CN111932079A - Enterprise comprehensive ranking quantification system and method - Google Patents

Enterprise comprehensive ranking quantification system and method Download PDF

Info

Publication number
CN111932079A
CN111932079A CN202010661018.1A CN202010661018A CN111932079A CN 111932079 A CN111932079 A CN 111932079A CN 202010661018 A CN202010661018 A CN 202010661018A CN 111932079 A CN111932079 A CN 111932079A
Authority
CN
China
Prior art keywords
module
enterprise
project
ranking
score
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010661018.1A
Other languages
Chinese (zh)
Inventor
王凯媛
李迪
张琦
林帅
孙传武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Saifeite Engineering Technology Group Co ltd
Original Assignee
Saifeite Engineering Technology Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Saifeite Engineering Technology Group Co ltd filed Critical Saifeite Engineering Technology Group Co ltd
Priority to CN202010661018.1A priority Critical patent/CN111932079A/en
Publication of CN111932079A publication Critical patent/CN111932079A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Physics & Mathematics (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a system and a method for quantifying enterprise comprehensive ranking, which belong to the technical field of campus enterprise management and comprise an information uploading system, an automatic scoring system and a ranking generating system; the information uploading system comprises an enterprise login module, a safety uploading module, an environment-friendly uploading module, an accident uploading module, an economic uploading module and a bonus uploading module; the automatic scoring system comprises a form sorting module, a scoring storage module and an automatic scoring module; the ranking generation system calls the enterprise comprehensive score table stored by the automatic scoring module and visually ranks the enterprises according to the enterprise comprehensive score tables of all the enterprises.

Description

Enterprise comprehensive ranking quantification system and method
Technical Field
The invention relates to the technical field of campus enterprise management, in particular to a system and a method for quantifying enterprise comprehensive ranking.
Background
The park at present refers to a standard building or building group which is generally planned and constructed by governments (private enterprises and government cooperation), has complete water supply, power supply, gas supply, communication, roads, storage and other supporting facilities and reasonable layout and can meet the production and scientific experiment needs of a certain specific industry. Managers in the garden can generally use various garden management systems to help the managers to manage each enterprise in the garden, and conditions such as environmental pollution, production safety and the like of the enterprises in the garden are managed and controlled.
In the prior art, reference may be made to the chinese patent application publication No. CN110705855A, which discloses an enterprise environment portrait evaluation method, including: collecting environmental data information of an enterprise; carrying out standardization processing on the data; ranking the standardized data according to a preset rule, selecting a certain ranked data value, determining a scoring index in real time, and calculating to obtain the scoring index required by enterprise environment portrait evaluation; according to the obtained grading indexes, a three-level enterprise environment image evaluation model is constructed, and grading rules corresponding to the three-level indexes are set; and acquiring enterprise standardized information, calculating according to the established three-level enterprise environment portrait evaluation model to obtain enterprise environment portrait scores, and generating enterprise environment portrait labels according to the obtained enterprise environment portrait scores. A three-level enterprise environment portrait evaluation system is constructed, and an enterprise environment label is used during evaluation display.
The above prior art solutions have the following drawbacks: the system mainly helps the park management personnel to manage the environmental pollution problem of enterprises in the park, but the conditions of the enterprises in the park are complex, and the management personnel can not only consider the environmental pollution problem when managing or helping the enterprises.
Disclosure of Invention
The invention aims to provide an enterprise comprehensive ranking quantification system, which enables managers to quickly know the rough situation of each aspect of each enterprise in a garden, provides help for regional managers such as governments and the like to comprehensively judge the enterprise situation, and is used as a decision reference.
The technical purpose of the invention is realized by the following technical scheme:
an enterprise comprehensive ranking quantification system comprises an information uploading system, an automatic scoring system and a ranking generation system;
the information uploading system comprises an enterprise login module, a safety uploading module, an environment-friendly uploading module, an accident uploading module, an economic uploading module and a bonus uploading module;
the enterprise login module is provided with a user database, receives input information and searches the information in the user database, and if the same item is searched, the enterprise login module completes login and outputs user information;
the safety uploading module is used for receiving input information and filling the input information into the safety project form, and user information output by the enterprise login module is added into the filled safety project form to generate and output a safety project completion table;
the environment-friendly uploading module is internally stored with an environment-friendly project form, receives input information and fills the input information into the environment-friendly project form, and adds user information output by the enterprise login module into the environment-friendly project form after the input information to generate and output an environment-friendly project completion table;
the accident uploading module is used for receiving input information and filling the input information into an accident item form, and user information output by the enterprise login module is added into the filled accident item form to generate and output an accident item completion table;
the economic uploading module is internally stored with an economic project form, receives input information and fills the input information into the economic project form, and adds user information output by the enterprise login module into the economic project form after the input information is filled to generate and output an economic project completion table;
the bonus point uploading module is used for receiving input information and filling the input information into the bonus point project form, and adding user information output by the enterprise login module into the filled bonus point project form to generate a bonus point project completion table and output the bonus point project completion table;
the automatic scoring system comprises a form sorting module, a scoring storage module and an automatic scoring module;
the form sorting module receives the safety project completion table, the environment-friendly project completion table, the accident project completion table, the economic project completion table and the scoring project completion table output by the information uploading system, sorts and sorts the safety project completion table, the environment-friendly project completion table, the accident project completion table, the economic project completion table and the scoring project completion table into an enterprise comprehensive information table, and outputs the enterprise comprehensive information table;
the scoring storage module stores a scoring rule table;
the automatic scoring module receives the enterprise comprehensive information table and calls a scoring rule table, scores contents in the enterprise comprehensive information table through the scoring rule table, calculates score sum and generates an enterprise comprehensive score table;
and the ranking generation system calls the enterprise comprehensive score table stored by the automatic scoring module and visually ranks the enterprises according to the enterprise comprehensive score tables of all the enterprises.
By adopting the scheme, the system can respectively count the safety index, the economic development index, the environmental protection index, the accident rate, the hidden danger index and the bonus encouragement item of each enterprise through the data uploaded by each enterprise, and add all scores to obtain the enterprise comprehensive ranking, so that managers can quickly know the rough condition of each aspect of each enterprise in a garden, and provide help for the comprehensive judgment of regional managers such as governments on the enterprise condition to serve as a decision reference basis.
The invention is further configured to: and the ranking generation system ranks the enterprises respectively according to the safety project score, the environmental protection project score, the accident project score, the economic project score, the bonus project score and the score sum and displays the enterprises in different ranks.
By adopting the scheme, the ranking generation system can generate a plurality of rankings according to different projects, and the regional management personnel can judge the enterprise situation more conveniently.
The invention is further configured to: the automatic scoring system also comprises a scoring modification module, and the scoring modification module receives the input information and modifies the scoring rule table stored in the scoring storage module according to the input information.
By adopting the scheme, the scoring modification module is convenient for managers to modify the scoring rule table according to the real-time policy.
The invention is further configured to: the information uploading system further comprises a certificate input module, the certificate input module scans images and generates image information, and the certificate input module receives instructions and sends the image information to the security uploading module, the environment-friendly uploading module, the accident uploading module, the economy uploading module or the bonus uploading module according to the instructions.
By adopting the scheme, the certificate entry module is convenient for enterprises to upload various certificates and certificates, and provides real and reliable evidence for data.
The invention is further configured to: the ranking generation system comprises a ranking generation module, a record storage module and a regular tabulation module;
the ranking generation module calls the enterprise comprehensive score table stored by the automatic scoring module and carries out visual ranking on the enterprises according to the enterprise comprehensive score tables of all the enterprises;
the record storage module calls the visual ranking generated by the ranking generation module and stores the visual ranking according to time;
the regular tabulation module times according to set time, calls the visual ranking of the storage time within the timing time period from the record storage module when the timing reaches the set time, adds the same item scores in the called visual ranking and carries out ranking again.
By adopting the scheme, the ranking generation system can generate periodic rankings such as monthly rankings, quarterly rankings or annual rankings at regular time, and managers can observe the change of the rankings of enterprises conveniently.
The invention is further configured to: the automatic grading module calls the certificate comparison template stored in the grading storage module to compare the image information in the enterprise comprehensive information table, and if the image information has no similar certificate comparison template, the image information is marked.
By adopting the scheme, the automatic scoring module can roughly correct the certificates and the certificates uploaded by the enterprises, so that managers can conveniently check the certificates or the certificates which may have problems, distinguish wrong certificates or certificates, prevent the enterprises from maliciously uploading incorrect data, and further ensure the authenticity and reliability of the data.
The invention aims to provide a method for quantizing the comprehensive ranking of enterprises, so that managers can quickly know the rough condition of each aspect of each enterprise in a garden, and regional managers such as governments and the like can comprehensively judge the conditions of the enterprises to be used as decision reference bases.
The technical purpose of the invention is realized by the following technical scheme:
an enterprise comprehensive ranking quantification method comprises the following steps:
firstly, an enterprise logs in an enterprise comprehensive ranking quantification system;
secondly, the enterprises upload corresponding data according to corresponding safety, environmental protection, accident, economy and bonus projects;
thirdly, the enterprise comprehensive ranking quantification system respectively makes each item of data into a safety item completion table, an environment-friendly item completion table, an accident item completion table, an economic item completion table and a scoring item completion table;
fourthly, the enterprise comprehensive ranking quantification system counts all project completion tables of the same enterprise and integrates the project completion tables into an enterprise comprehensive information table;
fifthly, the enterprise comprehensive ranking quantification system scores the enterprise comprehensive information table by using a pre-stored scoring rule table to generate an enterprise comprehensive scoring value table;
and sixthly, carrying out visual ranking on the enterprises by the enterprise comprehensive ranking quantification system according to the enterprise comprehensive score tables of all the enterprises.
By adopting the scheme, the safety index, the economic development index, the environmental protection index, the accident rate, the hidden danger index and the scoring encouragement item of each enterprise can be respectively counted through the data uploaded by each enterprise, and all scores are added to obtain the enterprise comprehensive ranking, so that the managers can quickly know the rough condition of each aspect of each enterprise in the garden, and the managers can provide help for the comprehensive judgment of the enterprise condition by regional managers such as governments and the like and serve as decision reference.
The invention is further configured to: the sixth step specifically comprises:
sixthly, screening out a single item score in the enterprise comprehensive ranking quantification system;
sixthly, the enterprise comprehensive ranking quantification system respectively performs visual ranking on the enterprises according to the safety project score, the environmental protection project score, the accident project score, the economic project score, the bonus project score and the score sum, and forms different ranks.
By adopting the scheme, managers can find the advantages and weaknesses of enterprises through different ranks, and the regional managers can more conveniently and specifically judge the enterprise conditions.
The invention is further configured to: further comprising the steps of:
seventhly, the enterprise comprehensive ranking quantification system stores the visual ranking;
and eighthly, adding the enterprise scores in the visual ranking stored in the time period by the enterprise comprehensive ranking quantification system after the set time, and then ranking again.
By adopting the scheme, the ranking generation system can generate periodic rankings such as monthly rankings, quarterly rankings or annual rankings at regular time, and managers can observe the change of the rankings of enterprises conveniently.
The invention is further configured to: the second step and the fifth step further comprise:
secondly, the enterprises upload certificates and certificates through scanning;
fifthly, the enterprise comprehensive ranking quantification system compares the certificates or the certificates uploaded by the enterprises through a prestored certificate comparison template, and if the certificates or the certificates uploaded by the enterprises do not have similar certificate comparison templates, the enterprise comprehensive ranking quantification system marks the certificates or the certificates.
By adopting the scheme, managers can conveniently check the certificates or certificates which may have problems, and distinguish wrong certificates or certificates, thereby preventing enterprises from maliciously uploading incorrect data and further ensuring the authenticity and reliability of data.
In conclusion, the invention has the following beneficial effects:
1. the system can respectively count the safety index, the economic development index, the environmental protection index, the accident rate, the hidden danger index and the bonus encouragement item of each enterprise through the data uploaded by each enterprise, and add all scores to obtain the enterprise comprehensive ranking, so that managers can quickly know the rough situation of each aspect of each enterprise in a garden, and the system provides help for regional managers such as governments and the like to comprehensively judge the enterprise situation and is used as a decision reference basis;
2. the ranking generation system can generate periodic rankings at regular time, such as monthly rankings, quarterly rankings or annual rankings, so that managers can observe changes of the rankings of enterprises conveniently;
3. the automatic scoring module can roughly check the certificates and certificates uploaded by the enterprises, so that managers can conveniently check the certificates or certificates which may have problems, distinguish wrong certificates or certificates, prevent the enterprises from maliciously uploading incorrect data, and further guarantee the authenticity and reliability of the data.
Drawings
FIG. 1 is a block diagram of an overall system of a first embodiment;
FIG. 2 is a block diagram of a highlighted information uploading system in one embodiment;
FIG. 3 is a block diagram of modules of the automatic scoring system according to one embodiment;
FIG. 4 is a block diagram of the outburst ranking generation system in accordance with one embodiment.
In the figure, 1, an information uploading system; 11. an enterprise login module; 12. a secure upload module; 13. an environment-friendly uploading module; 14. an accident uploading module; 15. an economic upload module; 16. adding and dividing an uploading module; 17. a certificate entry module; 2. an automatic scoring system; 21. a form sorting module; 22. an automatic scoring module; 23. a score storage module; 24. a score modification module; 3. a ranking generation system; 31. a ranking generation module; 32. a record storage module; 33. and a periodic tabulation module.
Detailed Description
The first embodiment is as follows: an enterprise comprehensive ranking quantification system is shown in fig. 1 and comprises an information uploading system 1, an automatic scoring system 2 and a ranking generation system 3.
As shown in fig. 2, the information uploading system 1 includes an enterprise login module 11, a certificate entry module 17, a secure uploading module 12, an environment-friendly uploading module 13, an accident uploading module 14, an economic uploading module 15, and a bonus uploading module 16. The enterprise login module 11 is provided with a user database, the enterprise login module 11 receives the input information and searches the information in the user database, if the same item is searched, the login is completed, and the user information is output. The certificate input module 17 scans images and generates image information, and the certificate input module 17 receives instructions and sends the image information to the security uploading module 12, the environment-friendly uploading module 13, the accident uploading module 14, the economy uploading module 15 or the bonus uploading module 16 according to the instructions. The certificate entry module 17 facilitates the enterprise to upload various certificates and certificates, and provides real and reliable evidence for data.
As shown in fig. 2, a security project form is stored in the security upload module 12, the security upload module 12 receives input information and fills the input information into the security project form, and adds user information output by the enterprise login module 11 into the filled security project form to generate and output a security project completion table. An environment-friendly project form is stored in the environment-friendly uploading module 13, the environment-friendly uploading module 13 receives input information and fills the input information into the environment-friendly project form, and user information output by the enterprise login module 11 is added into the environment-friendly project form after the input information is filled in to generate and output an environment-friendly project completion table. The accident uploading module 14 stores an accident item form, the accident uploading module 14 receives the input information and fills the input information into the accident item form, and the user information output by the enterprise login module 11 is added into the filled accident item form to generate and output an accident item completion form. The economic project form is stored in the economic upload module 15, the economic upload module 15 receives input information and fills the input information into the economic project form, and user information output by the enterprise login module 11 is added into the economic project form after the input information is filled to generate and output an economic project completion table. The bonus uploading module 16 stores a bonus project form, the bonus uploading module 16 receives the input information and fills the information into the bonus project form, and the user information output by the enterprise login module 11 is added into the filled bonus project form to generate a bonus project completion table and output the bonus project completion table. The safety items comprise production safety, safety equipment, fire safety and other items. The environmental protection project comprises the items of air environmental pollution, water resource utilization, solid waste pollution and the like. The accident item comprises various safety accidents of enterprises in the garden, and the accident item needs to calculate the occurrence size and the occurrence quantity of the accidents. The economic project comprises small items such as economic development, energy conservation and the like. The bonus items include various government support policies.
As shown in fig. 2 and 3, the automatic scoring system 2 includes a form sorting module 21, a score storage module 23, a score modification module 24, and an automatic scoring module 22. The form sorting module 21 receives the safety project completion table, the environmental protection project completion table, the accident project completion table, the economic project completion table and the bonus project completion table output by the information uploading system 1, sorts and sorts the safety project completion table, the environmental protection project completion table, the economic project completion table and the bonus project completion table into an enterprise comprehensive information table, and outputs the enterprise comprehensive information table. The score storage module 23 stores a score rule table and a certificate comparison template. The score modification module 24 receives the input information and modifies the score rule table stored in the score storage module 23 according to the input information. The automatic scoring module 22 receives the enterprise comprehensive information table and calls the scoring rule table, and the automatic scoring module 22 scores the contents in the enterprise comprehensive information table through the scoring rule table, calculates the total score and generates the enterprise comprehensive score table. The scoring modification module 24 facilitates modification of the scoring rule table by a manager according to a real-time policy.
As shown in fig. 3, the automatic scoring module 22 calls the certificate comparison template stored in the scoring storage module 23 to compare the image information in the enterprise integrated information table, and if the image information does not have a similar certificate comparison template, the image information is labeled. The automatic scoring module 22 can roughly collate the certificates and certificates uploaded by the enterprises, so that managers can conveniently check the certificates or certificates with possible problems and distinguish wrong certificates or certificates, thereby preventing the enterprises from maliciously uploading incorrect data and further ensuring the authenticity and reliability of the data.
As shown in fig. 4, the ranking generation system 3 includes a ranking generation module 31, a record storage module 32, and a periodic tabulation module 33. The ranking generation module 31 calls the enterprise integrated score table stored by the automatic scoring module 22. The ranking generation system 3 ranks the enterprises respectively according to the safety project score, the environmental protection project score, the accident project score, the economic project score, the bonus project score and the score sum, and displays the enterprises in different ranks. The system can help managers to quickly know the rough conditions of all aspects of enterprises in the garden, and the system can help regional managers such as governments to comprehensively judge the conditions of the enterprises to serve as decision reference bases.
As shown in fig. 4, the record storage module 32 calls the visual ranking generated by the ranking generation module 31 and stores the visual ranking according to time. The periodic tabulation module 33 counts time according to a set time. Every time the timing reaches the set time, the periodic tabulation module 33 calls the visual ranking of the storage time within the timing time period from the record storage module 32, and adds the scores of the same items in the called visual ranking and carries out ranking again. The ranking generation system 3 can generate periodic rankings such as monthly rankings, quarterly rankings, or annual rankings at regular time, which is convenient for managers to observe changes of the rankings of the enterprises.
The system can respectively count and rank the safety index, the economic development index, the environmental protection index, the accident rate, the hidden danger index and the bonus encouragement item of each enterprise through the data uploaded by each enterprise, so that managers can quickly know the rough situation of each aspect of each enterprise in a garden, and the system provides help for comprehensive judgment of regional managers such as governments on the situation of the enterprises and serves as a decision reference basis.
Example two: a method for quantifying enterprise comprehensive ranking uses the system in the first embodiment, and comprises the following steps:
firstly, an enterprise logs in the enterprise comprehensive ranking quantification system. Enterprises can register in advance at management personnel to obtain login accounts and passwords of the enterprise comprehensive ranking quantification system.
And secondly, the enterprises respectively upload corresponding data according to corresponding safety, environmental protection, accident, economy and bonus projects and upload certificates and certificates through scanning. The uploaded data needs to be uploaded according to the content of the corresponding project requirement. The safety items comprise production safety, safety equipment, fire safety and other items. The environmental protection project comprises the items of air environmental pollution, water resource utilization, solid waste pollution and the like. The accident item comprises various safety accidents of enterprises in the garden, and the accident item needs to calculate the occurrence size and the occurrence quantity of the accidents. The economic project comprises small items such as economic development, energy conservation and the like. The bonus items include various government support policies.
And thirdly, the enterprise comprehensive ranking quantification system respectively makes each item of data into a safety item completion table, an environment-friendly item completion table, an accident item completion table, an economic item completion table and a bonus item completion table. Each item completion table carries information about the business.
And fourthly, the enterprise comprehensive ranking quantification system counts all project completion tables of the same enterprise and integrates the project completion tables into an enterprise comprehensive information table.
And fifthly, the enterprise comprehensive ranking quantification system scores the enterprise comprehensive information table by using a pre-stored scoring rule table to generate an enterprise comprehensive scoring value table. The enterprise comprehensive ranking quantification system compares the certificates or the certificates uploaded by the enterprises through a prestored certificate comparison template, and if the certificates or the certificates uploaded by the enterprises do not have similar certificate comparison templates, the enterprise comprehensive ranking quantification system marks the certificates or the certificates. The administrator can identify the authenticity of the information uploaded by the enterprise by looking at the marked certificate or certificate.
And sixthly, screening out the single item scores in the enterprise comprehensive ranking quantification system. And the enterprise comprehensive ranking quantification system respectively performs visual ranking on the enterprises according to the safety project score, the environmental protection project score, the accident project score, the economic project score, the bonus project score and the score sum, and forms different ranks. Managers can find the advantages and weaknesses of the enterprises through different ranks, and the regional managers can judge the conditions of the enterprises more conveniently.
And seventhly, storing the visual ranking by the enterprise comprehensive ranking quantification system. The enterprise comprehensive ranking quantification system mainly stores the specific scores of the enterprises in the visual ranking.
And eighthly, adding the enterprise scores in the visual ranking stored in the time period by the enterprise comprehensive ranking quantification system after the set time, and then ranking again. The set time may be one quarter or one year. Periodic ranking facilitates managers to observe changes in the ranking of the enterprise.
The method can respectively count the safety index, the economic development index, the environmental protection index, the accident rate, the hidden danger index and the bonus encouragement item of each enterprise through the data uploaded by each enterprise, and adds all scores to obtain the enterprise comprehensive ranking and each item ranking, and sets periodic ranking, so that managers can quickly know the rough situation of each aspect of each enterprise in a garden, and provide help for regional managers such as governments and the like to comprehensively judge the enterprise situation, and the comprehensive judgment can be used as a decision reference basis.
The embodiments of the present invention are preferred embodiments of the present invention, and the scope of the present invention is not limited by these embodiments, so: all equivalent changes made according to the structure, shape and principle of the invention are covered by the protection scope of the invention.

Claims (10)

1. An enterprise comprehensive ranking quantification system is characterized in that: comprises an information uploading system (1), an automatic scoring system (2) and a ranking generating system (3);
the information uploading system (1) comprises an enterprise login module (11), a safety uploading module (12), an environment-friendly uploading module (13), an accident uploading module (14), an economic uploading module (15) and a bonus uploading module (16);
the enterprise login module (11) is provided with a user database, the enterprise login module (11) receives input information and searches the information in the user database, if the same item is searched, login is completed, and user information is output;
the safety uploading module (12) is internally stored with a safety project form, the safety uploading module (12) receives input information and fills the input information into the safety project form, and user information output by the enterprise login module (11) is added into the filled safety project form to generate a safety project completion table and output the safety project completion table;
an environment-friendly project form is stored in the environment-friendly uploading module (13), the environment-friendly uploading module (13) receives input information and fills the input information into the environment-friendly project form, and user information output by the enterprise login module (11) is added into the environment-friendly project form after the input information is filled into the environment-friendly project form to generate an environment-friendly project completion table and output the environment-friendly project completion table;
an accident item form is stored in the accident uploading module (14), the accident uploading module (14) receives input information and fills the input information into the accident item form, and user information output by the enterprise login module (11) is added into the filled accident item form to generate and output an accident item completion form;
the economic project form is stored in the economic uploading module (15), the economic uploading module (15) receives input information and fills the input information into the economic project form, and user information output by the enterprise login module (11) is added into the filled economic project form to generate and output an economic project completion table;
the bonus point uploading module (16) is internally stored with a bonus point project form, the bonus point uploading module (16) receives input information and fills the input information into the bonus point project form, and user information output by the enterprise login module (11) is added into the filled bonus point project form to generate a bonus point project completion table and output the bonus point project completion table;
the automatic scoring system (2) comprises a form sorting module (21), a scoring storage module (23) and an automatic scoring module (22);
the form sorting module (21) receives the safety project completion table, the environment-friendly project completion table, the accident project completion table, the economic project completion table and the bonus project completion table output by the information uploading system (1), sorts and sorts the safety project completion table, the environment-friendly project completion table, the accident project completion table, the economic project completion table and the bonus project completion table into an enterprise comprehensive information table, and outputs the enterprise comprehensive information table;
the scoring storage module (23) stores a scoring rule table;
the automatic scoring module (22) receives the enterprise comprehensive information table and calls a scoring rule table, and the automatic scoring module (22) scores the contents in the enterprise comprehensive information table through the scoring rule table, calculates the sum of scores and generates an enterprise comprehensive score table;
and the ranking generation system (3) calls the enterprise comprehensive score table stored by the automatic scoring module (22) and visually ranks the enterprises according to the enterprise comprehensive score tables of all the enterprises.
2. The system of claim 1, wherein: and the ranking generation system (3) ranks the enterprises respectively according to the safety project score, the environmental protection project score, the accident project score, the economic project score, the bonus project score and the score sum and displays the enterprises in different ranks.
3. The system of claim 1, wherein: the automatic scoring system (2) further comprises a score modification module (24), wherein the score modification module (24) receives input information and modifies a score rule table stored in the score storage module (23) according to the input information.
4. The system of claim 1, wherein: the information uploading system (1) further comprises a certificate input module (17), the certificate input module (17) scans images and generates image information, and the certificate input module (17) receives instructions and sends the image information to the safety uploading module (12), the environment-friendly uploading module (13), the accident uploading module (14), the economic uploading module (15) or the bonus uploading module (16) according to the instructions.
5. The system of claim 2, wherein: the ranking generation system (3) comprises a ranking generation module (31), a record storage module (32) and a regular tabulation module (33);
the ranking generation module (31) calls the enterprise comprehensive score table stored by the automatic scoring module (22), and performs visual ranking on the enterprises according to the enterprise comprehensive score tables of all the enterprises;
the record storage module (32) calls the visual ranking generated by the ranking generation module (31) and stores the visual ranking according to time;
the regular tabulation module (33) times according to set time, when the set time is reached, the regular tabulation module (33) calls the visual ranking of the storage time within the time period from the record storage module (32), adds the scores of the same items in the called visual ranking and carries out ranking again.
6. The system of claim 4, wherein: the automatic grading module (22) calls the certificate comparison template stored in the grading storage module (23) to compare the image information in the enterprise comprehensive information table, and if the image information has no similar certificate comparison template, the image information is marked.
7. A method for quantifying enterprise comprehensive ranking is characterized by comprising the following steps:
firstly, an enterprise logs in an enterprise comprehensive ranking quantification system;
secondly, the enterprises upload corresponding data according to corresponding safety, environmental protection, accident, economy and bonus projects;
thirdly, the enterprise comprehensive ranking quantification system respectively makes each item of data into a safety item completion table, an environment-friendly item completion table, an accident item completion table, an economic item completion table and a scoring item completion table;
fourthly, the enterprise comprehensive ranking quantification system counts all project completion tables of the same enterprise and integrates the project completion tables into an enterprise comprehensive information table;
fifthly, the enterprise comprehensive ranking quantification system scores the enterprise comprehensive information table by using a pre-stored scoring rule table to generate an enterprise comprehensive scoring value table;
and sixthly, carrying out visual ranking on the enterprises by the enterprise comprehensive ranking quantification system according to the enterprise comprehensive score tables of all the enterprises.
8. The method for quantifying the comprehensive ranking of enterprises of claim 7, wherein the sixth step specifically comprises:
sixthly, screening out a single item score in the enterprise comprehensive ranking quantification system;
sixthly, the enterprise comprehensive ranking quantification system respectively performs visual ranking on the enterprises according to the safety project score, the environmental protection project score, the accident project score, the economic project score, the bonus project score and the score sum, and forms different ranks.
9. The method of claim 7, further comprising the steps of:
seventhly, the enterprise comprehensive ranking quantification system stores the visual ranking;
and eighthly, adding the enterprise scores in the visual ranking stored in the time period by the enterprise comprehensive ranking quantification system after the set time, and then ranking again.
10. The method of claim 7, wherein the second step and the fifth step further comprise:
secondly, the enterprises upload certificates and certificates through scanning;
fifthly, the enterprise comprehensive ranking quantification system compares the certificates or the certificates uploaded by the enterprises through a prestored certificate comparison template, and if the certificates or the certificates uploaded by the enterprises do not have similar certificate comparison templates, the enterprise comprehensive ranking quantification system marks the certificates or the certificates.
CN202010661018.1A 2020-07-10 2020-07-10 Enterprise comprehensive ranking quantification system and method Pending CN111932079A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010661018.1A CN111932079A (en) 2020-07-10 2020-07-10 Enterprise comprehensive ranking quantification system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010661018.1A CN111932079A (en) 2020-07-10 2020-07-10 Enterprise comprehensive ranking quantification system and method

Publications (1)

Publication Number Publication Date
CN111932079A true CN111932079A (en) 2020-11-13

Family

ID=73312260

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010661018.1A Pending CN111932079A (en) 2020-07-10 2020-07-10 Enterprise comprehensive ranking quantification system and method

Country Status (1)

Country Link
CN (1) CN111932079A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113127539A (en) * 2021-04-22 2021-07-16 中国科学院青海盐湖研究所 Regional industry database processing method based on big data analysis and feature recognition

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108710998A (en) * 2018-05-03 2018-10-26 苏州朗动网络科技有限公司 Industrial Data Management method, apparatus, computer equipment and storage medium
CN110598081A (en) * 2019-08-30 2019-12-20 北京智云信国际信用评价有限公司 Reputation monitoring system and method based on enterprise service monitoring
CN110675026A (en) * 2019-08-27 2020-01-10 紫光云(南京)数字技术有限公司 System capable of dynamically evaluating enterprise comprehensive quality based on government angle
CN110705855A (en) * 2019-09-23 2020-01-17 清华苏州环境创新研究院 Enterprise environment portrait evaluation method and system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108710998A (en) * 2018-05-03 2018-10-26 苏州朗动网络科技有限公司 Industrial Data Management method, apparatus, computer equipment and storage medium
CN110675026A (en) * 2019-08-27 2020-01-10 紫光云(南京)数字技术有限公司 System capable of dynamically evaluating enterprise comprehensive quality based on government angle
CN110598081A (en) * 2019-08-30 2019-12-20 北京智云信国际信用评价有限公司 Reputation monitoring system and method based on enterprise service monitoring
CN110705855A (en) * 2019-09-23 2020-01-17 清华苏州环境创新研究院 Enterprise environment portrait evaluation method and system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113127539A (en) * 2021-04-22 2021-07-16 中国科学院青海盐湖研究所 Regional industry database processing method based on big data analysis and feature recognition

Similar Documents

Publication Publication Date Title
CN107330593A (en) A kind of traffic monitoring inspection and credit worthiness management system
CN114003586A (en) Construction method of intelligent education big data platform
CN109992576A (en) A kind of government data quality evaluation and abnormal data recovery technique based on big data technology
CN105761009B (en) Passenger ferry management system and method
CN102208057A (en) Method, platform and system for processing audit information
CN111062686A (en) Mobile intelligent supervision and control method and system based on digital model
CN106875091A (en) A kind of Management System of Urban Dangers based on address cloud service
CN112651644A (en) Bridge potential safety hazard troubleshooting informatization management system and application method thereof
CN111932079A (en) Enterprise comprehensive ranking quantification system and method
CN105225058A (en) Petroleum chemical industry green technology appraisal procedure
CN111798086A (en) Universal intelligent assessment method for industry system units
CN117455379A (en) Basic intelligent management system and method
CN102968700B (en) A kind of offshore oil and gas field general corrosion management system
RU2755520C1 (en) Automated logistical intelligent information decision-making system in manufacturing and logistical complex
Gong et al. Blockchain-based E-tendering evaluation framework
CN109064362B (en) AI technology-based power grid material management and training system
CN112015877A (en) Refined quick-check engine system for common books
CN115345465B (en) Multicolor level management method and system based on basic level treatment event
CN107016487A (en) A kind of index system modeling and modeling method based on environmental protection management
CN116843229A (en) Digital evaluation method and system for job-in-place security responsibility of power generation enterprise
CN116542827A (en) Road transportation enterprise safety training background management system and method
CN118113825A (en) Auxiliary report construction management method and system for language model fusion knowledge graph
Chen Construction of Human Resource Allocation Model Based on Apriori Algorithm
CN115587692A (en) Building construction technical scheme management system and method based on informatization management platform
Li Design and realization of computer network virtual experiment economic teaching platform based on mathematical image and signal processing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20201113