CN111910500A CN202010108145.9A CN202010108145A CN111910500A CN 111910500 A CN111910500 A CN 111910500A CN 202010108145 A CN202010108145 A CN 202010108145A CN 111910500 A CN111910500 A CN 111910500A
Authority
CN
China
Prior art keywords
concrete
steel box
box girder
connecting piece
post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010108145.9A
Other languages
Chinese (zh)
Inventor
聂建国
陶慕轩
赵继之
庄亮东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tsinghua University
Original Assignee
Tsinghua University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tsinghua University filed Critical Tsinghua University
Priority to CN202010108145.9A priority Critical patent/CN111910500A/en
Publication of CN111910500A publication Critical patent/CN111910500A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D1/00Bridges in general
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/12Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
    • E01D19/125Grating or flooring for bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • E01D2/04Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/30Metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention relates to the technical field of composite bridges, in particular to an anti-overturning composite bridge, which is a concrete capping beam; the plurality of open steel box girders are arranged above the concrete capping beams at preset intervals along the extension direction of the concrete capping beams, and post-cast concrete for weight reduction is poured in the open steel box girders; one end of the connecting piece penetrates through the opening steel box girder and the post-cast concrete, and the other end of the connecting piece is embedded in the cover girder and used for connecting the box girder and the cover girder, and the connecting piece and the post-cast concrete jointly form a connecting structure for preventing the opening steel box girder from turning on one side. The invention provides an anti-overturning combined bridge which is firm in connection and can effectively prevent the bridge from overturning. Meanwhile, a construction method of the overturn-preventing combined bridge is also provided.

Description

Anti-overturning combined bridge and construction method
Technical Field
The invention relates to the technical field of composite bridges, in particular to an anti-overturning composite bridge and a construction method.
Background
The bridge generally refers to a structure which is erected on rivers, lakes and seas and enables vehicles, pedestrians and the like to smoothly pass through. In order to adapt to the modern high-speed developed traffic industry, bridges are also extended to be constructed to span mountain stream, unfavorable geology or meet other traffic needs, so that the buildings are convenient to pass.
The combined structure bridge uses a beam type bridge span as a basic structure, and the concrete laminated slab and the steel box girder work together through connecting pieces such as studs. The combined beam bridge can greatly reduce the structural secondary internal force and the concrete tensile stress caused by the concrete shrinkage creep effect; by adopting the mode of pre-guiding prestress into the precast concrete plate, the preparation of larger compressive stress can be established in the concrete plate in the hogging moment area, and the cracking resistance of the concrete in the hogging moment area is greatly improved.
However, in the existing combined bridge, the connection between the open steel box girder and the concrete cap girder is weaker, and when the eccentric load on the bridge deck is larger, such as under a larger unbalanced load vehicle or an earthquake, a serious accident of lateral overturn of the bridge can occur.
Disclosure of Invention
Therefore, the technical problem to be solved by the invention is to provide an anti-overturning composite beam which is firm in connection and can effectively prevent the bridge from overturning and a construction method aiming at the defect that the bridge is overturned due to the fact that the composite beam support in the prior art is not firm in connection.
In order to solve the above technical problem, the present invention provides an anti-overturning composite bridge, comprising:
a concrete capping beam;
the plurality of open steel box girders are arranged above the concrete capping beams at preset intervals along the extension direction of the concrete capping beams, and post-cast concrete for weight reduction is poured in the open steel box girders;
one end of the connecting piece penetrates through the opening steel box girder and the post-cast concrete, and the other end of the connecting piece is embedded in the cover girder and used for connecting the box girder and the cover girder, and the connecting piece and the post-cast concrete jointly form a connecting structure for preventing the opening steel box girder from turning on one side.
Further, the arrangement direction of the box girder is perpendicular to the extension direction of the cover girder.
Further, the thickness of the post-cast concrete is 30-50 cm.
Further, still include:
the through hole penetrates through the bottom of the open steel box girder, and the diameter of the through hole is larger than that of the connecting piece.
Further, the connecting piece comprises fixing pieces arranged at two ends of the connecting piece.
Further, the open steel box girder further comprises:
the body is U-shaped and is provided with a lower flange parallel to the concrete cap beam and a web fixedly connected with the lower flange, and the post-cast concrete is poured on the lower flange;
and the two supports are symmetrically arranged below the body and are respectively fixedly connected with the body and the concrete cover beam.
And the laminated slab is fixed on the open steel box girder through the studs.
And the bridge further comprises a plurality of piers which are arranged at the bottom of the concrete capping beam and used for supporting the concrete capping beam.
The invention also provides a construction method of the overturn-preventing combined bridge, which comprises the following steps:
drilling a through hole in the bottom of the open steel box girder, inserting a connecting piece pre-embedded into the concrete cover beam into the through hole along the vertical direction, post-pouring concrete to the bottom of the open steel box girder, and forming a connecting structure for preventing the open steel box girder from side turning together by the connecting piece and the post-pouring concrete.
The technical scheme of the invention has the following advantages:
1. the invention provides an anti-overturning combined bridge, which comprises a concrete capping beam;
the plurality of open steel box girders are arranged above the concrete capping beams at preset intervals along the extension direction of the concrete capping beams, and post-cast concrete for weight reduction is poured in the open steel box girders; one end of the connecting piece penetrates through the opening steel box girder and the post-cast concrete, and the other end of the connecting piece is embedded in the cover girder and used for connecting the box girder and the cover girder, and the connecting piece and the post-cast concrete jointly form a connecting structure for preventing the opening steel box girder from turning on one side. One end of the connecting piece is directly embedded in the concrete cover beam, so that the connecting stability of the connecting piece and the concrete cover beam is improved; the other end of the connecting piece penetrates through the bottom of the open steel box girder, so that the concrete cover girder and the open steel box girder are firmly connected and form an integrated piece. The post-cast concrete poured inside the open steel box girder can effectively fix the connecting piece at the bottom of the open steel box girder, and meanwhile, the post-cast concrete can bear the compressive stress generated by the negative bending moment at the bottom of the composite girder under the action of loads of vehicles and the like, so that the condition that the lower flange of the open steel box girder is unstable under pressure is effectively avoided; meanwhile, as the open steel box girder is made of lighter materials, the later poured concrete can play a role in weight, so that the open steel box girder is effectively prevented from overturning and turning over; meanwhile, the anti-pulling capacity of the open steel box girder is effectively improved under the action of the connecting structure.
2. The anti-overturning combined bridge further comprises a through hole which penetrates through the bottom of the open steel box girder, and the diameter of the through hole is larger than that of the connecting piece. When the open steel box girder is hoisted, the connecting piece can be conveniently inserted into the through hole at the bottom of the open steel box girder and can be quickly aligned with the connecting piece, so that the open steel box girder is installed.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and other drawings can be obtained by those skilled in the art without creative efforts.
FIG. 1 is a schematic structural view of an anti-overturning composite bridge according to the present invention;
FIG. 2 is a schematic view of a structure before post-cast concrete;
FIG. 3 is a schematic structural view of the connection between an open steel box girder and a concrete composite slab;
description of reference numerals:
1-opening steel box girder; 2-body; 3-a lower flange; 4-a web; 5-support; 6-concrete capping beam; 7-bridge pier; 8-post-pouring concrete; 9-a through hole; 10-concrete laminated slab; 11-a stud; 12-a connector; 13-a first fixture; 14-a second fixture;
Detailed Description
The technical scheme of the invention is clearly and completely described below with reference to the accompanying drawings; obviously; the described embodiments are a part of the present invention; rather than all embodiments. Based on the embodiments of the invention; all other embodiments obtained by a person skilled in the art without making any inventive step; all fall within the scope of protection of the present invention.
Furthermore; the technical features mentioned in the different embodiments of the invention described below can be combined with each other as long as they do not conflict with each other.
As shown in fig. 1 to 3, the anti-overturning composite bridge provided by the embodiment of the invention comprises a plurality of open steel box girders 1, concrete capping girders 6, piers 7, post-cast concrete 8 and connecting pieces 12.
A concrete cap beam 6;
the open steel box girders 1 are arranged above the concrete capping beams 6 at preset intervals along the extension direction of the concrete capping beams 6, and post-cast concrete 8 for weight is poured in the open steel box girders 1;
connecting piece 12, one end is run through opening steel box girder 1 with after-cast concrete 8, the other end pre-buried extremely in the bent cap 6, be used for connecting box girder 1 with bent cap 6, connecting piece 12 with after-cast concrete 8 constitutes jointly and is used for preventing the connection structure that opening steel box girder 1 turned on one's side.
The bottom of the concrete capping beam 6 is respectively provided with a plurality of piers 7, and in the embodiment, the number of the concrete capping beams 6 is two; the open steel box girder 1 is made of steel and is directly arranged on the concrete bent cap 6 on the construction site. When the open steel box girder 1 is manufactured, one end of the connecting piece 12 is directly embedded in the concrete bent cap 6, so that the connection stability of the connecting piece 12 and the concrete bent cap 6 is improved; the other end of the connecting piece 12 penetrates through the bottom of the open steel box girder 1, and the concrete cover beam 6 and the open steel box girder 1 are connected into a whole through a fixing piece. In the embodiment, the connecting piece 12 can be effectively fixed at the bottom of the open steel box girder by pouring the concrete, and meanwhile, the post-cast concrete can bear the compressive stress generated by the negative bending moment at the bottom of the combination girder under the action of loads such as vehicles and the like, so that the condition that the lower flange of the open steel box girder is unstable under pressure is effectively avoided; meanwhile, as the material of the open steel box girder 1 is lighter, the post-cast concrete 8 can also increase the weight of the open steel box girder 1, so that the compressive stress of the open steel box girder 1 is equal to the sum of the compressive stresses of the open steel box girder 1 and the concrete, the compressive stress of the open steel box girder 1 is increased, and the open steel box girder 1 is prevented from overturning and turning over; meanwhile, the anti-pulling capacity of the open steel box girder 1 can be effectively improved under the action of the connecting structure of the open steel box girder 1. In this embodiment, the connecting member 12 is a steel anchor rod, and the number of the connecting members 12 is not limited, and is determined according to actual needs.
As an alternative, the connecting element 12 may also be of the hook type, with one end of the hook head pre-embedded in the concrete cap 6.
As an alternative embodiment, the connecting element 12 can also be arranged directly in a recess provided in the concrete cap 6, as shown in fig. 2-3, after which the connecting element 12 is connected to the concrete cap 6 in one piece by the post-cast concrete 8.
In this embodiment, the direction of the open steel box girder 1 is perpendicular to the extending direction of the concrete cap beam 6.
In the embodiment, the casting thickness of the concrete is 30-50cm, so that the sufficient compressive strength is ensured; the bearing effect can be effectively achieved under the action of the negative bending moment, and the instability of the steel beam is prevented. Meanwhile, the anti-overturning capacity of the composite beam is enhanced through the weight.
Still including running through in the through-hole 9 that the bottom of opening steel box girder 1 set up, the bottom of connecting piece 12 is directly pre-buried in concrete bent cap 6, and the top of connecting piece 12 stretches into to the through-hole 9 in, is connected with the steel stock through the mounting to fix opening steel box girder 1 on concrete bent cap 6. The number of the through holes 9 is not limited, and needs to correspond to the number of the connecting pieces 12, and the specific number and the aperture are determined according to actual needs. Wherein the diameter of the through hole 9 is larger than the diameter of the connecting piece 12. So that the connecting member 12 can be quickly aligned when the open steel box girder 1 is hoisted, thereby installing the open steel box girder 1 on the concrete cap girder 6. The fixing piece comprises a first fixing piece 13 arranged at the top end of the connecting piece 12 and a second fixing piece 14 arranged at the bottom end of the connecting piece 12, the first fixing piece 13 and the second fixing piece 14 are nuts matched with the connecting piece 12, and the number of the connecting pieces 12 is determined according to actual needs. The diameter of the first fixing piece 13 is larger than that of the through hole 9, so that the first fixing piece 13 can be effectively prevented from sliding into the through hole 9 to influence the connection stability of the connecting piece 12; the second fixing member 14 and the steel anchor rod are directly embedded in the concrete cap beam 6.
A low modulus of elasticity material is also provided on the peripheral wall of the connector 12. In this embodiment, the low elastic modulus material is EVA foam. The EVA foam effectively prevents concrete from cracking caused by the conditions of shrinkage, creep, temperature effect and the like of the concrete.
The shrinkage is a phenomenon in which the volume of concrete decreases when the concrete hardens in air.
Creep refers to the phenomenon that the strain of concrete increases with time under the long-term action of a certain constant load.
As shown in fig. 2-3, in this embodiment, the open steel box girder 1 further includes a U-shaped body 2 and a support 5, the body 2 has a lower flange 3 parallel to the concrete cap beam 6 and two webs 4 fixedly connected to the lower flange 3, and the post-cast concrete 8 is poured on the lower flange 3;
and the two supports 5 are symmetrically arranged below the body 2 and are respectively and fixedly connected with the body 2 and the concrete bent cap 6. The open steel box girder 1 is set to be U-shaped, and concrete can be effectively poured on the lower flange 3.
The two side plates are in an I shape, the number of the studs 11 on the top of the web 4 is set according to actual needs, and the concrete composite slab 10 is fixed on the open steel box girder 1 through the studs 11.
The invention also provides a construction method of the overturn-preventing combined bridge, which comprises the following steps: drilling a through hole 9 in the bottom of the open steel box girder 1, inserting a connecting piece 12 pre-embedded into the concrete cover girder 6 into the through hole 9 along the vertical direction, pouring post-cast concrete 8 at the bottom of the through hole 9 and the open steel box girder 1, wherein the connecting piece 12 and the post-cast concrete 8 jointly form a connecting structure for preventing the open steel box girder 1 from turning on one side.
The specific construction process comprises the following steps: the method comprises the steps of arranging a concrete cover beam 6 on the top of a pier 7, pre-burying a connecting piece 12 on the concrete cover beam 6, drilling a through hole 9 in the bottom of an open steel box beam 1, hoisting the open steel box beam 1 and fixing the open steel box beam on the concrete cover beam 6, enabling the connecting piece 12 to penetrate through the through hole 9, pouring concrete into the through hole 9, continuing to pour the concrete at the bottom of the open steel box beam 1 after the through hole 9 is filled with the concrete until the thickness of the poured concrete reaches more than 30cm, and installing a first fixing piece on the top of the connecting piece 12, so that the open steel box beam 1 is fixedly connected with the concrete cover beam 6.
Obviously; the above embodiments are merely examples provided for clarity of illustration; and not as restrictive. To one of ordinary skill in the art; other variations and modifications may be made on the basis of the above description. And are neither required nor exhaustive of all embodiments. And obvious variations or modifications therefrom are within the scope of the invention.

Claims (9)

1. An anti-overturning composite bridge, comprising:
a concrete capping beam (6);
the open steel box girders (1) are arranged above the concrete capping beams (6) at preset intervals along the extension direction of the concrete capping beams (6), and post-cast concrete (8) for weight is poured in the open steel box girders (1);
connecting piece (12), one end run through opening steel case roof beam (1) with after pour concrete (8), the other end is pre-buried extremely in bent cap (6), be used for connecting case roof beam (1) with bent cap (6), connecting piece (12) with after pour concrete (8) and constitute jointly and be used for preventing the connection structure that opening steel case roof beam (1) turned on one's side.
2. -overturn-preventing composite bridge according to claim 1, characterized in that the box girder (1) is arranged in a direction perpendicular to the extension direction of the cover girder (6).
3. The overturn-preventing composite bridge according to claim 1 or 2, characterized in that the thickness of the post-cast concrete (8) is 30-50 cm.
4. The overturn-preventing composite bridge of any one of claims 1 to 3, further comprising:
the through hole (9) penetrates through the bottom of the open steel box girder (1), and the diameter of the through hole (9) is larger than that of the connecting piece (12).
5. The overturn-preventing composite bridge of any one of claims 1 to 4, further comprising fixing members provided at both ends of the connecting member (12).
6. The overturn-preventing composite bridge beam of claim 5, wherein the open steel box girder (1) further comprises:
the body (2) is U-shaped and is provided with a lower flange (3) parallel to the concrete bent cap (6) and a web (4) fixedly connected with the lower flange (3), and the post-cast concrete (8) is poured on the lower flange (3);
the two supports (5) are symmetrically arranged below the body (2) and are respectively and fixedly connected with the body (2) and the concrete cover beam (6).
7. The overturn-preventing composite bridge girder according to claim 6, further comprising a stud (11) provided on the top of the web (4), and the concrete composite slab (10) is fixed on the open steel box girder (1) by the stud (11).
8. The overturn-preventing composite bridge according to any one of claims 1 to 7, further comprising a plurality of piers (7) provided at the bottom of the concrete cap beam (6) for supporting the concrete cap beam (6).
9. The construction method of the overturn-preventing combined bridge is characterized by comprising the following steps of:
drilling a through hole (9) on the bottom of the opening steel box girder (1), inserting a connecting piece (12) pre-buried in the concrete cover beam (6) into the through hole (9) along the vertical direction, and post-pouring concrete (8) to the bottom of the opening steel box girder (1), wherein the connecting piece (12) and the post-pouring concrete (8) jointly form a connecting structure for preventing the opening steel box girder (1) from side turning.
CN202010108145.9A 2020-02-21 2020-02-21 Anti-overturning combined bridge and construction method Pending CN111910500A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010108145.9A CN111910500A (en) 2020-02-21 2020-02-21 Anti-overturning combined bridge and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010108145.9A CN111910500A (en) 2020-02-21 2020-02-21 Anti-overturning combined bridge and construction method

Publications (1)

Publication Number Publication Date
CN111910500A true CN111910500A (en) 2020-11-10

Family

ID=73237363

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010108145.9A Pending CN111910500A (en) 2020-02-21 2020-02-21 Anti-overturning combined bridge and construction method

Country Status (1)

Country Link
CN (1) CN111910500A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112746554A (en) * 2021-02-08 2021-05-04 清华大学 Combined capping beam and bridge with same

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1800495A (en) * 2006-01-19 2006-07-12 清华大学 Grooved steel-concrete combination beam
CN203096599U (en) * 2013-03-01 2013-07-31 河海大学 Tension-compression rod type anti-toppling device of steel-and-concrete-combination beam bridge
CN206109961U (en) * 2016-09-29 2017-04-19 石家庄铁道大学 Steel concrete combination and continuous box girder bridge of coincide dual function
CN106906736A (en) * 2017-03-10 2017-06-30 东南大学 A kind of clad steel case performance of concrete column confined and girder steel are rigidly connected structural form and construction method
CN107675634A (en) * 2017-10-16 2018-02-09 东南大学 A kind of steel reinforced concrete combined bridge antidumping bracing means and its construction method
KR101869458B1 (en) * 2017-07-27 2018-06-20 김태균 Composite box girder using steel beam and construction method therefor
CN108951419A (en) * 2018-09-26 2018-12-07 清华大学 The crack resistence at the continuous position of freely-supported combined system composite beam bridge support floorings constructs
CN108978434A (en) * 2018-10-16 2018-12-11 河南省交通规划设计研究院股份有限公司 A kind of Novel steel-is mixed to be combined Continuous Box Girder Bridge and its industrializes construction method without bracket
CN109098094A (en) * 2018-10-16 2018-12-28 河南省交通规划设计研究院股份有限公司 Construction method without bracket horizontal splicing corrugated steel web plate combined box girder
CN212357938U (en) * 2019-12-18 2021-01-15 清华大学 Anti-overturning combined bridge

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1800495A (en) * 2006-01-19 2006-07-12 清华大学 Grooved steel-concrete combination beam
CN203096599U (en) * 2013-03-01 2013-07-31 河海大学 Tension-compression rod type anti-toppling device of steel-and-concrete-combination beam bridge
CN206109961U (en) * 2016-09-29 2017-04-19 石家庄铁道大学 Steel concrete combination and continuous box girder bridge of coincide dual function
CN106906736A (en) * 2017-03-10 2017-06-30 东南大学 A kind of clad steel case performance of concrete column confined and girder steel are rigidly connected structural form and construction method
KR101869458B1 (en) * 2017-07-27 2018-06-20 김태균 Composite box girder using steel beam and construction method therefor
CN107675634A (en) * 2017-10-16 2018-02-09 东南大学 A kind of steel reinforced concrete combined bridge antidumping bracing means and its construction method
CN108951419A (en) * 2018-09-26 2018-12-07 清华大学 The crack resistence at the continuous position of freely-supported combined system composite beam bridge support floorings constructs
CN108978434A (en) * 2018-10-16 2018-12-11 河南省交通规划设计研究院股份有限公司 A kind of Novel steel-is mixed to be combined Continuous Box Girder Bridge and its industrializes construction method without bracket
CN109098094A (en) * 2018-10-16 2018-12-28 河南省交通规划设计研究院股份有限公司 Construction method without bracket horizontal splicing corrugated steel web plate combined box girder
CN212357938U (en) * 2019-12-18 2021-01-15 清华大学 Anti-overturning combined bridge

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112746554A (en) * 2021-02-08 2021-05-04 清华大学 Combined capping beam and bridge with same

Similar Documents

Publication Publication Date Title
KR101022853B1 (en) Composite girder for constructing bridge
CN111778834A (en) Tensile device of large-span bridge side pier and auxiliary pier
US4866803A (en) Bridge structure with inclined towers
CN212357938U (en) Anti-overturning combined bridge
CN111910500A (en) Anti-overturning combined bridge and construction method
CN216130338U (en) Primary and secondary beam connecting joint
CN112627016B (en) Assembly type pier with self-resetting and strong energy consumption and construction method thereof
US5121518A (en) Cable-stayed bridge and construction process
CN112726377A (en) Short-tower cable-stayed bridge with flexible beams and dense cables
CN110792042A (en) Anti-overturning reinforcing method for rectangular single-column pier bridge
CN214939215U (en) Large cantilever assembly type light steel-concrete combined cover beam based on slot type connection
CN214993017U (en) Assembled pier that possesses from restoring to throne and consume energy by force
KR102151576B1 (en) Steel composite bridge
CN112144383B (en) Assembled steel-concrete composite beam and installation and construction method thereof
CN212801175U (en) Reinforced structure of single-column bridge
CN210140843U (en) Half hinge structure suitable for reducing stress of pier, cushion cap and foundation under earthquake action
CN110306425B (en) Pier bottom structure of short pier rigid frame bridge capable of greatly reducing bearing bending moment
KR102009704B1 (en) Steel permanent landfill form using upper flange box compound gider and construction method using the same
CN111893861A (en) Partial cable-stayed bridge of steel truss web type concrete composite beam and construction method thereof
CN110700122A (en) A antidumping reinforced structure for rectangle single-column mound bridge
CN214143234U (en) Steel-concrete combined beam slab and steel-concrete combined bridge
CN111926680A (en) Reinforced structure of single-column bridge and construction method
KR102151567B1 (en) Steel composite bridge
CN215252345U (en) Large longitudinal slope assembly type box girder anti-sliding device
CN102953346B (en) Reinforcement device for preventing vertical crack of root part of bridge cantilever pier cap

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination