CN111815268A - Project investment control method and device based on value assessment and terminal - Google Patents

Project investment control method and device based on value assessment and terminal Download PDF

Info

Publication number
CN111815268A
CN111815268A CN202010598785.2A CN202010598785A CN111815268A CN 111815268 A CN111815268 A CN 111815268A CN 202010598785 A CN202010598785 A CN 202010598785A CN 111815268 A CN111815268 A CN 111815268A
Authority
CN
China
Prior art keywords
project
value
evaluation
module
declared
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010598785.2A
Other languages
Chinese (zh)
Inventor
肖建
陈晓杜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiamen Sizai Information Technology Co ltd
Original Assignee
Xiamen Sizai Information Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiamen Sizai Information Technology Co ltd filed Critical Xiamen Sizai Information Technology Co ltd
Priority to CN202010598785.2A priority Critical patent/CN111815268A/en
Publication of CN111815268A publication Critical patent/CN111815268A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q40/00Finance; Insurance; Tax strategies; Processing of corporate or income taxes
    • G06Q40/06Asset management; Financial planning or analysis

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Theoretical Computer Science (AREA)
  • Development Economics (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Quality & Reliability (AREA)
  • Accounting & Taxation (AREA)
  • Finance (AREA)
  • Game Theory and Decision Science (AREA)
  • Data Mining & Analysis (AREA)
  • Technology Law (AREA)
  • Educational Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a project investment control method, a project investment control device and a project investment control terminal based on value evaluation, wherein the method comprises the following steps: inputting project information to be declared, confirming authenticity and value attribution of the project information to be declared, integrally evaluating a project to be declared by combining importance evaluation, internal control risk coefficient evaluation and project value evaluation, further performing resource allocation, analyzing and executing the project, and establishing a result evaluation and feedback mechanism. The invention further correspondingly provides a project investment management and control device and a terminal based on the value evaluation. The project investment management and control method, the project investment management and control device and the project investment management and control terminal based on value assessment can improve accuracy and authenticity of project investment management and control, guarantee reasonable distribution of large-scale overall projects in various fields, reduce participation of artificial subjective factors, and achieve all-round and efficient execution and monitoring of projects.

Description

Project investment control method and device based on value assessment and terminal
Technical Field
The invention relates to the technical field of information processing, in particular to a project investment management and control method, device and terminal based on value evaluation.
Background
In large-scale national enterprise and public institution or group company, a large amount of investment projects are available every year, and the general flow is as follows: and (4) submitting project establishment applications by a project demander, then examining and approving layer by layer, and finally auditing and evaluating each project by an expert group to determine an investment project list to be developed in the future.
Such a centralized conference evaluation manner can evaluate whether the project is necessary to be developed to a certain extent, but is limited to the authenticity and accuracy of detailed division and information transmission for large enterprises, and an expert group may make an erroneous determination on the project development necessity due to the reasons of the project declaration party such as counterfeiting and reporting-off of project information, and has a greater subjectivity on resource allocation of each project.
Based on the reasons, information in the investment process of a large project is asymmetric, so that the problems that the investment project is not expected, the project fund allocation is unreasonable and the whole process of the project is not tracked timely are caused. For more contents on the existing project management and control method, reference may be made to chinese patent documents with publication numbers CN110210979A and CN 110956374A.
Disclosure of Invention
In view of the above situation, the present invention provides a project investment management and control method, device and storage medium based on value evaluation, so as to solve the technical problems of inappropriate investment, unreasonable fund allocation and untimely tracking of the whole process of the european crown in the project investment process.
The invention provides a project investment management and control method based on value evaluation, which comprises the following steps:
inputting project information to be declared, and inputting project establishment information of a project to be declared by a project declarator;
information confirmation is carried out on the information to be declared, wherein a certifier and a confirmation department confirm authenticity and value attribution of the information of the project to be declared, and a project principal confirms overall authenticity of the project to be declared;
performing audit evaluation on the project to be declared, wherein the audit evaluation comprises importance evaluation, internal control risk coefficient evaluation and project value evaluation;
and allocating resources, setting resource limit limits based on the auditing and evaluating results, and generating a passing project list according to the scores in a descending order.
Analyzing and executing the project, determining a project composition diagram, a fund allocation diagram and a strategic investment number according to the project list, and further executing the project;
and evaluating and feeding back results, evaluating the overall completion condition of the project based on the project implementation condition, and carrying out feedback analysis on the value evaluation results.
Further, the project value assessment comprises:
setting a value evaluation coefficient calculation rule;
inputting the number of parameters, the average deviation, the value dimension and the budget amount;
and generating the value evaluation coefficient of the project to be declared according to the value evaluation coefficient calculation rule.
Further, the value evaluation coefficient calculation rule is specifically as follows:
Figure BDA0002558441020000021
wherein P represents the value evaluation score, k represents the adjustment coefficient, C represents the participation number, A represents the average variance, D represents the value dimension, and G represents the budget amount.
Further, the resource allocation specifically includes:
configuring a project comprehensive score calculation rule;
generating a project list based on the comprehensive score calculation rule;
setting a resource limit;
further generating a passing item list according to the limitation and the descending order of the scores;
and adjusting the passing item list and determining the passing item list.
Further, the result evaluation and feedback comprises:
randomly checking the item cause conformity;
further checking the project progress, budget compound and project completion conditions;
an overall evaluation of the project is made.
Further, the result evaluation and feedback further comprises:
comparing the items longitudinally and transversely;
analyzing the value dimension, and determining a feedback result by combining a value evaluation coefficient;
and generating a project investment map of the overall strategy.
The application also provides a project investment management and control device based on value evaluation, the device includes:
the data acquisition module is used for acquiring standing item information of the project to be declared;
the information confirmation module is used for confirming the accuracy and the authenticity of the project to be declared;
the auditing and evaluating module is used for performing importance evaluation, internal control risk coefficient evaluation and project value evaluation on the project to be declared;
the resource allocation module is used for determining a passed item list;
the item analysis and execution module is used for analyzing the passed item list and further executing the passed items;
and the result evaluation and feedback module is used for storing the project evaluation result and feeding back the analysis result.
Further, the resource allocation module specifically includes:
the resource allocation module is used for allocating project score calculation rules;
the item list generating module is used for generating an item list;
the limit setting module is used for setting resource limit;
the item list display module is used for displaying the passed item list;
and the item list adjusting module is used for adjusting the item list and determining that the item list passes through the item list.
The present application further provides a terminal device comprising a memory and a processor, which when executing the computer program implements the steps of the method as described above.
In order to achieve the above object, the present application also provides a computer readable storage medium having stored thereon a computer program which, when being executed by a processor, realizes the steps of the method as described above.
According to the project investment management and control method, device and terminal based on value evaluation, the overall authenticity of the project to be declared is confirmed, importance evaluation, internal control risk coefficient evaluation and project value evaluation are combined to perform resource allocation, and a project analysis execution and result evaluation feedback mechanism is further established. Compared with the prior art, the method and the device can improve the accuracy and authenticity of project investment management and control, ensure the reasonable distribution of large-scale overall projects in all fields, reduce the participation of artificial subjective factors, and realize the all-round and efficient execution and monitoring of the projects.
Drawings
FIG. 1 is a block flow diagram of a method for project investment management based on value valuation in one embodiment of the invention.
Fig. 2 is a flowchart of a project feasibility management and control method based on risk assessment in an embodiment of the present invention.
FIG. 3 is a block flow diagram of project value assessment in one embodiment of the invention.
Fig. 4 is a detailed flow diagram of resource allocation in an embodiment of the invention.
Fig. 5 is a block diagram of a project investment management apparatus based on value evaluation according to the present invention.
Fig. 6 is a structural diagram of a project feasibility management and control apparatus based on risk assessment according to the present invention.
Fig. 7 is a detailed structural diagram of a resource allocation module of the present invention.
Fig. 8 is a block diagram of a detailed structure of a terminal according to an embodiment of the present invention.
Description of the main elements
Terminal 100
Data acquisition module 110
Information confirmation module 120
Audit evaluation module 130
Information acquisition module 131
Information judging module 132
Risk assessment calculation Module 133
Threshold comparison module 134
Result acquisition module 135
Resource allocation module 140
Resource configuration module 141
Item list generation module 142
Limit setting module 143
Item list presentation module 144
Item list adjustment module 145
Processor 210
Memory 220
RAM 221
Cache 222
Storage system 223
Program module 224
I/O interface 230
Network adapter 240
The following detailed description will further illustrate the invention in conjunction with the above-described figures.
Detailed Description
The existing investment project management and control method is generally as follows:
the method comprises the following steps: filling out project declaration material by each project development demander and submitting
Step two: the leaders at all levels check the project declaration materials, and whether the project is approved to be declared is checked;
step three: and (5) the expert group issues a meeting, and whether each declaration item agrees to standing items is confirmed.
The deficiencies of the prior methods include:
1. the foundation of project demanders lacks authenticity verification;
2. the budget expenditure of the project demander lacks accuracy support;
3. the necessity of project establishment lacks certification by relevant departments;
4. the expert group evaluates whether the project has strong standing subjectivity and lacks data basis;
5. after each project is established, under the condition of limited resources, the basis for screening and sequencing the projects is lacked.
In order to promote effective control of investment projects, ensure cause and budget of investment projects, provide data support of project establishment necessity and provide objective reference basis for project resource allocation, the invention provides a novel project feasibility control method based on cause and value evaluation, so as to solve corresponding defects.
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. The terminology used in the description of the invention herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the invention. As used herein, the term "and/or" includes any and all combinations of one or more of the associated listed items.
It is to be further noted that, for the convenience of description, only some but not all of the matters related to the present invention are shown in the drawings. Before discussing exemplary embodiments in more detail, it should be noted that some exemplary embodiments are described as processes or methods depicted as flowcharts. Although a flowchart depicts various operations (or steps) as a sequential process, many of the operations can be performed in parallel, concurrently, or simultaneously. In addition, the order of various operations may be rearranged. The process may be terminated when its operations are completed, but may have additional steps not included in the figure. The processes may correspond to methods, functions, procedures, subroutines, and the like.
Referring to fig. 1, the present invention provides a method for managing and controlling project investment based on value evaluation, and the method of the present embodiment can be implemented by a device for managing and controlling project investment based on value evaluation, which can be implemented by hardware or software and can be generally integrated into a device, such as a server. The method of the embodiment specifically includes:
and S100, inputting information of the project to be declared.
In this embodiment, a project applicant inputs project standing information of a project to be declared. Specifically, the project applicant fills in project establishment information according to project conditions, including project basic information, establishment causes, project budgets, expected targets, value dimensions and the like.
The project cause is a project establishment cause, and after the project establishment cause is determined, a certifier or a confirmation department or a relevant uploading basis for the cause is further selected; on the aspect of value dimension, the multi-dimensional value of the project is mainly considered, and whether the association exists between the multi-dimensional value and the project is further confirmed.
S200, information confirmation is carried out on the information to be declared.
In this embodiment, after the project applicant submits the project information, an entry to be confirmed is generated, and further, the related information is sent to the account of the certifier and the account of the corresponding department, so that the certifier and the confirming department confirm the authenticity and value attribution of the project information to be declared.
For example, the budget is sent to a corresponding confirmer or department according to the confirmation, the selection of the value dimension is sent to a value governing department, and if the value dimension is safe, the corresponding project information is sent to a safety department to judge whether the value dimension has the safe value dimension. And confirming the integral authenticity of the project to be declared by the project principal.
And S300, auditing and evaluating the project to be declared.
In this embodiment, the evaluation and review includes importance evaluation, internal control risk coefficient evaluation, and project value evaluation.
When the importance evaluation is carried out, the project administrator carries out weight distribution on different project types, project factors, resource investment and expected effect lamps, further carries out weighted calculation on options corresponding to the project information, and generates an importance judgment result.
S400, resource allocation is carried out.
In the resource allocation process of this embodiment, the resource limit is set based on the result of the audit evaluation, and the passing item list is generated in descending order according to the scores.
And S500, analyzing and executing the project.
In this embodiment, the project composition diagram, the fund allocation diagram, and the strategic investment are determined based on the list of projects, and the projects are further executed.
Firstly, carrying out project composition analysis on dimensions such as project types, solved problems, project factors and the like on a passed project list, further establishing capital allocation analysis according to project invested capital, and generating a project strategy tree and a capital invested plan.
The project execution process adopts on-line full-flow management, and the signing, execution process, information change, project closing matters and the like are operated on line and recorded and stored.
And S600, evaluating and feeding back results.
In this embodiment, the overall completion of the project is evaluated based on the project implementation, and the value evaluation result is subjected to feedback analysis.
After the project is completed, the motivation compliance, the budget compliance and the overall completion of the project can be further checked.
The investment management and control method based on value evaluation provided by the invention confirms the integral authenticity of the project to be declared, combines importance evaluation, internal control risk coefficient evaluation and project value evaluation to distribute resources, and further establishes project analysis execution and result evaluation feedback mechanisms. Compared with the prior art, the method and the device can improve the accuracy and authenticity of project investment management and control, ensure the reasonable distribution of large-scale overall projects in all fields, reduce the participation of artificial subjective factors, and realize the all-round and efficient execution and monitoring of the projects.
Fig. 2 is a flowchart of a project feasibility management and control method based on risk assessment according to an embodiment of the present invention. The embodiment is optimized based on the above embodiment, and a specific implementation of project management and control based on risk assessment is given in the embodiment.
Correspondingly, the specific method of the embodiment includes:
and S321, inputting information of the project to be evaluated.
And S322, performing information confirmation on the to-be-evaluated item information.
In this embodiment, the confirmation person and the confirmation department perform corroboration on the corresponding information of the project to be evaluated, and the project chief responsible person confirms the whole information of the project to be evaluated, so as to ensure the information accuracy and the authenticity of the project to be evaluated.
And S323, performing project risk assessment calculation.
When the project risk assessment is calculated, the budget amount, the total number of participating persons, the project concentration and the participation rate of responsible persons of the project are mainly considered.
In this embodiment, the risk assessment coefficient calculation rule is calculated by using a risk assessment model, where the risk assessment model specifically includes:
Figure BDA0002558441020000091
wherein S represents an internal control risk parameter, k represents an adjusting coefficient, G represents a budget amount, R represents a total number of participants, X represents a project concentration ratio, and h represents a participation rate of responsible persons.
Based on the risk assessment model, risk assessment coefficients of different projects can be further calculated, and further screening can be performed according to the risk assessment coefficients.
And S324, setting a risk coefficient threshold value.
In order to further control the risk of the investment project, a risk coefficient threshold value is set, the projects with the risk evaluation coefficients lower than the risk coefficient threshold value are passed, and the projects with the risk evaluation coefficients higher than the risk coefficient threshold value are excluded.
And S325, checking the risk assessment information and giving a judgment result.
In this embodiment, the risk assessment coefficient calculated by the risk assessment model may determine the passing information of the item in combination with the comparison result of the risk coefficient threshold.
And S326, outputting item judgment results based on the risk assessment.
In the embodiment, by introducing the risk assessment coefficient and referring to the budget amount, the total number of participating persons, the project concentration and the participation rate of responsible persons, the risk of project implementation can be effectively controlled, and the success rate of project investment is improved.
FIG. 3 is a block flow diagram of a project value assessment of an embodiment of the present invention. The embodiment is further optimized on the basis of the embodiment, and a specific implementation mode of project value evaluation is given.
Accordingly, the specific implementation manner of this embodiment includes:
and S331, setting a value evaluation coefficient calculation rule.
The value evaluation coefficient calculation rule is specifically as follows:
Figure BDA0002558441020000101
wherein P represents the value evaluation score, k represents the adjustment coefficient, C represents the participation number, A represents the average variance, D represents the value dimension, and G represents the budget amount.
(1) Calculation of the parameter k
The parameter k is an adjusting coefficient, a weight coefficient of a project type is taken, the strategic guidance value of the investment project is reflected, and the value of k is higher for projects meeting strategic requirements.
Specifically, taking the investment management and control project of a certain large-scale national enterprise as an example:
item type classification:
1. production support class, subclass: site transformation, equipment transformation and process transformation.
2. Market expansion category, subclass: development of new market, maintenance of old market and exploration of new field.
3. Staff growth category, subclass: independent innovation, skill improvement and management improvement.
4. Social responsibility class, subclass: environmental protection, public welfare propaganda, charitable cause.
The weight settings are set as follows:
1. production support class (0.4):
subclass (ii): site transformation (0.3), equipment transformation (0.2), and process transformation (0.5)
2. Market expansion category (0.3):
subclass (ii): new market development (0.5), old market maintenance (0.3), new field exploration (0.2)
3. Employee growth category (0.2):
subclass (ii): independent innovation (0.6), skill improvement (0.2), management improvement (0.2)
4. Social responsibility class (0.1):
subclass (ii): environmental protection (0.4), public welfare propaganda (0.3), charitable cause (0.3)
Then the adjustment coefficient k is the classification weight and the subclass weight
Example (c): and if the project A is process improvement, the project B is old market maintenance, and the project C is independent innovation, the corresponding adjusting coefficient k values are as follows:
k(A)=0.4*0.5=0.2,
k(B)=0.3*0.3=0.09,
k(C)=0.2*0.6=0.12。
(2) the calculation of the parameter C and the calculation of the parameter A
The parameter C is the number of quantity indexes in the output indexes of the investment project, and the parameter A is the deviation mean value between the current value and the target value of each parameter. Parameter C represents how much the problem is being solved, and parameter A represents the urgency of problem resolution. In this embodiment, the more problems the project can solve, and the larger the deviation of the problems, the more urgent the project is, and the higher the value of the project is.
For example: item a is expected to implement the parameters 5,
a 1: tail gas discharge port
a 2: content of particulate matter
a 3: SO2 emission concentration
a 4: concentration of NOx emissions
a 5: satisfaction of peripheral residents
The current values of the parameters are respectively: 3, 40mg/m3, 600mg/m3, 450mg/m3, 80%.
The parameter target values are respectively: 2, 20mg/m3, 400mg/m3, 100mg/m3, 95%.
The deviation values are respectively: 33%, 50%, 33%, 78%, 19%.
The corresponding parameter C is 5,
parameter a is 0.426.
(3) Calculation of the parameter D
And the parameter D is the number of the authentication value dimensions of the project. The parameter is the ability of a single investment project to be put into multiple outputs. The valuable dimensionality of the investment project is determined, and then the number of the valuable dimensionalities which the project conforms to is certified by the relevant department.
In this embodiment, taking the investment management and control project of a large national enterprise as an example, the dimensionalities of the provided project values are determined by the group as follows:
1. the quality is improved; 2. the cost is saved; 3. the efficiency is improved; 4. expanding sales; 5. safety is strengthened; 6. the environment is protected; 7. the public welfare of the society; 8. employee growth
Example (c): the tail gas treatment related item A is judged by related department experts, the value dimension of safety enhancement and environmental protection is met, and the parameter D is 2.
(4) Calculation of the parameter G
The parameter G is the project budget amount, unit, the total budget application amount of project establishment, and the parameter is the input-output ratio of the investment project. On the premise of solving the same problem, the smaller the investment, the higher the input-output ratio of the project, the smaller the input risk of the corresponding project, and the more valuable the project is. The order of the budget investment is taken as the evaluation criterion.
For example: if the total budget of the personnel, equipment, traveling, etc. of item a is 10 ten thousand, G is 100000, log10G=5。
To sum up, the values of the parameters of the item a are as follows:
k=0.2,C=5,A=0.426,D=2,G=100000。
the value evaluation calculation results for investment project a are as follows:
Figure BDA0002558441020000131
in this embodiment, if the value evaluations of a batch of investment projects are:
p1, P2, P3 … … Pn, with a maximum value of Pmax and a minimum value of Pmin.
All items of the batch may be further normalized to yield a standard score for each item:
Figure BDA0002558441020000132
the lowest score after standardization is 0, and the highest score is 100. And then sorting in a descending order according to the standard, namely, sorting after evaluating the value of each investment project, and recommending a suggested investment project list according to the budget limit sum.
For example: the total investment of the planned project is 1 hundred million, and the standard of the existing selectable project after value evaluation is as follows:
project A is 100 points, budget 1300 ten thousand;
project B96.6 points, budget 3460 ten thousand;
project C93.2, budget 2398 ten thousand;
project D91.2, budget 1932 ten thousand;
project E is 90.3 points, budget 2340 ten thousand;
project F is 90.1 points, budget 900 ten thousand;
project G89.1 points, budget 394 ten thousand.
In this embodiment, the recommended item is A, B, C, D, F, and the total budget in this embodiment is: 9990 ten thousand.
S332, inputting the number of parameters, the average deviation, the value dimension and the budget amount.
S333, generating a value evaluation coefficient of the project to be declared according to the value evaluation coefficient calculation rule.
In this embodiment, the number of parameters, the average deviation, the value dimension, and the budget amount of the whole project are specifically considered, and the value coefficient of the project is calculated by further combining with the calculation rule. The implementation mode can really realize the combination of project requirements, group strategic planning and department daily operation, and realize the scientific and reasonable distribution of investment projects.
Fig. 4 is a detailed flow chart of resource allocation in the embodiment of the present invention. Accordingly, a specific embodiment of resource allocation is presented, the illustrated embodiment comprising:
and S410, configuring a project comprehensive score calculation rule.
In this embodiment, the project comprehensive score calculation rule may combine the importance coefficient, the risk evaluation coefficient, and the value evaluation coefficient of the project, and further consider strategic importance of the company, thereby providing a determination manner of the comprehensive score.
And S420, generating a new item list based on the comprehensive score calculation rule.
When a new item list is generated, all items in the item library are calculated in an integrated manner, and the item list is generated in the order of scores based on the score of each item.
S430, setting resource limit.
Furthermore, the project administrator sets the limit of resources according to the actual project investment requirement, and determines the recommendation list passing through the project according to the limit and the comprehensive score sequence.
S440, generating a passing item list.
Here, a list of through items is further presented.
S450, adjusting the item list and determining the passing item list.
In order to ensure that the project list meets the overall planning requirement of the company, the review group further adjusts the project list according to the actual requirement, thereby finally determining the investment project list.
The resource allocation mode provided by the embodiment can scientifically and effectively screen out high-resolution projects, and meanwhile, in the system operation process, a manual operation process is introduced, so that the project list meets the actual investment requirements of enterprises.
In order to further realize the random inspection and the whole-course tracking of the project and the complete scientific evaluation after the project is finished, the invention also introduces a result evaluation and feedback mechanism, wherein the result evaluation and feedback mechanism comprises the following steps:
randomly checking the item cause conformity;
further checking the project progress, budget compound and project completion conditions;
an overall evaluation of the project is made.
Further, the result evaluation and feedback further comprises:
comparing the items longitudinally and transversely;
analyzing the value dimension, and determining a feedback result by combining a value evaluation coefficient;
and generating a project investment map of the overall strategy.
Based on the result evaluation and feedback mechanism, the scientificity and rationality of the project investment management and control method provided by the invention can be further verified, meanwhile, the whole process tracking of the project implementation condition can be carried out, and the overall high-efficiency promotion of the project is ensured. Furthermore, multi-dimensional analysis is carried out on the investment projects, transverse comparison and longitudinal tracing are achieved, and reference basis is provided for selection of subsequent investment projects.
In order to implement the above embodiments, the embodiment of the present invention provides a project investment management and control apparatus based on value evaluation.
Fig. 5 is a block diagram of a project investment management and control apparatus based on value evaluation according to an embodiment of the present application.
As shown in fig. 5, the project investment management and control apparatus based on value evaluation includes: a data acquisition module 110, an information confirmation module 120, an audit evaluation module 130, a resource allocation module 140, a project analysis and execution module 150, and a result evaluation and feedback module 160.
The data obtaining module 110 is configured to obtain standing item information of the item to be declared. The information confirmation module 120 is configured to confirm the accuracy and authenticity of the item to be declared. The auditing and evaluating module 130 is used for performing importance evaluation, internal control risk coefficient evaluation and project value evaluation on the project to be declared. The resource allocation module 140 is configured to determine a list of passed items. The item analysis and execution module 150 is configured to analyze the passed item list and further execute the passed item. The result evaluation and feedback module 160 is used for storing the project evaluation result and the feedback analysis result.
In the embodiment, the overall authenticity of the project can be confirmed, the importance evaluation, the internal control risk coefficient evaluation and the project value evaluation are combined to allocate resources, and a project analysis execution and result evaluation feedback mechanism is further established. The risk coefficient in the project management and control process is effectively improved and reduced, so that the whole process from declaration to implementation to evaluation of the project can be directly displayed on line.
In a possible implementation manner of the embodiment of the present application, as shown in fig. 6, on the basis of the embodiment shown in fig. 5, the project investment management and control apparatus based on value evaluation further includes: an information acquisition module 131, an information judgment module 132, a risk assessment module 133, a threshold comparison module 134, and a result acquisition module 135.
The risk assessment module 133 is internally controlled with the risk assessment model, and further, a risk assessment coefficient can be calculated by combining the budget amount, the total number of participating persons, the project concentration ratio, and the participation rate of responsible persons in the project.
The threshold comparison module 134 is configured to set a risk coefficient threshold, and based on a comparison result between the risk coefficient threshold and the risk assessment coefficient, item information determined based on the risk assessment can be further obtained.
According to the embodiment of the application, by introducing the risk assessment module 133 and the threshold comparison module 134, the risk information of the investment project can be further controlled, based on the comparison result based on the risk coefficient threshold and the risk assessment coefficient, the project risk can be set more reasonably, so that the investment management and control project meets the enterprise development requirement.
Fig. 7 is a specific structural diagram of a resource allocation module according to another embodiment of the present application.
As shown in fig. 7, the resource allocation module 140 specifically includes: the resource allocation module 141, the item list generation module 142, the limit setting module 143, the item list display module 144, and the item list adjustment module 145.
In this embodiment, the resource allocation module 141 is configured to allocate a project score calculation rule, where the project score calculation rule includes the importance coefficient calculation rule, the internal control risk coefficient calculation rule, and the value evaluation coefficient calculation rule.
The item list generating module is configured to generate an item list, where it should be noted that the item list is obtained by arranging items in descending order according to the score calculation rule.
The limit setting module is used for setting resource limit, the project administrator sets the limit of the resource according to the actual project investment requirement, and the recommendation list passing through the project is determined according to the limit and the comprehensive score sequence.
The item list display module is used for displaying the passed item list.
The item list adjusting module is used for adjusting the item list and determining that the item list passes through.
According to the method and the system, the reasonable distribution of the projects is realized by refining the resource allocation, and when the system determines the project list based on the project scores, the project list adjusting module is introduced, so that the project management and control are more focused on the development direction of a group, and the performance guidance and decision efficiency of project investment fund distribution are further enhanced.
Fig. 8 is a block diagram of a terminal according to an embodiment of the present invention. The terminal 100 shown in fig. 8 is suitable for implementing embodiments of the present invention. The terminal 100 shown in fig. 8 is only an example, and should not bring any limitation to the functions and applicable scope of the embodiments of the present invention.
As shown in fig. 8, the components of terminal 100 may include, but are not limited to: one or more processors 210, and a system memory 220. In the present embodiment, the terminal 100 includes a variety of computer system readable media. Such media may be any available media that is accessible by terminal 100 and includes both volatile and nonvolatile media, removable and non-removable media.
The system memory 220 may include a computer system readable medium in the form of volatile memory, such as Random Access Memory (RAM) and/or cache memory 32. Memory 220 may include at least one program product having a set (e.g., at least one) of program modules 224 that are configured to carry out the functions of embodiments of the invention.
The terminal 100 can communicate with one or more terminals that enable a user to interact with the terminal 100, such communication being via input/output (I/O) interfaces 230. The terminal 100 may also communicate with one or more networks (e.g., a local area network, a wide area network, the internet, etc.) through a network adapter 240.
The processor 210 executes programs stored in the memory 220 to perform various functional applications and data processing, such as a project investment management method based on value evaluation provided by an embodiment of the present invention.
Embodiments of the present invention also provide a computer-readable storage medium, which when executed by a computer processor, is configured to perform a method for project investment management based on value assessment according to embodiments of the present invention. Computer storage media in accordance with embodiments of the present invention may employ any combination of one or more computer-readable media.
The computer readable storage medium of the present embodiments may be an electronic, magnetic, optical, or semiconductor system, apparatus, or device, or any combination thereof. In the present invention, a computer readable storage medium may be any tangible medium that can contain, or store a program for use by or in connection with an instruction execution system, apparatus, or device.
In embodiments of the present invention, computer program code for the operation of the present invention may be written in any combination of one or more programming languages, including an object oriented programming language such as Java, Smalltalk, C + +, and including conventional procedural programming languages. The program code may execute entirely on the computer, partly on the computer or remotely.
It will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential attributes thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned. Furthermore, it is obvious that the word "comprising" does not exclude other elements or steps, and the singular does not exclude the plural. The units or computer means recited in the computer means claims may also be implemented by the same unit or computer means, either in software or in hardware.
Finally, it should be noted that the above embodiments are only for illustrating the technical solutions of the present invention and not for limiting, and although the present invention is described in detail with reference to the preferred embodiments, it should be understood by those skilled in the art that modifications or equivalent substitutions may be made on the technical solutions of the present invention without departing from the spirit and scope of the technical solutions of the present invention.

Claims (10)

1. A project investment management and control method based on value assessment is characterized by comprising the following steps:
inputting project information to be declared, and inputting project establishment information of a project to be declared by a project declarator;
information confirmation is carried out on the information to be declared, wherein a certifier and a confirmation department confirm authenticity and value attribution of the information of the project to be declared, and a project principal confirms overall authenticity of the project to be declared;
performing audit evaluation on the project to be declared, wherein the audit evaluation comprises importance evaluation, internal control risk coefficient evaluation and project value evaluation;
and allocating resources, setting resource limit limits based on the auditing and evaluating results, and generating a passing project list according to the scores in a descending order.
Analyzing and executing the project, determining a project composition diagram, a fund allocation diagram and a strategic investment number according to the project list, and further executing the project;
and evaluating and feeding back results, evaluating the overall completion condition of the project based on the project implementation condition, and carrying out feedback analysis on the value evaluation results.
2. The value assessment based project investment management method according to claim 1, wherein the project value assessment comprises:
setting a value evaluation coefficient calculation rule;
inputting the number of parameters, the average deviation, the value dimension and the budget amount;
and generating the value evaluation coefficient of the project to be declared according to the value evaluation coefficient calculation rule.
3. The method for managing and controlling project investment based on value evaluation as claimed in claim 2, wherein the value evaluation coefficient calculation rule is specifically:
Figure FDA0002558441010000011
wherein P represents the value evaluation score, k represents the adjustment coefficient, C represents the participation number, A represents the average variance, D represents the value dimension, and G represents the budget amount.
4. The value-assessment-based project investment management and control method according to claim 1, wherein the resource allocation specifically comprises:
configuring a project comprehensive score calculation rule;
generating a project list based on the comprehensive score calculation rule;
setting a resource limit;
further generating a passing item list according to the limitation and the descending order of the scores;
and adjusting the passing item list and determining the passing item list.
5. The value-valuation-based project investment management and control method of claim 4, wherein said result valuation and feedback comprises:
randomly checking the item cause conformity;
further checking the project progress, budget compound and project completion conditions;
an overall evaluation of the project is made.
6. The value-valuation-based project investment management and control method of claim 5, wherein said result valuation and feedback further comprises:
comparing the items longitudinally and transversely;
analyzing the value dimension, and determining a feedback result by combining a value evaluation coefficient;
and generating a project investment map of the overall strategy.
7. A value assessment-based project investment management and control apparatus, the apparatus comprising:
the data acquisition module is used for acquiring standing item information of the project to be declared;
the information confirmation module is used for confirming the accuracy and the authenticity of the project to be declared;
the auditing and evaluating module is used for performing importance evaluation, internal control risk coefficient evaluation and project value evaluation on the project to be declared;
the resource allocation module is used for determining a passed item list;
the item analysis and execution module is used for analyzing the passed item list and further executing the passed items;
and the result evaluation and feedback module is used for storing the project evaluation result and feeding back the analysis result.
8. The value-assessment-based project investment management and control apparatus according to claim 7, wherein the resource allocation module specifically comprises:
the resource allocation module is used for allocating project score calculation rules;
the item list generating module is used for generating an item list;
the limit setting module is used for setting resource limit;
the item list display module is used for displaying the passed item list;
and the item list adjusting module is used for adjusting the item list and determining that the item list passes through the item list.
9. A terminal device comprising a memory and a processor, characterized in that the processor is adapted to carry out the steps of the method of any of claims 1-6 when executing the computer program.
10. A computer-readable storage medium, on which a computer program is stored, which, when being executed by a processor, carries out the steps of the method of any one of claims 1 to 6.
CN202010598785.2A 2020-06-28 2020-06-28 Project investment control method and device based on value assessment and terminal Pending CN111815268A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010598785.2A CN111815268A (en) 2020-06-28 2020-06-28 Project investment control method and device based on value assessment and terminal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010598785.2A CN111815268A (en) 2020-06-28 2020-06-28 Project investment control method and device based on value assessment and terminal

Publications (1)

Publication Number Publication Date
CN111815268A true CN111815268A (en) 2020-10-23

Family

ID=72855112

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010598785.2A Pending CN111815268A (en) 2020-06-28 2020-06-28 Project investment control method and device based on value assessment and terminal

Country Status (1)

Country Link
CN (1) CN111815268A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112381396A (en) * 2020-11-13 2021-02-19 常州润勇信息系统集成科技有限公司 Integrated management method and system for serving enterprise development planning

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030135399A1 (en) * 2002-01-16 2003-07-17 Soori Ahamparam System and method for project optimization
CN108182550A (en) * 2018-01-31 2018-06-19 恒泰艾普(北京)云技术有限公司 Oil gas field post project evaluation system
CN109325659A (en) * 2018-08-20 2019-02-12 国网江苏省电力有限公司 A kind of power network construction project investment sequence new method
CN110210979A (en) * 2019-05-27 2019-09-06 深圳市聚合碎片科技发展有限公司 Investment project management-control method, device, equipment and readable storage medium storing program for executing
CN110210736A (en) * 2019-05-21 2019-09-06 国网经济技术研究院有限公司 Power grid project collaborative optimization method and system
CN110309945A (en) * 2019-05-07 2019-10-08 广西电力职业技术学院 Power distribution station project optimizing evaluation method based on G1- entropy assessment

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030135399A1 (en) * 2002-01-16 2003-07-17 Soori Ahamparam System and method for project optimization
CN108182550A (en) * 2018-01-31 2018-06-19 恒泰艾普(北京)云技术有限公司 Oil gas field post project evaluation system
CN109325659A (en) * 2018-08-20 2019-02-12 国网江苏省电力有限公司 A kind of power network construction project investment sequence new method
CN110309945A (en) * 2019-05-07 2019-10-08 广西电力职业技术学院 Power distribution station project optimizing evaluation method based on G1- entropy assessment
CN110210736A (en) * 2019-05-21 2019-09-06 国网经济技术研究院有限公司 Power grid project collaborative optimization method and system
CN110210979A (en) * 2019-05-27 2019-09-06 深圳市聚合碎片科技发展有限公司 Investment project management-control method, device, equipment and readable storage medium storing program for executing

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
余谦等: "企业自主研发与合作创新的风险测度及组合优化", 《运筹与管理》 *
杨继伟等: "基于AHP―FUZZY评价的R&D项目资金分配研究", 《科技进步与对策》 *
王宇峰等: "基于价值链的R&D预算资金分配模式研究", 《科学学与科学技术管理》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112381396A (en) * 2020-11-13 2021-02-19 常州润勇信息系统集成科技有限公司 Integrated management method and system for serving enterprise development planning
CN112381396B (en) * 2020-11-13 2022-11-18 江苏润效企业管理咨询有限公司 Integrated management method and system for serving enterprise development planning

Similar Documents

Publication Publication Date Title
Love et al. Moving beyond optimism bias and strategic misrepresentation: An explanation for social infrastructure project cost overruns
Farid et al. NORMATIC: A visual tool for modeling non-functional requirements in agile processes
Barcus et al. Supporting the allocation of software development work in distributed teams with multi-criteria decision analysis
Chang et al. Productivity growth in the public accounting industry: The roles of information technology and human capital
CN113159569A (en) Government investment project full life cycle management system
CN111832912A (en) Project feasibility management and control method, device and terminal based on risk assessment
Zoriehhabib et al. Efficiency measurement of the environmental systems: a two-stage structure considering undesirable outputs
CN111815268A (en) Project investment control method and device based on value assessment and terminal
Garro The evolution of model risk management processes
Patil et al. Enhancing sustainability of Indian PPP procurement process using system dynamics model
Asadi et al. Classification of rework root causes in the design stage of projects for contract assessment
CN118115099A (en) Intelligent carbon asset management and accounting system
Love et al. Systemic modelling of design error causation in social infrastructure projects
Zisimou et al. Evaluation of public funding processes by mining event logs
Daujotaitė Insights on risk assessment in performance audit
Othman Value and risk management protocol for dynamic brief development in construction
Fill et al. An Approach to Support the Performance Management of Public Health Authorities using an IT based Modeling Method
Kirytopoulos et al. Project termination analysis in SMEs: making the right call
Han et al. A Two-Stage Method for Strategy-Oriented Dynamic Project Portfolio Selection Considering Project Substitution
Muhammad et al. Board Attributes and Credit Risk Exposure of Listed Deposit Money Banks in Nigeria: The Moderating Effect of Risk Committee Size
PAPCUNOVÁ196F et al. Evaluating of the financial management of the municipalities via parameters of data matrix in the Slovak Republic conditions
Wohlin et al. Reducing time to market through optimization with respect to soft factors
Dolo An Investigation into the Application of the Integrated Public Financial Management Reform Projects in Liberia at the Ministry of Finance and Development Planning
Pan et al. Diffusion mechanism of green building in industrial clusters: An agent-based modeling approach
Dian et al. The Implementation of Risk-Based Budgeting and Cost Mapping: Study at Pt Kereta Api Indonesia (Persero)

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination