CN111932211A - Municipal engineering construction control system based on BIM technology - Google Patents

Municipal engineering construction control system based on BIM technology Download PDF

Info

Publication number
CN111932211A
CN111932211A CN202010811152.5A CN202010811152A CN111932211A CN 111932211 A CN111932211 A CN 111932211A CN 202010811152 A CN202010811152 A CN 202010811152A CN 111932211 A CN111932211 A CN 111932211A
Authority
CN
China
Prior art keywords
module
data
construction
bim
control system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010811152.5A
Other languages
Chinese (zh)
Inventor
叶荣松
唐国发
胡靖华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Rongguan Environmental Construction Group Co ltd
Original Assignee
Fujian Rongguan Environmental Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Rongguan Environmental Construction Group Co ltd filed Critical Fujian Rongguan Environmental Construction Group Co ltd
Priority to CN202010811152.5A priority Critical patent/CN111932211A/en
Publication of CN111932211A publication Critical patent/CN111932211A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Human Resources & Organizations (AREA)
  • Tourism & Hospitality (AREA)
  • Economics (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Primary Health Care (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Educational Administration (AREA)
  • Development Economics (AREA)
  • Data Mining & Analysis (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a municipal engineering construction control system based on a BIM technology, and relates to the field of engineering construction. This municipal works construction control system based on BIM technique, including control center, BIM module, VR preview module, input module, valuation module in advance, data upload module, data receiving module, categorised module of keeping in, check module, settlement module, feedback module, management module, control center is connected with check module, feedback module, settlement module, BIM module respectively, BIM module and VR preview module electric connection, data upload module and data receiving module signal connection, data receiving module and categorised module electric connection of keeping in. Through the design of a standardized management control system, the quality of building material selection and the quality requirement of construction in the engineering construction process can be greatly increased when the system is managed and used, and meanwhile, the reasonable use of cost is facilitated.

Description

Municipal engineering construction control system based on BIM technology
Technical Field
The invention relates to the technical field of engineering construction, in particular to a municipal engineering construction control system based on a BIM technology.
Background
In China, municipal facilities refer to various buildings, structures, equipment and the like which are arranged in planning and construction ranges of urban areas and towns (villages) and provide paid or unpaid public products and services for residents based on government responsibilities and obligations. Various public infrastructure construction supporting urban life belongs to municipal engineering categories, such as common urban roads, bridges and subways, and various pipelines closely related to life: rainwater, sewage, water supply, reclaimed water, electric power (parts except red lines), telecommunication, heating power, gas and the like, and construction of squares, urban greening and the like belong to the municipal engineering category.
With the development of society, the construction scale of projects is getting larger and larger at present, and the management in the construction of the projects is an important link, but the management is neglected as the rate of pursuit of some projects is higher at present, so that the quality of the projects is possibly unqualified, the management of the qualification rate requirement on building materials and construction requirements in the construction of the projects is not neglected, and the management in the aspect of the qualification rate requirement is not enough at present.
Disclosure of Invention
Technical problem to be solved
Aiming at the defects of the prior art, the invention provides a municipal engineering construction control system based on a BIM technology, which solves the problems that certain defects exist in the management in the existing engineering construction, and particularly the building material and construction requirement management needs to be further improved.
(II) technical scheme
In order to achieve the purpose, the invention is realized by the following technical scheme: the utility model provides a municipal works construction control system based on BIM technique, includes control center, BIM module, VR preview module, input module, valuation module in advance, data upload module, data receiving module, categorised module of keeping in, check module, settlement module, feedback module, management module, control center is connected with check module, feedback module, settlement module, BIM module respectively, BIM module and VR preview module electric connection.
Preferably, the data uploading module is in signal connection with the data receiving module, the data receiving module is electrically connected with the classification temporary storage module, and the classification temporary storage module is electrically connected with the checking module.
Preferably, the input module is electrically connected with the pre-evaluation module, and the pre-evaluation module is electrically connected with the classification temporary storage module.
Preferably, the settlement module is electrically connected with the management module.
Preferably, the data transmission between the data uploading module and the data receiving module comprises building material detection data, construction detection data, purchase data and image data.
A municipal engineering construction control system based on BIM technology further comprises the following steps:
s1, carrying out simulation model construction by a BIM module according to the environment of a construction site and a construction drawing, and displaying model data through a VR preview module;
s2, carrying out market visit by a manager during engineering construction material selection, inputting the price condition of the building material of the market visit through an input module, then estimating the total price of the required building material by a pre-estimation module, uploading the estimated total price to a classification temporary storage module, then issuing the estimated total price to be purchased by a buyer, and after purchasing is finished, the buyer uploads the literal and image data of the building material information and cost data from a data uploading module;
s3, receiving the data uploaded by the data uploading module by the data receiving module, and transmitting the information to the classification temporary storage module;
s4, the checking module compares the evaluation information stored in the classification temporary storage module with the cost data, if the difference number of the two data is within the range, the data is considered to be normal, otherwise, the range is larger, the buyer explains the specific reason, and the manager checks the uploaded image data;
s5, during construction of the project, uploading the measured data of the construction process by using a data uploading module, receiving and transmitting the data to a separation temporary storage module by using a data receiving module, and then correspondingly transmitting the information to a control center;
s6, carrying out model construction by the BIM module through control center construction data, and carrying out visual management and checking by the VR preview module;
s7, all the people participating in the work in the engineering development process can feed back the opinions to the control center through the feedback module;
and S8, when the project is completed, a settlement module summarizes the construction information data in the control center, and then a management module manages and stores the construction information.
Preferably, the building material information in S2 includes specification and model of the building material.
(III) advantageous effects
The invention provides a municipal engineering construction control system based on a BIM technology. The method has the following beneficial effects:
1. through the design of a standardized management control system, the quality of building material selection and the quality requirement of construction in the engineering construction process can be greatly increased when the system is managed and used, and meanwhile, the reasonable use of cost is facilitated.
2. Through the mode that BIM technique and VR technique combine for this system can implement at the work progress and carry out more audio-visual observation to the construction situation, can provide the quality guarantee for later stage building.
3. Through the open feedback design, the system can be ensured to timely acquire the conditions appearing in the construction, so that the system can conveniently and timely take corresponding measures, and the severe probability of the unexpected conditions is reduced.
Drawings
FIG. 1 is a flow chart of the overall structure of the present invention.
Wherein, 1, a control center; 2. a BIM module; 3. a VR preview module; 4. an input module; 5. a pre-valuation module; 6. a data uploading module; 7. a data receiving module; 8. a classification temporary storage module; 9. a checking module; 10. a settlement module; 11. a feedback module; 12. and a management module.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The first embodiment is as follows:
as shown in fig. 1, an embodiment of the present invention provides a municipal engineering construction control system based on a BIM technology, including a control center 1, a BIM module 2, a VR preview module 3, an input module 4, a pre-evaluation module 5, a data upload module 6, a data reception module 7, a classification temporary storage module 8, a checking module 9, a settlement module 10, a feedback module 11, and a management module 12, where the control center 1 is connected to the checking module 9, the feedback module 11, the settlement module 10, and the BIM module 2 is electrically connected to the VR preview module 3.
The data uploading module 6 is in signal connection with the data receiving module 7, the data receiving module 7 is electrically connected with the classification temporary storage module 8, and the classification temporary storage module 8 is electrically connected with the checking module 9.
The input module 4 is electrically connected with the pre-evaluation module 5, and the pre-evaluation module 5 is electrically connected with the classification temporary storage module 8.
The settlement module 10 is electrically connected with the management module 12.
The data transmission between the data uploading module 6 and the data receiving module 7 comprises building material detection data, construction detection data, purchase data and image data.
A municipal engineering construction control system based on BIM technology further comprises the following steps:
s1, carrying out simulation model construction by the BIM module 2 according to the environment of a construction site and a construction drawing, and displaying model data through the VR preview module 3;
s2, carrying out market visit by managers during engineering construction material selection, inputting the price condition of the building materials of the market visit through an input module 4, then estimating the total price of the required building materials by a pre-estimation module 5, uploading the estimated total price to a classification temporary storage module 8, then issuing the estimated total price to be purchased by buyers, and after the purchase is finished, the buyers upload literal and image data of the building material information and cost data from a data uploading module 6;
s3, then the data receiving module 7 receives the data uploaded by the data uploading module 6 and transmits the information to the classification temporary storage module 8;
s4, the checking module 9 compares the evaluation information stored in the classification temporary storage module 8 with the cost data, if the difference between the two data is within the range, the evaluation information is considered to be normal, otherwise, the range is relatively large, the buyer explains the specific reason, and the manager checks the uploaded image data;
s5, during construction of the project, the measured data of the construction process are uploaded by the data uploading module 6, then are received by the data receiving module 7 and transmitted to the separation temporary storage module, and then the information is correspondingly transmitted to the control center 1;
s6, carrying out model construction by the BIM module 2 through the construction data of the control center 1, and carrying out intuitive management and check by the VR preview module 3;
s7, all the people participating in the work in the engineering development process can feed back opinions to the control center 1 through the feedback module 11;
and S8, when the project is completed, a settlement module 10 summarizes the construction information data in the control center 1, and then a management module 12 manages and stores the construction information.
The building material information in S2 includes specification and model of the building material.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a municipal works construction control system based on BIM technique, includes control center (1), BIM module (2), VR preview module (3), input module (4), in advance valuation module (5), data upload module (6), data receiving module (7), categorised temporary storage module (8), checks module (9), settlement module (10), feedback module (11), management module (12), its characterized in that: the control center (1) is respectively connected with the checking module (9), the feedback module (11), the settlement module (10) and the BIM module (2), and the BIM module (2) is electrically connected with the VR preview module (3).
2. The BIM technology-based municipal engineering construction control system according to claim 1, wherein: the data uploading module (6) is in signal connection with the data receiving module (7), the data receiving module (7) is electrically connected with the classification temporary storage module (8), and the classification temporary storage module (8) is electrically connected with the checking module (9).
3. The BIM technology-based municipal engineering construction control system according to claim 1, wherein: the input module (4) is electrically connected with the pre-evaluation module (5), and the pre-evaluation module (5) is electrically connected with the classification temporary storage module (8).
4. The BIM technology-based municipal engineering construction control system according to claim 1, wherein: the settlement module (10) is electrically connected with the management module (12).
5. The BIM technology-based municipal engineering construction control system according to claim 1 or 2, wherein: and the data transmission between the data uploading module (6) and the data receiving module (7) comprises building material detection data, construction detection data, purchase data and image data.
6. The utility model provides a municipal works construction control system based on BIM technique which characterized in that: further comprising the steps of:
s1, carrying out simulation model construction by a BIM module (2) according to the environment of a construction site and a construction drawing, and displaying model data through a VR preview module (3);
s2, carrying out market visit by managers during engineering construction material selection, inputting the price condition of the building materials of the market visit through an input module (4), estimating the total price of the required building materials by a pre-estimation module (5), uploading the estimated total price to a classification temporary storage module (8), and then issuing the estimated total price to be purchased by buyers, wherein the buyers upload literal and image data of the building material information and cost expense data from a data uploading module (6) after purchasing is finished;
s3, receiving the data uploaded by the data uploading module (6) by the data receiving module (7), and transmitting the information to the classification temporary storage module (8);
s4, a checking module (9) compares the evaluation information stored in the classification temporary storage module (8) with the cost data, if the difference between the two data is within a range, the data is considered to be normal, otherwise, the range is relatively large, a buyer explains a specific reason, and a manager checks the uploaded image data;
s5, during construction of the project, the measured data of the construction process are uploaded by the data uploading module (6), then are received by the data receiving module (7) and are transmitted to the separation temporary storage module, and then the information is correspondingly transmitted to the control center (1);
s6, carrying out model construction by the BIM module (2) through the construction data of the control center (1), and carrying out intuitive management and check by the VR preview module (3);
s7, all the people participating in the work in the engineering development process can feed back opinions to the control center (1) through the feedback module (11);
s8, when the project is finished, a settlement module (10) summarizes the construction information data in the control center (1), and then a management module (12) manages and stores the construction information.
7. The BIM technology-based municipal engineering construction control system according to claim 6, wherein: the building material information in S2 includes specification and model of the building material.
CN202010811152.5A 2020-08-13 2020-08-13 Municipal engineering construction control system based on BIM technology Pending CN111932211A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010811152.5A CN111932211A (en) 2020-08-13 2020-08-13 Municipal engineering construction control system based on BIM technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010811152.5A CN111932211A (en) 2020-08-13 2020-08-13 Municipal engineering construction control system based on BIM technology

Publications (1)

Publication Number Publication Date
CN111932211A true CN111932211A (en) 2020-11-13

Family

ID=73311637

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010811152.5A Pending CN111932211A (en) 2020-08-13 2020-08-13 Municipal engineering construction control system based on BIM technology

Country Status (1)

Country Link
CN (1) CN111932211A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107358340A (en) * 2017-06-23 2017-11-17 深圳云联万企科技有限公司 A kind of project management system based on list of engineering
CN109214040A (en) * 2018-07-17 2019-01-15 广州圣安环保科技有限公司 A kind of fabricated construction real-time monitoring system and method based on BIM
JP2019021190A (en) * 2017-07-20 2019-02-07 前田建設工業株式会社 Construction support method and construction support system
CN111339601A (en) * 2020-03-25 2020-06-26 中国十七冶集团有限公司 BIM + VR construction site arrangement method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107358340A (en) * 2017-06-23 2017-11-17 深圳云联万企科技有限公司 A kind of project management system based on list of engineering
JP2019021190A (en) * 2017-07-20 2019-02-07 前田建設工業株式会社 Construction support method and construction support system
CN109214040A (en) * 2018-07-17 2019-01-15 广州圣安环保科技有限公司 A kind of fabricated construction real-time monitoring system and method based on BIM
CN111339601A (en) * 2020-03-25 2020-06-26 中国十七冶集团有限公司 BIM + VR construction site arrangement method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
"《BIM建模基础》", 重庆大学出版社, pages: 240 *

Similar Documents

Publication Publication Date Title
WO2021056791A1 (en) Smart management platform for integrated construction and maintenance of rail transport engineering, and method
CN103177391B (en) A kind of facilities and equipment supervisory system based on three-dimensional live and system integration method
US8266076B2 (en) Apparatus, system, and method for quantifying energy usage and savings
CN103440600A (en) BIM (Building Information Modeling) risk monitoring system and method of multilayer 4D (4-Dimensional) model
US20090228405A1 (en) Apparatus and Method for Determining and Applying an Energy Savings to a Financial Transaction
CN105425752A (en) Real-time monitoring system of pipe network and working method of same
CN113836622B (en) Drainage pipe network information management and comprehensive application system based on GIS and BIM
CN107545373A (en) A kind of municipal information analysis and security evaluation management system
CN106845837B (en) Power transmission and transformation project environment sensitive area monitoring system and method based on big data technology
KR102187365B1 (en) Apparatus for managing self-supply green-energy town house and method thereof
CN111932211A (en) Municipal engineering construction control system based on BIM technology
Chen et al. A holistic assessment of the photovoltaic-energy storage-integrated charging station in residential areas: A case study in Wuhan
CN116798142A (en) Visual inspection method, system, equipment and storage medium for long bridge
CN208597117U (en) A kind of intelligent Community monitoring system based on BIM
Selvakumar et al. Quality assurance and quality control practices for rehabilitation of sewer and water mains
CN113327155A (en) Land information display system and method
Quiroga et al. Strategic Research Needs in the Area of Utilities
CN107589307A (en) A kind of electromagnetic environment intelligent test system
JP2005024375A (en) Water service control and support system and water service control and support method
TWI662857B (en) Network system based on street lamp
CN117709693B (en) Method for assisting merchant to accurately lock house construction requirements of owners
KR20020012080A (en) The record carrier capable of reading a housing information
LaManes et al. Wyandotte Integrated Renewable Energy Strategy (WIRES 2)(Final Technical Report)
Hsieh et al. Building Facility Management System Using Sensors and Digital Technologies.
Ahmed Reducing Non-Revenue Water

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination