CN111960184A - Replacement structure and replacement method for single steel wire rope of metallurgical crane - Google Patents

Replacement structure and replacement method for single steel wire rope of metallurgical crane Download PDF

Info

Publication number
CN111960184A
CN111960184A CN202010830492.2A CN202010830492A CN111960184A CN 111960184 A CN111960184 A CN 111960184A CN 202010830492 A CN202010830492 A CN 202010830492A CN 111960184 A CN111960184 A CN 111960184A
Authority
CN
China
Prior art keywords
wire rope
steel wire
rope
old
new
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010830492.2A
Other languages
Chinese (zh)
Other versions
CN111960184B (en
Inventor
郑君
陈志刚
刘必胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maanshan Iron and Steel Co Ltd
Original Assignee
Maanshan Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maanshan Iron and Steel Co Ltd filed Critical Maanshan Iron and Steel Co Ltd
Priority to CN202010830492.2A priority Critical patent/CN111960184B/en
Publication of CN111960184A publication Critical patent/CN111960184A/en
Application granted granted Critical
Publication of CN111960184B publication Critical patent/CN111960184B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H54/00Winding, coiling, or depositing filamentary material
    • B65H54/02Winding and traversing material on to reels, bobbins, tubes, or like package cores or formers
    • B65H54/40Arrangements for rotating packages
    • B65H54/44Arrangements for rotating packages in which the package, core, or former is engaged with, or secured to, a driven member rotatable about the axis of the package
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H49/00Unwinding or paying-out filamentary material; Supporting, storing or transporting packages from which filamentary material is to be withdrawn or paid-out
    • B65H49/18Methods or apparatus in which packages rotate
    • B65H49/20Package-supporting devices
    • B65H49/30Swifts or skein holders
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H49/00Unwinding or paying-out filamentary material; Supporting, storing or transporting packages from which filamentary material is to be withdrawn or paid-out
    • B65H49/18Methods or apparatus in which packages rotate
    • B65H49/34Arrangements for effecting positive rotation of packages
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H57/00Guides for filamentary materials; Supports therefor
    • B65H57/14Pulleys, rollers, or rotary bars
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H61/00Applications of devices for metering predetermined lengths of running material
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2701/00Handled material; Storage means
    • B65H2701/30Handled filamentary material
    • B65H2701/35Ropes, lines

Abstract

The invention discloses a replacement structure and a replacement method for a single steel wire rope of a metallurgical crane, and belongs to the technical field of equipment maintenance. The invention comprises a steel wire rope coiling device, wherein the steel wire rope coiling device comprises a steel wire rope coil and a driving system, the steel wire rope coil and the driving system are in transmission through a gear, the steel wire rope coil is provided with two winding areas I and II, a new steel wire rope is wound in the winding area I, an old steel wire rope is wound in the winding area II, the steel wire rope coil is also provided with a winding area, and a thin winding steel wire rope is wound in the winding area. The invention uses the wire rope coiling device as mechanical power, has simple operation and low labor intensity, and can effectively ensure the safety in operation because the new and old ropes are butted with the same rope diameter, the old wire rope drives the new wire rope, the feeding of the old wire rope into the wire rope coiling and the main lifting coiling block on the new rope are synchronously carried out, thereby ensuring the accurate sequence and direction of the feeding of the new rope into the pulley block, and reducing the environmental pollution because the wire rope does not contact the ground.

Description

Replacement structure and replacement method for single steel wire rope of metallurgical crane
Technical Field
The invention relates to the technical field of equipment maintenance, in particular to a structure and a method for replacing a single steel wire rope of a metallurgical crane.
Background
The metallurgical liquid casting crane is used as hoisting equipment for hoisting liquid metal, and the safety requirement is extremely high. The steel wire rope of the main hoisting mechanism should meet the winding system of the double-hoisting-point four steel wire ropes. In the actual use process, a certain steel wire rope has a problem, but other steel wire ropes are normal and in the service cycle. In order to save cost, a single steel wire rope needs to be replaced, because the metallurgical liquid casting crane has large tonnage and large diameter and heavy weight, the steel wire rope can be brought into the pulley block and the main trolley winding drum of the casting crane by mechanical power, and when the four steel wire ropes are integrally replaced, the power of a main lifting transmission system of the casting crane is utilized. When a single steel wire rope is replaced, proper mechanical power is lacked for operation; at present, two methods are adopted for replacing a common single rope, wherein the other three steel wire ropes are detached from a main hoisting drum of a liquid casting crane and fixed on a vehicle body; butting new and old steel wire ropes; a main lifting transmission system of the liquid casting crane is used as power, a new steel wire rope is brought into the movable pulley block and the fixed pulley block, and an old steel wire rope is placed on the ground; cutting off the new and old ropes, and connecting and fixing the new and old ropes on the liquid casting hoisting drum; fixing the tail rope on the vehicle body by a winch; finally, recovering the three steel wire ropes to finish the replacement of the steel wire ropes; the other method is that a winch is used as power, a certain steel wire rope is replaced independently, an old steel wire rope is detached from a main lifting reel and a movable and fixed pulley block, a thin steel wire rope of the winch reversely penetrates into the movable and fixed pulley block, and a new steel wire rope is butted with the thin steel wire rope of the winch; the winding engine is used for driving the thin steel wire rope, so that a new steel wire rope enters the movable pulley block and the fixed pulley block and is fixed on the winding drum, and finally the winding engine is used for fixing the tail rope on the vehicle body to complete the replacement of the steel wire rope; the two methods have the defects of complex operation procedures, high labor intensity and the like, and particularly have great potential safety hazards in the overhauling process.
Disclosure of Invention
1. Technical problem to be solved by the invention
Aiming at the defects and shortcomings in the prior art, the invention provides a replacement structure and a replacement method of a single steel wire rope of a metallurgical crane, which can adapt to the emergencies of wire breakage, damage and the like in the use process of a site steel wire rope.
2. Technical scheme
In order to achieve the purpose, the technical scheme provided by the invention is as follows:
the invention relates to a replacement structure of a single metallurgical hoisting steel wire rope, which comprises a steel wire rope coiling device, wherein the steel wire rope coiling device comprises a steel wire rope coil and a driving system, the steel wire rope coil and the driving system are in transmission through a gear, the steel wire rope coil is provided with two winding areas I and II, a new steel wire rope is wound in the area I, a new steel wire rope head rope and a new steel wire rope tail rope are respectively arranged at two ends of the new steel wire rope, an old steel wire rope is wound in the area II, the steel wire rope coil is also provided with a winding area, and a thin winding steel wire rope is wound in the winding area;
the steel wire rope coiling device is placed on an overhaul site, a plate hook cross beam is arranged on one side of the steel wire rope coiling device, the steel wire rope coiling device and the laid plate hook cross beam are on the same horizontal plane, the axes of the steel wire rope coiling device and the laid plate hook cross beam are parallel, an auxiliary coil is arranged at the upper end of the plate hook cross beam, the plate hook cross beam is lifted through the auxiliary coil, a main trolley is arranged above the auxiliary coil, a main lifting winding drum is arranged on the surface of the main trolley, a main lifting balance frame is arranged on one side of the main lifting winding drum in parallel, a trolley body slider is arranged above the main lifting winding drum, a rope sleeve is arranged on the outer side of the trolley body slider, the trolley body slider is fixed on the upper side of the main lifting winding drum through the rope sleeve, an old steel wire rope is wound on the main lifting winding drum, an old steel wire rope head rope and;
the plate hook cross beam is provided with a movable pulley block, the movable pulley block is arranged in parallel with the steel wire rope coiling device, the tail rope of the old steel wire rope is cut off and put on the ground and is in butt joint with the head rope of the new steel wire rope, and the head rope of the old steel wire rope is cut off and put on the ground and is fixed on the II winding area of the steel wire rope coil.
Furthermore, the steel wire rope disc is provided with two winding areas I and II, wherein the winding area I is used for winding a new steel wire rope, the winding area II is used for fixing an old steel wire rope head rope and winding the old steel wire rope, and the penetrating direction of the old steel wire rope head rope is opposite to the rope outlet direction of the new steel wire rope head rope.
Furthermore, a ground slider is arranged on one side of the plate hook cross beam, a pressing plate is arranged on the main lifting winding drum, and the old steel wire rope head rope is fixed on the main lifting winding drum through the pressing plate.
Furthermore, the movable pulley block comprises a movable pulley I, a movable pulley II, a movable pulley III, a movable pulley IV, a fixed pulley I, a fixed pulley II and a fixed pulley III, a new steel wire rope head rope sequentially penetrates through the movable pulley I, the fixed pulley I, the movable pulley II, the fixed pulley II, the movable pulley III, the fixed pulley III, the movable pulley IV and the vehicle body slider and then is fixed on the main lifting winding drum, and a new steel wire rope tail rope is lifted through the hoisting steel wire rope and the ground slider and is fixed on the main lifting balance frame to complete replacement.
A replacement method of a replacement structure of a single steel wire rope of a metallurgical crane comprises the following steps:
the method comprises the following steps: a new steel wire rope to be replaced is placed on the steel wire rope disc according to a standard length disc, the counting encoder in the steel wire rope disc device can ensure the accurate length of the new steel wire rope, and the length difference between the new steel wire rope and the old steel wire rope is avoided during installation;
step two: the plate hook cross beam is laid down, the plate hook cross beam is hung by an auxiliary coil, after an old steel wire rope on a main lifting winding drum falls to three circles, the power supply of the main lifting winding drum is stopped, the old steel wire rope is detached from the main lifting winding drum, a vehicle body slider is fixed above the main lifting winding drum by a rope sleeve, and the head rope of the old steel wire rope penetrates through the vehicle body slider and is placed on the ground;
step three: the steel wire rope coiling device and the new steel wire rope are placed on one side of the plate hook cross beam and are parallel to the position of the movable pulley block above the plate hook cross beam, the tail rope of the old steel wire rope, needing to be replaced, of the main lifting balance frame on the main trolley is cut off and placed on the ground, and the tail rope of the old steel wire rope placed on the ground is butted with the head rope of the new steel wire rope; fixing an old steel wire rope head rope detached from the main hoisting drum on a II winding area of the steel wire rope disc, wherein the penetrating direction of the old steel wire rope head rope is opposite to the rope outlet direction of a new steel wire rope head rope, and ensuring that the winding of the old steel wire rope on the steel wire rope disc and the separation of the new steel wire rope from the steel wire rope disc are carried out simultaneously without mutual interference;
step four: the steel wire rope disc is driven by a driving system of the steel wire rope disc device, so that an old steel wire rope head rope fixed on the steel wire rope disc sequentially takes out an old steel wire rope from a driven pulley IV, a fixed pulley III, a movable pulley III, a fixed pulley II, a movable pulley II, a fixed pulley I and a movable pulley I; the tail rope of the old steel wire rope simultaneously and sequentially brings the head rope of the new steel wire rope into the movable pulley I, the fixed pulley I, the movable pulley II, the fixed pulley II, the movable pulley III, the fixed pulley III, the movable pulley IV and the vehicle body slider to complete replacement, after the head rope of the new steel wire rope reaches the position of the main lifting winding drum, the head rope of the new steel wire rope is locked by a hemp rope, the connecting point of the tail rope of the old steel wire rope and the head rope of the new steel wire rope is cut off, and the head rope of the new steel wire rope is fixed on the main lifting winding drum by a pressing plate to complete;
step five: if the main lifting balance frame is arranged on the body of the main trolley, a thin hoisting steel wire rope wound on a steel wire rope disc sequentially passes through a ground slider and a trolley body slider, a steel wire rope disc rope device is driven to drive the thin hoisting rope, a tail rope of a new steel wire rope is lifted to the body of the main trolley, and the tail rope and the main lifting balance frame are fixedly arranged by a pin shaft;
step six: operating the main hoisting mechanism of the liquid metallurgy crane, slowly winding a new steel wire rope onto the main hoisting drum, and lifting the plate hook beam to complete the replacement of the new steel wire rope; the old steel wire rope is coiled on the steel wire rope coiling device.
Further, the fifth step: if the main lifting balance frame is arranged on the plate hook cross beam, the liquid metallurgy lifting main lifting mechanism is directly operated to slowly lift the tail rope of the new steel wire rope to the height of the main lifting balance frame, and the pin shaft and the main lifting balance frame are fixedly arranged.
3. Advantageous effects
Compared with the prior art, the technical scheme provided by the invention has the following beneficial effects:
the invention can adapt to the emergencies of broken wires, damage and the like in the using process of the on-site steel wire rope, the steel wire rope coiling device is used as mechanical power, the prepared new steel wire rope on the steel wire rope coil is butted with the old steel wire rope on the liquid casting hanger, the old rope is wound by the driving system, the new rope is brought into the liquid casting hanger pulley system, the liquid casting hanger is not required to be lifted as power, the winding steel wire rope is not required to be wound in a pulley block in a complex way, the operation is simple, the labor intensity is low, the safety in the operation can be effectively guaranteed because the new rope and the old rope are butted with the same rope diameter, the old steel wire rope drives the new steel wire rope, the old steel wire rope enters the steel wire rope coil and the main lifting reel on the new rope is carried out synchronously, the sequence and.
Drawings
Fig. 1 is a structural view of a wire rope reeling device of the present invention;
FIG. 2 is an overall structural view of the present invention;
FIG. 3 is a partial block diagram of the present invention;
FIG. 4 is a view illustrating an initial state of the present invention for replacing a rope;
FIG. 5 is a view of the present invention with the rope replaced toward a termination state;
FIG. 6 is a block diagram of the movable pulley block of the present invention;
fig. 7 is a diagram showing the effect of the rope feeding of the thin hoisting rope according to the present invention.
In the figure: 1. a new wire rope; 101. a new wire rope head rope; 102. a new wire rope tail rope; 2. a wire rope reel; 3. a wire rope coiling device; 4. a drive system; 5. a plate hook beam; 6. secondary volumes; 7. a main hoisting drum; 8. old wire ropes; 801. an old steel wire rope is taken as a head rope; 802. an old wire rope tail rope; 9. a vehicle body slider; 10. rope sleeves; 11. a main lifting balance frame; 12. a movable pulley block; 121. a movable pulley I; 122. a movable pulley II; 123. a movable pulley III; 124. a movable pulley IV; 125. a fixed pulley I; 126. a fixed pulley II; 127. a fixed pulley III; 13. pressing a plate; 14. hoisting a steel wire rope; 15. a ground slider; 16. a main trolley; 17. and (7) a pin shaft.
Detailed Description
The invention is further described with reference to the following figures and examples:
example 1
As can be seen from fig. 1-3, the replacement structure for a single steel wire rope of a metallurgical crane in the present embodiment includes a steel wire rope coiling device 3, the steel wire rope coiling device 3 includes a steel wire rope coil 2 and a driving system 4, the steel wire rope coil 2 and the driving system 4 are driven by a gear, the steel wire rope coil 2 is provided with two winding areas i and ii, a new steel wire rope 1 is wound in the area i, two ends of the new steel wire rope 1 are respectively provided with a new steel wire rope head rope 101, the new steel wire rope tail rope 102 and the old steel wire rope 8 are wound in the second area, the steel wire rope disc 2 is further provided with a winding area, the winding area is located in the third area in the figure 1, the thin winding steel wire rope 14 is wound in the winding area, the steel wire rope disc 2 is provided with two winding areas I and II, the winding area I is used for winding the new steel wire rope 1, the winding area II is used for fixing the old steel wire rope head rope 801 and winding the old steel wire rope 8, and the penetrating direction of the old steel wire rope head rope 801 is opposite to the rope outlet direction of the new steel wire rope head rope.
As can be seen from fig. 2, in an actual field, the wire rope reeling device 3 is placed at an overhaul field, one side of the wire rope reeling device 3 is provided with a plate hook beam 5, the wire rope reeling device 3 and the laid plate hook beam 5 are on the same horizontal plane, and the axes are parallel, in the attached drawings, fig. 4, 5 and 7 are used for moving the wire rope reeling device 3 outwards, so that the description can be fully understood.
As can be seen from fig. 4-7, the upper end of the plate hook beam 5 is provided with the auxiliary roll 6, the plate hook beam 5 is lifted by the auxiliary roll 6, the main trolley 16 is arranged above the auxiliary roll 6, the surface of the main trolley 16 is provided with the main lifting drum 7, one side of the main lifting drum 7 is provided with the main lifting balance frame 11 in parallel, the vehicle body slider 9 is arranged above the main lifting drum 7, the outer side of the vehicle body slider 9 is provided with the rope sheath 10, the vehicle body slider 9 is fixed on the upper side of the main lifting drum 7 through the rope sheath 10, the main lifting drum 7 is wound with the old steel wire rope 8, two ends of the old steel wire rope 8 are respectively provided with the old steel wire rope head rope 801 and the old steel wire rope tail 802, and the joint of the old steel wire rope tail 802 and the.
The plate hook beam 5 is provided with a movable pulley block 12, the movable pulley block 12 is arranged in parallel with the steel wire rope coiling device 3, an old steel wire rope tail rope 802 is cut off and placed on the ground and is in butt joint with a new steel wire rope head rope 101, and an old steel wire rope head rope 801 is cut off and placed on the ground and is fixed on a II winding area of the steel wire rope coil 2.
One side of the plate hook beam 5 is provided with a ground slider 15, a pressing plate 13 is arranged on the main hoisting drum 7, and the old steel wire rope head rope 801 is fixed on the main hoisting drum 7 by the pressing plate 13.
The movable pulley block 12 comprises a movable pulley I121, a movable pulley II 122, a movable pulley III 123, a movable pulley IV 124, a fixed pulley I125, a fixed pulley II 126 and a fixed pulley III 127, a new steel wire rope head rope 101 sequentially penetrates through the movable pulley I121, the fixed pulley I125, the movable pulley II 122, the fixed pulley II 126, the movable pulley III 123, the fixed pulley III 127, the movable pulley IV 124 and the vehicle body slider 9 and then is fixed on the main lifting drum 7, and a new steel wire rope tail rope 102 is lifted through a hoisting steel wire rope 14 and a ground slider 15 and is fixed on the main lifting balancing stand 11 to finish replacement.
A replacement method of a replacement structure of a single steel wire rope of a metallurgical crane comprises the following steps:
the method comprises the following steps: the new steel wire rope 1 to be replaced is placed on the steel wire rope disc 2 according to the standard length, the counting encoder in the steel wire rope coiling device 3 can ensure the accurate length of the new steel wire rope 1, and the length difference between the new steel wire rope 1 and the old steel wire rope 8 is avoided during installation;
step two: the plate hook cross beam 5 is laid down, the plate hook cross beam 5 is hung by the auxiliary coil 6, after an old steel wire rope 8 on the main lifting reel 7 falls to three circles, the power supply of the main lifting reel 7 is stopped, the old steel wire rope 8 is detached from the main lifting reel 7, the vehicle body slider 9 is fixed above the main lifting reel 7 by the rope sleeve 10, and the head rope 801 of the old steel wire rope 8 penetrates through the vehicle body slider 9 and is placed on the ground;
step three: the wire rope coiling device 3 and the new wire rope 1 are placed on one side of the plate hook cross beam 5 and are parallel to the position of the movable pulley block 12 above the plate hook cross beam 5, an old wire rope tail rope 802 of an old wire rope 8 needing to be replaced of a main lifting balance frame 11 on a main trolley 16 is cut off and placed on the ground, and the old wire rope tail rope 802 placed on the ground is butted with a new wire rope head rope 101; fixing an old steel wire rope head rope 801 detached from the main hoisting drum 7 on a winding area II of the steel wire rope disc 2, wherein the penetrating direction of the old steel wire rope head rope 801 is opposite to the rope outlet direction of the new steel wire rope head rope 101, so that the old steel wire rope 8 is ensured to wind the steel wire rope disc 2 and the new steel wire rope 1 leaves the steel wire rope disc 2 at the same time without mutual interference;
step four: the steel wire rope disc 2 is driven by a driving system 4 of the steel wire rope disc device 3, so that an old steel wire rope head rope 801 fixed on the steel wire rope disc 2 sequentially takes out an old steel wire rope 802 from a driven pulley IV 124, a fixed pulley III 127, a movable pulley III 123, a fixed pulley II 126, a movable pulley II 122, a fixed pulley I125 and a movable pulley I121; meanwhile, the old wire rope tail rope 802 simultaneously brings the new wire rope head rope 101 into the movable pulley I121, the fixed pulley I125, the movable pulley II 122, the fixed pulley II 126, the movable pulley III 123, the fixed pulley III 127, the movable pulley IV 124 and the vehicle body slider 9 in sequence to finish replacement, after the new wire rope head rope 101 reaches the position of the main hoisting drum 7, the connecting point of the old wire rope tail rope 802 and the new wire rope head rope 101 is cut off, the new wire rope head rope 101 is fixed on the main hoisting drum 7 by the pressing plate 13, and the installation of the new wire rope head rope 101 is finished;
step five: if the main lifting balancing frame 11 is arranged on the body of the main trolley 16, the thin hoisting steel wire rope 14 wound on the steel wire rope disc 2 sequentially passes through the ground slider 15 and the trolley body slider 9, the steel wire rope winding device 3 is driven to drive the thin hoisting rope 14, the new steel wire rope tail rope 102 is lifted to the body of the main trolley 16, and the new steel wire rope tail rope 102 is fixedly arranged with the main lifting balancing frame 11 by using a pin shaft 17; if the main lifting balance frame 11 is arranged on the plate hook cross beam 5, the liquid metallurgy lifting main lifting mechanism is directly operated, a new steel wire rope tail rope 102 of a new steel wire rope 1 is slowly lifted to the height of the main lifting balance frame 11, and the main lifting balance frame 11 is fixedly installed through a pin shaft 17;
step six: operating the main hoisting mechanism of the liquid metallurgy crane, slowly winding the new steel wire rope 1 onto the main hoisting drum 7, and lifting the plate hook beam 5 to complete the replacement of the new steel wire rope 1; the old steel wire rope 8 is also coiled on the steel wire rope coiling device 3.
The invention can adapt to the emergency situations of wire breakage, damage and the like in the using process of a site steel wire rope, the new steel wire rope 1 prepared on the steel wire rope disc 2 is butted with the old steel wire rope 8 on the liquid casting crane by using the steel wire rope coiling device 3 as mechanical power, the old steel wire rope is wound by using the driving system 4, the new steel wire rope is brought into the liquid casting crane pulley system, the main hoisting of the liquid casting crane is not needed as power, the winding of the steel wire rope in a pulley block is not needed to be complicated, the operation is simple, the labor intensity is low, the safety in the operation can be effectively ensured because the new and old steel wires are butted with the same diameter of the steel wire, the old steel wire rope drives the new steel wire rope, the feeding of the old steel wire rope into the steel wire rope disc 2 and the main hoisting drum 7 on the new steel wire rope are.
The replacing method has strong practicability and simple and quick operation, the replacing time is reduced from 6 hours for 8 persons to 3 hours for 5 persons, the overhauling efficiency is greatly improved, and the hoisting function of the steel wire rope coiling device is utilized, so that the overhauling is more efficient. The single-rope replacing method can quickly solve the sudden wire breakage, derailment and other situations of the steel wire rope in field production, and has strong practicability and popularization value.
The present invention and its embodiments have been described above schematically, without limitation, and what is shown in the drawings is only one of the embodiments of the present invention, and the actual structure is not limited thereto. Therefore, if the person skilled in the art receives the teaching, without departing from the spirit of the invention, the person skilled in the art shall not inventively design the similar structural modes and embodiments to the technical solution, but shall fall within the scope of the invention.

Claims (6)

1. The utility model provides a metallurgical single wire rope of hanging changes structure, includes wire rope coiling device (3), its characterized in that: the steel wire rope reel device (3) comprises a steel wire rope reel (2) and a driving system (4), the steel wire rope reel (2) and the driving system (4) are in transmission through gears, the steel wire rope reel (2) is provided with two winding areas I and II, a new steel wire rope (1) is wound in the area I, a new steel wire rope head rope (101) and a new steel wire rope tail rope (102) are respectively arranged at two ends of the new steel wire rope (1), an old steel wire rope (8) is wound in the area II, the steel wire rope reel (2) is further provided with a winding area, and a thin winding steel wire rope (14) is wound in the winding area;
the steel wire rope coiling device (3) is placed on an overhaul site, one side of the steel wire rope coiling device (3) is provided with a plate hook cross beam (5), the steel wire rope coiling device (3) and the laid plate hook cross beam (5) are on the same horizontal plane, the axes of the steel wire rope coiling device and the laid plate hook cross beam are parallel, the upper end of the plate hook cross beam (5) is provided with an auxiliary coil (6), the plate hook cross beam (5) is hoisted through the auxiliary coil (6), a main trolley (16) is arranged above the auxiliary coil (6), the surface of the main trolley (16) is provided with a main hoisting drum (7), one side of the main hoisting drum (7) is provided with a main hoisting balance frame (11) in parallel, a vehicle body slider (9) is arranged above the main hoisting drum (7), the outer side of the vehicle body slider (9) is provided with a rope sleeve (10), the vehicle body slider (9) is fixed on the upper side of the main hoisting drum (7) through the rope sleeve (10), and, an old steel wire rope head rope (801) and an old steel wire rope tail rope (802) are respectively arranged at two ends of an old steel wire rope (8), and a pin shaft (17) is arranged at the joint of the old steel wire rope tail rope (802) and the main lifting balance frame (11);
the plate hook beam (5) is provided with a movable pulley block (12), the movable pulley block (12) and the steel wire rope coiling device (3) are arranged in parallel, an old steel wire rope tail rope (802) is cut off and placed on the ground and is in butt joint with a new steel wire rope head rope (101), and an old steel wire rope head rope (801) is cut off and placed on the ground and is fixed on a II winding area of the steel wire rope coil (2).
2. A metallurgical hangs single wire rope replacement structure of claim 1, characterized by: wire rope dish (2) be equipped with I, two winding district II, I winding district is used for twining new wire rope (1), II winding districts are used for fixed old wire rope head rope (801) and twine old wire rope (8), the direction of penetrating of old wire rope head rope (801) and new wire rope head rope (101) play rope opposite direction.
3. A metallurgical hangs single wire rope replacement structure of claim 1, characterized by: one side of the plate hook cross beam (5) is provided with a ground slider (15), a pressing plate (13) is arranged on the main hoisting drum (7), and the old steel wire rope head rope (801) is fixed on the main hoisting drum (7) through the pressing plate (13).
4. A metallurgical hangs single wire rope replacement structure of claim 3, characterized by: the movable pulley block (12) comprises a movable pulley I (121), a movable pulley II (122), a movable pulley III (123), a movable pulley IV (124), a fixed pulley I (125), a fixed pulley II (126) and a fixed pulley III (127), a new steel wire rope head rope (101) sequentially penetrates through the movable pulley I (121), the fixed pulley I (125), the movable pulley II (122), the fixed pulley II (126), the movable pulley III (123), the fixed pulley III (127), the movable pulley IV (124) and a vehicle body slider (9) and then is fixed on a main lifting winding drum (7), and a new steel wire rope tail rope (102) is lifted through a hoisting steel wire rope (14) and a ground slider (15) and is fixed on a main lifting balance frame (11) to complete replacement.
5. A replacement method of a replacement structure of a single steel wire rope of a metallurgical crane is characterized by comprising the following steps: the method comprises the following steps:
the method comprises the following steps: a new steel wire rope (1) to be replaced is placed on the steel wire rope reel (2) according to a standard length disc, the counting encoder in the steel wire rope reel device (3) can ensure that the length of the new steel wire rope (1) is accurate, and the length difference between the new steel wire rope (1) and an old steel wire rope (8) is avoided during installation;
step two: the plate hook cross beam (5) is laid down, the plate hook cross beam (5) is hung by using an auxiliary coil (6), after an old steel wire rope (8) on a main lifting winding drum (7) falls to three circles, the power supply of the main lifting winding drum (7) is stopped, the old steel wire rope (8) is detached from the main lifting winding drum (7), a vehicle body slider (9) is fixed above the main lifting winding drum (7) by using a rope sleeve (10), and an old steel wire rope head rope (801) of the old steel wire rope (8) penetrates through the vehicle body slider (9) and is placed on the ground;
step three: the steel wire rope coiling device (3) and the new steel wire rope (1) are placed on one side of a plate hook cross beam (5) and are parallel to the position of a movable pulley block (12) above the plate hook cross beam (5), an old steel wire rope tail rope (802) of an old steel wire rope (8) needing to be replaced on a main lifting balance frame (11) on a main trolley (16) is cut off and placed on the ground, and the old steel wire rope tail rope (802) placed on the ground is butted with a new steel wire rope head rope (101); fixing an old steel wire rope head rope (801) detached from a main hoisting drum (7) on a II winding area of a steel wire rope disc (2), wherein the penetrating direction of the old steel wire rope head rope is opposite to the rope outlet direction of a new steel wire rope head rope (101), so that the old steel wire rope (8) is ensured to wind the steel wire rope disc (2) and the new steel wire rope (1) leaves the steel wire rope disc (2) at the same time without mutual interference;
step four: the steel wire rope reel (2) is driven by a driving system (4) of the steel wire rope reel device (3), so that an old steel wire rope head rope (801) fixed on the steel wire rope reel (2) sequentially takes out an old steel wire rope (802) from a movable pulley IV (124), a fixed pulley III (127), a movable pulley III (123), a fixed pulley II (126), a movable pulley II (122), a fixed pulley I (125) and a movable pulley I (121); meanwhile, the old steel wire rope tail rope (802) simultaneously brings the new steel wire rope head rope (101) into the movable pulley I (121), the fixed pulley I (125), the movable pulley II (122), the fixed pulley II (126), the movable pulley III (123), the fixed pulley III (127), the movable pulley IV (124) and the vehicle body slider (9) in sequence to finish replacement, after the new steel wire rope head rope (101) reaches the position of the main lifting drum (7), the hemp rope is used for locking, the connecting point of the old steel wire rope tail rope (802) and the new steel wire rope head rope (101) is cut off, the new steel wire rope head rope (101) is fixed on the main lifting drum (7) by the pressing plate (13), and the installation of the new steel wire rope head rope (101) is finished;
step five: if the main lifting balance frame (11) is arranged on the body of the main trolley (16), the thin hoisting steel wire rope (14) wound on the steel wire rope disc (2) sequentially passes through the ground slider (15) and the trolley body slider (9), the steel wire rope disc device (3) is driven to drive the thin hoisting rope (14), the new steel wire rope tail rope (102) is lifted to the body of the main trolley (16), and the pin shaft (17) and the main lifting balance frame (11) are fixedly installed;
step six: operating the main hoisting mechanism of the liquid metallurgy crane, slowly winding a new steel wire rope (1) onto a main hoisting drum (7), and lifting a plate hook cross beam (5) to complete the replacement of the new steel wire rope (1); the old steel wire rope (8) is also coiled on the steel wire rope coiling device (3).
6. The replacement method of the replacement structure of the single steel wire rope of the metallurgical crane according to claim 5, wherein the replacement method comprises the following steps: the fifth step is as follows: if the main lifting balance frame (11) is arranged on the plate hook cross beam (5), the liquid metallurgy lifting main lifting mechanism is directly operated to slowly lift the tail rope (102) of the new steel wire rope (1) to the height of the main lifting balance frame (11), and the pin shaft (17) and the main lifting balance frame (11) are fixedly installed.
CN202010830492.2A 2020-08-18 2020-08-18 Replacement structure and replacement method for single steel wire rope of metallurgical crane Active CN111960184B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010830492.2A CN111960184B (en) 2020-08-18 2020-08-18 Replacement structure and replacement method for single steel wire rope of metallurgical crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010830492.2A CN111960184B (en) 2020-08-18 2020-08-18 Replacement structure and replacement method for single steel wire rope of metallurgical crane

Publications (2)

Publication Number Publication Date
CN111960184A true CN111960184A (en) 2020-11-20
CN111960184B CN111960184B (en) 2022-04-05

Family

ID=73389153

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010830492.2A Active CN111960184B (en) 2020-08-18 2020-08-18 Replacement structure and replacement method for single steel wire rope of metallurgical crane

Country Status (1)

Country Link
CN (1) CN111960184B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113605119A (en) * 2021-10-11 2021-11-05 江苏中英钢绳有限公司 Automatic steel wire rope guiding equipment for steel wire rope conveyer belt production line

Citations (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1997034824A1 (en) * 1996-03-15 1997-09-25 Hitachi, Ltd. Crane and method for replacing ropes
CN1169704A (en) * 1994-12-02 1998-01-07 萨林斯马斯金有限公司 Winding arrangement for coiling of elongated flexible element and coiling means
US20050230670A1 (en) * 2002-12-19 2005-10-20 Hhh Manufacturing Co. Electric hoist
CN1966385A (en) * 2005-11-17 2007-05-23 上海宝钢冶金建设公司 Method for quickly changing large-size steel wire of traveling crane
CN102009917A (en) * 2010-10-26 2011-04-13 北京首钢建设集团有限公司 Method for replacing steel wire rope and gantry hook of large-scale bridge crane simultaneously
CN103274323A (en) * 2013-06-13 2013-09-04 济钢集团有限公司 Quick replacement method for movable pulley blocks and wire ropes in cranes
CN203959557U (en) * 2014-07-09 2014-11-26 山东金晶科技股份有限公司 crane rope replacing car
CN104627911A (en) * 2013-11-08 2015-05-20 中冶宝钢技术服务有限公司 Method for replacing hoisting steel wire rope of vertical loop
CN104828696A (en) * 2015-03-27 2015-08-12 山东钢铁股份有限公司 Movable pulley set and wire rope replacing method used for bridge type crane
JP2015145307A (en) * 2014-02-04 2015-08-13 日本車輌製造株式会社 Re-hanging method of auxiliary hoist rope
CN204823466U (en) * 2015-06-30 2015-12-02 甘肃酒钢集团宏兴钢铁股份有限公司 Metallurgy crane equipment wire rope changes serving device
CN105800490A (en) * 2016-06-06 2016-07-27 山东钢铁股份有限公司 Method for replacing crane main hook steel wire rope
CN105905806A (en) * 2016-06-20 2016-08-31 甘肃酒钢集团宏兴钢铁股份有限公司 Changing device for steel wire rope of metallurgy overhead crane, manufacturing method and utilization method
CN106044574A (en) * 2016-06-06 2016-10-26 山东钢铁股份有限公司 Method for synchronously replacing gantry beam and steel wire ropes of ladle crane
CN206108762U (en) * 2016-09-28 2017-04-19 五冶集团上海有限公司 A device that is used for cold rolling galvanizing line's loop wire rope to change
US20170225929A1 (en) * 2014-08-15 2017-08-10 Mhwirth As Apparatus and method for replacing cable or wire in a hoisting system
CN207046740U (en) * 2017-07-04 2018-02-27 唐山港集团股份有限公司 A kind of two-way delivery roller that can carry out folding and unfolding simultaneously
CN207404751U (en) * 2017-10-31 2018-05-25 武钢新日铁(武汉)镀锡板有限公司 A kind of horizontal loop steel cable replaces new equipment
CN109019306A (en) * 2018-09-04 2018-12-18 宣化钢铁集团有限责任公司 A kind of method of quick-replaceable bridge crane single hook head
CN109553012A (en) * 2017-09-27 2019-04-02 宝山钢铁股份有限公司 A kind of replacing options of crane rope
CN110255376A (en) * 2019-05-29 2019-09-20 邯郸钢铁集团有限责任公司 A method of replacement metallurgical bridge crane wirerope
JP2020121817A (en) * 2019-01-29 2020-08-13 住友金属鉱山株式会社 Crane wire replacement method

Patent Citations (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1169704A (en) * 1994-12-02 1998-01-07 萨林斯马斯金有限公司 Winding arrangement for coiling of elongated flexible element and coiling means
WO1997034824A1 (en) * 1996-03-15 1997-09-25 Hitachi, Ltd. Crane and method for replacing ropes
US20050230670A1 (en) * 2002-12-19 2005-10-20 Hhh Manufacturing Co. Electric hoist
CN1966385A (en) * 2005-11-17 2007-05-23 上海宝钢冶金建设公司 Method for quickly changing large-size steel wire of traveling crane
CN102009917A (en) * 2010-10-26 2011-04-13 北京首钢建设集团有限公司 Method for replacing steel wire rope and gantry hook of large-scale bridge crane simultaneously
CN103274323A (en) * 2013-06-13 2013-09-04 济钢集团有限公司 Quick replacement method for movable pulley blocks and wire ropes in cranes
CN104627911A (en) * 2013-11-08 2015-05-20 中冶宝钢技术服务有限公司 Method for replacing hoisting steel wire rope of vertical loop
JP2015145307A (en) * 2014-02-04 2015-08-13 日本車輌製造株式会社 Re-hanging method of auxiliary hoist rope
CN203959557U (en) * 2014-07-09 2014-11-26 山东金晶科技股份有限公司 crane rope replacing car
US20170225929A1 (en) * 2014-08-15 2017-08-10 Mhwirth As Apparatus and method for replacing cable or wire in a hoisting system
CN104828696A (en) * 2015-03-27 2015-08-12 山东钢铁股份有限公司 Movable pulley set and wire rope replacing method used for bridge type crane
CN204823466U (en) * 2015-06-30 2015-12-02 甘肃酒钢集团宏兴钢铁股份有限公司 Metallurgy crane equipment wire rope changes serving device
CN105800490A (en) * 2016-06-06 2016-07-27 山东钢铁股份有限公司 Method for replacing crane main hook steel wire rope
CN106044574A (en) * 2016-06-06 2016-10-26 山东钢铁股份有限公司 Method for synchronously replacing gantry beam and steel wire ropes of ladle crane
CN105905806A (en) * 2016-06-20 2016-08-31 甘肃酒钢集团宏兴钢铁股份有限公司 Changing device for steel wire rope of metallurgy overhead crane, manufacturing method and utilization method
CN206108762U (en) * 2016-09-28 2017-04-19 五冶集团上海有限公司 A device that is used for cold rolling galvanizing line's loop wire rope to change
CN207046740U (en) * 2017-07-04 2018-02-27 唐山港集团股份有限公司 A kind of two-way delivery roller that can carry out folding and unfolding simultaneously
CN109553012A (en) * 2017-09-27 2019-04-02 宝山钢铁股份有限公司 A kind of replacing options of crane rope
CN207404751U (en) * 2017-10-31 2018-05-25 武钢新日铁(武汉)镀锡板有限公司 A kind of horizontal loop steel cable replaces new equipment
CN109019306A (en) * 2018-09-04 2018-12-18 宣化钢铁集团有限责任公司 A kind of method of quick-replaceable bridge crane single hook head
JP2020121817A (en) * 2019-01-29 2020-08-13 住友金属鉱山株式会社 Crane wire replacement method
CN110255376A (en) * 2019-05-29 2019-09-20 邯郸钢铁集团有限责任公司 A method of replacement metallurgical bridge crane wirerope

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李素平: "多绳摩擦式提升机钢丝绳的更换方法的改进与创新", 《新疆有色金属》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113605119A (en) * 2021-10-11 2021-11-05 江苏中英钢绳有限公司 Automatic steel wire rope guiding equipment for steel wire rope conveyer belt production line
CN113605119B (en) * 2021-10-11 2021-11-30 江苏中英钢绳有限公司 Automatic steel wire rope guiding equipment for steel wire rope conveyer belt production line

Also Published As

Publication number Publication date
CN111960184B (en) 2022-04-05

Similar Documents

Publication Publication Date Title
CN105800490A (en) Method for replacing crane main hook steel wire rope
CN102009917B (en) Method for replacing steel wire rope and gantry hook of large-scale bridge crane simultaneously
CN108821138B (en) Hoisting equipment for key parts of offshore wind turbine generator
CN111960184B (en) Replacement structure and replacement method for single steel wire rope of metallurgical crane
CN110294427B (en) Method for replacing steel wire rope of main hoisting system of large tower crane
CN113387272A (en) Method for replacing steel wire rope of bridge crane
CN201713229U (en) Steel box girder cable-loaded crane for suspension bridge construction
CN109019306B (en) A kind of method of quick-replaceable bridge crane single hook head
CN209536579U (en) A kind of production board band volume unloads winding apparatus
CN112794168B (en) Replacement device for grab bucket steel wire rope of bridge type grab bucket ship unloader
CN204530513U (en) The manned maintenance Hanging Basket of suspension cable
CN207061730U (en) Possesses the hoist engine of suspension hook supervising device
CN112429665A (en) Winch with positioning structure for vehicle-mounted hoisting
CN213445945U (en) Steel wire rope replacing and rope combining device of crane
CN214879737U (en) Ship overhauls with overhead hoist that can fix a position
CN219688959U (en) Steel wire rope winding device
CN212503707U (en) Maintenance crane of wind generating set
CN220051664U (en) Crown block motor bearing detaching tool
CN117163815A (en) Quick replacement method for gantry hook lifting appliance of large crane
CN214879693U (en) Lifting and winding device of single-beam bridge crane
CN217894899U (en) Pipeline mobile device for hydraulic engineering
CN214989771U (en) Device is changed to overhead traveling crane steel cable
CN215854799U (en) Synchronous plain type reinforcing bar hoist device
CN212954004U (en) Electric drive type disconnecting link maintenance hanging bracket
CN215479353U (en) Tower machine balancing weight dismounting device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant