CN111928817A - 采用多环撑沉降水平监测点的深坑基工程监测系统与方法 - Google Patents
采用多环撑沉降水平监测点的深坑基工程监测系统与方法 Download PDFInfo
- Publication number
- CN111928817A CN111928817A CN202010998263.1A CN202010998263A CN111928817A CN 111928817 A CN111928817 A CN 111928817A CN 202010998263 A CN202010998263 A CN 202010998263A CN 111928817 A CN111928817 A CN 111928817A
- Authority
- CN
- China
- Prior art keywords
- horizontal
- settlement
- steel cable
- pit
- axial
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000012544 monitoring process Methods 0.000 title claims abstract description 66
- 238000000034 method Methods 0.000 title claims abstract description 36
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 43
- 239000010959 steel Substances 0.000 claims abstract description 43
- 238000009412 basement excavation Methods 0.000 claims abstract description 28
- 239000002689 soil Substances 0.000 claims abstract description 24
- 238000004062 sedimentation Methods 0.000 claims abstract description 9
- 238000004088 simulation Methods 0.000 claims abstract description 8
- 238000006073 displacement reaction Methods 0.000 claims description 7
- 238000011161 development Methods 0.000 claims description 4
- 238000010276 construction Methods 0.000 description 6
- 230000008569 process Effects 0.000 description 5
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 4
- 238000012937 correction Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 239000004927 clay Substances 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 230000004044 response Effects 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 238000009933 burial Methods 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000005315 distribution function Methods 0.000 description 1
- 230000007717 exclusion Effects 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 230000005641 tunneling Effects 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01C—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
- G01C5/00—Measuring height; Measuring distances transverse to line of sight; Levelling between separated points; Surveyors' levels
Landscapes
- Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Radar, Positioning & Navigation (AREA)
- Remote Sensing (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
- Foundations (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010998263.1A CN111928817B (zh) | 2020-09-22 | 2020-09-22 | 采用多环撑沉降水平监测点的深坑基工程监测系统与方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010998263.1A CN111928817B (zh) | 2020-09-22 | 2020-09-22 | 采用多环撑沉降水平监测点的深坑基工程监测系统与方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111928817A true CN111928817A (zh) | 2020-11-13 |
CN111928817B CN111928817B (zh) | 2021-01-29 |
Family
ID=73334905
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010998263.1A Active CN111928817B (zh) | 2020-09-22 | 2020-09-22 | 采用多环撑沉降水平监测点的深坑基工程监测系统与方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111928817B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112902913A (zh) * | 2021-01-13 | 2021-06-04 | 中国矿业大学(北京) | 一种采空区沉降监测系统与方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104404979A (zh) * | 2014-11-28 | 2015-03-11 | 中铁二十三局集团有限公司 | H型桩板墙施工方法 |
CN105043344A (zh) * | 2015-07-10 | 2015-11-11 | 镇江绿材谷新材料科技有限公司 | 一种基于连续纤维复合型材的沉降分布监测系统及监测方法 |
CN106522235A (zh) * | 2016-11-01 | 2017-03-22 | 中化二建集团有限公司 | 狭小场地深基坑开挖支护施工方法 |
US20180202281A1 (en) * | 2015-08-12 | 2018-07-19 | Halliburton Energy Services Inc. | Locating wellbore flow paths behind drill pipe |
CN109944255A (zh) * | 2019-05-06 | 2019-06-28 | 重庆建工市政交通工程有限责任公司 | 无支撑双层弧形钻孔灌注深基坑围护结构及开挖施工方法 |
CN111593773A (zh) * | 2020-05-15 | 2020-08-28 | 中建二局第一建筑工程有限公司 | 一种深基坑的监测方法及系统、可读存储介质 |
-
2020
- 2020-09-22 CN CN202010998263.1A patent/CN111928817B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104404979A (zh) * | 2014-11-28 | 2015-03-11 | 中铁二十三局集团有限公司 | H型桩板墙施工方法 |
CN105043344A (zh) * | 2015-07-10 | 2015-11-11 | 镇江绿材谷新材料科技有限公司 | 一种基于连续纤维复合型材的沉降分布监测系统及监测方法 |
US20180202281A1 (en) * | 2015-08-12 | 2018-07-19 | Halliburton Energy Services Inc. | Locating wellbore flow paths behind drill pipe |
CN106522235A (zh) * | 2016-11-01 | 2017-03-22 | 中化二建集团有限公司 | 狭小场地深基坑开挖支护施工方法 |
CN109944255A (zh) * | 2019-05-06 | 2019-06-28 | 重庆建工市政交通工程有限责任公司 | 无支撑双层弧形钻孔灌注深基坑围护结构及开挖施工方法 |
CN111593773A (zh) * | 2020-05-15 | 2020-08-28 | 中建二局第一建筑工程有限公司 | 一种深基坑的监测方法及系统、可读存储介质 |
Non-Patent Citations (1)
Title |
---|
王家全 等: "动载频率对土工格栅加筋土挡墙动力特性的影响", 《振动工程学报》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112902913A (zh) * | 2021-01-13 | 2021-06-04 | 中国矿业大学(北京) | 一种采空区沉降监测系统与方法 |
CN112902913B (zh) * | 2021-01-13 | 2022-04-19 | 中国矿业大学(北京) | 一种采空区沉降监测系统与方法 |
Also Published As
Publication number | Publication date |
---|---|
CN111928817B (zh) | 2021-01-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103352455B (zh) | 开挖基坑坑底土体隆起的监测方法 | |
Roboski et al. | Distributions of ground movements parallel to deep excavations in clay | |
CN111998825B (zh) | 隧道浅埋段监控量测方法 | |
CN104328776B (zh) | 一种预测动力强夯对土体及周边环境影响的方法 | |
CN103643668A (zh) | 一种建筑工程基坑监测的方法 | |
CN111928817B (zh) | 采用多环撑沉降水平监测点的深坑基工程监测系统与方法 | |
CN102979102B (zh) | 软土地区深大圆形基坑明挖顺作控制变形的设计方法 | |
CN112836270A (zh) | 一种应用于预测潜水降水对建筑物沉降影响的方法 | |
CN112177061B (zh) | 复杂地质构造下的微观水平变形监测系统与方法 | |
CN110241870A (zh) | 一种基坑开挖监测系统的布置方法以及基坑开挖监测系统 | |
CN201901875U (zh) | 一种大规模超深基坑开挖环境控制与保护监测装置 | |
CN109184802A (zh) | 一种大断面多导洞隧道信息化监测施工方法 | |
CN117146889A (zh) | 一种大直径顶管施工中始发井变形监测装置及方法 | |
CN112344983B (zh) | 软土基环境下的沉降施工水平监测方法与系统 | |
CN105809610A (zh) | 一种基坑支撑拆除对周边地层影响的评估方法 | |
CN113006084A (zh) | 一种无支撑基坑支档系统的施工方法及其动态设计方法 | |
Gorska et al. | Analysis of displacement of excavation based on inclinometer measurements | |
CN111794294B (zh) | 基于分布式光纤的灌注桩静载试验溶洞识别系统及方法 | |
CN112343098B (zh) | 用于围护结构顶部的水平监测系统与方法 | |
Marr et al. | Displacement-based design for deep excavations | |
Tan et al. | Challenges in design and construction of deep excavation for KVMRT in Kuala Lumpur limestone formation | |
Hsu et al. | Normalized analysis of deformation for deep excavation diaphragm walls under different neighboring building conditions | |
Xin et al. | Study on the design calculation method and construction control method of suction drum foundation for guided frame platform | |
JP2019214900A (ja) | 刃口部貫入幅測定装置、及び、ケーソン沈設方法 | |
CN115492420B (zh) | 一种夯土墙的纠偏扶正及结构加固方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Jiang Meng Inventor after: Zhang Huai Inventor after: Wang He Inventor after: Gao Yuliang Inventor after: Gao Fei Inventor after: Dong Jianhua Inventor after: Ding Haiyou Inventor after: Kang Qiujing Inventor after: Huang Yujun Inventor before: Jiang Meng Inventor before: Huang Yujun Inventor before: Zhang Huai Inventor before: Zhong Wenqing Inventor before: Wang He Inventor before: Gao Yuliang Inventor before: Gao Fei Inventor before: Dong Jianhua Inventor before: Ding Haiyou Inventor before: Kang Qiujing |
|
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: B713 (Changping Demonstration Park), Building 8, No. 97, Changping Road, Shahe Town, Changping District, Beijing, 102206 Patentee after: Beijing Dacheng Guoce Technology Co.,Ltd. Address before: 102206 room 503, building 6, No.97, Changping Road, Changping District, Beijing Patentee before: BEIJING DACHENG GUOCE SCIENCE AND TECHNOLOGY CO.,LTD. |