CN219033731U - Roof steel structure of assembled board house building - Google Patents

Roof steel structure of assembled board house building Download PDF

Info

Publication number
CN219033731U
CN219033731U CN202320137907.7U CN202320137907U CN219033731U CN 219033731 U CN219033731 U CN 219033731U CN 202320137907 U CN202320137907 U CN 202320137907U CN 219033731 U CN219033731 U CN 219033731U
Authority
CN
China
Prior art keywords
top plate
board house
plate
roof
house building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320137907.7U
Other languages
Chinese (zh)
Inventor
张媛媛
袁三芳
张勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chuzhou Maoye Construction Engineering Co ltd
Original Assignee
Chuzhou Maoye Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chuzhou Maoye Construction Engineering Co ltd filed Critical Chuzhou Maoye Construction Engineering Co ltd
Priority to CN202320137907.7U priority Critical patent/CN219033731U/en
Application granted granted Critical
Publication of CN219033731U publication Critical patent/CN219033731U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

The utility model discloses an assembled board house building roof steel structure, which relates to the technical field of assembled board house buildings and comprises a first top plate, a second top plate and a central support post, wherein fixing grooves are formed in two symmetrical sides of the upper surface of the central support post, fixing strips are arranged in the fixing grooves, the first top plate and the second top plate are respectively integrated with the corresponding fixing strips, a plurality of thread grooves are uniformly formed in the surfaces of the fixing strips, screws are arranged in the thread grooves, support rods are fixedly arranged at positions, close to the center, of the lower surfaces of the fixing strips, a plurality of damping springs are uniformly arranged on the lower surfaces of the support rods, a support plate is fixedly arranged on the lower surfaces of the damping springs, a first mounting plate and a second mounting plate are arranged below the support plate, auxiliary support rods are fixedly arranged between the first top plate and the second top plate and the central support post, and the auxiliary support rods are attached to the surfaces of the central support post, so that the effects of improving the fixity and damping and buffering are achieved.

Description

Roof steel structure of assembled board house building
Technical Field
The utility model relates to the technical field of assembled board house buildings, in particular to an assembled board house building roof steel structure.
Background
Most of the existing board houses are composed of core boards and steel materials, and are one of the main building structure types of the factory buildings. The roof structure of the board house mainly comprises steel beams, steel columns, steel trusses and other components made of section steel, steel plates and the like, the roof of the board house mostly adopts an integral welding structure, and the area width of the board house is inconsistent; during assembly, the requirement on the assembly process is high, and meanwhile, due to the fact that the dead weight of steel is large, the buffering and damping effects of most of roof steel structures of assembled board house buildings are often ignored when stability among the steel structures is considered.
Disclosure of Invention
The utility model aims to provide an assembled board house building roof steel structure which solves the technical problems in the background technology.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides an assembled board house building roof steel construction, includes first roof, second roof and center pillar, the fixed slot has all been seted up to the symmetry both sides of center pillar upper surface, be provided with the fixed strip in the fixed slot, first roof with the second roof respectively with the fixed strip that corresponds respectively sets up as an organic wholely, a plurality of screw thread groove has evenly been seted up on fixed strip surface, the screw thread inslot screw thread is provided with the screw, the center pillar lower surface is close to the fixed bracing piece that is provided with in position in center, the lower surface of bracing piece evenly is provided with a plurality of damping spring, damping spring's lower fixed surface is provided with the backup pad, the below of backup pad is provided with first mounting panel and second mounting panel.
Optionally, the first roof with the second roof with fixedly be provided with the auxiliary stay between the center pillar, the auxiliary stay with the first roof with the second roof is integrated setting, the auxiliary stay laminating sets up the surface of center pillar.
Optionally, both sides of the supporting plate are attached to the inner inclined surfaces of the first top plate and the second top plate.
Optionally, the second mounting plate is fixedly arranged on the bottom end surfaces of the first top plate and the second top plate.
Optionally, the draw-in groove has been seted up to the relative both sides surface symmetry of second mounting panel, first mounting panel is close to one side of draw-in groove is fixed to be provided with the fixture block, the fixture block with draw-in groove looks adaptation.
Optionally, threaded holes are uniformly formed on the surfaces of the first mounting plate 10 and the second mounting plate 11.
Compared with the prior art, the utility model has the following beneficial effects:
1. according to the utility model, by means of the arrangement of the damping spring, if vibration caused by natural disasters is encountered, the damping spring can reduce the structural vibration of the roof caused by the vibration as far as possible, so that collapse of the roof caused by severe vibration is avoided, the stability of the roof steel structure of the assembled board house building is ensured, and the damping and buffering effects are improved.
2. According to the utility model, through the cooperation of the auxiliary supporting rods and the supporting plates, on the basis that the central supporting column supports the first top plate and the second top plate to be firmly connected, auxiliary supporting force is provided for the first top plate and the second top plate, and the stability of the first top plate and the second top plate is ensured.
Drawings
FIG. 1 is a front view of the structure of the present utility model;
FIG. 2 is a top view of the structure of the present utility model;
FIG. 3 is a front view of the structure of the present utility model;
fig. 4 is an exploded view of a portion of the structure of the present utility model.
In the figure: 1-center pillar, 2-first roof, 3-second roof, 4-fixed slot, 5-fixed strip, 6-auxiliary stay, 7-bracing piece, 8-damping spring, 9-backup pad, 10-first mounting panel, 11-second mounting panel, 12-screw hole, 13-draw-in groove, 14-fixture block, 15-thread groove, 16-screw.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Embodiment one:
referring to fig. 1 to 4, the present utility model provides a technical solution: the utility model provides an assembled board house building roof steel construction, including first roof 2, second roof 3 and center pillar 1, fixed slot 4 has all been seted up to the symmetry both sides of center pillar 1 upper surface, be provided with fixed strip 5 in the fixed slot 4, first roof 2 and second roof 3 respectively with the fixed strip 5 that corresponds respectively set up as an organic wholely, a plurality of screw thread groove 15 has evenly been seted up on fixed strip 5 surface, screw thread groove 15 internal thread is provided with screw 16, center pillar 1 lower surface is close to the fixed bracing piece 7 that is provided with in position in center, the lower surface of bracing piece 7 evenly is provided with a plurality of damping spring 8, damping spring 8's lower fixed support plate 9 that is provided with, backup plate 9's below is provided with first mounting panel 10 and second mounting panel 11.
More specifically, in this embodiment, when assembling the roof steel structure of the fabricated board house, the fixing strip 5 is first clamped into the fixing groove 4 of the center pillar 1, then the screw 16 in the screw thread groove 15 is installed in a threaded manner, the supporting plate 9 below the supporting rod 7 is abutted against and supports the first top plate 2 and the second top plate 3, the vibration of the vibration absorbing spring 8 is utilized, if the vibration caused by natural disasters is encountered, the vibration absorbing spring 8 can reduce the structural vibration of the roof as much as possible, so that the collapse of the roof caused by severe vibration is avoided, the stability of the roof steel structure of the fabricated board house is ensured, the vibration absorbing and buffering effects are improved, and the first mounting plate 10 and the second mounting plate 11 are mounted corresponding to the roof to be mounted.
Embodiment II, based on the above embodiment:
further, an auxiliary supporting rod 6 is fixedly arranged between the first top plate 2, the second top plate 3 and the central supporting column 1, the auxiliary supporting rod 6 is integrally arranged with the first top plate 2 and the second top plate 3, and the auxiliary supporting rod 6 is attached to the surface of the central supporting column 1.
More specifically, in this embodiment, after the screws 16 in the screw grooves 15 are screwed, the auxiliary support rods 6 abut against two sides of the center pillar 1, and on the basis that the center pillar 1 supports the first top plate 2 and the second top plate 3 to perform stable connection, the auxiliary support rods 6 provide auxiliary supporting force for the first top plate 2 and the second top plate 3, so as to ensure the stability of the first top plate 2 and the second top plate 3.
Embodiment III, based on the above embodiment:
further, both sides of the support plate 9 are attached to the inner slopes of the first top plate 2 and the second top plate 3.
More specifically, in the present embodiment, on the basis that the center pillar 1 supports the first top plate 2 and the second top plate 3 for stable connection, the supporting plate 9 is in interference fit with the center pillar 1 by the inner inclined planes of the first top plate 2 and the second top plate 3 and the auxiliary supporting rod 6, so that the stability of the first top plate 2 and the second top plate 3 is improved.
Embodiment IV, based on the above embodiment:
further, the second mounting plate 11 is fixedly provided on the bottom end surfaces of the first top plate 2 and the second top plate 3.
More specifically, in this embodiment, the bottom end surfaces of the first top plate 2 and the second top plate 3 are both fixed with the second mounting plate 11, which is convenient for connecting and fixing with the first mounting plate 10, so as to fix the first top plate 2 and the second top plate 3.
Fifth embodiment, based on the above embodiment:
further, clamping grooves 13 are symmetrically formed in the surfaces of two opposite sides of the second mounting plate 11, clamping blocks 14 are fixedly arranged on one side, close to the clamping grooves 13, of the first mounting plate 10, and the clamping blocks 14 are matched with the clamping grooves 13.
More specifically, in the present embodiment, the clamping block 14 of the first mounting plate 10 can be clamped into the clamping groove 13 of the second mounting plate 11 by utilizing the clamping block 14 and the clamping groove 13, so as to connect and fix the first mounting plate 10 and the second mounting plate 11, and further stabilize the roof angle positions of the first roof plate 2 and the second roof plate 3.
Embodiment six, based on the above embodiment:
further, threaded holes 12 are uniformly formed in the surfaces of the first mounting plate 10 and the second mounting plate 11.
More specifically, in the present embodiment, through the screw holes 12 of the first mounting plate 10 and the second mounting plate 11, an operator can place the first mounting plate 10 and the second mounting plate 11 on a roof to be assembled and mounted, and then screw-fix the screw holes 12, thereby securing the assembled board house roof steel structure as a whole.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides an assembled board house building roof steel construction, includes first roof (2), second roof (3) and center pillar (1), its characterized in that: the utility model discloses a damping device for a concrete pile, including center pillar (1), fixed slot (4) have all been seted up to the symmetry both sides of center pillar (1) upper surface, be provided with fixed strip (5) in fixed slot (4), first roof (2) with second roof (3) respectively with each correspond fixed strip (5) set up as an organic wholely, a plurality of screw groove (15) have evenly been seted up on fixed strip (5) surface, screw groove (15) internal thread is provided with screw (16), the fixed bracing piece (7) that are provided with in position that center pillar (1) lower surface is close to the center, the lower surface of bracing piece (7) evenly is provided with a plurality of damping spring (8), damping spring (8)'s lower fixed backup pad (9) that is provided with, backup pad (9) below is provided with first mounting panel (10) and second mounting panel (11).
2. A fabricated board house building roof steel structure as claimed in claim 1, wherein: the auxiliary support rod (6) is fixedly arranged between the first top plate (2) and the second top plate (3) and the center support column (1), the auxiliary support rod (6) is integrally arranged with the first top plate (2) and the second top plate (3), and the auxiliary support rod (6) is attached to the surface of the center support column (1).
3. A fabricated board house building roof steel structure as claimed in claim 1, wherein: the two sides of the supporting plate (9) are attached to the inner inclined surfaces of the first top plate (2) and the second top plate (3).
4. A fabricated board house building roof steel structure as claimed in claim 1, wherein: the second mounting plate (11) is fixedly arranged on the bottom end surfaces of the first top plate (2) and the second top plate (3).
5. The fabricated board house building roof steel structure according to claim 4, wherein: clamping grooves (13) are symmetrically formed in the surfaces of two opposite sides of the second mounting plate (11), clamping blocks (14) are fixedly arranged on one side, close to the clamping grooves (13), of the first mounting plate (10), and the clamping blocks (14) are matched with the clamping grooves (13).
6. The fabricated board house building roof steel structure according to claim 5, wherein: screw holes (12) are uniformly formed in the surfaces of the first mounting plate (10) and the second mounting plate (11).
CN202320137907.7U 2023-02-07 2023-02-07 Roof steel structure of assembled board house building Active CN219033731U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320137907.7U CN219033731U (en) 2023-02-07 2023-02-07 Roof steel structure of assembled board house building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320137907.7U CN219033731U (en) 2023-02-07 2023-02-07 Roof steel structure of assembled board house building

Publications (1)

Publication Number Publication Date
CN219033731U true CN219033731U (en) 2023-05-16

Family

ID=86283795

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320137907.7U Active CN219033731U (en) 2023-02-07 2023-02-07 Roof steel structure of assembled board house building

Country Status (1)

Country Link
CN (1) CN219033731U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117926965A (en) * 2024-03-25 2024-04-26 中旭万承工程设计集团有限公司 Building shock attenuation roof structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117926965A (en) * 2024-03-25 2024-04-26 中旭万承工程设计集团有限公司 Building shock attenuation roof structure
CN117926965B (en) * 2024-03-25 2024-06-04 中旭万承工程设计集团有限公司 Building shock attenuation roof structure

Similar Documents

Publication Publication Date Title
CN219033731U (en) Roof steel structure of assembled board house building
CN214574887U (en) Novel assembled shear wall structure power consumption device
CN113250316B (en) Anti-seismic device of beam-column joint of reinforced concrete structure
CN113638495B (en) Assembly type steel structure building main body connecting structure and mounting method thereof
CN210888099U (en) Platform beam auxiliary mounting device of platform is encorbelmented in opposite directions in narrow space
CN112282106A (en) Assembled building side fascia perps connected node
CN209780318U (en) prefabricated component installation bearing structure
CN217631500U (en) Support column for assembly type building
CN115538600A (en) Connecting structure of steel structure column and steel structure beam
CN213926702U (en) Adjustable assembled beam column supporting and connecting piece
CN114776066A (en) Traditional village building protection device
CN220954201U (en) Prefabricated building spandrel post structure
CN212926704U (en) High-precision prefabricated building steel structure beam
CN217924237U (en) Mounting structure of light steel wall body and light steel composite beam
CN216973729U (en) Steel structure node connecting device
CN219387260U (en) Assembled building construction superimposed sheet fixing device
CN220814226U (en) Novel assembled concrete beam column node
CN220928291U (en) Anti-seismic wall structure of integrated house
CN221030718U (en) Prefabricated building mechanism
CN220565440U (en) Locking and fixing device for steel member
CN219825571U (en) Antiseep bearing balcony convenient to concatenation installation
CN216740092U (en) Auxiliary mechanism for horizontal connection and installation of steel structure
CN220319197U (en) Film structure trompil department correction fixing device
CN211572020U (en) Beam clamp fixing mechanism and beam clamp
CN220184355U (en) Main body connecting structure of assembled steel structure building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant