CN111910607B - Method for building artificial island and pile foundation bearing platform workbench by waste boxing and stacking - Google Patents

Method for building artificial island and pile foundation bearing platform workbench by waste boxing and stacking Download PDF

Info

Publication number
CN111910607B
CN111910607B CN202010863361.4A CN202010863361A CN111910607B CN 111910607 B CN111910607 B CN 111910607B CN 202010863361 A CN202010863361 A CN 202010863361A CN 111910607 B CN111910607 B CN 111910607B
Authority
CN
China
Prior art keywords
artificial island
stacking
pile
water
box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202010863361.4A
Other languages
Chinese (zh)
Other versions
CN111910607A (en
Inventor
何世鸣
李江
郭党生
周与诚
张宝河
郁和坤
陈辉
司呈庆
贾城
黄鑫峰
梁成华
王海宁
洪伟
岳忠杰
郭跃龙
陈鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING URBAN CONSTRUCTION SCIENCE TECHNOLOGY PROMOTING ASSOCIATION
Zhongcai Geological Engineering Exploration Academy Co ltd
Beijing Building Material Geotechnical Engineering Corp
Original Assignee
BEIJING URBAN CONSTRUCTION SCIENCE TECHNOLOGY PROMOTING ASSOCIATION
Zhongcai Geological Engineering Exploration Academy Co ltd
Beijing Building Material Geotechnical Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING URBAN CONSTRUCTION SCIENCE TECHNOLOGY PROMOTING ASSOCIATION, Zhongcai Geological Engineering Exploration Academy Co ltd, Beijing Building Material Geotechnical Engineering Corp filed Critical BEIJING URBAN CONSTRUCTION SCIENCE TECHNOLOGY PROMOTING ASSOCIATION
Priority to CN202010863361.4A priority Critical patent/CN111910607B/en
Publication of CN111910607A publication Critical patent/CN111910607A/en
Application granted granted Critical
Publication of CN111910607B publication Critical patent/CN111910607B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/02Restraining of open water
    • E02D19/04Restraining of open water by coffer-dams, e.g. made of sheet piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/385Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with removal of the outer mould-pipes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork

Abstract

The invention relates to a method for stacking and building artificial islands and pile foundation bearing platform workbenches by waste packing, which is characterized by comprising the following steps: filling the garbage slag powder into a sealed box, and vibrating the sealed box tightly by using a vibrating table after the sealed box is filled with the garbage slag powder to form a permanent sealed box; the seal box is hung into the water by a crane to form an artificial island by a step-shaped code base, and a plurality of water service pipes are preset at the lower part of the artificial island; fixing a steel cofferdam at a preset position, and stacking and building the artificial island around the outer wall of the steel cofferdam through the seal box; sealing bottom is needed in the steel cofferdam to ensure dry operation after water pumping, and cement water glass soil balls are adopted for sealing bottom; the invention changes the construction on water into the construction on land, is beneficial to using large-scale equipment, improves the efficiency, ensures the quality and the safety to be easily controlled, and effectively reduces the construction cost.

Description

Method for building artificial island and pile foundation bearing platform workbench by waste boxing and stacking
Technical Field
The invention relates to a method for stacking and building artificial islands and pile foundation bearing platform workbenches by waste packing.
Background
At present, three construction schemes of bridge construction on water surface, mountain skin stone island construction, clay island construction and rotary spraying pile treatment and steel bridge and steel platform construction are used for reference, the steel platform scheme is not only time-consuming and time-consuming but also not economical, the scheme of grouting and reinforcing by filling soil by using a rotary spraying method is not only time-consuming and not economical, but also obviously not feasible to pollute rivers, compared with the prior art, mountain skin stone filling is a relatively feasible scheme, the scheme also has several problems, has large workload, long time and high cost, cannot utilize wastes, is not environment-friendly enough, is difficult and heavy in the construction process, for example, after the pile is driven, a slope needs to be put and excavated to be used as a bearing platform, the process is also carried out in strong permeable mountain skin stones, and the process needs to take great effort to insulate water or stop water, and is basically not feasible.
Disclosure of Invention
The invention utilizes the slag powder of the construction waste treatment plant and the integral hoisting of the box body, and arranges the bearing platform steel cofferdam and the pile casing in advance, thereby reducing the workload and improving the efficiency, and further having obvious economic benefit, social benefit and environmental protection benefit.
In order to achieve the purpose, the invention adopts the technical scheme that:
a method for stacking and building artificial islands and pile foundation bearing platforms by waste packing is characterized by comprising the following steps:
filling garbage slag powder into a sealed box, and vibrating the sealed box tightly by using a vibrating table after the sealed box is filled with the garbage slag powder to form a permanent sealed box;
secondly, the seal box is hung in the water by a crane to form an artificial island by a step-shaped code base, and a plurality of water pipes are preset at the lower part of the artificial island for upstream water to flow through the lower part of the artificial island;
thirdly, fixing a steel cofferdam at a preset position, and stacking and piling the artificial island around the outer wall of the steel cofferdam through the seal box;
fourthly, sealing the bottom in the steel cofferdam to ensure the dry operation after water pumping, wherein the sealing bottom adopts cement water glass soil balls;
fifthly, inserting a steel pile casing into the position of a preset pile in the steel cofferdam, filling a workbench around the outer wall of the steel pile casing, excavating the workbench after the pile construction is finished, and carrying out bearing platform construction.
The method for building the artificial island and the pile foundation bearing platform workbench by waste boxing and stacking comprises the following steps: the artificial island is trapezoidal, and the slope rate is 1: 1-1: 1.25, the top of artificial island sets up one side and sets up vehicle passageway and construction machinery operation district, the vehicle passageway reaches lay a plurality of layers of steel sheet on the construction machinery operation district, the walking of being convenient for to the protection safety, the opposite side sets gradually mound district, cushion cap operation district and material pile up in the district, put into in the cushion cap operation district the steel cofferdam, the top both sides edge of artificial island sets up protector.
The method for building the artificial island and the pile foundation bearing platform workbench by waste boxing and stacking comprises the following steps: the protection device comprises a protection railing and an anti-collision retaining wall, wherein the height of the protection railing is 2m, the height of the anti-collision retaining wall is 1m, the width of the top end is 1m, and the width of the bottom end is 2 m.
The method for building the artificial island and the pile foundation bearing platform workbench by waste boxing and stacking comprises the following steps: the cross section of the water service pipe is 2m multiplied by 2m and is square, the water service pipe is matched with the sealing box, the sealing box is made of plastic or glass fiber reinforced plastic, and the sealing box is sealed through universal glue.
The invention has the beneficial effects that: the slag powder of a construction waste treatment plant is utilized, the box body is integrally hoisted, and the bearing platform steel cofferdam and the pile casing are arranged in advance, so that the workload is reduced, the efficiency is improved, and the economic benefit, the social benefit and the environmental protection benefit are very obvious.
Drawings
Fig. 1 is a flow chart of a method for stacking and building artificial islands and pile foundation cap workbenches by waste packing.
Fig. 2 is a sectional structure view of an artificial island in a method of stacking and constructing the artificial island and a pile foundation cap workbench by waste packing.
Fig. 3 is a top view structural diagram of an artificial island of a method for stacking and building an artificial island and a pile foundation cap workbench by waste packing.
Fig. 4 is a sectional structure view of a bearing platform and a pile of the method for stacking and building artificial islands and pile foundation bearing platform workbenches by waste packing.
Fig. 5 is a sectional structure view of a bearing platform operation area of a method for stacking and building artificial islands and pile foundation bearing platform workbenches by waste packing.
Fig. 6 is a structural plan view of a bearing platform operation area of the method for stacking and building artificial islands and pile foundation bearing platform workbenches by waste packing.
Fig. 7 is a structural view of a protection device for a method of stacking and constructing an artificial island and a pile foundation cap work table by waste packing.
Description of reference numerals: 1-artificial island; 2-water pipe; 3-a guard device; 4-vehicle access; 5-constructing a mechanical action area; 6-soil piling area; 7-a cushion cap operation area; 8-steel cofferdam; 9-steel casing; 10-a material stacking area; 11-a cushion cap; 12-piling; 13-protective railing; 14-crashworthy retaining wall.
Detailed Description
As shown in fig. 1 to 7, a method for stacking and constructing artificial islands and pile foundation platform workbenches by waste packing is characterized by comprising the following steps:
filling garbage slag powder into a sealed box, and vibrating the sealed box tightly by using a vibrating table after the sealed box is filled with the garbage slag powder to form a permanent sealed box;
secondly, the seal box is hung in the water by a crane to form an artificial island 1 in a step-shaped code base, and a plurality of water pipes 2 are preset at the lower part of the artificial island 1 for upstream water to flow through the lower part of the artificial island 1;
thirdly, fixing the steel cofferdam 8 at a preset position, and stacking the artificial island 1 around the outer wall of the steel cofferdam 8 through the seal box;
fourthly, sealing the bottom in the steel cofferdam 8 to ensure the dry operation after water pumping, wherein the sealing bottom adopts cement water glass soil balls;
fifthly, inserting a steel pile casing 9 at the position of a preset pile 12 in the steel cofferdam 8, filling a workbench around the outer wall of the steel pile casing 9, excavating the workbench after the pile 12 is constructed, and constructing a bearing platform 11.
The artificial island 1 is trapezoidal, and the slope rate is 1: 1-1: 1.25, the top of artificial island 1 sets up one side and sets up vehicle passageway 4 and construction machinery operation district 5, vehicle passageway 4 reaches lay a plurality of layers of steel sheet on the construction machinery operation district 5, the walking of being convenient for to the protection safety, the opposite side sets gradually heap soil district 6, cushion cap operation district 7 and material piling up district 10, the cushion cap operation district 7 is built-in the steel cofferdam 8, the top both sides edge of artificial island 1 sets up protector 3.
The protection device 3 comprises a protection railing 13 and an anti-collision retaining wall 14, wherein the protection railing 13 is high in length and is 2m, the anti-collision retaining wall 14 is high in length and is 1m, the top end is 1m in width, and the bottom end is 2m in width.
The cross section of the water service pipe 2 is 2m multiplied by 2m and is square, the water service pipe is matched with the sealing box, the sealing box is made of plastic or glass fiber reinforced plastic, and the sealing box is sealed through universal glue.
In the embodiment, the slag powder of a construction waste disposal plant is filled into the sealed box, the vibration platform is started when the slag powder is filled into the box, the slag powder is vibrated to be dense, water is sprayed to suppress flying dust and enable the flying dust to reach the optimal water content when necessary, the situation is judged that the situation is that the user clenches into a group by hands, falls to the ground and flowers, the slag powder is sealed by universal glue to form a permanently sealed box, the sizes of the sealed box are two, and the sealed box is 1m in size3Cube and 16m of 2X 4m specification3Cuboid, 8-10 dress string bags of square hang into the aquatic, begin by the bank, fill to the aquatic, the both sides of artificial island 1 are transversely pressed with the rectangle case, can be 2 or 4 case dress string bags, and the slope rate is according to 1: 1-1: 1.25 step-shaped stacking is carried out, a plurality of water service pipes 2 with the cross sections of 2 x 2m are preset at the lower part of the artificial island 1, upstream water flows through the lower part of the artificial island 1 and is matched with a cuboid sealing box with the specification of 2 x 4m, the position and the size of the bearing platform 11 are marked in advance, the position of the bearing platform is reserved when the bearing platform is hung in the sealing box, then the steel cofferdam 8 is placed, the steel cofferdam 8 is sealed by cement glass soil balls, dry operation in the steel cofferdam 8 can be guaranteed after water pumping, the position of the pile 12 preset in the steel cofferdam 8 is inserted into the steel pile casing 9, a working platform is filled around the outer wall of the steel pile casing 9, the sealing box is stacked around the outer wall of the steel pile casing 9, small gaps are filled with soil and tamped if necessary, the firmness of the steel pile casing 9 is guaranteed, and the construction of a rotary drilling machine on the pile 12 cannot be influenced, or directly tamping and filling a soil layer, filling the workbench, or pouring cement slurry with low strength, and fixing the cement slurry, so that the steel pile casing 9 can be recovered after the construction of the pile 12 is completed, the workbench is excavated, and the bearing platform 11 and the bridge column are constructed in the steel cofferdam 8 through dry operation.
The top of artificial island 1 sets up one side setting vehicle passageway 4 reaches construction machinery operation district 5 lays a plurality of layers of steel sheet on it, the walking of being convenient for to the protection safety, the top both sides edge setting of artificial island 1 prevent guardrail 13 and prevent crashproof barricade 14, prevent guardrail 13 height and be 2m, prevent crashproof barricade 14 height and be 1m, top width 1m, bottom width 2m, prevent crashproof barricade 14 adopts and weaves bagged soil and puts things in good order, a plurality of is predetermine to the lower part of artificial island 1 water service pipe 2 supplies the rivers of swimming the lower part of artificial island 1, the cross section of water service pipe 2 is 2m, is the square, supplies with the seal box matches, what the building refuse disposal plant was selected to fill in the seal box is less than 5 mm's slag powder, waste utilization and ten minutes environmental protection.
The invention has the advantages that:
the slag powder of a construction waste treatment plant is utilized, the box body is integrally hoisted, and the bearing platform steel cofferdam and the pile casing are arranged in advance, so that the workload is reduced, the efficiency is improved, and the economic benefit, the social benefit and the environmental protection benefit are very obvious.
The foregoing description is intended to be illustrative rather than limiting, and it will be appreciated by those skilled in the art that many modifications, variations or equivalents may be made without departing from the spirit and scope of the invention as defined in the appended claims.

Claims (4)

1. A method for stacking and building artificial islands and pile foundation bearing platforms by waste packing is characterized by comprising the following steps:
filling garbage slag powder into a sealed box, and vibrating the sealed box tightly by using a vibrating table after the sealed box is filled with the garbage slag powder to form a permanent sealed box;
secondly, the seal box is hung into the underwater step-shaped code base by a crane to form an artificial island (1), and a plurality of water pipes (2) are preset at the lower part of the artificial island (1) for upstream water to flow through the lower part of the artificial island (1);
thirdly, fixing a steel cofferdam (8) at a preset position, and stacking the artificial island (1) around the outer wall of the steel cofferdam (8) through the seal box;
fourthly, sealing the bottom in the steel cofferdam (8) to ensure the dry operation after water pumping, wherein the sealing bottom adopts cement water glass soil balls;
fifthly, inserting a steel pile casing (9) at the position of a preset pile (12) in the steel cofferdam (8), filling a workbench around the outer wall of the steel pile casing (9), excavating the workbench after the pile (12) is constructed, and constructing a bearing platform (11).
2. The method of waste encasement stacking construction of man-made islands and pile-foundation cap platforms as claimed in claim 1, wherein: the artificial island (1) is trapezoidal, and the slope rate is 1: 1-1: 1.25, top one side of artificial island (1) sets up vehicle passageway (4) and construction machinery operation district (5), vehicle passageway (4) reaches lay a plurality of layers of steel sheet on construction machinery operation district (5), the walking of being convenient for to the protection safety, the opposite side sets gradually heap soil district (6), cushion cap operation district (7) and material piling up district (10), built-in cushion cap operation district (7) steel cofferdam (8), the top both sides edge of artificial island (1) sets up protector (3).
3. The method of waste encasement stacking construction of man-made islands and pile-foundation cap platforms as claimed in claim 2, wherein: the protection device (3) comprises a protection railing (13) and an anti-collision retaining wall (14), wherein the height of the protection railing (13) is 2m, the height of the anti-collision retaining wall (14) is 1m, the top end width is 1m, and the bottom end width is 2 m.
4. The method of waste encasement stacking construction of man-made islands and pile-foundation cap platforms as claimed in claim 1, wherein: the cross section of the water service pipe (2) is 2m multiplied by 2m and is square, the water service pipe is matched with the seal box, the seal box is made of plastic or glass fiber reinforced plastic, and the seal box is sealed through universal glue.
CN202010863361.4A 2020-08-25 2020-08-25 Method for building artificial island and pile foundation bearing platform workbench by waste boxing and stacking Active CN111910607B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010863361.4A CN111910607B (en) 2020-08-25 2020-08-25 Method for building artificial island and pile foundation bearing platform workbench by waste boxing and stacking

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010863361.4A CN111910607B (en) 2020-08-25 2020-08-25 Method for building artificial island and pile foundation bearing platform workbench by waste boxing and stacking

Publications (2)

Publication Number Publication Date
CN111910607A CN111910607A (en) 2020-11-10
CN111910607B true CN111910607B (en) 2022-05-10

Family

ID=73279254

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010863361.4A Active CN111910607B (en) 2020-08-25 2020-08-25 Method for building artificial island and pile foundation bearing platform workbench by waste boxing and stacking

Country Status (1)

Country Link
CN (1) CN111910607B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1631560A (en) * 2005-01-14 2005-06-29 北京市四清环卫工程集团有限责任公司 Refuse landfilling process in rainy season
CN206567308U (en) * 2017-02-15 2017-10-20 王欣悦 Ocean and the artificial islands and reefs burying treatment system of municipal refuse offshore
CN107514006A (en) * 2017-08-03 2017-12-26 中交铁道设计研究总院有限公司 It is a kind of to build island operation construction method for shallow sea or shallow river bridge foundation
CN109098191A (en) * 2018-09-19 2018-12-28 河北工业大学 A kind of depth cheats method for reinforcing side slope of paddling suddenly

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1631560A (en) * 2005-01-14 2005-06-29 北京市四清环卫工程集团有限责任公司 Refuse landfilling process in rainy season
CN206567308U (en) * 2017-02-15 2017-10-20 王欣悦 Ocean and the artificial islands and reefs burying treatment system of municipal refuse offshore
CN107514006A (en) * 2017-08-03 2017-12-26 中交铁道设计研究总院有限公司 It is a kind of to build island operation construction method for shallow sea or shallow river bridge foundation
CN109098191A (en) * 2018-09-19 2018-12-28 河北工业大学 A kind of depth cheats method for reinforcing side slope of paddling suddenly

Also Published As

Publication number Publication date
CN111910607A (en) 2020-11-10

Similar Documents

Publication Publication Date Title
CN100554596C (en) Vacuum preloading method for non-water discharge sand cushion
CN102127908B (en) Method for quickly reinforcing ultra-soft soil foundation by using bagged sand cushion
CN101250868B (en) Precipitation prepressing association motive power induration deep densification method
CN100373013C (en) Treatment method for thick collapsed loess foundation
CN102888834B (en) A kind of construction method of major diameter broken stone pile
CN101220589B (en) Soil engineering bag and method for dynamically squeezing and synthetically reinforcing soft groundwork
CN111188349A (en) Construction device and method for three-dimensional drainage vacuum preloading treatment of bagged sludge cofferdam
CN105625420A (en) Extension type manual hole digging pile support structure and construction method thereof
CN106869153B (en) A kind of method of the quick soft soil foundation treatment of well-points dewatering
CN111910607B (en) Method for building artificial island and pile foundation bearing platform workbench by waste boxing and stacking
CN207333947U (en) A kind of oil-gas pipeline protective device
CN102704458A (en) Sand-free cushion layer vacuum-surcharge preloading reinforcement device and method for soft ground
CN110424202B (en) Wave-proof structure of coastal roadbed and construction method thereof
CN1827924A (en) Foundation treatment method by static pressure replacement and multi-purpose press pipe thereof
CN102359101A (en) Foundation treatment method for collapsible soil
CN108385651B (en) Design and construction method for reinforcing soft foundation by using composite geotextile
CN109706914A (en) It is a kind of to be layered the blast-filled ground method for processing foundation drained downwards
RU121275U1 (en) REINFORCED GROUND-CEMENT WALL FOR PROTECTION OF BUILDINGS AND STRUCTURES FROM THE DIGGED NEAR THE CROWDED
CN100593604C (en) Flexible explosion-proof dike and construction method thereof
CN203741813U (en) Soft soil combined pre-compaction structure
CN209760216U (en) reinforcement system based on soft soil foundation drainage consolidation
CN210031758U (en) A surcharge and carry pre-compaction structure for soft soil highway section construction
RU131747U1 (en) ANTI-FILTRATION SCREEN
CN203846479U (en) Saturated loose sand compacting system
CN206143819U (en) Take injection system's perpendicular membrane equipment down

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant