CN100564697C - 水平顶管地基处理工法 - Google Patents
水平顶管地基处理工法 Download PDFInfo
- Publication number
- CN100564697C CN100564697C CNB2008100478520A CN200810047852A CN100564697C CN 100564697 C CN100564697 C CN 100564697C CN B2008100478520 A CNB2008100478520 A CN B2008100478520A CN 200810047852 A CN200810047852 A CN 200810047852A CN 100564697 C CN100564697 C CN 100564697C
- Authority
- CN
- China
- Prior art keywords
- foundation
- push pipe
- pipe
- soil
- jacking
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 25
- 239000002689 soil Substances 0.000 claims abstract description 21
- 238000010276 construction Methods 0.000 claims abstract description 17
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 9
- 239000010959 steel Substances 0.000 claims abstract description 9
- 238000007569 slipcasting Methods 0.000 claims abstract 3
- 230000015572 biosynthetic process Effects 0.000 claims abstract 2
- 238000012544 monitoring process Methods 0.000 claims description 12
- 238000012937 correction Methods 0.000 claims description 9
- 230000000694 effects Effects 0.000 claims description 9
- 238000013461 design Methods 0.000 claims description 8
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 6
- 238000004364 calculation method Methods 0.000 claims description 5
- 238000004458 analytical method Methods 0.000 claims description 3
- 230000006835 compression Effects 0.000 claims description 3
- 238000007906 compression Methods 0.000 claims description 3
- 229910052742 iron Inorganic materials 0.000 claims description 3
- 230000007774 longterm Effects 0.000 claims description 3
- 230000035699 permeability Effects 0.000 claims description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 3
- 206010061619 Deformity Diseases 0.000 claims 1
- 239000004568 cement Substances 0.000 claims 1
- 238000010835 comparative analysis Methods 0.000 claims 1
- 238000007596 consolidation process Methods 0.000 claims 1
- 230000001815 facial effect Effects 0.000 claims 1
- 230000002093 peripheral effect Effects 0.000 claims 1
- 239000011148 porous material Substances 0.000 claims 1
- 238000004062 sedimentation Methods 0.000 claims 1
- 239000002002 slurry Substances 0.000 claims 1
- 230000002787 reinforcement Effects 0.000 abstract description 5
- 239000002131 composite material Substances 0.000 abstract description 3
- 230000002708 enhancing effect Effects 0.000 abstract description 2
- 239000000463 material Substances 0.000 abstract description 2
- 239000000758 substrate Substances 0.000 abstract 2
- 230000007812 deficiency Effects 0.000 abstract 1
- 238000001514 detection method Methods 0.000 abstract 1
- 238000005259 measurement Methods 0.000 description 6
- 238000012360 testing method Methods 0.000 description 4
- 238000009412 basement excavation Methods 0.000 description 2
- 238000007796 conventional method Methods 0.000 description 2
- 239000011440 grout Substances 0.000 description 2
- 230000003068 static effect Effects 0.000 description 2
- 238000009435 building construction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000004927 fusion Effects 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Landscapes
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2008100478520A CN100564697C (zh) | 2008-05-28 | 2008-05-28 | 水平顶管地基处理工法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2008100478520A CN100564697C (zh) | 2008-05-28 | 2008-05-28 | 水平顶管地基处理工法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101280565A CN101280565A (zh) | 2008-10-08 |
CN100564697C true CN100564697C (zh) | 2009-12-02 |
Family
ID=40013221
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB2008100478520A Active CN100564697C (zh) | 2008-05-28 | 2008-05-28 | 水平顶管地基处理工法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100564697C (zh) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104215748B (zh) * | 2014-08-19 | 2015-04-22 | 山东大学 | 一种地下工程破碎围岩注浆加固效果的综合定量检测方法 |
CN104455726A (zh) * | 2014-11-20 | 2015-03-25 | 广州市市政集团有限公司 | 一种管道底部注浆加固的顶管施工方法 |
CN106703063B (zh) * | 2016-12-13 | 2017-08-25 | 中国地质大学(武汉) | 一种加固软土地层中桩基础的顶管施工方法 |
CN114810115B (zh) * | 2022-04-14 | 2025-06-24 | 中国建筑第八工程局有限公司 | 矩形顶管后靠背结构及其施工方法 |
CN115095353B (zh) * | 2022-07-08 | 2023-08-15 | 山东建筑大学 | 一种利用注浆顶升既有结构的沉降控制设计方法 |
-
2008
- 2008-05-28 CN CNB2008100478520A patent/CN100564697C/zh active Active
Non-Patent Citations (5)
Title |
---|
大口径顶管工程的施工. 张庆华.广东建材,第4期. 2006 * |
浅议顶管施工技术及在某工程中的应用. 莫筠,刘勇.山西建筑,第33卷第5期. 2007 * |
软土地基顶管施工的关键问题. 王芳.施工技术,第35卷第S2期. 2006 * |
顶管施工技术. 周民强.甘肃水利水电技术,第41卷第1期. 2005 * |
顶管施工技术. 潘波.科学之友(B版),第5期. 2007 * |
Also Published As
Publication number | Publication date |
---|---|
CN101280565A (zh) | 2008-10-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Tan et al. | Measured performance of a 26 m deep top-down excavation in downtown Shanghai | |
CN100572686C (zh) | 坑中坑支护体系的施工工艺 | |
Schweiger et al. | Numerical modelling of settlement compensation by means of fracture grouting | |
CN103147442B (zh) | 超深基坑压灌桩与预应力锚杆联合支护施工方法 | |
CN111779045B (zh) | 一种地基加固纠偏方法 | |
Chen et al. | Large-scale experimental investigation of the installation of suction caissons in silt sand | |
Zhang et al. | Pressure characteristics of rectangular box jacking considering box-soil-lubricant interaction | |
CN102635113A (zh) | 一种液压振动沉管灌注桩施工方法 | |
Zheng et al. | Field measurements and analysis of real-time capsule grouting to protect existing tunnel adjacent to excavation | |
CN105953078B (zh) | 高压燃气管道的保护装置及保护方法 | |
CN100564697C (zh) | 水平顶管地基处理工法 | |
Xu et al. | Shanghai center project excavation induced ground surface movements and deformations | |
CN109944244A (zh) | 一种抗浮锚杆及其施工方法 | |
CN109811771B (zh) | 使锚杆钢腰梁张拉时不发生弯曲的简易方法 | |
CN105178331B (zh) | 深基坑及超深基坑桩锚支护方法 | |
CN207109805U (zh) | 一种隧道侧穿桥桩的复合隔离桩 | |
Rabaiotti et al. | Pre-stressing of soil and structures due to jet grouting | |
CN109299508A (zh) | 一种计算smw支挡结构临界嵌固系数的方法 | |
CN105696600B (zh) | 一种自动控制地下连续墙水平位移的基坑支护方法 | |
CN108252303B (zh) | 一种基于锚杆静压桩技术的多层建筑基础设计方法 | |
CN113221418A (zh) | 一种修正的Tschebotarioff土压力模型 | |
Jia et al. | Research and design on top-down method for large scale podium basement excavation of Shanghai Tower | |
CN110258521A (zh) | 地连墙围井结构 | |
Liu et al. | Load Transfer Mechanism Variations of Bored Piles in Collapsible Loess Subjected to Water Infiltration | |
Rizal et al. | Bridge Approach Embankments on Rigid Inclusions |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: WUHAN SURVEYING-GEOTECHNICAL RESEARCH INSTITUTE OF Free format text: FORMER OWNER: CHINA METALLURGY GROUP WUKAN GROUND FOUNDATIONAL ENGINEERING COMPANY Effective date: 20110920 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20110920 Address after: 430080 Wuhan, Heilongjiang Province, Qingshan District, metallurgical Road, No. 177, No. Patentee after: Wuhan Surveying-Geotechnical Research Institute of China Metallurgical Science and Industry Group Co Address before: 430080 Wuhan, Heilongjiang Province, Qingshan District, metallurgical Road, No. 177, No. Patentee before: China Metallurgy Group Wukan Ground Foundational Engineering Company |