CN111720848A - System for reducing temperature of smoke at outlet of wet desulphurization absorption tower - Google Patents

System for reducing temperature of smoke at outlet of wet desulphurization absorption tower Download PDF

Info

Publication number
CN111720848A
CN111720848A CN202010670025.8A CN202010670025A CN111720848A CN 111720848 A CN111720848 A CN 111720848A CN 202010670025 A CN202010670025 A CN 202010670025A CN 111720848 A CN111720848 A CN 111720848A
Authority
CN
China
Prior art keywords
cooling
outlet
cooling water
tower
absorption tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010670025.8A
Other languages
Chinese (zh)
Inventor
付康丽
赵瀚辰
甘增芳
朱小毕
王福君
刘安勇
陈满园
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian Thermal Power Research Institute Co Ltd
Jinggangshan Power Plant of Huaneng Power International Inc
Original Assignee
Xian Thermal Power Research Institute Co Ltd
Jinggangshan Power Plant of Huaneng Power International Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian Thermal Power Research Institute Co Ltd, Jinggangshan Power Plant of Huaneng Power International Inc filed Critical Xian Thermal Power Research Institute Co Ltd
Priority to CN202010670025.8A priority Critical patent/CN111720848A/en
Publication of CN111720848A publication Critical patent/CN111720848A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23JREMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES 
    • F23J15/00Arrangements of devices for treating smoke or fumes
    • F23J15/06Arrangements of devices for treating smoke or fumes of coolers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23JREMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES 
    • F23J15/00Arrangements of devices for treating smoke or fumes
    • F23J15/02Arrangements of devices for treating smoke or fumes of purifiers, e.g. for removing noxious material
    • F23J15/04Arrangements of devices for treating smoke or fumes of purifiers, e.g. for removing noxious material using washing fluids
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23JREMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES 
    • F23J2215/00Preventing emissions
    • F23J2215/20Sulfur; Compounds thereof

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Treating Waste Gases (AREA)

Abstract

The invention relates to the technical field of industrial flue gas pollution treatment, in particular to a system for reducing the temperature of flue gas at the outlet of a wet desulphurization absorption tower. The system comprises a cooling water tower arranged outside a desulfurization tower cylinder body, and a plurality of cooling modules arranged inside the desulfurization tower cylinder body and connected with the cooling water tower; the cooling module is arranged between the uppermost spray layer and the demister in the desulfurization tower and below the rest spray layers; the cooling module comprises a plurality of cooling water pipes, and the cooling water pipes are connected with the cylinder body of the desulfurizing tower through flanges; one end of the cooling water pipe is connected with a water outlet of the cooling water tower through a water inlet pipeline of the cooling module, and the other end of the cooling water pipe is connected with a water inlet of the cooling water tower through a water outlet pipeline of the cooling module. The invention not only can effectively realize the reduction of the temperature of the flue gas after the absorption tower, but also can reduce the carrying amount of liquid drops of the flue gas at the outlet of the desulfurizing tower, and has the advantages of small modification engineering amount, simple system, low investment cost and high adaptability.

Description

System for reducing temperature of smoke at outlet of wet desulphurization absorption tower
Technical Field
The invention relates to the technical field of industrial flue gas pollution treatment, in particular to a system for reducing the temperature of flue gas at the outlet of a wet desulphurization absorption tower.
Background
As is well known, the wet desulphurization technology is dominant in the domestic industrial coal-fired boiler flue gas desulphurization technology. However, in the industrial coal-fired boiler adopting the wet desulphurization technology, wet saturated flue gas at the outlet of the absorption tower is cooled in the process of being discharged through a chimney, and supersaturation and condensation are generated to form white smoke plume. In contrast, due to various factors, the temperature and the moisture content of the flue gas at the outlet of the absorption tower of the industrial coal-fired boiler need to be controlled, and the emission value of the controller is strictly controlled to realize the elimination of the white smoke plume.
In order to realize the treatment of white smoke plume at the outlet of a chimney, the current mainstream technology is to condense and cool the smoke at the outlet of an absorption tower, then heat and raise the temperature, and finally realize white elimination. Condensation cooling is a necessary link in the smoke plume treatment process, and on one hand, the reduction of the moisture content of smoke is realized, so that the aim of whitening reduction is fulfilled; on the other hand, a large amount of fine liquid drops are separated out after the saturated flue gas is condensed, and the liquid drops can adsorb a small amount of dust and SO2、SO3And the pollutant particles are used for further removing pollutants. The existing flue gas condensation technology is more commonly used and comprises a rear gas-liquid condensation tube type heat exchanger of an absorption tower and a liquid-liquid slurry plate type heat exchanger arranged on a slurry circulating pipeline outside the absorption tower. The former has more operation performance, but the modification work amount is very large, and has high requirements on the space between the absorption tower and the chimney because the former is usually arranged on a clean flue between the absorption tower and the chimney, and the flow speed in the gas-liquid condensation tube type heat exchanger is far lower than the flow speed of flue gas in the clean flueThe arrangement position of the gas-liquid condensing tube type heat exchanger usually needs larger flue variable cross section; in addition, in order to prevent the secondary carrying of the condensate caused by the flue gas, a flue demister is often added behind the gas-liquid condensation tube type heat exchanger, so that the complexity and the water consumption of a desulfurization system are increased. The latter has less operation performance, the liquid-liquid slurry plate heat exchanger has severe operation condition, the blockage and the abrasion of the heat exchanger body are easily caused, and once the heat exchanger body breaks down, the corresponding slurry circulating pump needs to be stopped for maintenance, so that great pressure is generated on the operation of the desulfurization system.
Disclosure of Invention
Aiming at the problems in the prior art, the invention provides a system for reducing the smoke temperature at the outlet of a wet desulphurization absorption tower, which not only can effectively realize the reduction of the smoke temperature after the absorption tower, the reduction of the moisture content of smoke and the prevention of condensate liquid from being brought out of the absorption tower by the smoke, but also has the function of a certain demister and can reduce the carrying capacity of liquid drops of the smoke at the outlet of the desulphurization tower; the system has the advantages of small modification engineering amount, simple system, low investment cost and high adaptability.
The invention is realized by the following technical scheme:
a system for reducing the temperature of smoke at the outlet of a wet desulphurization absorption tower comprises a cooling tower arranged outside a desulphurization tower cylinder and a plurality of cooling modules arranged inside the desulphurization tower cylinder and connected with the cooling tower; the cooling module is arranged between the uppermost layer of the desulfurization tower and the demister in the tower, and below the rest layers of the desulfurization tower.
Preferably, the cooling module comprises a plurality of cooling water pipes, and the cooling water pipes are connected with the cylinder body of the desulfurizing tower through flanges; one end of the cooling water pipe is connected with a water outlet of the cooling water tower through a water inlet pipeline of the cooling module, and the other end of the cooling water pipe is connected with a water inlet of the cooling water tower through a water outlet pipeline of the cooling module.
Furthermore, the pipe diameter range of the cooling water pipe is phi 20 mm-phi 500 mm.
Furthermore, the cooling water pipe is made of duplex stainless steel.
Furthermore, the water inlet pipeline of each cooling water pipe is respectively provided with a valve.
Furthermore, the cooling water pipes are arranged in a layer and adopt a straight pipe bundle type or a snake-shaped pipe bundle type.
Furthermore, the plurality of cooling water pipes are arranged in an upper layer and a lower layer, the plurality of cooling water pipes in each layer are in a straight pipe bundle type, and the upper layer and the lower layer are alternately paved.
Preferably, the water inlet pipeline of the cooling module is connected with the plurality of cooling modules through a plurality of connecting branch pipes; and the connecting branch pipes are provided with cooling module water inlet control valves.
Preferably, the cooling module water inlet pipeline and the cooling module water outlet pipeline are both provided with pressure and temperature testing elements.
Preferably, a cooling water circulating pump is installed on the water inlet pipeline of the cooling module; and the slurry tank and the connecting pipeline of the spraying layer are respectively provided with a slurry circulating pump.
Compared with the prior art, the invention has the following beneficial technical effects:
according to the invention, the cooling modules are arranged between the uppermost spray layer and the demister in the desulfurizing tower and below each spray layer, so that the cooling modules directly contact with flue gas in the tower for heat exchange, thereby realizing cooling of the flue gas in the tower, condensing saturated wet flue gas, and directly intercepting condensate into the absorption tower when the condensate passes through the demister in the tower along with the flue gas, thereby reducing the temperature of desulfurizing slurry and the temperature of flue gas in the desulfurizing tower in the desulfurizing operation process, and further reducing the temperature of exhaust smoke and the temperature of slurry of the desulfurizing tower; in the process of cooling the flue gas in the desulfurizing tower, soluble salts, sulfuric acid mist, organic matters and the like in the flue gas are separated out along with the condensation of water vapor in the flue gas, so that the colored smoke plume emission at the outlet of the chimney can be effectively relieved, and the generation of gypsum rain of the chimney is avoided; meanwhile, the low-temperature slurry can reduce the amount of flue gas in the tower, improve the liquid-gas ratio of a desulfurization device, improve the desulfurization efficiency and the synergistic dust removal effect, and compared with the existing flue condensation heat exchanger, the low-temperature slurry has the advantages of low newly-increased power consumption, small reconstruction workload, low investment, reliable operation and simple overhaul and maintenance; and the temperature of the desulfurization slurry can be flexibly adjusted by controlling the cooling water amount of the slurry cooling module according to different seasonal environment temperatures and different cooling water temperatures.
Furthermore, the cooling water pipe in the cooling module is made of duplex stainless steel and above materials, so that the corrosion resistance, the erosion wear resistance, the good mechanical property and the high strength of the cooling water pipe are ensured.
Furthermore, the mode of arranging the valve for independent control on the inlet pipeline of each cooling water pipe is adopted, so that the cooling water pipes can be separately disconnected when in fault or damage, and the normal operation of the whole cooling device is not influenced.
Furthermore, the pressure and temperature testing elements are respectively arranged on the water inlet pipeline of the cooling module and the water outlet pipeline of the cooling module, so that the operating pressure and temperature of the cooling water pipe can be effectively monitored.
Drawings
FIG. 1 is a schematic diagram of the system of the present invention.
Fig. 2 is a schematic structural diagram of a cooling module according to embodiment 1 of the present invention.
Fig. 3 is a schematic structural diagram of a cooling module according to embodiment 2 of the present invention.
Fig. 4 is a schematic structural diagram of a cooling module according to embodiment 3 of the present invention.
In the figure: 1-a cooling water tower, 2-a desulfurization tower flue gas inlet, 3-a slurry pool, 41-a cooling water circulating pump, 42-a slurry circulating pump, 5-a cooling module, 51-a cooling water pipe, 6-a desulfurization tower flue gas outlet, 7-a cooling module water inlet pipeline, 8-a spraying layer, 9-a cooling module water inlet control valve, 10-a cooling module water outlet pipeline, 11-a desulfurization tower cylinder and 12-a demister.
Detailed Description
The present invention will now be described in further detail with reference to the attached drawings, which are illustrative, but not limiting, of the present invention.
Example 1
The invention discloses a system for reducing the smoke temperature at the outlet of a wet desulphurization absorption tower, which comprises a desulphurization tower cylinder 11, a demister 12, a desulphurization tower smoke inlet 2, a desulphurization tower smoke outlet 6, a slurry pool 3, a spraying layer 8, a slurry circulating pump 42, a cooling module 5, a cooling water pipe 51, a cooling water tower 1, a cooling water circulating pump 41, a cooling module water inlet pipeline 7, a cooling module water inlet control valve 9 and a cooling module water outlet pipeline 10, wherein the desulphurization tower smoke inlet 2 is connected with the slurry pool 3 through a pipeline;
desulfurization slurry in a desulfurization tower cylinder body 11 enters a multilayer spraying layer 8 through a slurry circulating pump 42 and then falls from top to bottom, flue gas enters the desulfurization tower cylinder body 11 from a desulfurization tower flue gas inlet 2 from bottom to top, the flue gas is not only in countercurrent contact with the spraying slurry for cooling, but also is further subjected to heat exchange and cooling through a plurality of cooling water pipes 51 in a multilayer cooling module 5, in the process, wet saturated flue gas is changed into supersaturated wet flue gas, substances such as water vapor, soluble salt, sulfuric acid mist and organic matters in the flue gas are condensed and separated out from the flue gas, the generation of colored smoke plume at the outlet of a chimney and gypsum rain is relieved, and the treated flue gas is discharged from a desulfurization tower flue gas outlet 6 through a demister 12;
the high-temperature cooling water after heat exchange enters the cooling water tower 1 for cooling through the cooling module water outlet pipeline 10, and the low-temperature cooling water after cooling enters the cooling module 5 through the cooling module water inlet pipeline 7 and the cooling water circulating pump 41 to exchange heat with the desulfurization slurry and the flue gas;
wherein, the cooling water pipe 51 in the cooling module 5 adopts a straight pipe bundle type, as shown in fig. 2, and has simple processing and convenient maintenance.
Aiming at different cooling water sources of different power plants, the cooling water source of the invention can adopt circulating water, river water or seawater and the like in the cooling water tower 1.
Example 2
According to the system for reducing the smoke temperature at the outlet of the wet desulphurization absorption tower, as shown in fig. 3, the cooling water pipe 51 in the cooling module 5 is in a serpentine pipe bundle type, so that the action area of the cooling water pipe 51 is increased, the cooling efficiency is improved, and the rest of the structure is the same as that in the embodiment 1.
Example 3
According to the system for reducing the temperature of the smoke at the outlet of the wet desulphurization absorption tower, if the temperature of the smoke at the outlet is higher, the cooling module 5 shown in fig. 4 can be adopted, the cooling water pipes 51 in the cooling module 5 in fig. 4 are in a straight pipe bundle type and are laid in a vertically staggered mode, and the rest of the structure is the same as that in the embodiment 1.
The above embodiments 1-3 are preferred embodiments of the cooling module 5 of the present invention, and are not intended to limit the present invention, and the cooling module 5 may be modified, improved or replaced with equivalents within the principles of the present invention.

Claims (10)

1. A system for reducing the smoke temperature at the outlet of a wet desulphurization absorption tower is characterized by comprising a cooling tower (1) arranged outside a desulphurization tower cylinder (11) and a plurality of cooling modules (5) arranged in the desulphurization tower cylinder (11) and connected with the cooling tower (1); the cooling module (5) is arranged between the uppermost layer spraying layer (8) in the desulfurizing tower and the demister (12) in the tower, and the rest layers are arranged below the spraying layer (8).
2. The system for reducing the smoke temperature at the outlet of the wet desulphurization absorption tower according to claim 1, wherein the cooling module (5) comprises a plurality of cooling water pipes (51), and the cooling water pipes (51) are connected with the desulphurization tower cylinder (11) through flanges; one end of the cooling water pipe (51) is connected with the water outlet of the cooling water tower (1) through a cooling module water inlet pipeline (7), and the other end of the cooling water pipe is connected with the water inlet of the cooling water tower (1) through a cooling module water outlet pipeline (10).
3. The system for reducing the smoke temperature at the outlet of the wet desulphurization absorption tower according to claim 2, wherein the cooling water pipe (51) has a pipe diameter ranging from phi 20mm to phi 500 mm.
4. The system for reducing the smoke temperature at the outlet of the wet desulphurization absorption tower according to claim 2, wherein the cooling water pipe (51) is made of duplex stainless steel.
5. The system for reducing the smoke temperature at the outlet of the wet desulphurization absorption tower according to claim 2, wherein the inlet pipeline of each cooling water pipe (51) is provided with a valve.
6. The system for reducing the smoke temperature at the outlet of the wet desulphurization absorption tower according to claim 2, wherein the cooling water pipes (51) are arranged in a layer and adopt a straight pipe bundle type or a serpentine pipe bundle type.
7. The system for reducing the smoke temperature at the outlet of the wet desulphurization absorption tower according to claim 2, wherein the plurality of cooling water pipes (51) are arranged in an upper layer and a lower layer, the plurality of cooling water pipes (51) in each layer are in a straight pipe bundle type, and the upper layer and the lower layer are alternately laid.
8. The system for reducing the smoke temperature at the outlet of the wet desulphurization absorption tower according to claim 1, wherein the cooling module water inlet pipeline (7) is connected with a plurality of cooling modules (5) through a plurality of connecting branch pipes; and the connecting branch pipes are provided with cooling module water inlet control valves (9).
9. The system for reducing the outlet smoke temperature of the wet desulphurization absorption tower according to claim 1, wherein the inlet pipeline (7) of the cooling module and the outlet pipeline (10) of the cooling module are provided with pressure and temperature test elements.
10. The system for reducing the smoke temperature at the outlet of the wet desulphurization absorption tower according to claim 1, wherein a cooling water circulating pump (41) is installed on the cooling module water inlet pipeline (7); and a slurry circulating pump (42) is respectively arranged on the connecting pipeline of the slurry pool (3) and the spraying layer (8).
CN202010670025.8A 2020-07-13 2020-07-13 System for reducing temperature of smoke at outlet of wet desulphurization absorption tower Pending CN111720848A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010670025.8A CN111720848A (en) 2020-07-13 2020-07-13 System for reducing temperature of smoke at outlet of wet desulphurization absorption tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010670025.8A CN111720848A (en) 2020-07-13 2020-07-13 System for reducing temperature of smoke at outlet of wet desulphurization absorption tower

Publications (1)

Publication Number Publication Date
CN111720848A true CN111720848A (en) 2020-09-29

Family

ID=72573971

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010670025.8A Pending CN111720848A (en) 2020-07-13 2020-07-13 System for reducing temperature of smoke at outlet of wet desulphurization absorption tower

Country Status (1)

Country Link
CN (1) CN111720848A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112121590A (en) * 2020-09-30 2020-12-25 华中科技大学 Rectification-heat exchange coupling type tray and wet flue gas desulfurization tower

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102188888A (en) * 2011-04-12 2011-09-21 王晓晔 A wet method treatment process of purified flue gas with a water collection function in the process and a processing apparatus thereof
WO2016192272A1 (en) * 2015-06-05 2016-12-08 童裳慧 Integrated flue gas treatment device and method
US10112145B1 (en) * 2017-09-07 2018-10-30 Jiangnan Environmental Protection Group Inc. Method for controlling aerosol production during absorption in ammonia desulfurization
CN109126331A (en) * 2018-09-05 2019-01-04 武汉华德环保工程技术有限公司 A kind of device and method for eliminating the coloured plume of wet desulphurization
CN109381989A (en) * 2018-11-05 2019-02-26 华电电力科学研究院有限公司 The system and its working method of Multi-stage cooling cooperation-removal multiple pollutant in a kind of tower
CN208878276U (en) * 2018-07-05 2019-05-21 江苏中顺节能科技有限公司 Cooling down type fume desulfurating absorption tower
CN109985467A (en) * 2019-04-30 2019-07-09 北京朗净时代环境科技有限公司 A kind of dedusting disappears white system and desulfurizing tower
CN209138329U (en) * 2018-11-15 2019-07-23 华能国际电力股份有限公司 Desulfurizing tower slurry cooling device for realizing saturated wet flue gas condensation
CN209406043U (en) * 2018-11-05 2019-09-20 华电电力科学研究院有限公司 The system of Multi-stage cooling cooperation-removal multiple pollutant in a kind of tower
CN209828704U (en) * 2018-09-26 2019-12-24 北京清新环境技术股份有限公司 Boiler flue gas can condense particulate matter and get rid of heat recovery system in coordination
CN212511237U (en) * 2020-07-13 2021-02-09 西安热工研究院有限公司 System for reducing temperature of smoke at outlet of wet desulphurization absorption tower

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102188888A (en) * 2011-04-12 2011-09-21 王晓晔 A wet method treatment process of purified flue gas with a water collection function in the process and a processing apparatus thereof
WO2016192272A1 (en) * 2015-06-05 2016-12-08 童裳慧 Integrated flue gas treatment device and method
US10112145B1 (en) * 2017-09-07 2018-10-30 Jiangnan Environmental Protection Group Inc. Method for controlling aerosol production during absorption in ammonia desulfurization
CN208878276U (en) * 2018-07-05 2019-05-21 江苏中顺节能科技有限公司 Cooling down type fume desulfurating absorption tower
CN109126331A (en) * 2018-09-05 2019-01-04 武汉华德环保工程技术有限公司 A kind of device and method for eliminating the coloured plume of wet desulphurization
CN209828704U (en) * 2018-09-26 2019-12-24 北京清新环境技术股份有限公司 Boiler flue gas can condense particulate matter and get rid of heat recovery system in coordination
CN109381989A (en) * 2018-11-05 2019-02-26 华电电力科学研究院有限公司 The system and its working method of Multi-stage cooling cooperation-removal multiple pollutant in a kind of tower
CN209406043U (en) * 2018-11-05 2019-09-20 华电电力科学研究院有限公司 The system of Multi-stage cooling cooperation-removal multiple pollutant in a kind of tower
CN209138329U (en) * 2018-11-15 2019-07-23 华能国际电力股份有限公司 Desulfurizing tower slurry cooling device for realizing saturated wet flue gas condensation
CN109985467A (en) * 2019-04-30 2019-07-09 北京朗净时代环境科技有限公司 A kind of dedusting disappears white system and desulfurizing tower
CN212511237U (en) * 2020-07-13 2021-02-09 西安热工研究院有限公司 System for reducing temperature of smoke at outlet of wet desulphurization absorption tower

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112121590A (en) * 2020-09-30 2020-12-25 华中科技大学 Rectification-heat exchange coupling type tray and wet flue gas desulfurization tower

Similar Documents

Publication Publication Date Title
CN107860153B (en) Energy-saving water-saving coal-fired boiler wet flue gas deep comprehensive treatment system and method
CN101063527B (en) Process for controlling the moisture concentration of a combustion flue gas
CN106563337B (en) Absorption type flue gas waste heat utilization, purification and dehumidification device and method with multi-path circulation
CN204923035U (en) Processing system is synthesized to coal fired boiler's flue gas
CN207379110U (en) A kind of energy-saving and water-saving type coal-burning boiler wet flue gas depth total system
CN109442449B (en) Spraying treatment device for flue gas
CN108194939B (en) Device and method for waste heat cascade utilization and white smoke elimination of thermal power plant
CN102980171A (en) Economizer capable of recycling waste heat of flue in depth and concealing, desulfurizing and aspirating flue of coal-fired boiler
CN109945278A (en) A kind of energy conserving system being used for central heating using absorption heat pump depth Mist heat recovering
CN205032022U (en) Ash -laden gas condensation heat recovery and gas cleaning integration system
CN108479289A (en) A kind of white-smoke-removing system and technique accurately controlling corrosion
CN109395539B (en) Device for removing white by spraying
CN214635248U (en) Waste heat utilization system of clean flue gas of desulfurization
CN213272674U (en) Deep purification and waste heat recovery system for flue gas of coal-fired boiler
CN208406509U (en) A kind of white-smoke-removing system of accurate control corrosion rate
CN208025546U (en) It is a kind of to remove white thermal siphon heat exchanger for wet flue gas
CN212511237U (en) System for reducing temperature of smoke at outlet of wet desulphurization absorption tower
CN111720848A (en) System for reducing temperature of smoke at outlet of wet desulphurization absorption tower
CN109157941A (en) A kind of coal-fired plant flue gas dehumidifying emission-reducing system and technique
CN109925839A (en) It is a kind of to utilize fume afterheat deep condensation demister system
CN110433635A (en) A kind of high-efficiency desulfurization eliminating white smoke device and technique
CN210448655U (en) Ammonia working medium circulation process energy-saving whitening device for flue gas after wet desulphurization
JP3251883B2 (en) Exhaust gas desulfurization method and apparatus
CN109469918B (en) Flue heating regenerating unit
CN109569199B (en) Flue gas treatment device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination