CN111861165A - Project management method and device, computer equipment and storage medium - Google Patents

Project management method and device, computer equipment and storage medium Download PDF

Info

Publication number
CN111861165A
CN111861165A CN202010642283.5A CN202010642283A CN111861165A CN 111861165 A CN111861165 A CN 111861165A CN 202010642283 A CN202010642283 A CN 202010642283A CN 111861165 A CN111861165 A CN 111861165A
Authority
CN
China
Prior art keywords
project
information
acquiring
splitting
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010642283.5A
Other languages
Chinese (zh)
Inventor
张文化
吴永华
谭添华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Deer Smart Factory Technology Co Ltd
Original Assignee
Guangdong Deer Smart Factory Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Deer Smart Factory Technology Co Ltd filed Critical Guangdong Deer Smart Factory Technology Co Ltd
Priority to CN202010642283.5A priority Critical patent/CN111861165A/en
Publication of CN111861165A publication Critical patent/CN111861165A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention belongs to the technical field of project management, and particularly relates to a project management method, a project management device, computer equipment and a storage medium, wherein the project management method comprises the steps of obtaining project basic information of a project, and generating an information input completion instruction according to the project basic information; splitting the project according to the project basic information, obtaining project splitting information, and generating a project splitting completion instruction according to the project splitting information, wherein the project splitting information completion instruction is used for prompting a user that the splitting and inputting of the project are completed; acquiring the project splitting information, acquiring project state information of each split project, and acquiring project rectification information according to the project state information; acquiring project progress updating information in the project proceeding process according to the project correcting information; and acquiring project data management data according to the project progress updating information. The invention realizes the systematic management of project data, saves labor cost and improves production efficiency.

Description

Project management method and device, computer equipment and storage medium
Technical Field
The invention belongs to the technical field of project management, and particularly relates to a project management method, a project management device, computer equipment and a storage medium.
Background
Projects are created by the effort of organizing human, material and financial resources in a new way to accomplish an independent, one-time job within given cost and time constraint specifications in an effort to achieve the goals defined by quantity and quality metrics.
At present, when a project is managed in a factory or a group, the data of the project often needs to be manually registered, followed, coordinated and recorded, so as to realize the management of the project. However, this kind of management method has many disadvantages, on one hand, because the items contain many and complicated contents, the manual recording is very easy to cause data missing; on the other hand, the project management mode needs to consume great manpower and material resources, and does not utilize filing and data analysis after the project is completed, so that the project management efficiency is low, and great inconvenience is caused to production. Therefore, it is necessary to design a project management method, apparatus, computer device and storage medium.
Disclosure of Invention
The invention aims to provide a project management method, a project management device, computer equipment and a storage medium, and aims to solve the technical problem that the management efficiency is low when projects are managed in the prior art.
In order to achieve the above object, an embodiment of the present invention provides a project management method, where the method includes:
acquiring project basic information of a project, and generating an information entry completion instruction according to the project basic information, wherein the information entry completion instruction is used for prompting a user that entry of the basic information of the project is completed;
splitting the project according to the project basic information, obtaining project splitting information, and generating a project splitting completion instruction according to the project splitting information, wherein the project splitting information completion instruction is used for prompting a user that the splitting and inputting of the project are completed;
acquiring the project splitting information, acquiring project state information of each split project, and acquiring project rectification information according to the project state information;
acquiring project progress updating information in the project proceeding process according to the project correcting information;
and acquiring project data management data according to the project progress updating information.
Optionally, the method further comprises:
and acquiring risk assessment information of the project.
Optionally, the obtaining of the risk assessment information about the item specifically includes:
acquiring a risk assessment interface, wherein the risk assessment interface is used for displaying a project survey content column, a project survey conclusion column and a project survey risk source prompt column;
Acquiring risk contents filled in a project survey content column, a project survey conclusion column and a project survey risk source prompt column according to the risk assessment interface display;
and generating a risk assessment report according to the risk content.
Optionally, the method further comprises:
acquiring a project change instruction in a project process;
generating a project change page according to the project change instruction, wherein the project change page is used for displaying a change project column, a change content column and a change reason column;
acquiring the change content filled in a change item column, a change content column and a change reason column which are displayed according to the item change page;
and generating an item change registration table according to the change content.
Optionally, the method further comprises: and performing weight analysis setting operation on the project data management data and generating a project analysis image.
Optionally, the weight analysis setting operation includes:
acquiring a weight setting instruction;
generating a weight setting interface according to the weight setting instruction, wherein the weight setting interface is used for displaying weight setting items and corresponding weight setting options;
acquiring a target setting option set from the weight setting options according to the weight setting item displayed on the weight setting interface;
And generating the project analysis image according to the target setting option.
Optionally, the obtaining of the project progress update information in the project process according to the project rectification information specifically includes:
acquiring a progress updating instruction of the rectification project shown in the project rectification information;
generating a progress updating interface according to the progress updating instruction, wherein the progress updating interface is used for displaying progress updating content filling columns;
acquiring progress contents filled according to the progress updating content filling column;
and generating the project progress updating information according to the progress content.
An embodiment of the present invention further provides a project management apparatus, where the apparatus includes:
the basic information acquisition module is used for acquiring project basic information of a project and generating an information entry completion instruction according to the project basic information, wherein the information entry completion instruction is used for prompting a user that entry of the basic information of the project is completed;
the splitting information acquisition module is used for splitting the project according to the project basic information and acquiring project splitting information, and generating a project splitting completion instruction according to the project splitting information, wherein the project splitting information completion instruction is used for prompting a user to complete splitting and entry of the project;
A status information acquisition module for acquiring the project splitting information and acquiring the project status information of each split project, and acquiring project modification information according to the project status information;
the progress information acquisition module is used for acquiring project progress updating information in the project processing process according to the project rectification information;
and the data acquisition module is used for acquiring project data management data according to the project progress updating information.
The embodiment of the present invention further provides a computer device, which includes a memory and a processor, where the memory stores a computer program, and the processor implements the steps of the method when executing the computer program.
Embodiments of the present invention also provide a computer-readable storage medium, on which a computer program is stored, where the computer program, when executed by a processor, implements the steps of the above-mentioned method.
One or more technical solutions in the project management method, the project management apparatus, the computer device and the storage medium provided by the embodiment of the present invention have at least one of the following technical effects:
the method comprises the steps of sequentially acquiring project basic information of a project, and generating an information entry completion instruction according to the project basic information, wherein the information entry completion instruction is used for prompting a user that entry of the basic information of the project is completed; splitting the project according to the project basic information, obtaining project splitting information, and generating a project splitting completion instruction according to the project splitting information, wherein the project splitting information completion instruction is used for prompting a user that the splitting and inputting of the project are completed; acquiring the project splitting information, acquiring project state information of each split project, and acquiring project rectification information according to the project state information; acquiring project progress updating information in the project proceeding process according to the project correcting information; acquiring project data management data according to the project progress updating information; therefore, under the constraint of limited resources, the systematic management of basic information, splitting information, correcting information, progress updating information and project data related to the project is realized by using the viewpoint, method and theory of the system, the labor cost is saved, and the production efficiency is improved.
Drawings
In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings needed to be used in the embodiments or the prior art descriptions will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art to obtain other drawings based on these drawings without inventive exercise.
FIG. 1 is a flowchart of a project management method according to an embodiment of the present invention;
FIG. 2 is a flowchart illustrating steps S810-S830 of a project management method according to an embodiment of the present invention;
fig. 3 is a block diagram illustrating a structure of a risk assessment interface in the project management method according to the embodiment of the present invention;
FIG. 4 is a flowchart illustrating steps S710-S740 of a project management method according to an embodiment of the present invention;
fig. 5 is a block diagram of a structure of a project change page in the project management method according to the embodiment of the present invention;
FIG. 6 is a flowchart illustrating steps S910-S940 of a project management method according to an embodiment of the present invention;
fig. 7 is a block diagram illustrating a structure of a weight setting interface in the project management method according to the embodiment of the present invention;
FIG. 8 is a flowchart illustrating steps S410-S440 of a project management method according to an embodiment of the present invention;
Fig. 9 is a block diagram illustrating a structure of a progress update interface in the project management method according to the embodiment of the present invention;
FIG. 10 is a block diagram of a project management apparatus according to an embodiment of the present invention;
fig. 11 is an internal structural diagram of a computer device according to an embodiment of the present invention.
Detailed Description
Reference will now be made in detail to embodiments of the present invention, examples of which are illustrated in the accompanying drawings, wherein like or similar reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below with reference to the drawings are exemplary and intended to be illustrative of the embodiments of the present invention, and should not be construed as limiting the invention.
In the following description, for purposes of explanation and not limitation, specific details are set forth, such as particular system structures, techniques, etc. in order to provide a thorough understanding of the embodiments of the present application. It will be apparent, however, to one skilled in the art that the present application may be practiced in other embodiments that depart from these specific details. In other instances, detailed descriptions of well-known systems, devices, circuits, and methods are omitted so as not to obscure the description of the present application with unnecessary detail.
It will be understood that the terms "comprises" and/or "comprising," when used in this specification and the appended claims, specify the presence of stated features, integers, steps, operations, elements, and/or components, but do not preclude the presence or addition of one or more other features, integers, steps, operations, elements, components, and/or groups thereof.
It should also be understood that the term "and/or" as used in this specification and the appended claims refers to and includes any and all possible combinations of one or more of the associated listed items.
As used in this specification and the appended claims, the term "if" may be interpreted contextually as "when", "upon" or "in response to" determining "or" in response to detecting ". Similarly, the phrase "if it is determined" or "if a [ described condition or event ] is detected" may be interpreted contextually to mean "upon determining" or "in response to determining" or "upon detecting [ described condition or event ]" or "in response to detecting [ described condition or event ]".
Furthermore, in the description of the present application and the appended claims, the terms "first," "second," "third," and the like are used for distinguishing between descriptions and not necessarily for describing or implying relative importance.
Reference throughout this specification to "one embodiment" or "some embodiments," or the like, means that a particular feature, structure, or characteristic described in connection with the embodiment is included in one or more embodiments of the present application. Thus, appearances of the phrases "in one embodiment," "in some embodiments," "in other embodiments," or the like, in various places throughout this specification are not necessarily all referring to the same embodiment, but rather "one or more but not all embodiments" unless specifically stated otherwise. The terms "comprising," "including," "having," and variations thereof mean "including, but not limited to," unless expressly specified otherwise.
In one embodiment of the present invention, as shown in fig. 1, there is provided a project management method, the method including:
step S100: acquiring project basic information of a project, and generating an information entry completion instruction according to the project basic information, wherein the information entry completion instruction is used for prompting a user that entry of the basic information of the project is completed;
the acquisition of the basic information of the project in this step is to collect basic information of a project. Specifically, the item information includes: the project management system comprises a project number, a project name, project content, project progress, project state, a view exception bar, a project setting date, a planned start date, an actual start date, a design unit, a construction unit and an acceptance date.
Thus, the basic information of the project is counted and summarized through the input of the information, and the project management efficiency is improved.
Further, after the user finishes inputting the basic information of the project, clicking 'submit immediately', and displaying 'submit finish', namely generating the information input finishing instruction.
Step S200: splitting the project according to the project basic information, obtaining project splitting information, and generating a project splitting completion instruction according to the project splitting information, wherein the project splitting information completion instruction is used for prompting a user that the splitting and inputting of the project are completed;
in this step, during the actual project process, each project needs to be sub-packaged to other suppliers, and statistics needs to be performed after splitting, so that the completeness of the project statistical data is ensured by acquiring the project splitting information.
Specifically, the project splitting information includes a splitting project number, a splitting project name, splitting project content, a splitting project progress, a splitting project state, a splitting viewing exception column, and a splitting project standing date.
Step S300: acquiring the project splitting information, acquiring project state information of each split project, and acquiring project rectification information according to the project state information;
Specifically, after splitting the project, the project follow-up is required to be performed on the split project to acquire the performing state information of the project, and whether the project needs to be modified or not is judged according to the performing state information of the project.
Further, when the project is completed in stages or integrally, if the project construction quality, such as workmanship, impression and the like, does not meet the requirements of customers, does not meet the construction specifications, use requirements and the like, the part which does not meet the requirements needs to be turned over, namely the project is modified.
The project rectification information at least comprises rectification content, rectification units, rectification reasons, follow-up persons and penalty information. Therefore, the statistics and the management of the project correction information are realized, and the project management efficiency is improved.
Step S400: acquiring project progress updating information in the project proceeding process according to the project correcting information;
step S500: and acquiring project data management data according to the project progress updating information.
In this step, the project data management data includes a work-in checklist, customer satisfaction, a construction schedule, a field patrol checklist, a construction change list, an organization frame diagram, and a completion checklist. The data condition of each stage in the project implementation process is reliably reflected through the table, so that all the work related to the project is effectively managed.
The method comprises the steps of sequentially acquiring project basic information of a project, and generating an information entry completion instruction according to the project basic information, wherein the information entry completion instruction is used for prompting a user that entry of the basic information of the project is completed; splitting the project according to the project basic information, obtaining project splitting information, and generating a project splitting completion instruction according to the project splitting information, wherein the project splitting information completion instruction is used for prompting a user that the splitting and inputting of the project are completed; acquiring the project splitting information, acquiring project state information of each split project, and acquiring project rectification information according to the project state information; acquiring project progress updating information in the project proceeding process according to the project correcting information; acquiring project data management data according to the project progress updating information; therefore, under the constraint of limited resources, the systematic management of basic information, splitting information, correcting information, progress updating information and project data related to the project is realized by using the viewpoint, method and theory of the system, the labor cost is saved, and the production efficiency is improved.
In one embodiment of the invention, the method further comprises:
And acquiring risk assessment information of the project.
In particular, a source of danger is necessarily present during the course of the project. In the step, risk assessment information existing in the project is obtained to prompt a project engineer to obtain a possible risk source in the project process, so that the safety of the project engineer in the project process is guaranteed, and the safety is improved.
Specifically, as shown in fig. 2 to fig. 3, the acquiring risk assessment information about the existence of the project specifically includes:
step S810: acquiring a risk assessment interface, wherein the risk assessment interface is used for displaying a project survey content column, a project survey conclusion column and a project survey risk source prompt column;
when acquiring the risk assessment information, project engineers need to survey the content to be implemented by the project to acquire the actual project condition of the project, namely the project survey content; then, performing condition analysis according to the actual project condition obtained by surveying so as to obtain a conclusion of project surveying; meanwhile, a risk source in the project exploration process can be obtained. Finally, the project engineer begins to register the information obtained. Namely, a risk assessment interface is obtained, and corresponding contents are filled in the project survey content column, the project survey conclusion column and the project survey risk source prompt column which are displayed on the risk assessment interface, so that the steps are realized: and acquiring a risk assessment interface, wherein the risk assessment interface is used for displaying a project survey content column, a project survey conclusion column and a project survey risk source prompt column.
Furthermore, the project survey risk source prompt bar can also be set as a selection item for the user to select, and the 'selection risk source' is clicked, so that the user can select the risk source associated with the specific project from the pre-stored risk sources, the time is saved, and the project work management efficiency is improved.
Step S820: acquiring risk contents filled in a project survey content column, a project survey conclusion column and a project survey risk source prompt column according to the risk assessment interface display;
in this step, the project engineering personnel fills corresponding contents in a project survey content column, a project survey conclusion column and a project survey risk source prompt column which are displayed in the risk assessment interface, so as to obtain the risk content.
Step S830: and generating a risk assessment report according to the risk content.
Therefore, through the steps S810-S830, the registration, the entry and the report generation of the risk items in the project process are realized, and compared with the prior art that the risk is avoided by depending on the experience of project engineering personnel, the method and the system improve the project management efficiency through acquiring the risk assessment information and through the visual risk assessment report, provide the reference of the risk items for the project engineering personnel in the construction process, and greatly improve the safety performance.
In one embodiment of the present invention, as shown in fig. 4-5, the method further comprises:
step S710: acquiring a project change instruction in a project process;
in this step, the original position of the project change is due to customer requirements, design missing, etc., the project changes, the project amount needs to be added, or the original project amount is increased or reduced. Therefore, in the actual project construction process, the project often needs to be changed.
Specifically, the step of obtaining the item change instruction means that the item change instruction is obtained when the instruction input by the user matches the item change instruction.
Step S720: generating a project change page according to the project change instruction, wherein the project change page is used for displaying a change project column, a change content column and a change reason column;
specifically, the change item column is used for the user to fill in the name of the change item according to the actual situation.
And the change content column is used for filling the specific change content of the change item by the user.
And the change reason column is used for filling the specific reason of the item change for the user.
Further, the project change page also includes a change date, a planned start date, an actual start date, and a projected completion date.
Step S730: acquiring the change content filled in a change item column, a change content column and a change reason column which are displayed according to the item change page;
step S740: and generating an item change registration table according to the change content.
In this step, after the user registers for multiple times, the number of the item change registration table conveniently includes a plurality of item change contents, so that the item change information is visually managed, and meanwhile, the statistics and summarization of the item changes are realized, so that the subsequent data summarization and processing after the item is completed are facilitated.
In this way, through steps S710 to S740, efficient visual management of project changes is achieved, and management efficiency of project management is improved.
In one embodiment of the present invention, as shown in fig. 6-7, the method further comprises: and performing weight analysis setting operation on the project data management data and generating a project analysis image.
In this step, the image is analyzed through the project, so that the proportion and the data of each item of parameter information in the whole process of the project are obtained. The method and the device facilitate the summary and data processing of the project, and adopt an image form, so that the user can more conveniently, intuitively and clearly obtain the required data.
Optionally, the weight analysis setting operation includes:
Step S910: acquiring a weight setting instruction;
when the user needs to set the weight of each project for repair, the user inputs a weight setting instruction.
Step S920: generating a weight setting interface according to the weight setting instruction, wherein the weight setting interface is used for displaying weight setting items and corresponding weight setting options;
wherein the weight setting item is used for displaying each item which can set the weight. Specifically, as shown in fig. 7, the weight setting items may be set to items such as "reliability", "security", "environmental protection", "energy saving", and "cost". The right sides of the "reliability", the "security", the "environmental protection", the "energy saving" and the "cost" are weight setting options, and it can also be understood that the weight setting options are occupied weight proportions.
Further, the safety is a safety factor in the implementation process of a specific project, and project engineering personnel input information according to the actual project progress condition; "environmental protection" is the environmental protection coefficient in the process of implementing a specific project; "energy saving" is the energy saving coefficient in the concrete project implementation process; "cost" is the specific cost in the implementation of a specific project.
Step S930: acquiring a target setting option set from the weight setting options according to the weight setting item displayed on the weight setting interface;
specifically, the user may manually input the occupied weight ratio in the weight setting option bar, for example, in this embodiment, the "reliability" weight is set to 20; the "security" weight is set to 10; the "Environment protection" weight is set to 20; the "energy saving" weight is set to 20 and the "cost" weight is set to 20.
Step S940: and generating the project analysis image according to the target setting option.
In the actual production process, after the project is completed, the data in the project implementation process is necessarily required to be analyzed to obtain the conditions of technical cooperation, process flow, resource allocation and corresponding equipment allocation in the project implementation process, so that the economic benefit and the social benefit of project investment are comprehensively evaluated. However, different manufacturers focus on different items, so different weights need to be set for different proportions of analysis.
Therefore, in this embodiment, through the steps S910 to S940, the weight setting during the analysis of each data in the project implementation process can be realized, so as to ensure the adjustability and flexible adaptability of data processing, and further adapt to different customer requirements, and the application range is wide.
In addition, the project analysis image is generated after the steps S910 to S940, so that project engineers can more easily know the construction investment cost and further analyze the fund source and the repayment method, thereby estimating the production cost and evaluating the project effect and greatly improving the project management efficiency.
In an embodiment of the present invention, as shown in fig. 8 to 9, the acquiring, according to the project correction information, project progress update information in a project proceeding process specifically includes:
step S410: acquiring a progress updating instruction of the rectification project shown in the project rectification information;
step S420: generating a progress updating interface according to the progress updating instruction, wherein the progress updating interface is used for displaying progress updating content filling columns;
specifically, the project update content column includes an actual start time column, an actual completion time column, and an rectification progress column; the actual starting time column is used for the user to fill in the starting time, the actual completion time column is used for the user to fill in the completion time, and the rectification progress column is used for the user to set the user progress percentage.
Step S430: acquiring progress contents filled according to the progress updating content filling column;
Step S440: and generating the project progress updating information according to the progress content.
Specifically, in step S440, the item schedule update information may be in a form of a table or a text to visually display the item update information.
In this way, through steps S410-S440, the information of the project progress after the project has been modified can be obtained, so that the user can timely know the project update information after the project has been modified, and further, the real-time progress update in the project progress process is improved.
In an embodiment of the present invention, as shown in fig. 10, an embodiment of the present invention further provides an item management apparatus, including:
the basic information acquisition module 10 is configured to acquire project basic information of a project, and generate an information entry completion instruction according to the project basic information, where the information entry completion instruction is used to prompt a user that entry of the basic information of the project is completed;
the splitting information acquisition module 20 is configured to split the project according to the project basic information and acquire project splitting information, and generate a project splitting completion instruction according to the project splitting information, where the project splitting information completion instruction is used to prompt a user that splitting entry of the project is completed;
A status information acquiring module 30, configured to acquire the project splitting information and acquire project status information of each split project, and acquire project modification information according to the project status information;
the progress information acquisition module 40 is used for acquiring project progress updating information in the project progress process according to the project rectification information;
and the data acquisition module 50 is used for acquiring project data management data according to the project progress updating information.
Furthermore, the project management device of the invention realizes effective management, coordination and overall planning of projects from beginning to end, and comprises project information, risk assessment, project splitting, project rectifying and reforming, project changing, progress updating and data management.
In one embodiment, a computer device is provided, which may be a terminal, and its internal structure diagram may be as shown in fig. 11. The computer device includes a processor, a memory, a network interface, a display screen, and an input device connected by a system bus. Wherein the processor of the computer device is configured to provide computing and control capabilities. The memory of the computer device comprises a nonvolatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the operation of an operating system and computer programs in the non-volatile storage medium. The network interface of the computer device is used for communicating with an external terminal through a network connection. The computer program is executed by a processor to implement a risk assessment method. The display screen of the computer equipment can be a liquid crystal display screen or an electronic ink display screen, and the input device of the computer equipment can be a touch layer covered on the display screen, a key, a track ball or a touch pad arranged on the shell of the computer equipment, an external keyboard, a touch pad or a mouse and the like.
Those skilled in the art will appreciate that the architecture shown in fig. 11 is merely a block diagram of some of the structures associated with the disclosed aspects and is not intended to limit the computing devices to which the disclosed aspects apply, as particular computing devices may include more or less components than those shown, or may combine certain components, or have a different arrangement of components.
In an embodiment of the present invention, there is also provided a computer apparatus including a memory and a processor, the memory storing a computer program, the processor implementing the following steps when executing the computer program: acquiring project basic information of a project, and generating an information entry completion instruction according to the project basic information, wherein the information entry completion instruction is used for prompting a user that entry of the basic information of the project is completed; splitting the project according to the project basic information, obtaining project splitting information, and generating a project splitting completion instruction according to the project splitting information, wherein the project splitting information completion instruction is used for prompting a user that the splitting and inputting of the project are completed; acquiring the project splitting information, acquiring project state information of each split project, and acquiring project rectification information according to the project state information; acquiring project progress updating information in the project proceeding process according to the project correcting information; and acquiring project data management data according to the project progress updating information.
In another embodiment of the present invention, the processor further implements the following steps when executing the computer program: acquiring a risk assessment interface, wherein the risk assessment interface is used for displaying a project survey content column, a project survey conclusion column and a project survey risk source prompt column; acquiring risk contents filled in a project survey content column, a project survey conclusion column and a project survey risk source prompt column according to the risk assessment interface display; and generating a risk assessment report according to the risk content.
In another embodiment of the present invention, the processor further implements the following steps when executing the computer program: acquiring a project change instruction in a project process; generating a project change page according to the project change instruction, wherein the project change page is used for displaying a change project column, a change content column and a change reason column; acquiring the change content filled in a change item column, a change content column and a change reason column which are displayed according to the item change page; and generating an item change registration table according to the change content.
In another embodiment of the present invention, the processor further implements the following steps when executing the computer program: acquiring a weight setting instruction; generating a weight setting interface according to the weight setting instruction, wherein the weight setting interface is used for displaying weight setting items and corresponding weight setting options; acquiring a target setting option set from the weight setting options according to the weight setting item displayed on the weight setting interface; and generating the project analysis image according to the target setting option.
In another embodiment of the present invention, the processor further implements the following steps when executing the computer program: acquiring a progress updating instruction of the rectification project shown in the project rectification information; generating a progress updating interface according to the progress updating instruction, wherein the progress updating interface is used for displaying progress updating content filling columns; acquiring progress contents filled according to the progress updating content filling column; and generating the project progress updating information according to the progress content.
An embodiment of the present invention further provides a computer-readable storage medium, on which a computer program is stored, where the computer program, when executed by a processor, implements the following steps: acquiring project basic information of a project, and generating an information entry completion instruction according to the project basic information, wherein the information entry completion instruction is used for prompting a user that entry of the basic information of the project is completed; splitting the project according to the project basic information, obtaining project splitting information, and generating a project splitting completion instruction according to the project splitting information, wherein the project splitting information completion instruction is used for prompting a user that the splitting and inputting of the project are completed; acquiring the project splitting information, acquiring project state information of each split project, and acquiring project rectification information according to the project state information; acquiring project progress updating information in the project proceeding process according to the project correcting information; and acquiring project data management data according to the project progress updating information.
In another embodiment of the invention, the computer program when executed by a processor implements the steps of: acquiring a risk assessment interface, wherein the risk assessment interface is used for displaying a project survey content column, a project survey conclusion column and a project survey risk source prompt column; acquiring risk contents filled in a project survey content column, a project survey conclusion column and a project survey risk source prompt column according to the risk assessment interface display; and generating a risk assessment report according to the risk content.
In another embodiment of the invention, the computer program when executed by a processor implements the steps of: acquiring a project change instruction in a project process; generating a project change page according to the project change instruction, wherein the project change page is used for displaying a change project column, a change content column and a change reason column; acquiring the change content filled in a change item column, a change content column and a change reason column which are displayed according to the item change page; and generating an item change registration table according to the change content.
In another embodiment of the invention, the computer program when executed by a processor implements the steps of: acquiring a weight setting instruction; generating a weight setting interface according to the weight setting instruction, wherein the weight setting interface is used for displaying weight setting items and corresponding weight setting options; acquiring a target setting option set from the weight setting options according to the weight setting item displayed on the weight setting interface; and generating the project analysis image according to the target setting option.
In another embodiment of the invention, the computer program when executed by a processor implements the steps of: acquiring a progress updating instruction of the rectification project shown in the project rectification information; generating a progress updating interface according to the progress updating instruction, wherein the progress updating interface is used for displaying progress updating content filling columns; acquiring progress contents filled according to the progress updating content filling column; and generating the project progress updating information according to the progress content.
It will be understood by those skilled in the art that all or part of the processes of the methods of the embodiments described above can be implemented by hardware instructions of a computer program, which can be stored in a non-volatile computer-readable storage medium, and when executed, can include the processes of the embodiments of the methods described above. Any reference to memory, storage, database, or other medium used in the embodiments provided herein may include non-volatile and/or volatile memory, among others. Non-volatile memory can include read-only memory (ROM), Programmable ROM (PROM), Electrically Programmable ROM (EPROM), Electrically Erasable Programmable ROM (EEPROM), or flash memory. Volatile memory can include Random Access Memory (RAM) or external cache memory. By way of illustration and not limitation, RAM is available in a variety of forms such as Static RAM (SRAM), Dynamic RAM (DRAM), Synchronous DRAM (SDRAM), Double Data Rate SDRAM (DDRSDRAM), Enhanced SDRAM (ESDRAM), Synchronous Link DRAM (SLDRAM), Rambus Direct RAM (RDRAM), direct bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM).
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the invention, and any modifications, equivalents and improvements made within the spirit and principle of the present invention are intended to be included within the scope of the present invention.

Claims (10)

1. A method for project management, the method comprising:
acquiring project basic information of a project, and generating an information entry completion instruction according to the project basic information, wherein the information entry completion instruction is used for prompting a user that entry of the basic information of the project is completed;
splitting the project according to the project basic information, obtaining project splitting information, and generating a project splitting completion instruction according to the project splitting information, wherein the project splitting information completion instruction is used for prompting a user that the splitting and inputting of the project are completed;
acquiring the project splitting information, acquiring project state information of each split project, and acquiring project rectification information according to the project state information;
acquiring project progress updating information in the project proceeding process according to the project correcting information;
and acquiring project data management data according to the project progress updating information.
2. The project management method of claim 1, wherein said method further comprises:
and acquiring risk assessment information of the project.
3. The project management method according to claim 1, wherein the acquiring risk assessment information of the project specifically comprises:
acquiring a risk assessment interface, wherein the risk assessment interface is used for displaying a project survey content column, a project survey conclusion column and a project survey risk source prompt column;
acquiring risk contents filled in a project survey content column, a project survey conclusion column and a project survey risk source prompt column according to the risk assessment interface display;
and generating a risk assessment report according to the risk content.
4. The project management method of claim 1, wherein said method further comprises:
acquiring a project change instruction in a project process;
generating a project change page according to the project change instruction, wherein the project change page is used for displaying a change project column, a change content column and a change reason column;
acquiring the change content filled in a change item column, a change content column and a change reason column which are displayed according to the item change page;
And generating an item change registration table according to the change content.
5. The project management method of claim 1, wherein said method further comprises: and performing weight analysis setting operation on the project data management data and generating a project analysis image.
6. The project management method according to claim 5, wherein said weight analysis setting operation comprises:
acquiring a weight setting instruction;
generating a weight setting interface according to the weight setting instruction, wherein the weight setting interface is used for displaying weight setting items and corresponding weight setting options;
acquiring a target setting option set from the weight setting options according to the weight setting item displayed on the weight setting interface;
and generating the project analysis image according to the target setting option.
7. The project management method according to claim 1, wherein the acquiring project progress update information in a project proceeding process according to the project correction information specifically comprises:
acquiring a progress updating instruction of the rectification project shown in the project rectification information;
generating a progress updating interface according to the progress updating instruction, wherein the progress updating interface is used for displaying progress updating content filling columns;
Acquiring progress contents filled according to the progress updating content filling column;
and generating the project progress updating information according to the progress content.
8. An item management apparatus, characterized in that the apparatus comprises:
the basic information acquisition module is used for acquiring project basic information of a project and generating an information entry completion instruction according to the project basic information, wherein the information entry completion instruction is used for prompting a user that entry of the basic information of the project is completed;
the splitting information acquisition module is used for splitting the project according to the project basic information and acquiring project splitting information, and generating a project splitting completion instruction according to the project splitting information, wherein the project splitting information completion instruction is used for prompting a user to complete splitting and entry of the project;
a status information acquisition module for acquiring the project splitting information and acquiring the project status information of each split project, and acquiring project modification information according to the project status information;
the progress information acquisition module is used for acquiring project progress updating information in the project processing process according to the project rectification information;
and the data acquisition module is used for acquiring project data management data according to the project progress updating information.
9. A computer device comprising a memory and a processor, the memory storing a computer program, wherein the processor implements the steps of the method of any one of claims 1 to 7 when executing the computer program.
10. A computer-readable storage medium, on which a computer program is stored, which, when being executed by a processor, carries out the steps of the method of any one of claims 1 to 7.
CN202010642283.5A 2020-07-06 2020-07-06 Project management method and device, computer equipment and storage medium Pending CN111861165A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010642283.5A CN111861165A (en) 2020-07-06 2020-07-06 Project management method and device, computer equipment and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010642283.5A CN111861165A (en) 2020-07-06 2020-07-06 Project management method and device, computer equipment and storage medium

Publications (1)

Publication Number Publication Date
CN111861165A true CN111861165A (en) 2020-10-30

Family

ID=73152292

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010642283.5A Pending CN111861165A (en) 2020-07-06 2020-07-06 Project management method and device, computer equipment and storage medium

Country Status (1)

Country Link
CN (1) CN111861165A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113887931A (en) * 2021-09-29 2022-01-04 中核核电运行管理有限公司 Digital visual management system and method for personnel behavior track
JP7422265B1 (en) 2023-10-20 2024-01-25 株式会社日立社会情報サービス Information processing device and information processing method

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040098300A1 (en) * 2002-11-19 2004-05-20 International Business Machines Corporation Method, system, and storage medium for optimizing project management and quality assurance processes for a project
CN103679544A (en) * 2012-11-27 2014-03-26 江苏省电力公司南京供电公司 Comprehensive assessment method for running of intelligent power distribution network
US20140229212A1 (en) * 2011-09-19 2014-08-14 Sandy MacElheron Method and system for managing construction projects
CN104896651A (en) * 2014-03-05 2015-09-09 珠海格力电器股份有限公司 Method and system for analyzing air conditioner operation data
CN106910044A (en) * 2017-02-27 2017-06-30 努比亚技术有限公司 Project process based reminding method and system
CN107798477A (en) * 2017-11-01 2018-03-13 国网天津市电力公司 A kind of distribution network planning project implementation operating method
CN109359125A (en) * 2018-08-27 2019-02-19 中铁建工集团有限公司 A kind of progress fine-grained management method and its system for construction project
CN109840748A (en) * 2017-11-29 2019-06-04 镇江市新创计算机系统集成有限公司 A kind of project management system and method
CN110322147A (en) * 2019-07-04 2019-10-11 四川元丰建设项目管理有限公司 A kind of Project Supervision approaches to IM and system
CN110865747A (en) * 2019-11-05 2020-03-06 广东优世联合控股集团股份有限公司 Project management method, device, medium and electronic equipment
CN111142992A (en) * 2019-12-07 2020-05-12 广东优世联合控股集团股份有限公司 Interface switching method, device, medium and electronic equipment
CN111369158A (en) * 2019-12-30 2020-07-03 中铁四局集团有限公司 BIM-based informatization quality management method and system

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040098300A1 (en) * 2002-11-19 2004-05-20 International Business Machines Corporation Method, system, and storage medium for optimizing project management and quality assurance processes for a project
US20140229212A1 (en) * 2011-09-19 2014-08-14 Sandy MacElheron Method and system for managing construction projects
CN103679544A (en) * 2012-11-27 2014-03-26 江苏省电力公司南京供电公司 Comprehensive assessment method for running of intelligent power distribution network
CN104896651A (en) * 2014-03-05 2015-09-09 珠海格力电器股份有限公司 Method and system for analyzing air conditioner operation data
CN106910044A (en) * 2017-02-27 2017-06-30 努比亚技术有限公司 Project process based reminding method and system
CN107798477A (en) * 2017-11-01 2018-03-13 国网天津市电力公司 A kind of distribution network planning project implementation operating method
CN109840748A (en) * 2017-11-29 2019-06-04 镇江市新创计算机系统集成有限公司 A kind of project management system and method
CN109359125A (en) * 2018-08-27 2019-02-19 中铁建工集团有限公司 A kind of progress fine-grained management method and its system for construction project
CN110322147A (en) * 2019-07-04 2019-10-11 四川元丰建设项目管理有限公司 A kind of Project Supervision approaches to IM and system
CN110865747A (en) * 2019-11-05 2020-03-06 广东优世联合控股集团股份有限公司 Project management method, device, medium and electronic equipment
CN111142992A (en) * 2019-12-07 2020-05-12 广东优世联合控股集团股份有限公司 Interface switching method, device, medium and electronic equipment
CN111369158A (en) * 2019-12-30 2020-07-03 中铁四局集团有限公司 BIM-based informatization quality management method and system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113887931A (en) * 2021-09-29 2022-01-04 中核核电运行管理有限公司 Digital visual management system and method for personnel behavior track
JP7422265B1 (en) 2023-10-20 2024-01-25 株式会社日立社会情報サービス Information processing device and information processing method

Similar Documents

Publication Publication Date Title
US9501463B2 (en) Spreadsheet cell-based notifications
CN111861165A (en) Project management method and device, computer equipment and storage medium
CN109800445A (en) The processing method and system of the visualization auxiliary assessment of bids are realized based on BIM technology
CN105719112A (en) Determination method and device for distribution abnormal state, and server
US20120226484A1 (en) Calculation simulation system and method thereof
Shams Bidhendi et al. Development of a weighted leanness measurement method in modular construction companies
Preiser et al. From linear delivery process to life cycle phases: The validity of the concept of building performance evaluation
CN108921459B (en) Index generation method and device, computer equipment and storage medium
CN114548685A (en) Building construction project progress management method, system, electronic device and storage medium
CN113342249A (en) Content management method, device, equipment and storage medium capable of previewing in real time
Aurich et al. Engineering change impact analysis in production using VR
Anthopoulos et al. The impact of enterprise architecture's absence in e-Government development: The Greek case
CN112950299A (en) Scheme design method, device, computer equipment and storage medium
CN111191999A (en) Product research and development management method and device, computer equipment and storage medium
CN111159796B (en) Method and device for generating beam of building, computer equipment and storage medium
CN114841663A (en) Verification method, device and equipment for installation quality of GPS equipment and storage medium
Thornton “Perfect” Is the Enemy of Good: Jumpstarting Environmental Lifecycle Costing in Federal Procurement
CN110838003A (en) Management system, method, device and readable medium for shared office
CN110704902A (en) Method for placing connecting node of combined lintel model and combined column model and product
Buschmann et al. Framework-based software architectures for process automation systems
CN113987619B (en) Industrial design system and method for improving interactive experience
JP2009157693A (en) Data input device, data input method, program thereof, and storage medium
CN111079991A (en) Service index prediction method, device, equipment and storage medium
Ferens Software support cost models: quo vadis?
JP2019159347A (en) Information processor and program

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination