CN111781121B CN202010629396.1A CN202010629396A CN111781121B CN 111781121 B CN111781121 B CN 111781121B CN 202010629396 A CN202010629396 A CN 202010629396A CN 111781121 B CN111781121 B CN 111781121B
Authority
CN
China
Prior art keywords
signal
early warning
isotope
warning system
surface subsidence
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202010629396.1A
Other languages
Chinese (zh)
Other versions
CN111781121A (en
Inventor
袁勋
刘长武
康舜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan University
Original Assignee
Sichuan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan University filed Critical Sichuan University
Priority to CN202010629396.1A priority Critical patent/CN111781121B/en
Publication of CN111781121A publication Critical patent/CN111781121A/en
Application granted granted Critical
Publication of CN111781121B publication Critical patent/CN111781121B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N15/00Investigating characteristics of particles; Investigating permeability, pore-volume or surface-area of porous materials
    • G01N15/08Investigating permeability, pore-volume, or surface area of porous materials
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/18Special adaptations of signalling or alarm devices
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C5/00Measuring height; Measuring distances transverse to line of sight; Levelling between separated points; Surveyors' levels
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M3/00Investigating fluid-tightness of structures
    • G01M3/02Investigating fluid-tightness of structures by using fluid or vacuum
    • G01M3/04Investigating fluid-tightness of structures by using fluid or vacuum by detecting the presence of fluid at the leakage point
    • G01M3/20Investigating fluid-tightness of structures by using fluid or vacuum by detecting the presence of fluid at the leakage point using special tracer materials, e.g. dye, fluorescent material, radioactive material
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V15/00Tags attached to, or associated with, an object, in order to enable detection of the object

Landscapes

  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Remote Sensing (AREA)
  • Analytical Chemistry (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Geology (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Dispersion Chemistry (AREA)
  • Health & Medical Sciences (AREA)
  • Geophysics (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Geophysics And Detection Of Objects (AREA)
  • Testing Or Calibration Of Command Recording Devices (AREA)

Abstract

The invention provides a subway ground surface subsidence early warning system which comprises a pre-buried isotope tracer filling pipe, a signal monitoring device, a signal transmission device, a signal processing system and a ground surface subsidence early warning system. After the isotope tracer filling pipe is embedded into the lining wall of the subway tunnel segment, hydrophilic reagent dimethylolpropionic acid (DMPA) mixed with the isotope tracer filling pipe is periodically filled in the tunnel construction period 18 An O isotope tracer, wherein the tracer has the characteristic of carrying out tracing along the reverse propagation of the water seepage direction; the signal monitoring device can monitor the propagation path of the isotope and convert the path into a current signal; the signal transmission device collects the monitored isotope tracer diffusion signals and transmits the signals to the signal processing system; the signal processing system converts the received signals into three-dimensional visual images to obtain a settled displacement field; the surface subsidence early warning system can judge the state of the cavity below the surface according to the signal processing result and send out subsidence early warning in time.

Description

Subway surface subsidence early warning system
Technical Field
The invention relates to the field of subway construction surface subsidence monitoring and forecasting and prevention and control of subsidence disasters, in particular to a subway surface subsidence early warning system.
Background
In the construction process of the subway tunnel shield, the earth layer consolidation caused by stratum loss and groundwater loss can cause the subsidence or sudden collapse of the earth surface, and property loss and casualties are caused. According to statistics, as long as 1 month 2020, in 46 cities, including harbors, australia and desks, where China owns subways, 92 people die and 34 people are injured due to the occurrence of the ground surface subsidence accident 78, and the economic property loss is not quantifiable. The collapse disasters generally exist in the field of subway construction, and the forecast and prevention of the collapse disasters are great problems which are not solved so far.
The isotope is an atom with the same number of protons and different numbers of neutrons in an atomic nucleus, and the isotope content is expressed by the isotopic abundance, namely the percentage content of a certain isotope in an element in the atom. The isotope labeling method is a microanalysis method for labeling a research object by using a radionuclide as a tracer. And forming a visual image according to the diffusion distribution of the particles in the research object to obtain the change state of the research object.
Disclosure of Invention
In order to solve the problem of surface subsidence prediction in the conventional subway construction, the invention provides a surface subsidence early warning system which can timely and accurately forecast the surface subsidence and reduce property loss and casualties.
The invention provides a subway ground surface subsidence early warning system which comprises a pre-buried isotope tracer filling pipe, a signal monitoring device, a signal transmission device, a signal processing system and a ground surface subsidence early warning system.
Preferably, after the isotope perfusion tube is pre-embedded in the lining wall of the tube piece at the top end of the tunnel, a release hole is reserved every 10 m. During tunnel construction, the mixture of hydrophilic reagent dimethylolpropionic acid (DMPA) is periodically poured through the pouring tube 18 And the O isotope tracer is used for detecting whether the water seepage phenomenon of the cracks possibly causing surface subsidence exists in the stratum.
Preferably, the signal monitoring device is capable of automatically identifying the propagation path of the isotope tracer, collecting the pulse signal, and converting it into a current signal.
Preferably, the signal transmission device transmits the underground monitoring signal to a signal processing system on the ground for subsequent processing.
Preferably, the signal processing system converts the received current signal into a displacement field three-dimensional visual image, and displays the moving direction and magnitude of the displacement vector.
Preferably, the surface subsidence early warning system automatically gives a forecast warning according to the calculation result of the signal processing system.
Has the beneficial effects that: the subway ground surface subsidence early warning system skillfully utilizes an isotope tracing principle to invert the movement conditions of the stratum above the tunnel and below the ground surface and forecast the possible ground surface subsidence. The system is simple in structure and convenient to arrange, and only needs to be arranged along with the tunnel during the previous tunnel construction. After the arrangement is finished, the system is controlled by a computer on the ground, and the operation is simple. Because in the current subway tunnel construction, ground surface subsidence disasters occur every year, casualties and huge property losses are caused. By applying the method and the device, early warning can be performed before a disaster occurs, blocking measures can be taken in time, and the safety of subway construction is improved.
Drawings
FIG. 1 is a schematic view of the monitoring system layout according to the present invention; fig. 2 is a schematic diagram of a signal processing and early warning system according to the present invention.
(1) A signal monitoring and transmission device; (2) an isotope tracer perfusion tube; (3) water seepage cracks; (4) a settling tank.
The accompanying drawings, which are included to provide a further understanding of the invention, are not to be considered limiting of the invention.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention more apparent, the embodiments of the present invention will be described in detail below with reference to the accompanying drawings.
It is to be understood that descriptive terms in the present disclosure, such as "comprising" and "consisting of … …, or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a product, apparatus, process or method that comprises a list of elements does not include only those elements but may include other elements not expressly listed if desired, even elements inherent to such product, apparatus, process or method. Without further limitation, an element defined by the phrases "comprising" and "consisting of … …" does not exclude the presence of additional like elements in a product, apparatus, process or method that includes the element.
As shown in fig. 1 and 2, in an embodiment of the present invention, a system for warning a surface subsidence of a subway is provided, which comprises: the isotope tracer filling pipe is pre-embedded after the top end of the tunnel is lined with the wall, a release port is reserved every 10m, and a signal monitoring device and a signal transmission device are pre-embedded along the filling pipe. During tunnel construction, the isotope tracers are periodically poured through the filling pipe. If water seepage occurs in the overburden layer on the tunnel, the tracer agent is transmitted along the water seepage crack to find a source. The signal monitoring device monitors the propagation path of the isotope tracer and transmits the signal to the signal processing system along the signal transmission device. And the displacement field three-dimensional visual image of the subsurface soil layer is inverted after the analysis and the processing of the signal processing system, and an alarm is given when the displacement reaches a certain threshold value. The part can be treated in time according to system alarm, and the ground surface collapse disaster is prevented.
In the invention, the isotope tracer is selected from the isotope which can trace the water source and the migration of the water source 18 The O + hydrophilic agent dimethylolpropionic acid (DMPA), which acts to guide the tracer to travel in the reverse direction along the water-percolation direction.
In the invention, the signal monitoring device adopts a CS-DET series integrated detector of Beijing Zhonghuahai science and technology Limited, and the detector converts the recorded pulse into a current signal and then transmits the current signal into a signal processing system. Three detectors are arranged in each interval tunnel, and the detectors are arranged at the head, the tail and the middle of each interval tunnel, so that the signal monitoring accuracy is improved.
In the invention, the signal transmission device adopts a signal transmission line matched with a CS-DET series integrated detector of Beijing Zhonghuahai science and technology Limited company, is synchronously embedded along an isotope tracer grouting pipe and is connected with a signal processing system on the ground.
In the invention, the signal processing system converts the received current signal into a three-dimensional visual image representing a soil displacement field, and the movement condition of the soil can be judged according to the distribution state of the displacement vector.
In the invention, the ground surface subsidence early warning system sends out corresponding indication signals according to the movement condition of the soil body: when the soil body displacement is less than 10 mm, the indication signal is green; when the soil body displacement of 10 mm is not more than 30 mm, the indicating signal is yellow; when the soil body displacement is more than or equal to 30 mm, the indicating signal is red, and a settlement early warning is sent out. The larger soil body displacement is easy to induce the ground surface settlement or the ground surface collapse, so reinforcement measures such as grouting and the like are taken in time according to the early warning signal, and the ground surface settlement disaster is avoided.
Thus, it should be understood by those skilled in the art that while exemplary embodiments of the present invention have been illustrated and described in detail herein, many other variations and modifications can be made, which are consistent with the principles of the invention, from the disclosure herein, without departing from the spirit and scope of the invention. Accordingly, the scope of the invention should be understood and interpreted to cover all such other variations or modifications.

Claims (5)

1. The subway ground surface subsidence early warning system is characterized by comprising a pre-buried isotopic tracer filling pipe, a signal monitoring device, a signal transmission device, a signal processing system and a ground surface subsidence early warning system;
the signal monitoring device is used for monitoring a propagation path of the isotope tracer in the isotope tracer filling pipe and converting the path into an electric signal; the signal transmission device collects the monitored isotope tracer diffusion signals and transmits the signals to the signal processing system; the signal processing system receives the signal and converts the signal into a three-dimensional visual graph, and the movement condition of the soil body is judged according to the distribution state of the displacement vectors in the three-dimensional visual graph; the ground surface subsidence early warning system sends out corresponding signal according to the removal condition of the soil body.
2. The subway ground surface subsidence early warning system of claim 1, wherein after the isotope tracer filling pipe is pre-buried in the lining wall at the top end of the tunnel, a release port is reserved every 10m, and isotope tracer filling leak detection is performed periodically; the released tracer agent reversely propagates along the water seepage direction, so that a water seepage source is found; if the water seepage amount is large, the density of the concentrated isotope tracer at the position is large, and the signal is strong; if the situation occurs below the ground surface, underground cavities are easily formed, and the ground surface is suddenly collapsed after a certain degree.
3. A subway surface subsidence warning system as claimed in claim 1, wherein said signal monitoring means is buried in synchronization with the isotope tracer-filled pipe, and after the isotope propagates in the water seepage direction, the signal is monitored and transmitted to the signal transmission means.
4. A subway ground surface subsidence early warning system as claimed in claim 1, wherein said signal transmission device is connected with signal monitoring devices along the line, collects the monitored isotope diffusion signals, and transmits them into the signal processing system.
5. A subway surface subsidence early warning system as claimed in claim 1, wherein said signal processing system converts the received electric signal into a visual image, constructs a three-dimensional displacement field state, and visually displays the area and severity of subsidence.
CN202010629396.1A 2020-07-03 2020-07-03 Subway surface subsidence early warning system Active CN111781121B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010629396.1A CN111781121B (en) 2020-07-03 2020-07-03 Subway surface subsidence early warning system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010629396.1A CN111781121B (en) 2020-07-03 2020-07-03 Subway surface subsidence early warning system

Publications (2)

Publication Number Publication Date
CN111781121A CN111781121A (en) 2020-10-16
CN111781121B true CN111781121B (en) 2023-01-31

Family

ID=72759170

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010629396.1A Active CN111781121B (en) 2020-07-03 2020-07-03 Subway surface subsidence early warning system

Country Status (1)

Country Link
CN (1) CN111781121B (en)

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01169338A (en) * 1987-09-18 1989-07-04 Agency Of Ind Science & Technol Photoacousto spectroscope for detecting tunnel current
CN1031768C (en) * 1991-07-02 1996-05-08 中国建筑材料科学研究院水泥科学研究所 Multi-element analyzer with isotope and X fluorescence
CN1028790C (en) * 1991-09-28 1995-06-07 北京市西城区新开通用试验厂 Measuring, alarming, tracing and transmitting in conjuction with drill
CN105527452B (en) * 2015-12-21 2018-05-22 山东科技大学 Water blockoff based on isotope marks cuts the assay method of bottom plate pressure-bearing water behind source
CN106437844B (en) * 2016-10-26 2020-02-07 重庆大学 Method for forecasting tunnel water burst position in advance
CN108195742A (en) * 2018-02-12 2018-06-22 浙江大学 A kind of device and method for quickly measuring a variety of sand infiltration coefficients
CN109386267A (en) * 2018-12-25 2019-02-26 西南石油大学 A kind of water enchroachment (invasion) dynamic monitor and method
CN111236927B (en) * 2020-01-09 2021-10-29 山东大学 Advanced dynamic prediction method using isotope labeled rock mass water guide channel
CN112964730B (en) * 2021-01-26 2024-04-09 中铁九局集团第二工程有限公司 Tunnel deformation monitoring device and use method

Also Published As

Publication number Publication date
CN111781121A (en) 2020-10-16

Similar Documents

Publication Publication Date Title
Li et al. Experimental study of the precursor information of the water inrush in shield tunnels due to the proximity of a water-filled cave
CN101493366B (en) Drilling hole stress sensor and drilling hole stress monitoring method thereof
CN103293560B (en) A kind of method of testing adopting triple stress court
CN108412547B (en) Pressure-bearing fault activation water inrush multi-field information collaborative monitoring impending forecasting method and monitoring system
Di et al. Investigation of progressive settlement of sandy cobble strata for shield tunnels with different burial depths
Kang et al. Safe mining technology of undersea metal mine
CN103485268B (en) Informationalized intelligent grouting system for road
CN106919129A (en) A kind of hanger rail type movable monitoring early-warning system based on Urban Underground pipe gallery
CN114659442A (en) Visual slope deformation intelligent monitoring and early warning system
CN111781121B (en) Subway surface subsidence early warning system
CN105351007B (en) A kind of colliery water quality quickly detects and system for pre-warning water disaster
Peng et al. Failure mechanisms of ground collapse caused by shield tunnelling in water-rich composite sandy stratum: A case study
CN205804433U (en) Metro Deep Excavation water sealing structure seepage defect sonar seepage detector
CN107764323A (en) A kind of multi-parameter enclosed area danger Monitoring and forecasting system in real-time method
CN108915766A (en) A kind of working face deep concealed conduit pipe method for surveying
Zhang et al. Research on the stability of shallow-buried large cross-section tunnel by construction method conversion
Wang et al. Investigating deformation along metro lines in coastal cities considering different structures with InSAR and SBM analyses
CN106643984A (en) Novel online underground water level monitoring and warning system and method
CN104265368B (en) Increase resistance water conservancy diversion and creep into the outstanding discharge method of prediction coal road and device thereof continuously
CN203569466U (en) Road informatization intelligent grouting system
CN113236366A (en) Water damage risk low-field nuclear magnetic resonance three-dimensional monitoring method
CN104613858A (en) Tunnel surrounding rock primary bracing horizontal convergence displacement monitoring instrument and method
CN206648761U (en) Colliery depth shaft wall safety monitoring assembly
Xiongyao et al. Real-time detection technology of synchronous grouting for shield tunnel and analysis of grouting effect
CN107832505B (en) Underground engineering pathological block advanced prediction method based on TSP (Total suspended particulate) system and block theory

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant