CN111851730A - A connection method between modules of a modular building - Google Patents

A connection method between modules of a modular building Download PDF

Info

Publication number
CN111851730A
CN111851730A CN202010739907.5A CN202010739907A CN111851730A CN 111851730 A CN111851730 A CN 111851730A CN 202010739907 A CN202010739907 A CN 202010739907A CN 111851730 A CN111851730 A CN 111851730A
Authority
CN
China
Prior art keywords
plate
steel ring
bearing block
floor steel
fixing device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010739907.5A
Other languages
Chinese (zh)
Other versions
CN111851730B (en
Inventor
张文元
王鲜团
张林涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Zhongju Green Building Technology Co ltd
Original Assignee
Suzhou Zhongju Green Building Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Zhongju Green Building Technology Co ltd filed Critical Suzhou Zhongju Green Building Technology Co ltd
Priority to CN202010739907.5A priority Critical patent/CN111851730B/en
Publication of CN111851730A publication Critical patent/CN111851730A/en
Application granted granted Critical
Publication of CN111851730B publication Critical patent/CN111851730B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38—Connections for building structures in general

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention provides a connection mode between modules of a modular building, and particularly relates to the technical field of buildings. The invention comprises floor steel ring beams, wherein a first fixing device is arranged between the floor steel ring beams; the floor steel ring beam is provided with a stand column; a second fixing device is arranged between the upright columns arranged at the end parts of the floor steel ring beams; a connecting rod is arranged between the upright columns arranged in the middle of the floor steel ring beam; be equipped with third fixing device between the stand along vertical direction, third fixing device comprises connecting pipe, fall way and screw rod, and the fall way is located between bearing block and the lower bearing block, and the screw rod runs through last bearing block and the lower bearing block on two stands respectively, and the screw rod meets with the connecting pipe and the fall way of two stands respectively. The connection mode between the modules of the modular building provided by the invention is convenient to assemble, effectively ensures the assembly precision of the super high-rise modular building, reduces the welding quantity, and has the characteristics of high construction speed, simple and convenient construction and flexible assembly.

Description

一种模块化建筑的模块间连接方式A connection method between modules of a modular building

技术领域technical field

本发明属于建筑技术领域,具体涉及一种模块化建筑的模块间连接方式。The invention belongs to the technical field of construction, and particularly relates to a connection mode between modules of a modular building.

背景技术Background technique

模块化建筑是一种组装化技术,它用事先预制好的模块构件进行组装,施工简便、组装灵活。模块构件在工厂中预制,便于组织工业化生产、提高工效、减少材料消耗、受季节影响小。模块化建筑具有施工速度快、建筑自重轻、施工简便、组装灵活等特点,因此在城市建设中具有很好的应用价值。Modular building is an assembly technology, which is assembled with prefabricated modular components, which is easy to construct and flexible to assemble. The modular components are prefabricated in the factory, which facilitates the organization of industrial production, improves work efficiency, reduces material consumption, and is less affected by seasons. Modular buildings have the characteristics of fast construction speed, light building weight, simple construction and flexible assembly, so they have good application value in urban construction.

房屋除了具有承重的墙体、梁结构之外还具有用于控制房间受力点的立柱以及立柱内部连接器,现有的立柱内部连接器不易装配,并且模块建筑装配精度较低,焊接量较大。因此,现需要一种能够解决以上问题的模块化建筑立柱内部连接器。In addition to the load-bearing wall and beam structure, the house also has columns for controlling the stress point of the room and the internal connectors of the columns. The existing internal connectors of the columns are not easy to assemble, and the assembly accuracy of the module building is low, and the amount of welding is relatively high. big. Therefore, there is a need for an internal connector for a modular building column that can solve the above problems.

发明内容SUMMARY OF THE INVENTION

本发明的目的是提供一种模块化建筑的模块间连接方式,方便装配,有效的确保了超高层模块建筑装配精度,减少焊接量,具有施工速度快、施工简便、组装灵活的特点。The purpose of the present invention is to provide a connection method between modules of a modular building, which is convenient for assembly, effectively ensures the assembly accuracy of super high-rise modular buildings, reduces the amount of welding, and has the characteristics of fast construction speed, simple construction and flexible assembly.

本发明提供了如下的技术方案:The invention provides the following technical solutions:

一种模块化建筑的模块间连接方式,包括楼板钢圈梁,所述楼板钢圈梁之间设有第一固定装置,所述第一固定装置由底块和连接板组成,所述底块与所述楼板钢圈梁相接,所述连接板的两端与所述底块相接;所述楼板钢圈梁上设有立柱,所述立柱由外柱、上承重块和下承重块组成,所述上承重块和所述下承重块分别设于所述外柱的两端;设于所述楼板钢圈梁端部的所述立柱之间设有第二固定装置,所述第二固定装置由螺栓和双孔连接板组成,所述双孔连接板的两端分别与两个所述立柱相接,所述螺栓贯穿所述双孔连接板与所述立柱相接;设于所述楼板钢圈梁中部的所述立柱之间设有连接杆;沿竖直方向的所述立柱之间设有第三固定装置,所述第三固定装置由连接管、升降管和螺杆组成,所述连接管设于所述外柱内,所述连接管与所述上承重块相接,所述升降管设于所述上承重块和所述下承重块之间,所述升降管的外壁与所述外柱的内壁滑动连接,所述螺杆分别贯穿两个所述立柱上的所述上承重块和所述下承重块,所述螺杆分别与所述两个立柱的所述连接管和所述升降管相接。An inter-module connection method of a modular building includes floor steel ring beams, a first fixing device is arranged between the floor steel ring beams, the first fixing device is composed of a bottom block and a connecting plate, and the bottom block It is connected with the floor steel ring beam, and the two ends of the connecting plate are connected with the bottom block; the floor steel ring beam is provided with a column, and the column is composed of an outer column, an upper bearing block and a lower bearing block. The upper bearing block and the lower bearing block are respectively arranged at both ends of the outer column; a second fixing device is arranged between the vertical columns arranged at the end of the steel ring beam of the floor plate, and the first The second fixing device is composed of bolts and a double-hole connecting plate, two ends of the double-hole connecting plate are respectively connected with the two uprights, and the bolts pass through the double-hole connecting plate and are connected to the uprights; A connecting rod is arranged between the vertical columns in the middle of the floor steel ring beam; a third fixing device is arranged between the vertical columns along the vertical direction, and the third fixing device is composed of a connecting pipe, a lifting pipe and a screw rod , the connecting pipe is arranged in the outer column, the connecting pipe is connected with the upper bearing block, the lifting pipe is arranged between the upper bearing block and the lower bearing block, the lifting pipe The outer wall of the outer column is slidably connected with the inner wall of the outer column. A tube is connected to the lift tube.

优选的,所述外柱内设有上导管和下导管,所述上导管的上端与所述上承重块相接,所述下导管的下端与所述下承重块相接,所述连接管设于所述上导管内,所述升降管的外侧壁与所述上导管和所述下导管滑动连接。Preferably, the outer column is provided with an upper conduit and a lower conduit, the upper end of the upper conduit is connected to the upper bearing block, the lower end of the lower conduit is connected to the lower bearing block, and the connecting pipe It is arranged in the upper duct, and the outer side wall of the lifting duct is slidably connected with the upper duct and the lower duct.

优选的,所述升降管的上端和下端分别设有上连接管和下连接管,所述下连接管和所述连接管的内侧壁分别设有与所述螺杆相匹配的内螺纹,所述下连接管与所述螺杆螺纹连接。Preferably, the upper end and the lower end of the lifting pipe are respectively provided with an upper connecting pipe and a lower connecting pipe, and the inner side walls of the lower connecting pipe and the connecting pipe are respectively provided with internal threads matching the screws, and the The lower connecting pipe is threadedly connected with the screw.

优选的,所述双孔连接板与所述立柱之间设有底板,所述螺栓贯穿所述底板,所述螺栓的帽端与所述双孔连接板之间设有支撑架,所述螺栓的侧壁设有连接筒。Preferably, a bottom plate is provided between the double-hole connecting plate and the upright column, the bolts pass through the bottom plate, and a support frame is provided between the cap end of the bolt and the double-hole connecting plate, and the bolts pass through the bottom plate. The side wall is provided with a connecting cylinder.

优选的,所述支撑架由支撑板和固定板组成,所述支撑板与所述固定板垂直设置,所述支撑板的一侧与所述固定板的端面相接,所述支撑板的另一侧与所述双孔连接板相接,所述连接筒设于所述支撑板之间。Preferably, the supporting frame is composed of a supporting plate and a fixing plate, the supporting plate and the fixing plate are arranged vertically, one side of the supporting plate is connected to the end surface of the fixing plate, and the other side of the supporting plate is connected to the end surface of the fixing plate. One side is connected with the double-hole connecting plate, and the connecting cylinder is arranged between the supporting plates.

优选的,所述楼板钢圈梁的上端设有固定杆,所述固定杆的下端与所述楼板钢圈梁相接,所述连接板的两侧设有与所述固定杆相匹配的卡槽,所述卡槽的槽底与所述固定杆的侧壁相接。Preferably, the upper end of the floor steel ring beam is provided with a fixing rod, the lower end of the fixing rod is connected with the floor steel ring beam, and the two sides of the connecting plate are provided with clamps matching the fixing rod The slot bottom of the card slot is connected to the side wall of the fixing rod.

优选的,所述固定杆的上端设有封板,所述封板的下端面与所述固定杆相接。Preferably, the upper end of the fixing rod is provided with a sealing plate, and the lower end surface of the sealing plate is connected with the fixing rod.

优选的,所述楼板钢圈梁内设有稳固板,所述稳固板的边缘与所述楼板钢圈梁的槽底和槽壁相接。Preferably, the floor steel ring beam is provided with a stabilizing plate, and the edge of the stabilizing plate is connected to the groove bottom and the groove wall of the floor steel ring beam.

本发明的有益的效果:Beneficial effects of the present invention:

本发明楼板钢圈梁之间设有第一固定装置,第一固定装置由底板和连接板组成,底板与楼板钢圈梁相接,连接板的两端与底板相接,第一固定装置使楼板钢圈梁之间固定牢靠;In the present invention, a first fixing device is arranged between the floor steel ring beams. The first fixing device is composed of a bottom plate and a connecting plate. The bottom plate is connected with the floor steel ring beam, and both ends of the connecting plate are connected with the bottom plate. The first fixing device makes The floor steel ring beams are firmly fixed;

楼板钢圈梁上设有立柱,立柱由外柱、上承重块和下承重块组成,上承重块和下承重块分别设于外柱的两端,立柱起到了固定支撑楼板钢圈梁的作用;There are upright columns on the floor steel ring beam, and the upright column consists of an outer column, an upper bearing block and a lower bearing block. The upper bearing block and the lower bearing block are respectively arranged at both ends of the outer column. ;

设于楼板钢圈梁端部的立柱之间设有第二固定装置,第二固定装置由螺栓和双孔连接板组成,双孔连接板的两端分别与两个立柱相接,螺栓贯穿双孔连接板与立柱相接,第二固定装置使楼板钢圈梁端部的立柱之间固定牢靠;A second fixing device is arranged between the columns at the end of the steel ring beam of the floor slab. The second fixing device is composed of bolts and a double-hole connecting plate. The two ends of the double-hole connecting plate are respectively connected to the two columns. The hole connecting plate is connected with the column, and the second fixing device makes the column at the end of the steel ring beam of the floor plate firmly fixed;

设于楼板钢圈梁中部的立柱之间设有连接杆,连接杆使楼板钢圈梁中部的立柱之间固定牢靠;Connecting rods are arranged between the columns in the middle of the floor steel ring beam, and the connecting rods make the columns in the middle of the floor steel ring beam fixed firmly;

沿竖直方向的立柱之间设有第三固定装置,第三固定装置由连接管、升降管和螺杆组成,连接管设于外柱内,连接管与上承重块相接,升降管设于上承重块和下承重块之间,升降管的外壁与外柱的内壁滑动连接,螺杆贯穿上承重板,螺杆与连接管相接,第三固定装置使沿竖直方向的立柱固定牢靠。A third fixing device is arranged between the vertical columns along the vertical direction. The third fixing device is composed of a connecting pipe, a lifting pipe and a screw rod. Between the upper bearing block and the lower bearing block, the outer wall of the lifting pipe is slidingly connected with the inner wall of the outer column, the screw penetrates the upper bearing plate, and the screw is connected with the connecting pipe.

附图说明Description of drawings

附图用来提供对本发明的进一步理解,并且构成说明书的一部分,与本发明的实施例一起用于解释本发明,并不构成对本发明的限制。在附图中:The accompanying drawings are used to provide a further understanding of the present invention, and constitute a part of the specification, and are used to explain the present invention together with the embodiments of the present invention, and do not constitute a limitation to the present invention. In the attached image:

图1是本发明的结构示意图;Fig. 1 is the structural representation of the present invention;

图2是本发明立柱的结构示意图;Fig. 2 is the structural representation of the column of the present invention;

图3是本发明立柱安装的结构示意图;Fig. 3 is the structural representation of column installation of the present invention;

图4是本发明第二固定装置的结构示意图;Fig. 4 is the structural representation of the second fixing device of the present invention;

图5是本发明第一固定装置的剖视图;Fig. 5 is the sectional view of the first fixing device of the present invention;

图6是本发明连接板的俯视图;Fig. 6 is the top view of the connecting plate of the present invention;

图7是本发明连接杆的俯视图。Figure 7 is a top view of the connecting rod of the present invention.

附图标记说明:Description of reference numbers:

1、楼板钢圈梁;2、第一固定装置;3、第二固定装置;4、连接杆;5、第三固定装置;6、底块;7、连接板;8、固定杆;9、封板;10、稳固板;11、卡槽;12、外柱;13、上承重块;14、下承重块;15、连接管;16、升降管;17、内螺杆;18、上导管;19、下导管;20、上连接管;21、下连接管;22、内螺纹;23、电机;24、卡盘;25、六角螺杆;26、立柱;27、支撑板;28、支撑架;29、双孔连接板;30、螺栓;31、底板;32、连接筒;33、固定板。1. Floor steel ring beam; 2. The first fixing device; 3. The second fixing device; 4. The connecting rod; 5. The third fixing device; 6. The bottom block; 7. The connecting plate; 8. The fixing rod; 9. Sealing plate; 10. Stable plate; 11. Card slot; 12. Outer column; 13. Upper bearing block; 14. Lower bearing block; 15. Connecting pipe; 16. Lifting pipe; 17. Inner screw; 18. Upper conduit; 19. Downpipe; 20. Upper connecting pipe; 21. Lower connecting pipe; 22. Internal thread; 23. Motor; 24. Chuck; 25. Hexagonal screw; 26. Upright column; 27. Support plate; 28. Support frame; 29. Double-hole connecting plate; 30. Bolt; 31. Bottom plate; 32. Connecting cylinder; 33. Fixing plate.

具体实施方式Detailed ways

如图1至图7所示,一种模块化建筑的模块间连接方式,包括楼板钢圈梁1,楼板钢圈梁1内设有稳固板10,稳固板10的边缘与楼板钢圈梁1的槽底和槽壁相接,稳固板10使楼板钢圈梁1的结构更加稳定;楼板钢圈梁1之间设有第一固定装置2,第一固定装置2由底块6和连接板7组成,底块6的下端与楼板钢圈梁1的上端相接,连接板7的两端与两个楼板钢圈梁1上的底块6相接,第一固定装置2使楼板钢圈梁1之间固定牢靠;其中一个楼板钢圈梁1的上端沿竖直方向设有固定杆8,固定杆8的下端与楼板钢圈梁1相接,连接板7的两侧设有与固定杆8相匹配的卡槽11,卡槽11的槽底与固定杆8的侧壁相接,固定杆8和卡槽11使连接板7与楼板钢圈梁1连接的更加稳定;固定杆8的上端设有封板9,封板9的下端面与固定杆8相接,封板9避免了连接板7沿固定杆8滑脱。As shown in FIG. 1 to FIG. 7 , a connection method between modules of a modular building includes a floor steel ring beam 1 , a stabilizing plate 10 is arranged in the floor steel ring beam 1 , and the edge of the stabilizing plate 10 is connected to the floor steel ring beam 1 . The bottom of the groove is connected to the wall of the groove, and the stabilizing plate 10 makes the structure of the floor steel ring beam 1 more stable; a first fixing device 2 is arranged between the floor steel ring beam 1, and the first fixing device 2 is composed of the bottom block 6 and the connecting plate. 7, the lower end of the bottom block 6 is connected with the upper end of the floor steel ring beam 1, the two ends of the connecting plate 7 are connected with the bottom block 6 on the two floor steel ring beams 1, and the first fixing device 2 makes the floor steel ring The beams 1 are firmly fixed; the upper end of one of the floor steel ring beams 1 is provided with a fixing rod 8 along the vertical direction, the lower end of the fixing rod 8 is connected with the floor steel ring beam 1, and the two sides of the connecting plate 7 are provided with fixed rods 8. The slot 11 matched with the rod 8, the bottom of the slot 11 is connected with the side wall of the fixing rod 8, the fixing rod 8 and the slot 11 make the connection between the connecting plate 7 and the floor steel ring beam 1 more stable; the fixing rod 8 A sealing plate 9 is provided at the upper end of the sealing plate 9 , and the lower end surface of the sealing plate 9 is connected with the fixing rod 8 , and the sealing plate 9 prevents the connecting plate 7 from slipping off along the fixing rod 8 .

楼板钢圈梁1上设有立柱26,立柱26由外柱12、上承重块13和下承重块14组成,上承重块13和下承重块14分别设于外柱12的两端,立柱26起到了固定支撑楼板钢圈梁1的作用;沿竖直方向的立柱26之间设有第三固定装置5,第三固定装置5由连接管15、升降管16和螺杆17组成,连接管15设于外柱12内,连接管15与上承重块13相接,升降管16设于上承重块13和下承重块14之间,升降管16的外壁与外柱12的内壁滑动连接,外柱12内设有上导管18和下导管19,上导管18的上端与上承重块13相接,下导管19的下端与下承重块14相接,连接管15设于上导管18内,升降管16的外侧壁与上导管18和下导管19滑动连接,升降管16的上端和下端分别设有上连接管20和下连接管21,下连接管21和连接管15的内侧壁分别设有与螺杆17相匹配的内螺纹22,螺杆17分别贯穿两个立柱26的上承重块13和下承重块14,下连接管21与螺杆17的上端螺纹连接,螺杆17的下端与连接管15螺纹连接,一个立柱26的下端与另一个立柱26的上端进行固定时,螺杆17的下端与另一个的立柱26上的连接管15相接,一个立柱26的上端设有卡盘24,卡盘24与上承重块13相接,卡盘24的上方设有电机23,电机23与上连接管25之间设有六角螺杆25,六角螺杆25贯穿卡盘24和上承重块12,六角螺杆25与连接管15螺纹连接,上连接管20的内壁横截面呈与六角螺杆25相匹配的孔洞,六角螺杆25的两端分别与电机23和上连接管20相接,电机23通过六角螺杆25带动升降管16转动下移,使下连接管21与螺杆17的上端相接,第三固定装置5固定操作简单方便,且使沿竖直方向的立柱26固定牢靠。The floor steel ring beam 1 is provided with a column 26, and the column 26 is composed of an outer column 12, an upper bearing block 13 and a lower bearing block 14. The upper bearing block 13 and the lower bearing block 14 are respectively arranged at both ends of the outer column 12. The column 26 It plays the role of fixing and supporting the steel ring beam 1 of the floor; a third fixing device 5 is arranged between the vertical columns 26, and the third fixing device 5 is composed of a connecting pipe 15, a lifting pipe 16 and a screw 17. The connecting pipe 15 Set in the outer column 12, the connecting pipe 15 is connected with the upper bearing block 13, the lifting tube 16 is arranged between the upper bearing block 13 and the lower bearing block 14, the outer wall of the lifting tube 16 is slidably connected with the inner wall of the outer column 12, and the outer The column 12 is provided with an upper conduit 18 and a lower conduit 19. The upper end of the upper conduit 18 is connected to the upper bearing block 13, the lower end of the lower conduit 19 is connected to the lower bearing block 14, and the connecting pipe 15 is arranged in the upper conduit 18. The outer side wall of the pipe 16 is slidably connected with the upper conduit 18 and the lower conduit 19, the upper and lower ends of the lifting pipe 16 are respectively provided with an upper connecting pipe 20 and a lower connecting pipe 21, and the inner walls of the lower connecting pipe 21 and the connecting pipe 15 are respectively provided with The inner thread 22 matched with the screw 17, the screw 17 penetrates the upper bearing block 13 and the lower bearing block 14 of the two uprights 26 respectively, the lower connecting pipe 21 is threadedly connected with the upper end of the screw 17, and the lower end of the screw 17 is threaded with the connecting pipe 15 Connection, when the lower end of one column 26 is fixed with the upper end of the other column 26, the lower end of the screw 17 is connected with the connecting pipe 15 on the other column 26, the upper end of one column 26 is provided with a chuck 24, and the chuck 24 Connected to the upper bearing block 13, a motor 23 is arranged above the chuck 24, and a hexagonal screw 25 is arranged between the motor 23 and the upper connecting pipe 25, and the hexagonal screw 25 penetrates the chuck 24 and the upper bearing block 12. The connecting pipe 15 is threadedly connected, the cross section of the inner wall of the upper connecting pipe 20 is a hole matching the hexagonal screw 25, the two ends of the hexagonal screw 25 are respectively connected with the motor 23 and the upper connecting pipe 20, and the motor 23 drives the lifting and lowering through the hexagonal screw 25 The tube 16 is rotated and moved downward, so that the lower connecting tube 21 is connected to the upper end of the screw 17 , the third fixing device 5 is easy to fix, and the vertical column 26 is fixed firmly.

设于楼板钢圈梁1端部的立柱26之间设有第二固定装置3,第二固定装置3由螺栓30和双孔连接板29组成,双孔连接板29的两端分别与两个立柱26相接,螺栓30贯穿双孔连接板29与立柱26相接,第二固定装置3使楼板钢圈梁1端部的立柱26之间固定牢靠;双孔连接板29与立柱26之间设有底板31,螺栓30贯穿底板31,螺栓30的帽端与双孔连接板29之间设有支撑架28,螺栓30的侧壁设有连接筒32,支撑架28由支撑板32和固定板33组成,支撑板32与固定板33垂直设置,支撑板32的一侧与固定板33的端面相接,支撑板32的另一侧与双孔连接板29相接,连接筒27设于支撑板32之间,支撑架28、连接筒27和底板31进一步提高了第二固定装置3固定的稳定性。A second fixing device 3 is arranged between the columns 26 at the end of the steel ring beam 1 of the floor plate. The second fixing device 3 is composed of bolts 30 and a double-hole connecting plate 29. The two ends of the double-hole connecting plate 29 are respectively connected to two The uprights 26 are connected, the bolts 30 are connected to the uprights 26 through the double-hole connecting plate 29, and the second fixing device 3 makes the uprights 26 at the end of the floor steel ring beam 1 firmly fixed; A bottom plate 31 is provided, the bolt 30 penetrates the bottom plate 31, a support frame 28 is provided between the cap end of the bolt 30 and the double-hole connecting plate 29, the side wall of the bolt 30 is provided with a connecting cylinder 32, and the support frame 28 is fixed by the support plate 32 and The support plate 32 and the fixed plate 33 are vertically arranged, one side of the support plate 32 is connected with the end face of the fixed plate 33, the other side of the support plate 32 is connected with the double-hole connecting plate 29, and the connecting cylinder 27 is arranged in the Between the supporting plates 32 , the supporting frame 28 , the connecting cylinder 27 and the bottom plate 31 further improve the fixing stability of the second fixing device 3 .

设于楼板钢圈梁1中部的立柱26之间设有连接杆4,连接杆4的两端分别与两个立柱26相接,连接杆4使楼板钢圈梁1中部的立柱26之间固定牢靠。A connecting rod 4 is arranged between the uprights 26 in the middle of the floor steel ring beam 1, and the two ends of the connecting rod 4 are respectively connected with two uprights 26, and the connecting rod 4 makes the middle of the floor steel ring beam 1 fixed between the uprights 26 reliable.

本发明的工作方式:一个立柱26的下端与另一个立柱26的上端进行固定时,电机23通过六角螺杆25带动升降管16转动下移,连接管21与螺杆17的上端相接,第三固定装置5固定操作简单方便,且使沿竖直方向的立柱26固定牢靠;连接板7的两端与两个楼板钢圈梁1上的底块6相接,卡槽11的槽底与固定杆8的侧壁相接,封板9的下端面与固定杆8相接,第一固定装置2使楼板钢圈梁1之间固定牢靠;螺栓30贯穿双孔连接板29、固定板33和底板31与立柱26相接,第二固定装置3使楼板钢圈梁1端部的立柱26之间固定牢靠;连接杆4的两端分别与两个立柱26相接,连接杆4使楼板钢圈梁1中部的立柱26之间固定牢靠;有效的确保了超高层模块建筑装配精度,减少焊接量,具有施工速度快、施工简便、组装灵活的特点。The working mode of the present invention: when the lower end of one column 26 is fixed with the upper end of the other column 26, the motor 23 drives the lifting tube 16 to rotate and move downward through the hexagonal screw 25, the connecting tube 21 is connected with the upper end of the screw 17, and the third fixed The fixing operation of the device 5 is simple and convenient, and the upright column 26 along the vertical direction is firmly fixed; the two ends of the connecting plate 7 are connected with the bottom blocks 6 on the two floor steel ring beams 1, and the groove bottom of the clamping groove 11 is connected with the fixing rod. The side walls of 8 are connected, the lower end surface of the sealing plate 9 is connected with the fixing rod 8, the first fixing device 2 makes the floor steel ring beam 1 fixed firmly; the bolt 30 penetrates the double-hole connecting plate 29, the fixing plate 33 and the bottom plate 31 is connected with the column 26, the second fixing device 3 makes the column 26 at the end of the floor steel ring beam 1 firmly fixed; the two ends of the connecting rod 4 are respectively connected with the two columns 26, and the connecting rod 4 makes the floor steel ring. The uprights 26 in the middle of the beam 1 are firmly fixed; the assembly accuracy of the super high-rise module building is effectively ensured, the welding quantity is reduced, and the construction speed is fast, the construction is simple, and the assembly is flexible.

以上所述仅为本发明的优选实施例而已,并不用于限制本发明,尽管参照前述实施例对本发明进行了详细的说明,对于本领域的技术人员来说,其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。The above descriptions are only preferred embodiments of the present invention, and are not intended to limit the present invention. Although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art can still understand the foregoing embodiments. The technical solutions described are modified, or some technical features thereof are equivalently replaced. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included within the protection scope of the present invention.

Claims (8)

1.一种模块化建筑的模块间连接方式,其特征在于:包括楼板钢圈梁,所述楼板钢圈梁之间设有第一固定装置,所述第一固定装置由底块和连接板组成,所述底块与所述楼板钢圈梁相接,所述连接板的两端与所述底块相接;所述楼板钢圈梁上设有立柱,所述立柱由外柱、上承重块和下承重块组成,所述上承重块和所述下承重块分别设于所述外柱的两端;设于所述楼板钢圈梁端部的所述立柱之间设有第二固定装置,所述第二固定装置由螺栓和双孔连接板组成,所述双孔连接板的两端分别与两个所述立柱相接,所述螺栓贯穿所述双孔连接板与所述立柱相接;设于所述楼板钢圈梁中部的所述立柱之间设有连接杆;沿竖直方向的所述立柱之间设有第三固定装置,所述第三固定装置由连接管、升降管和螺杆组成,所述连接管设于所述外柱内,所述连接管与所述上承重块相接,所述升降管设于所述上承重块和所述下承重块之间,所述升降管的外壁与所述外柱的内壁滑动连接,所述螺杆分别贯穿两个所述立柱上的所述上承重块和所述下承重块,所述螺杆分别与所述两个立柱的所述连接管和所述升降管相接。1. The inter-module connection mode of a modular building is characterized in that: comprising floor steel ring beams, between the floor steel ring beams, a first fixing device is provided, and the first fixing device is composed of a bottom block and a connecting plate. The bottom block is connected with the floor steel ring beam, and the two ends of the connecting plate are connected with the bottom block; the floor steel ring beam is provided with a column, and the column is composed of an outer column, an upper It is composed of a bearing block and a lower bearing block. The upper bearing block and the lower bearing block are respectively arranged at both ends of the outer column; a second bearing block is arranged between the vertical columns arranged at the end of the steel ring beam of the floor plate. A fixing device, the second fixing device is composed of bolts and a double-hole connecting plate, two ends of the double-hole connecting plate are respectively connected with the two uprights, and the bolts pass through the double-hole connecting plate and the The vertical columns are connected; connecting rods are arranged between the vertical columns arranged in the middle of the floor steel ring beam; a third fixing device is arranged between the vertical columns along the vertical direction, and the third fixing device is connected by a connecting pipe , a lifting pipe and a screw, the connecting pipe is arranged in the outer column, the connecting pipe is connected with the upper bearing block, and the lifting pipe is arranged between the upper bearing block and the lower bearing block the outer wall of the lift pipe is slidably connected with the inner wall of the outer column, the screw rods respectively penetrate the upper and lower bearing blocks on the two vertical columns, and the screw rods are respectively connected to the two The connecting pipe of each upright column is connected with the lifting pipe. 2.根据权利要求1所述的一种模块化建筑的模块间连接方式,其特征在于:所述外柱内设有上导管和下导管,所述上导管的上端与所述上承重块相接,所述下导管的下端与所述下承重块相接,所述连接管设于所述上导管内,所述升降管的外侧壁与所述上导管和所述下导管滑动连接。2 . The inter-module connection method of a modular building according to claim 1 , wherein an upper conduit and a lower conduit are arranged in the outer column, and the upper end of the upper conduit is in contact with the upper bearing block. 3 . The lower end of the lower conduit is connected with the lower bearing block, the connecting pipe is arranged in the upper conduit, and the outer side wall of the lift pipe is slidably connected with the upper conduit and the lower conduit. 3.根据权利要求2所述的一种模块化建筑的模块间连接方式,其特征在于:所述升降管的上端和下端分别设有上连接管和下连接管,所述下连接管和所述连接管的内侧壁分别设有与所述螺杆相匹配的内螺纹,所述下连接管与所述螺杆螺纹连接。3. The inter-module connection method of a modular building according to claim 2, wherein the upper and lower ends of the lifting pipe are respectively provided with an upper connecting pipe and a lower connecting pipe, and the lower connecting pipe and the The inner side walls of the connecting pipes are respectively provided with internal threads matching the screws, and the lower connecting pipes are threadedly connected with the screws. 4.根据权利要求1所述的一种模块化建筑的模块间连接方式,其特征在于:所述双孔连接板与所述立柱之间设有底板,所述螺栓贯穿所述底板,所述螺栓的帽端与所述双孔连接板之间设有支撑架,所述螺栓的侧壁设有连接筒。4 . The inter-module connection method of a modular building according to claim 1 , wherein a bottom plate is provided between the double-hole connecting plate and the upright column, the bolts penetrate through the bottom plate, and the A support frame is arranged between the cap end of the bolt and the double-hole connecting plate, and a connecting cylinder is arranged on the side wall of the bolt. 5.根据权利要求4所述的一种模块化建筑的模块间连接方式,其特征在于:所述支撑架由支撑板和固定板组成,所述支撑板与所述固定板垂直设置,所述支撑板的一侧与所述固定板的端面相接,所述支撑板的另一侧与所述双孔连接板相接,所述连接筒设于所述支撑板之间。5 . The inter-module connection method of a modular building according to claim 4 , wherein the supporting frame is composed of a supporting plate and a fixing plate, the supporting plate and the fixing plate are arranged vertically, and the One side of the support plate is connected with the end surface of the fixing plate, the other side of the support plate is connected with the double-hole connecting plate, and the connecting cylinder is arranged between the support plates. 6.根据权利要求1所述的一种模块化建筑的模块间连接方式,其特征在于:所述楼板钢圈梁的上端设有固定杆,所述固定杆的下端与所述楼板钢圈梁相接,所述连接板的两侧设有与所述固定杆相匹配的卡槽,所述卡槽的槽底与所述固定杆的侧壁相接。6 . The inter-module connection method of a modular building according to claim 1 , wherein the upper end of the floor steel ring beam is provided with a fixing rod, and the lower end of the fixing rod is connected to the floor steel ring beam. 7 . In connection, the two sides of the connecting plate are provided with clamping grooves matching with the fixing rod, and the groove bottom of the clamping groove is connected with the side wall of the fixing rod. 7.根据权利要求6所述的一种模块化建筑的模块间连接方式,其特征在于:所述固定杆的上端设有封板,所述封板的下端面与所述固定杆相接。7 . The inter-module connection method of a modular building according to claim 6 , wherein the upper end of the fixing rod is provided with a sealing plate, and the lower end surface of the sealing plate is connected to the fixing rod. 8 . 8.根据权利要求1所述的一种模块化建筑的模块间连接方式,其特征在于:所述楼板钢圈梁内设有稳固板,所述稳固板的边缘与所述楼板钢圈梁的槽底和槽壁相接。8 . The inter-module connection method of a modular building according to claim 1 , wherein the floor steel ring beam is provided with a stabilizing plate, and the edge of the stabilizing plate is connected to the edge of the floor steel ring beam. 9 . The groove bottom is connected with the groove wall.
CN202010739907.5A 2020-07-28 2020-07-28 A method for connecting modules of modular buildings Active CN111851730B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010739907.5A CN111851730B (en) 2020-07-28 2020-07-28 A method for connecting modules of modular buildings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010739907.5A CN111851730B (en) 2020-07-28 2020-07-28 A method for connecting modules of modular buildings

Publications (2)

Publication Number Publication Date
CN111851730A true CN111851730A (en) 2020-10-30
CN111851730B CN111851730B (en) 2025-01-14

Family

ID=72948422

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010739907.5A Active CN111851730B (en) 2020-07-28 2020-07-28 A method for connecting modules of modular buildings

Country Status (1)

Country Link
CN (1) CN111851730B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20130102890A (en) * 2012-03-08 2013-09-23 주식회사 포스코에이앤씨건축사사무소 Panelized modular building system and method of construction thereof
CN203247699U (en) * 2013-05-16 2013-10-23 山东鲁帆集团有限公司 Modular building structure
CN206110331U (en) * 2016-10-12 2017-04-19 成都绿建科技有限公司 Prefabricated assembly building of lightweight steel construction lightweight concrete
CN212715328U (en) * 2020-07-28 2021-03-16 苏州中聚绿色建筑技术有限公司 Module-to-module connection structure of modular building

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20130102890A (en) * 2012-03-08 2013-09-23 주식회사 포스코에이앤씨건축사사무소 Panelized modular building system and method of construction thereof
CN203247699U (en) * 2013-05-16 2013-10-23 山东鲁帆集团有限公司 Modular building structure
CN206110331U (en) * 2016-10-12 2017-04-19 成都绿建科技有限公司 Prefabricated assembly building of lightweight steel construction lightweight concrete
CN212715328U (en) * 2020-07-28 2021-03-16 苏州中聚绿色建筑技术有限公司 Module-to-module connection structure of modular building

Also Published As

Publication number Publication date
CN111851730B (en) 2025-01-14

Similar Documents

Publication Publication Date Title
CN108678278A (en) A kind of assembly-type light partition
CN219968322U (en) Prefabricated box girder movable outer formwork structure
CN108035546A (en) A kind of shear wall formwork for placing fixing device for building
CN212105178U (en) An assembled unloading platform for building construction
CN222228090U (en) Auxiliary support device for installing building steel structure
CN220058928U (en) Beam-column node connection device
CN204310646U (en) A kind of novel elevator hoistway
CN212715328U (en) Module-to-module connection structure of modular building
CN111851730B (en) A method for connecting modules of modular buildings
CN219732331U (en) Steel beam connecting device for assembled building
CN218665044U (en) Lifting seat device for space pipe truss construction
CN217974789U (en) Strong connection device for building steel structure
CN211173128U (en) Multifunctional assembled stand column and cross beam auxiliary supporting device
CN217734358U (en) Box column and high girder steel connection structure that varies
CN211312819U (en) A kind of prefabricated balcony installation fixed support steel frame
CN216042031U (en) Pull rod formula aluminium package steel construction large-span glass curtain wall
CN119843808B (en) Curtain wall keel and curtain wall construction method
CN223634200U (en) A wind-resistant column for building structures
CN113187244A (en) Concrete plate thickness control device and method
CN222667512U (en) Scaffold frame
CN219034163U (en) X-shaped support for prefabricated floor slab
CN222822513U (en) A steel structure column that is easy to install
CN218161569U (en) Tunnel cable installing support cross arm mounting structure
CN220133551U (en) A wall support device
CN218493239U (en) Two-layer steel structure room of easy dismouting

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant