CN100564697C - 水平顶管地基处理工法 - Google Patents
水平顶管地基处理工法 Download PDFInfo
- Publication number
- CN100564697C CN100564697C CNB2008100478520A CN200810047852A CN100564697C CN 100564697 C CN100564697 C CN 100564697C CN B2008100478520 A CNB2008100478520 A CN B2008100478520A CN 200810047852 A CN200810047852 A CN 200810047852A CN 100564697 C CN100564697 C CN 100564697C
- Authority
- CN
- China
- Prior art keywords
- foundation
- push pipe
- pipe
- soil
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2008100478520A CN100564697C (zh) | 2008-05-28 | 2008-05-28 | 水平顶管地基处理工法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2008100478520A CN100564697C (zh) | 2008-05-28 | 2008-05-28 | 水平顶管地基处理工法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101280565A CN101280565A (zh) | 2008-10-08 |
CN100564697C true CN100564697C (zh) | 2009-12-02 |
Family
ID=40013221
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB2008100478520A Active CN100564697C (zh) | 2008-05-28 | 2008-05-28 | 水平顶管地基处理工法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100564697C (zh) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104215748B (zh) * | 2014-08-19 | 2015-04-22 | 山东大学 | 一种地下工程破碎围岩注浆加固效果的综合定量检测方法 |
CN104455726A (zh) * | 2014-11-20 | 2015-03-25 | 广州市市政集团有限公司 | 一种管道底部注浆加固的顶管施工方法 |
CN106703063B (zh) * | 2016-12-13 | 2017-08-25 | 中国地质大学(武汉) | 一种加固软土地层中桩基础的顶管施工方法 |
CN115095353B (zh) * | 2022-07-08 | 2023-08-15 | 山东建筑大学 | 一种利用注浆顶升既有结构的沉降控制设计方法 |
-
2008
- 2008-05-28 CN CNB2008100478520A patent/CN100564697C/zh active Active
Non-Patent Citations (10)
Title |
---|
大口径顶管工程的施工. 张庆华.广东建材,第4期. 2006 |
大口径顶管工程的施工. 张庆华.广东建材,第4期. 2006 * |
浅议顶管施工技术及在某工程中的应用. 莫筠,刘勇.山西建筑,第33卷第5期. 2007 |
浅议顶管施工技术及在某工程中的应用. 莫筠,刘勇.山西建筑,第33卷第5期. 2007 * |
软土地基顶管施工的关键问题. 王芳.施工技术,第35卷第S2期. 2006 |
软土地基顶管施工的关键问题. 王芳.施工技术,第35卷第S2期. 2006 * |
顶管施工技术. 周民强.甘肃水利水电技术,第41卷第1期. 2005 |
顶管施工技术. 潘波.科学之友(B版),第5期. 2007 |
顶管施工技术. 周民强.甘肃水利水电技术,第41卷第1期. 2005 * |
顶管施工技术. 潘波.科学之友(B版),第5期. 2007 * |
Also Published As
Publication number | Publication date |
---|---|
CN101280565A (zh) | 2008-10-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Tan et al. | Measured performance of a 26 m deep top-down excavation in downtown Shanghai | |
Schweiger et al. | Numerical modelling of settlement compensation by means of fracture grouting | |
CN204491626U (zh) | 拉森钢板桩与预应力锚杆组合的基坑围护结构 | |
CN204199335U (zh) | 一种减小phc管桩施工挤土效应的泄压井 | |
CN102635113A (zh) | 一种液压振动沉管灌注桩施工方法 | |
CN105953078B (zh) | 高压燃气管道的保护装置及保护方法 | |
AU2020100838A4 (en) | A kind of stress adjustment system for side walls of foundation pit in deep and unstable strata | |
Fan et al. | Water pressure evolution and structural failure characteristics of tunnel lining under hydrodynamic pressure | |
CN110438999A (zh) | 一种地下水丰富的深基坑放坡开挖施工方法 | |
CN100564697C (zh) | 水平顶管地基处理工法 | |
Xu et al. | Shanghai center project excavation induced ground surface movements and deformations | |
Hung et al. | Practice and experience in deep excavations in soft soil of Ho Chi Minh City, Vietnam | |
CN102134861B (zh) | 土体内预制桩试桩方法 | |
CN104652411B (zh) | 一种基于砂性土的强化预处理加强夯的复合地基处理方法 | |
Long et al. | Retaining walls in dublin boulder clay, Ireland | |
CN102817349B (zh) | 精细强夯置换加固软土地基的方法 | |
Shi et al. | Ground surface settlement caused by foundation pit excavation and dewatering. | |
CN207109805U (zh) | 一种隧道侧穿桥桩的复合隔离桩 | |
CN105178331A (zh) | 深基坑及超深基坑桩锚支护方法 | |
CN106337418A (zh) | 一种狭小区域深基坑的支护结构及支护方法 | |
Tang et al. | Experimental study on the mechanical and deformation properties of pipe and soil in rectangular pipe jacking construction with controllable cement grouting technology | |
CN113221418B (zh) | 一种修正的Tschebotarioff土压力模型 | |
Jia et al. | Research and design on top-down method for large scale podium basement excavation of Shanghai Tower | |
Jin-Wei et al. | Deformation monitoring and numerical simulation of retaining structure in subway station deep foundation pit | |
TW463011B (en) | Ground base modification: horizontal compaction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: WUHAN SURVEYING-GEOTECHNICAL RESEARCH INSTITUTE OF Free format text: FORMER OWNER: CHINA METALLURGY GROUP WUKAN GROUND FOUNDATIONAL ENGINEERING COMPANY Effective date: 20110920 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20110920 Address after: 430080 Wuhan, Heilongjiang Province, Qingshan District, metallurgical Road, No. 177, No. Patentee after: Wuhan Surveying-Geotechnical Research Institute of China Metallurgical Science and Industry Group Co Address before: 430080 Wuhan, Heilongjiang Province, Qingshan District, metallurgical Road, No. 177, No. Patentee before: China Metallurgy Group Wukan Ground Foundational Engineering Company |