CN111749694B - Collaborative mining method capable of mining under pressure - Google Patents

Collaborative mining method capable of mining under pressure Download PDF

Info

Publication number
CN111749694B
CN111749694B CN202010668292.1A CN202010668292A CN111749694B CN 111749694 B CN111749694 B CN 111749694B CN 202010668292 A CN202010668292 A CN 202010668292A CN 111749694 B CN111749694 B CN 111749694B
Authority
CN
China
Prior art keywords
ore
water
mining
vein
lane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202010668292.1A
Other languages
Chinese (zh)
Other versions
CN111749694A (en
Inventor
董军庭
许荣勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Makeng Mining Co ltd
Original Assignee
Fujian Makeng Mining Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Makeng Mining Co ltd filed Critical Fujian Makeng Mining Co ltd
Priority to CN202010668292.1A priority Critical patent/CN111749694B/en
Publication of CN111749694A publication Critical patent/CN111749694A/en
Application granted granted Critical
Publication of CN111749694B publication Critical patent/CN111749694B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage

Abstract

The invention provides a collaborative mining method capable of mining under pressure, wherein rocks between ore bodies and a water body are used as a water-resisting layer, the ore bodies adopt a subsequent filling mining method, the ore bodies with the thickness above the middle thickness are all subjected to subsection medium-length hole rock drilling or large-aperture deep hole rock drilling, and a stage bottom structure is mined; the mining engineering layout form is as follows: the ore rooms with horizontal ore removal are arranged along the trend and are provided with a vein-through lane; the ore body is arranged above the ore removal level, the rock drilling level and the blasting level are arranged above the ore body, the vein penetrating transport lane is arranged below the ore removal level, the vein penetrating lane is parallel to the vein penetrating transport lane, a plurality of ore pass shafts are arranged according to the thickness of the ore body, the ore pass shafts are communicated with the vein penetrating lane and the vein penetrating transport lane, and the ore pass shafts are distributed on the vein penetrating lane; after blasting is carried out on the blasting level above the ore body, ore is removed to a chute after falling to the ore removal level below the ore body, and then falls to a drift transportation roadway below the stope for ore removal.

Description

Collaborative mining method capable of mining under pressure
Technical Field
The invention relates to a collaborative mining method capable of mining under pressure.
Background
At present, a roof karst aquifer of an ore body has the characteristics of large thickness, karst cave development, high mud and sand filling rate, water guide fault development and rich still water storage capacity; if pre-drainage is not carried out in the initial stage of mine infrastructure and production, the sudden water inflow and the underground debris flow are easily generated when roadway development and mining preparation engineering are carried out in a top plate and then stoping is carried out, and the threat to underground infrastructure and production safety is formed; because the iron ore body is stored in the water-rich stratum, the method mainly adopting water avoidance has no feasibility; and the underground ore body side curtain grouting is adopted, so that the engineering quantity is too large, a certain water inrush risk exists, and the underground ore body side curtain grouting is not suitable for being adopted.
Therefore, the traditional dredging method is adopted at present, and the dewatering is required to be carried out one stage in advance, namely when the +100 stage of mining is required, the dewatering engineering must be carried out at the +0 meter stage, and the water level is ensured to be below +100 meters; the problem of sudden water burst of the karst cave and the water guide fault can be solved by pre-draining, and simultaneously, the fillers such as silt, broken stone and the like in the karst cave can release water along with the reduction of the underground water level and lose the fluidity, thereby fundamentally solving the problem of possibility of generating the underground debris flow.
However, the following problems also exist: the water level of the strong rock solution area is greatly reduced to be lower than the middle section of mining, and the water inflow of a pit is also obviously increased, so that a large amount of drainage engineering is required, the yield is also delayed due to the slow influence of the water level reduction, and the mining condition can be met only after drainage is required for a plurality of years; in addition, the increase of the water discharge amount can occupy large fund in advance for water dredging and draining engineering, and the two points obviously influence the economic benefit of the mine.
Disclosure of Invention
The invention aims to overcome the defects and provide a collaborative mining method capable of mining under pressure.
The invention adopts the following technical scheme:
a cooperative mining method capable of mining under pressure takes rocks between an ore body and a water body as a water-resisting layer and protects the rocks; adopting a subsequent filling mining method for ore bodies, performing segmented medium-deep hole drilling or large-aperture deep hole drilling on the ore bodies with the thickness above the medium thickness, and removing ores from the bottom structure of the stage; the mining engineering layout form is as follows: the ore rooms with horizontal ore removal are arranged along the trend and are provided with a vein-through lane; an ore body is arranged above the ore removal level, a rock drilling level and a blasting level are arranged above the ore body, a vein-penetrating conveying lane is arranged below the ore removal level, the vein-penetrating conveying lane is parallel to the vein-penetrating conveying lane, a plurality of ore chutes are arranged according to the thickness of the ore body, the ore chutes are communicated with the vein-penetrating conveying lane and are distributed on the vein-penetrating conveying lane; after blasting is carried out on the blasting level above the ore body, ore is removed to a chute after falling to the ore removal level below the ore body, and then falls to a drift transportation roadway below the stope for ore removal.
Preferably, the drift transport lane is equipped with many, and every 120 meters interval is equipped with a drift transport lane, every the level of ore removal parallel of drift transport lane top is equipped with one the drift lane, two between the drift lane, can follow the stope both ends and exploit simultaneously during mining, improve mining efficiency, and because the drift lane all is equipped with the ore pass, make the distance of transporting to the ore pass after the mining shorten, improve mining efficiency once more.
Preferably, the section with the thicker ore body is prevented by adopting approximate curtain grouting.
Preferably, the method comprises the steps of mining the chamber far away from the water-resisting layer firstly, and mining the chamber close to the water-resisting layer finally; and the finally mined chamber can be used as a raw rock protective layer of a water-resisting layer for a longer period.
Preferably, the ground above the stope is provided with waterproof facilities, and the method of arranging a catch basin, arranging an anti-seepage riverbed, and filling and plugging collapse and cracks is adopted for water prevention.
Preferably, the groundwater around the stope is drained by a draining method, and the groundwater is intercepted in a groundwater recharge direction.
The invention follows the principle of firstly simplifying and then complicating, firstly arranging defences on the ground and then underground layer by layer; for various surface water which possibly flows into the mine pit, ground waterproof measures (intercepting ditches, seepage-proof riverbeds, collapse and crack filling, plugging and the like) are adopted; the method mainly adopts the measures of draining the underground water near the ore body, and the holes are distributed in the supply direction to intercept the underground water as much as possible.
The main research work to be carried out on the drainage technology is as follows: firstly, the distribution rule of the waterproof strip: detecting the distribution characteristics and the water-resisting performance of the water-resisting strip by adopting necessary drilling holes; secondly, monitoring water pressure: and (3) grasping the state of the underground water level funnel in the pit range by utilizing the established underground water pressure observation network, and analyzing the influence on mining production. Generally, the water level of the limestone close to the ore body is reduced to the elevation of the middle mining section or below, and the water level of a strong aquifer on the north side of the diabase and skarn water-resisting belt can be kept at a high level; thirdly, local grouting and water plugging: if a water-conducting fracture or a large crack (such as a northwest fault or a crack) is found to destroy the water-resisting performance of the diabase and the skarn, and strong aquifer water on the north side is led into a stope, a local grouting water-stopping measure is adopted to strengthen the overall water-resisting performance of the diabase and the skarn. In addition, the concentrated sandstone and granite fissure water in the pit is also subjected to grouting plugging so as to reduce ineffective drainage; fourthly, controlling the mining method and the ground pressure: in order to protect diabase and skarn water-resisting strips from being damaged, a filling mining method is required to be adopted, and stope structure parameters are optimized simultaneously so as to control deformation of a stope roof or one side close to the water-resisting strips within a reasonable range; fifthly, determining the safety height: if diabase and skarn water-stop belts exist on the top plate of the ore body and strong aquifers exist on the water-stop belts, in order to avoid the deformation of the top plate caused by mining from damaging the integrity of the water-stop belts, a safety height value is optimized and determined, and the structural parameters of a mining field are matched with the safety height value; sixthly, safety measures are as follows: in order to prevent a great amount of underground water from flowing into a stope, a series of safety measures are made, and the safety measures mainly comprise the aspects of safe distance between the stope and a water-resisting strip, water exploration and drainage, blasting control, water pressure monitoring, long anchor rope reinforcement, local grouting and the like.
For the safety problem of underground water inrush concerned by mines, the following safety measures can be adopted besides the technical measures: firstly, enough drainage equipment is equipped according to the maximum water inflow amount of a pit, so that water burst can be resisted, and well flooding accidents are avoided; predicting the possible maximum water inrush amount under the condition of local under-pressure mining to achieve the central number; thirdly, arranging underground pressure measuring holes and rock-shifting monitoring points in the key sections, and predicting water inrush risks; fourthly, in a possible water inrush risk section, drain holes are arranged in advance, so that water can be drained controllably, the water pressure is reduced, and water inrush is avoided; fifthly, the protection of the diabase and skarn hidden water-proof strip is emphasized.
The invention has the beneficial effects that: one panel is arranged every 120 meters along the trend, and corresponds to a lower transportation lane, so that the transportation is convenient; a plurality of ore orepasses can be arranged in each panel area, so that centralized and efficient loading, transportation and management can be realized, the distance from a stope to the orepasses is short, and efficient shoveling and transportation can be realized; thirdly, if the ore pass of the adjacent panels is reused, ore removal can be performed on two sides of a stope, strong mining of the stope is realized, the exposure time of a goaf is shortened, and the safety effect is good; the direction of the stone clamping belt is generally the same as that of the ore body, the stope is designed along the direction, so that the stope and the stone clamping belt are consistent in direction, the stone clamping belt is easy to remove, the stone clamping belt can be arranged at intervals, and the mixing rate of waste stones and the engineering quantity of re-excavating cutting grooves are reduced; fifthly, the mining preparation design difficulty is reduced, after the mining preparation design is arranged along the trend, the ore body in the range of the panel area is stable in appearance, the design parameters are single, and different sections do not need to be designed respectively; sixthly, arrange along the trend, the long-and-short distance condition can be looked near to the stope that is close to the roof aquifer and not adopt or slow mining, treats to adopt again after the water level descends to safe height, and the stope remains completely, is favorable to mining work.
Seventhly, arranging a plurality of drift shafts corresponding to drift wells, namely ore pillars of the panel, reserving the ore pillars to a later stage for stoping, reserving a stope on the roof for stoping, and then recovering the ore pillars, wherein the two have combined action, so that the water-bearing layer of the roof can be guaranteed not to be disturbed for a long time; the design of the chamber enables the direction of the chamber to be perpendicular to the water body, and a subsequent filling mining method and a chamber close to the isolation belt are adopted for final mining, so that the ore body keeps good density in case of water inrush, and safety accidents caused by the fact that water flow can quickly pass through the chamber when the direction of the traditional mining chamber is the same as the direction of the water body are solved; ninthly, mining at the 0 m stage in advance can be started without waiting for the completion of-100 drainage projects; production can be started several years in advance.
Drawings
FIG. 1 is a schematic of the present invention.
Fig. 2 is a top view of the present invention.
Fig. 3 is a schematic representation of the ore removal level of the present invention.
Detailed Description
In order to make the purpose and technical solution of the present invention clearer, the present invention is further described with reference to the accompanying drawings and embodiments:
the collaborative mining method capable of mining under pressure as shown in fig. 1-3 is characterized in that rocks between an ore body 1 and a water body are used as a water-resisting layer 2, the ore body adopts a subsequent filling mining method, the ore body with a medium thickness or more is subjected to subsection medium-length hole drilling or large-aperture deep hole drilling, and a stage bottom structure is mined; the mining engineering layout form is as follows: the ore rooms 31 of the ore removal level 3 are arranged along the trend and are provided with a vein-through lane 32; an ore body 1 is arranged above the ore removal level 3, a rock drilling level and a blasting level 4 are arranged above the ore body 1, a vein-penetrating transport lane 5 is arranged below the ore removal level 3, the vein-penetrating lane 32 is parallel to the vein-penetrating transport lane 5, a plurality of ore chutes 6 are arranged according to the thickness of the ore body 1, and the plurality of ore chutes 6 are distributed on the vein-penetrating lane 32 and are communicated with the vein-penetrating transport lane 32 and the vein-penetrating transport lane 5; after blasting is carried out above the stope, ores fall to a lower ore removal level 3, are mined and are transported to a chute 6, and then fall to a drift transport lane 5 below the stope for ore removal; an upper plate return airway (not shown in the figure) is arranged at both the rock drilling level and the ore removal level.
Preferably, the vein-penetrating transport lane 5 is provided with a plurality of vein-penetrating transport lanes 5, each vein-penetrating transport lane 5 is arranged at an interval of 120 meters, each vein-penetrating transport lane 5 is provided with one ore removal level parallel above the vein-penetrating transport lane 32 and two ore rooms 31 are arranged between the vein-penetrating lanes 32, mining can be simultaneously carried out from two ends of the ore rooms 31 during mining, the mining efficiency is improved, and the vein-penetrating lanes 32 are provided with the ore chutes 6, so that the distance from the ore to the ore chutes 6 after mining is shortened, and the mining efficiency is improved again.
Preferably, the section with the thicker ore body is prevented by adopting approximate curtain grouting.
Preferably, the method comprises the steps of firstly mining the stope far away from the water-resisting layer, and finally mining the stope close to the water-resisting layer; and the finally mined chamber can be used as a raw rock protective layer of a waterproof layer for a long period.
Preferably, the ground above the stope is provided with waterproof facilities, and the method of arranging a catch basin, arranging an anti-seepage riverbed, and filling and plugging collapse and cracks is adopted for water prevention.
Preferably, the groundwater around the stope is drained by a drainage method, and the groundwater is intercepted in the groundwater recharge direction.
The main research work to be carried out on the drainage technology is as follows: firstly, the distribution rule of the waterproof strip: detecting the distribution characteristics and the water-resisting performance of the water-resisting strip by adopting necessary drilling holes; secondly, monitoring water pressure: and (3) grasping the underground water level funnel state in the pit range by utilizing the established underground water pressure observation network, and analyzing the influence on mining production. Generally, the water level of the limestone close to the ore body is reduced to the level of the middle mining section or below, and the water level of a strong aquifer at the north side of the diabase and skarn water-resisting belt can be kept at a high level; thirdly, local grouting and water plugging: if water-conducting fracture or large fracture (such as northwest fault or fracture) is found to destroy the water-resisting performance of diabase and diabase, and strong water-bearing stratum water on the north side is guided into a stope, a local grouting water-stopping measure is adopted to strengthen the overall water-resisting performance of diabase and skase. In addition, sandstone and granite fissure water concentrated in the pit is also subjected to grouting plugging so as to reduce ineffective drainage; fourthly, controlling the mining method and the ground pressure: in order to protect diabase and skarn water-resisting strips from being damaged, a filling mining method is required to be adopted, and stope structure parameters are optimized at the same time, so that the deformation of a stope top plate or one side close to the water-resisting strips is controlled within a reasonable range; fifthly, determining the safety height: if diabase and skarn water-stop belts exist on the top plate of the ore body and strong aquifers exist on the water-stop belts, under the condition, in order to avoid the deformation of the top plate caused by mining from damaging the integrity of the water-stop belts, a safety height value is optimized and determined, and the structural parameters of a stope are matched with the safety height value; sixthly, safety measures are as follows: in order to prevent a great amount of underground water from flowing into a stope, a series of safety measures are made, and the safety measures mainly comprise the aspects of safe distance between the stope and a water-resisting strip, water exploration and drainage, blasting control, water pressure monitoring, long anchor rope reinforcement, local grouting and the like.
For the safety problem of underground water inrush concerned by mines, the following safety measures can be adopted besides the technical measures: firstly, enough drainage equipment is equipped according to the maximum water inflow amount of a pit, so that water burst can be resisted, and well flooding accidents are avoided; predicting the possible maximum water inrush amount under the condition of local under-pressure mining to achieve the central number; thirdly, arranging underground pressure measuring holes and rock-shifting monitoring points in the key sections, and predicting water inrush risks; fourthly, in a possible water inrush risk section, drain holes are arranged in advance, so that water can be drained controllably, the water pressure is reduced, and water inrush is avoided; and fifthly, paying attention to the protection of the diabase and skarn hidden waterproof strip.
The invention follows the principle of firstly simplifying and then complicating, firstly arranging defences on the ground and then underground layer by layer; for various surface water which possibly gushes into the pit, ground waterproof measures (intercepting ditches, seepage-proofing riverbeds, collapse and crack filling, plugging and the like) are adopted; and (3) taking measures of mainly draining the underground water near the ore body, and distributing holes in the supply direction to intercept the underground water as much as possible.
The beneficial effects of the invention are as follows: one panel is arranged every 120 meters along the trend, and corresponds to a lower transportation lane, so that the transportation is convenient; a plurality of ore orepasses can be arranged in each panel area, so that centralized and efficient loading, transportation and management can be realized, the distance from a stope to the orepasses is short, and efficient shoveling and transportation can be realized; thirdly, if the drop shafts of the adjacent panels are reused, ore removal can be carried out on two sides of one stope, strong mining of the stope is realized, the exposure time of a goaf is shortened, and the safety effect is good; the direction of the stone clamping belt 7 is generally the same as that of the ore body, the stope is designed along the direction, the direction of the stope is consistent with that of the stone clamping belt 7, the stone clamping belt 7 is easy to remove, and the stone clamping belt can be arranged at intervals, so that the mixing rate of waste stones is reduced, and the work amount of excavating the cutting groove again is reduced; fifthly, the mining preparation design difficulty is reduced, after the mining preparation design is arranged along the trend, the ore body in the range of the panel area is stable in appearance, the design parameters are single, and different sections do not need to be designed respectively; and sixthly, the chamber is arranged along the trend, the chamber close to the water-bearing layer of the top plate can be not mined or slowly mined according to the distance condition, and is mined after the water level is lowered to the safety height, so that the chamber is completely reserved, and the mining work is facilitated. Seventhly, arranging a plurality of drift shafts corresponding to drift wells, namely ore pillars of the panel, reserving the ore pillars to a later stage for stoping, reserving a stope on the roof for stoping, and then recovering the ore pillars, wherein the two have combined action, so that the water-bearing layer of the roof can be guaranteed not to be disturbed for a long time; the design of the chamber enables the direction of the chamber to be perpendicular to the water body, and a subsequent filling mining method and a chamber close to the isolation belt are adopted for final mining, so that the ore body keeps good density in case of water inrush, and safety accidents caused by the fact that water flow can quickly pass through the chamber when the direction of the traditional mining chamber is the same as the direction of the water body are solved; ninthly, mining at the 0 m stage in advance can be started without waiting for the completion of-100 drainage projects; production can be started several years ahead.
The principles and implementations of the conventional methods known to those skilled in the art used in the present invention can be known to those skilled in the art through related art books or through conventional experimental methods, such as: the method for grouting ore body curtains, setting intercepting ditches, setting anti-seepage riverbeds and carrying out water prevention by collapse, crack filling and plugging is the prior method or technology, and the method is not repeated.
The above description is only a preferred embodiment of the present invention, and is not intended to limit the technical scope of the present invention, so that any minor modifications, equivalent changes and modifications made to the above embodiment according to the technical spirit of the present invention still belong to the protection scope of the present invention.

Claims (5)

1. A collaborative mining method capable of mining under pressure is characterized in that:
drilling holes are adopted to check the distribution characteristics and the water-resisting performance of the water-resisting strip; the underground water pressure observation network is utilized to master the underground water level funnel state in the pit range, the influence on mining production is analyzed, the limestone water level close to an ore body is reduced to the elevation of the middle mining section or below, diabase and skarn between the ore body and a water body are utilized as a water-resisting layer, and the water level of a strong aquifer at one side of the water-resisting layer can be kept at a high level;
mining the chamber far away from the water-resisting layer, and finally mining the chamber close to the water-resisting layer; finally, the mined chamber can be used as a raw rock protective layer of a water-resisting layer for a longer period; adopting a subsequent filling mining method for ore bodies, performing sectional medium-length hole drilling or large-aperture hole drilling on the ore bodies with the thickness above the medium thickness, and removing ores from the bottom structure of a stage;
mining method and control of ground pressure: in order to protect the water-resisting layer from being damaged, a filling mining method is required to be adopted, and stope structure parameters are optimized at the same time, so that the deformation of the stope top plate or one side close to the water-resisting layer is controlled within a reasonable range;
the mining engineering layout form is as follows: the ore rooms with horizontal ore removal are arranged along the trend and are provided with drift tunnels, and the walking direction of the ore rooms is vertical to the water body; the ore body is arranged above the ore removal level, the rock drilling level and the blasting level are arranged above the ore body, the vein penetrating transport lane is arranged below the ore removal level, the vein penetrating lane is parallel to the vein penetrating transport lane, a plurality of ore pass shafts are arranged according to the thickness of the ore body, the ore pass shafts are communicated with the vein penetrating lane and the vein penetrating transport lane, and the ore pass shafts are distributed on the vein penetrating lane;
after blasting is carried out on the blasting level above the ore body, the ore falls to the ore removal level below, and is conveyed to a chute, and then falls to a vein-through transportation roadway below the stope for ore removal.
2. A method of co-ordinated mining with extraction under pressure as claimed in claim 1, characterised in that: the wearing vein haulage lane is equipped with many, and every 120 meters interval is equipped with a wearing vein haulage lane, every the level of ore removal parallel of wearing vein haulage lane top is equipped with one the wearing vein lane, two there is a plurality of between the wearing vein lane the stope can be followed a plurality of during the mining the stope both ends are mined simultaneously, improve mining efficiency, and because the wearing vein lane all is equipped with the ore pass for the distance of transporting the ore pass after the mining shortens, improves mining efficiency once more.
3. A collaborative mining method with pressure extraction as claimed in claim 1, wherein: and (5) adopting approximate curtain grouting to prevent the section with the thicker ore body.
4. A collaborative mining method with pressure extraction as claimed in claim 1, wherein: and the ground above the stope is provided with waterproof facilities, and the waterproof facilities are used for preventing water by adopting methods of arranging a catch basin, arranging an anti-seepage riverbed, and filling and plugging collapse and cracks.
5. A collaborative mining method with pressure extraction as claimed in claim 1, wherein: draining the groundwater around the stope by adopting a draining method, and intercepting the groundwater in the groundwater supply direction.
CN202010668292.1A 2020-07-13 2020-07-13 Collaborative mining method capable of mining under pressure Active CN111749694B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010668292.1A CN111749694B (en) 2020-07-13 2020-07-13 Collaborative mining method capable of mining under pressure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010668292.1A CN111749694B (en) 2020-07-13 2020-07-13 Collaborative mining method capable of mining under pressure

Publications (2)

Publication Number Publication Date
CN111749694A CN111749694A (en) 2020-10-09
CN111749694B true CN111749694B (en) 2022-07-15

Family

ID=72711119

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010668292.1A Active CN111749694B (en) 2020-07-13 2020-07-13 Collaborative mining method capable of mining under pressure

Country Status (1)

Country Link
CN (1) CN111749694B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1320416A1 (en) * 1986-01-20 1987-06-30 Производственное Объединение "Южкузбассуголь" Method of mining fire-hazardous coal seams
CN1963148A (en) * 2006-11-17 2007-05-16 中国矿业大学 Water-protection coal-mining method using structural key layer as waterproof layer
CN102418526A (en) * 2011-12-02 2012-04-18 瓮福(集团)有限责任公司 High-sublevel subdivision mining method of moderately thick heavy-pitch waste-rock-containing interlayer phosphate orebody along strike
CN105587318A (en) * 2016-01-22 2016-05-18 长沙有色冶金设计研究院有限公司 Filling mining method for continuous backstoping of gently inclined parallel medium thick ore body group

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1320416A1 (en) * 1986-01-20 1987-06-30 Производственное Объединение "Южкузбассуголь" Method of mining fire-hazardous coal seams
CN1963148A (en) * 2006-11-17 2007-05-16 中国矿业大学 Water-protection coal-mining method using structural key layer as waterproof layer
CN102418526A (en) * 2011-12-02 2012-04-18 瓮福(集团)有限责任公司 High-sublevel subdivision mining method of moderately thick heavy-pitch waste-rock-containing interlayer phosphate orebody along strike
CN105587318A (en) * 2016-01-22 2016-05-18 长沙有色冶金设计研究院有限公司 Filling mining method for continuous backstoping of gently inclined parallel medium thick ore body group

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
史艳辉等.司家营铁矿南矿段采矿方法设计.《现代矿业》.2013,(第3期), *
司家营铁矿南矿段采矿方法设计;史艳辉等;《现代矿业》;20130331(第3期);第76页-79页记载 *
杂水文地质条件的矿山安全开采技术研究与实践;朱国辉等;《金属矿山》;20091031(第10期);第21页左栏第1段 *

Also Published As

Publication number Publication date
CN111749694A (en) 2020-10-09

Similar Documents

Publication Publication Date Title
CN102505963B (en) Stope face roof water pre-drainage construction method
CN105587318A (en) Filling mining method for continuous backstoping of gently inclined parallel medium thick ore body group
CN104632220B (en) Mining method with adjustable and controllable structure size of gentle dip medium-thickness ore body strip column reconstructed stope
CN105041314A (en) Method for united mining of deep subsequent stoping chamber and layered stoping jamb
CN109281707B (en) Advanced prevention and control method for water damage of working face roof separation layer
CN113175325B (en) Coal and intergrown sandstone type uranium ore coordinated mining method based on key layer protection
CN105804754B (en) A kind of coal seam is Main aquifer pitshaft method for uncovering coal
CN111828007A (en) Stoping method for residual studs in underground mine goaf
CN105736009A (en) Shrinkage heap leaching subsequent filling mining method used for steeply-inclined thin orebody
CN109611146B (en) Separation layer water drainage grouting method
CN103982186B (en) The vertical Inclined strips sublevel caving of oper cylinler retrusive
CN205638458U (en) Accelerate construction structures of broken system construction speed of underground swift current
CN104989408A (en) Safe and high-efficiency mining method for metal mine in mountainous area
CN103726848B (en) Be applicable to the mining methods of recovery of gentle-inclined/inclthin thin ore body
CN109899070B (en) Slow-inclination medium-thickness ore body solid-waste-free filling mining method based on ellipsoid ore drawing structure
CN108952725B (en) Low dilution mining method suitable for gentle dip thin ore body
CN111749694B (en) Collaborative mining method capable of mining under pressure
RU2664281C1 (en) Method for developing kimberlite deposits
CN113006797B (en) Mining method for partial filling loss reduction of coal bed under surface valley runoff
CN103291307B (en) A kind of rich water rockhole Dewatering by leading level method
CN114278372B (en) Diversion arrangement method for underground directional drilling area of huge thick water-rich layer
CN115653602A (en) Reserved interval type pillar upward access filling mining method
CN109184784A (en) Based on the synchronous filling system of fully mechanized mining gangue for mitigating coal mining subsidence area degree and method
RU2114307C1 (en) Method for opencast mining of flooded mineral deposits
CN104763423B (en) Technology for mining powder ore by inverse well rock drilling

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant