue information are added to the rescue group;
and sending the ship alarm rescue information and the ship information which sends the ship alarm rescue information to the rescue group.
2. The accident rescue scheduling method for a ship management system according to claim 1,
the ship information pre-entered in the ship management system comprises: the name of the ship, the speed of the ship and the contact information of the ship.
3. The accident rescue scheduling method for a ship management system according to claim 2, further comprising the steps of:
the ship management system calculates theoretical time of all ships in the rescue group reaching the ship sending the ship alarm rescue information according to the distance between all the ships in the rescue group and the ship speed of the ship in the rescue group;
the ship management system sequences the theoretical time of all ships in the rescue group reaching the ship sending the ship alarm rescue information from short to long;
and the ship management system automatically contacts ships in the rescue group according to the sequencing order to send requests to assist rescue.
4. The accident rescue scheduling method for a ship management system according to claim 3, further comprising the steps of:
and after receiving the ship alarm rescue information, the ship management system sends out a rescue alarm prompt to inform a manager of the ship management system.
5. The accident rescue scheduling method for a ship management system according to claim 3, further comprising the steps of:
and the ship management system adds the feedback information of the ships in the rescue group after receiving the rescue assistance into the record and sends a feedback alarm prompt to inform a manager of the ship management system.
6. The accident rescue scheduling method for a ship management system according to claim 5,
the feedback information sent by the ships in the rescue group comprises whether the ships sending the feedback information have rescue conditions and actual expected time.
7. The accident rescue scheduling method for a ship management system according to claim 6, further comprising the steps of:
and the ship management system reorders the actual expected time for installing the ship with rescue conditions.
8. The accident rescue scheduling method for a ship management system according to claim 7, further comprising the steps of:
and the ship management system selects a preset number of ships from short to long according to the sequence of the actual expected time to form a recommended scheme as an actual rescue ship, and sends out a recommended scheme alarm prompt to inform an administrator of the ship management system.
9. The accident rescue scheduling method for a ship management system according to claim 8, further comprising the steps of:
and if the ship management system does not receive the rescue scheduling instruction of the administrator within the preset time, executing the recommended scheme as an actual rescue scheme.
10. The accident rescue scheduling method for a ship management system according to claim 8, further comprising the steps of:
and if the ship management system receives a rescue scheduling instruction of an administrator, executing the rescue scheduling instruction as an actual rescue scheme.
CN202010801481.1A 2020-08-11 2020-08-11 Ship management system accident rescue scheduling method Pending CN111967755A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010801481.1A CN111967755A (en) 2020-08-11 2020-08-11 Ship management system accident rescue scheduling method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010801481.1A CN111967755A (en) 2020-08-11 2020-08-11 Ship management system accident rescue scheduling method

Publications (1)

Publication Number Publication Date
CN111967755A true CN111967755A (en) 2020-11-20

Family

ID=73366218

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010801481.1A Pending CN111967755A (en) 2020-08-11 2020-08-11 Ship management system accident rescue scheduling method

Country Status (1)

Country Link
CN (1) CN111967755A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116629584A (en) * 2023-07-21 2023-08-22 交通运输部水运科学研究所 Ship multi-channel collaborative optimization rescue scheduling method, system and storage medium

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102819932A (en) * 2011-06-09 2012-12-12 北京合众思壮科技股份有限公司 Shipped terminal alarming method and shipped terminal alarming system
CN108447232A (en) * 2018-05-18 2018-08-24 高辉 A kind of alarm recourse method, alarm are sought help platform, storage medium and system
CN109545393A (en) * 2018-11-09 2019-03-29 泰康保险集团股份有限公司 The method and system of Emergency Assistance

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102819932A (en) * 2011-06-09 2012-12-12 北京合众思壮科技股份有限公司 Shipped terminal alarming method and shipped terminal alarming system
CN108447232A (en) * 2018-05-18 2018-08-24 高辉 A kind of alarm recourse method, alarm are sought help platform, storage medium and system
CN109545393A (en) * 2018-11-09 2019-03-29 泰康保险集团股份有限公司 The method and system of Emergency Assistance

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
罗永宏等: "海上搜救智能辅助决策系统探究", 《中国航海》 *
谢耀华;张晓梅;: "基于云服务的交通应急救援在线管理系统", 系统仿真技术 *
颉沛;: "浅析如何做好公路工程应急救援保障", 企业导报 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116629584A (en) * 2023-07-21 2023-08-22 交通运输部水运科学研究所 Ship multi-channel collaborative optimization rescue scheduling method, system and storage medium
CN116629584B (en) * 2023-07-21 2023-09-19 交通运输部水运科学研究所 Ship multi-channel collaborative optimization rescue scheduling method, system and storage medium

Similar Documents

Publication Publication Date Title
JP7136750B2 (en) Unmanned driving vehicle dispatch method, device, equipment and storage medium
US11052775B2 (en) Power management system and power management method
CN106130104B (en) A kind of unmanned plane charging method and device
CN107203824A (en) A kind of share-car order allocation method and device
CN111967755A (en) Ship management system accident rescue scheduling method
CN110816781B (en) Ship running state identification method and device
CN105376333A (en) Subway monitoring system and monitoring method
CN108627159B (en) Method and device for assisting user in positioning vehicle
CN113788009B (en) Method and device for indicating parking mode and electronic equipment
CN115542919A (en) Intelligent berthing and port-berthing method for ship
CN111474929B (en) Mine charging method and device
CN112660376A (en) Method for implementing search and rescue by using unmanned aerial vehicle-mounted EPIRB and photoelectric pod equipment
CN105844903A (en) Vehicle positioning method and device
CN112566076B (en) Robot request assistance method, device, robot and storage medium
CN113435745A (en) 5G-based personnel task execution state monitoring method and system
CN107562056A (en) A kind of automatic driving of motor vehicle method and system based on cloud computing
CN103754326A (en) Beacon system and searching method for searching multiple targets on sea surface
CN116382288A (en) Multi-unmanned-plane cooperative obstacle avoidance system and method based on 5G edge calculation
CN104709092A (en) Device and method for preventing discharge of ecall system backup battery
CN115099663A (en) Automatic vehicle distribution method, system, equipment and storage medium
CN114781843A (en) Vehicle matching scheduling method and system for maintenance support service
CN114179078A (en) Robot control method, device and system and readable storage medium
CN114265408A (en) Unmanned ship remote control system and method
CN115311871B (en) Method, device, system, equipment and storage medium for judging vehicle running direction
CN111739189A (en) Communication method of navigation equipment, terminal equipment and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20201120