CN111720109A - Dry gas well production simulation device and method based on fixed-yield production - Google Patents

Dry gas well production simulation device and method based on fixed-yield production Download PDF

Info

Publication number
CN111720109A
CN111720109A CN202010618882.3A CN202010618882A CN111720109A CN 111720109 A CN111720109 A CN 111720109A CN 202010618882 A CN202010618882 A CN 202010618882A CN 111720109 A CN111720109 A CN 111720109A
Authority
CN
China
Prior art keywords
pressure
production
core holder
control valve
core
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010618882.3A
Other languages
Chinese (zh)
Other versions
CN111720109B (en
Inventor
杨威
李志军
陈中华
向祖平
刘忠华
姜柏材
丁洋洋
程泽华
唐欢
常小龙
王子怡
张涵
何琚瑜
胡钟文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing University of Science and Technology
Original Assignee
Chongqing University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing University of Science and Technology filed Critical Chongqing University of Science and Technology
Priority to CN202010618882.3A priority Critical patent/CN111720109B/en
Publication of CN111720109A publication Critical patent/CN111720109A/en
Application granted granted Critical
Publication of CN111720109B publication Critical patent/CN111720109B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/06Measuring temperature or pressure
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geophysics (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The invention discloses a dry gas well production simulation device and method based on fixed-yield production, which can perform physical simulation on a dry gas well gas production rule to obtain the dry gas well gas production rule. Including first constant-speed constant-pressure pump, first control valve, middle container, second control valve, first rock core holder, third control valve, air-vent valve, second rock core holder, backpressure valve, flowmeter of establishing ties in proper order, have connected gradually fourth control valve, nitrogen gas cylinder through three way connection between middle container, the second control valve, first rock core holder carries out temperature control through heating system, and first rock core holder sets up the confining pressure through confining pressure system, second rock core holder sets up the confining pressure through confining pressure automatic tracking pump, the backpressure valve sets up the backpressure through second constant-speed constant-pressure pump, and both ends between the first rock core holder, the both ends of second rock core holder are equipped with pressure sensor respectively for pressure tracking.

Description

Dry gas well production simulation device and method based on fixed-yield production
Technical Field
The invention belongs to the technical field of oil and gas exploitation experiments, and mainly relates to a physical simulation device and a physical simulation method for simulating gas production rule of a gas well indoors under the condition of a fixed-yield production system.
Background
The conventional gas well yield decreasing rule is mainly researched by using a gas reservoir engineering method or a numerical simulation method based on the existing production data, and the conventional gas well yield determining method mainly refers to the similar gas wells, and the gas wells with the same gas reservoir basically use the same yield determining standard. However, the actual production of the gas well has unidirectional characteristics (production cannot be reproduced and parameters cannot be reset), so that the difference between the actual production and the optimal production of the gas well is too large.
Disclosure of Invention
The invention aims to overcome the defects of the prior art and provides a dry gas well production simulation device and method based on fixed-yield production, which can perform physical simulation on a dry gas well gas production rule to obtain the dry gas well gas production rule.
The purpose of the invention is realized as follows:
the utility model provides a dry gas well production analogue means based on fixed production volume production, is including the first constant speed constant pressure pump, first control valve, middle container, second control valve, first rock core holder, third control valve, air-vent valve, second rock core holder, back pressure valve, the flowmeter of establishing ties in proper order, have connected gradually fourth control valve, nitrogen gas cylinder through three way connection between middle container, the second control valve, first rock core holder carries out temperature control through heating system, and first rock core holder sets up the confining pressure through confining pressure system, second rock core holder sets up the confining pressure through confining pressure automatic tracking pump, the back pressure valve sets up the back pressure through second constant speed constant pressure pump, and both ends between the first rock core holder, the both ends of second rock core holder are equipped with pressure sensor respectively for pressure tracking.
Preferably, the first core holder is connected with a first pressure gauge, and the second core holder is connected with a second pressure gauge for detecting confining pressure.
Preferably, the flowmeter and each pressure sensor are respectively connected with the data acquisition system and used for acquiring pressure data and flow data.
Preferably, a tracking pipeline of the confining pressure automatic tracking pump is connected to the inlet end of the second core holder and used for tracking the pressure of the inlet end of the second core holder.
Preferably, a fifth control valve is arranged on a pipeline between the first core holder and the confining pressure system and used for stabilizing the confining pressure.
A method for simulating production of a dry gas well based on fixed-volume production comprises the following steps:
preparing a first core and a second core from the target layer tight sandstone, loading the first core into a first core holder, and loading the second core into a second core holder;
starting a heating system and a confining pressure system, simulating an external environment of a target layer in the first rock core holder, and setting the formation pressure of the target layer as P;
closing the first control valve and the second control valve, opening the fourth control valve, filling enough nitrogen into the intermediate container, and then closing the fourth control valve;
opening a first control valve and a second control valve, starting a first constant-speed constant-pressure pump, filling nitrogen into the first core holder, and after the pressure P is reached, closing the first constant-speed constant-pressure pump, the first control valve and the second control valve in sequence until the pressure is stable;
adjusting the pressure regulating valve according to the required production pressure difference, reducing the air pressure at the inlet end of the second core holder, wherein after the air pressure is reduced, the air pressure at the inlet end of the second core holder is P1The pressure of the outlet end of the second rock core holder is P2
Setting differential pressure by using confining pressure automatic tracking pump to track gas pressure P at inlet end of second core holder1Further automatically converting to generate confining pressure;
according to the waste pressure of the gas layer, a second constant-speed constant-pressure pump is utilized to give a back pressure P to the back pressure valve3Opening a third control valve, adjusting a pressure regulating valve to start to simulate production, monitoring the change curve of the pressure at two ends of the first core holder and the second core holder along with the time by using a pressure sensor, and synchronously monitoring the change curve of the gas flow in the flowmeter along with the time until the production is finished;
the differential pressure of the system production is delta P ═ P1-P3When P is>P1The gas well production simulation system is in a stable production stage, and when P is P1Then, the gas well production simulation system begins to change from a stable production stage to a decreasing stage, and P are at the moment1While decreasing, when P ═ P1=P3And stopping simulating production by the gas well production simulation system.
Preferably, the preparation method of the first core and the second core comprises the following steps: and drying the core to constant weight, placing the core in a cooler, cooling the core to room temperature, measuring the length and the diameter of the core, wherein the permeability of the second core is lower than that of the first core.
Preferably, the first core holder and the second core holder are pre-filled with gas before production is simulated so as to ensure the continuity of experimental data.
Preferably, the gas production rule of the dry gas well is obtained by changing the production pressure difference and carrying out production simulation for multiple times.
Due to the adoption of the technical scheme, the invention has the following beneficial effects:
the physical simulation device and the physical simulation method provided by the invention are mainly based on the production characteristics of a dry gas well and the physical characteristics of a gas reservoir, and the reservoir core or the artificial core is used for simulating the gas reservoir under the conditions of indoor simulation of the temperature, the pressure and the like of the reservoir; based on the automatic pressure tracking control technology, the yield control device in the experimental process simulates a gas well wellhead throttling device; the rules presented by the experimental test data can be analyzed using existing yield decrement and pressure decrement analysis methods.
The invention has the following advantages:
(1) compared with the traditional gas well production allocation method which carries out theoretical calculation by simplifying a stratum seepage process and establishing a model, the method is based on the process of gas output of the tight sandstone gas layer, so that the condition of gas output of the reservoir is reduced more truly, and the production allocation error is reduced;
(2) by utilizing a similar principle, a bridge of an indoor experimental result and mine field production data is established, and the reasonable production allocation on the site can be guided;
(3) the operation process is simple, and the economic cost is low;
(4) strong pertinence, good repeatability and convenient long-time experiment development.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2-5 are graphs showing the results of simulation production experiments.
1. The system comprises a nitrogen gas cylinder, 2, 5, 7, 13 and 17 control valves, 3, 8, 15 and 25 three-way joints, 4 intermediate containers, 6 and 26 constant-speed and constant-pressure pumps, 9, 16, 20 and 24 pressure sensors, 10 first core holders, 11 and 21 pressure gauges, 12 heating systems, 14 confining pressure systems, 18 pressure regulating valves, 19 four-way joints, 22 second core holders, 23 confining pressure automatic tracking pumps, 27 back pressure valves, 28 flow meters and 29 data acquisition systems.
Detailed Description
A dry gas well production simulation device based on constant-yield production comprises a first constant-speed constant-pressure pump 6, a first control valve 5, an intermediate container 4, a second control valve 7, a first core holder 10(38mm core holder), a third control valve 17, a pressure regulating valve 18, a second core holder 22(25mm core holder), a back pressure valve 27 and a flowmeter 28 which are sequentially connected in series, wherein a fourth control valve 2 and a nitrogen gas cylinder 1 are sequentially connected between the intermediate container 4 and the second control valve 7 through a three-way joint 3, the first core holder 10 is subjected to temperature control through a heating system 12, the first core holder 10 is provided with confining pressure through a confining pressure system 14, the confining pressure system 14 adopts a conventional confining pressure system, the second core holder 22 is provided with confining pressure through a confining pressure automatic tracking pump 23, and the automatic tracking pump is selected to set the pressure difference because the pressure is required to be regulated, the pressure at the outlet end of the pressure regulating valve is slightly unstable, and the pressure difference between the confining pressure and the inlet end of the second core holder can be more conveniently regulated by using the automatic tracking pump, and meanwhile, the influence of the stress sensitivity effect is eliminated. The pressure can be more conveniently controlled by using the automatic tracking pump so as to better maintain stable yield. The back pressure valve 27 is provided with back pressure through the second constant-speed constant-pressure pump 26, and pressure sensors are respectively arranged at two ends of the first core holder 10 and two ends of the second core holder 22 and used for pressure tracking.
A trace line of the confining pressure automatic trace pump 23 is connected to the inlet end of the second core holder 22, and is used for tracing the pressure at the inlet end of the second core holder 22. The first core holder 10 is connected with a first pressure gauge 11, and the second core holder 22 is connected with a second pressure gauge 21 and used for detecting confining pressure. And a fifth control valve 13 is arranged on a pipeline between the first core holder 10 and the confining pressure system 14 and used for stabilizing the confining pressure. The confining pressure is very high in the experimental process, when the hand pump is driven to the head and needs to suck liquid again, the valve 13 should be closed, when the liquid sucking is finished and pressurization is continued, the fifth control valve 13 is kept closed, the pressure of the confining pressure pump is increased to be basically equal to the confining pressure of the clamp holder, and then the fifth control valve 13 is opened to continue increasing the confining pressure of the clamp holder. The reduction of the pressure of the pump body after the hand pump absorbs liquid is prevented, so that the confining pressure of the clamp holder is reduced along with the reduction of the pressure, and the confining pressure is stabilized. The flowmeter 28 and the pressure sensors are respectively connected with the data acquisition system 29 and used for acquiring pressure data and flow data.
A method for simulating production of a dry gas well based on fixed-volume production comprises the following steps:
preparing a first core and a second core from the target layer tight sandstone, loading the first core into a first core holder 10, and loading the second core into a second core holder 22; the preparation method of the first core and the second core comprises the following steps: and drying the core at 100 ℃ to constant weight, placing the core in a cooler, cooling the core to room temperature, and measuring the length and the diameter of the core to enable the core to be adapted to the core holder. And the permeability of the second core is lower than that of the first core so as to correspond to the required pressure, and the second core is selected according to the deflation speed.
Before production is simulated, the first core holder 10 and the second core holder 22 are pre-filled with gas to ensure the continuity of experimental data.
Starting a heating system 12 and a confining pressure system 14, simulating the external environment of a target layer in the first core holder 10, and setting the formation pressure of the target layer as P;
closing the first control valve 5 and the second control valve 7, opening the fourth control valve 2, filling enough nitrogen into the intermediate container 4, and closing the fourth control valve 2;
opening a first control valve 5 and a second control valve 7, starting a first constant-speed constant-pressure pump 6, filling nitrogen into a first core holder 10, and after the pressure P is reached, sequentially closing the first constant-speed constant-pressure pump 6, the first control valve 5 and the second control valve 7 until the pressure is stable;
adjusting the pressure regulating valve 18 according to the required production pressure difference, reducing the air pressure at the inlet end of the second core holder 22, and after the pressure is reduced, the air pressure at the inlet end of the second core holder 22 is P1The pressure at the outlet end of the second core holder 22 is P2
Setting a pressure difference by using an automatic confining pressure tracking pump 23, tracking the gas pressure P1 at the inlet end of the second core holder 22, and further automatically converting to generate confining pressure;
according to the waste pressure of the air layer, a back pressure P is given to a back pressure valve 27 by a second constant-speed constant-pressure pump 263Opening a third control valve 17, adjusting a pressure regulating valve 18 to start to simulate production, monitoring the change curve of the pressure at two ends of the first core holder 10 and the second core holder 22 along with the time by using pressure sensors 9, 16, 20 and 24 respectively, and synchronously monitoring the change curve of the gas flow in a flowmeter 28 along with the time until the production is finished;
the differential pressure of the system production is delta P ═ P1-P3When P is>P1The gas well production simulation system is in a stable production stage, and when P is P1Then, the gas well production simulation system begins to change from a stable production stage to a decreasing stage, and P are at the moment1While decreasing, when P ═ P1=P3And stopping simulating production by the gas well production simulation system.
And the gas production rule of the dry gas well is obtained by changing the production pressure difference and carrying out production simulation for multiple times.
Finally, it is noted that the above-mentioned preferred embodiments illustrate rather than limit the invention, and that, although the invention has been described in detail with reference to the above-mentioned preferred embodiments, it will be understood by those skilled in the art that various changes in form and detail may be made therein without departing from the scope of the invention as defined by the appended claims.

Claims (9)

1. The utility model provides a dry gas well production analogue means based on fixed production, its characterized in that, includes first constant speed constant pressure pump, first control valve, middle container, second control valve, first rock core holder, third control valve, air-vent valve, second rock core holder, back pressure valve, the flowmeter of establishing ties in proper order, fourth control valve, nitrogen gas cylinder have connected gradually through three way connection between middle container, the second control valve, first rock core holder carries out temperature control through heating system, and first rock core holder sets up the confining pressure through confining pressure system, second rock core holder sets up the confining pressure through confining pressure automatic tracking pump, the back pressure valve sets up the back pressure through second constant speed constant pressure pump, and both ends between the first rock core holder, the both ends of second rock core holder are equipped with pressure sensor respectively for pressure tracking.
2. The production simulation device for the dry gas well based on the fixed-yield production as claimed in claim 1, wherein the first core holder is connected with a first pressure gauge, and the second core holder is connected with a second pressure gauge for detecting confining pressure.
3. The production simulator for dry gas wells based on fixed-volume production according to claim 1, wherein: the flowmeter and each pressure sensor are respectively connected with the data acquisition system and used for acquiring pressure data and flow data.
4. The production simulator for dry gas wells based on fixed-volume production according to claim 1, wherein: and a tracking pipeline of the confining pressure automatic tracking pump is connected to the inlet end of the second core holder and used for tracking the pressure of the inlet end of the second core holder.
5. The production simulator for dry gas wells based on fixed-volume production according to claim 1, wherein: and a fifth control valve is arranged on a pipeline between the first rock core holder and the confining pressure system and used for stabilizing the confining pressure.
6. A method for simulating production of a dry gas well based on fixed-volume production, comprising:
preparing a first core and a second core from the target layer tight sandstone, loading the first core into a first core holder, and loading the second core into a second core holder;
starting a heating system and a confining pressure system, simulating an external environment of a target layer in the first rock core holder, and setting the formation pressure of the target layer as P;
closing the first control valve and the second control valve, opening the fourth control valve, filling enough nitrogen into the intermediate container, and then closing the fourth control valve;
opening a first control valve and a second control valve, starting a first constant-speed constant-pressure pump, filling nitrogen into the first core holder, and after the pressure P is reached, closing the first constant-speed constant-pressure pump, the first control valve and the second control valve in sequence until the pressure is stable;
adjusting the pressure regulating valve according to the required production pressure difference, reducing the air pressure at the inlet end of the second core holder, wherein after the air pressure is reduced, the air pressure at the inlet end of the second core holder is P1The pressure of the outlet end of the second rock core holder is P2
Setting differential pressure by using confining pressure automatic tracking pump to track gas pressure P at inlet end of second core holder1Further automatically converting to generate confining pressure;
according to the waste pressure of the gas layer, a second constant-speed constant-pressure pump is utilized to give a back pressure P to the back pressure valve3Opening a third control valve, adjusting a pressure regulating valve to start to simulate production, monitoring the change curve of the pressure at two ends of the first core holder and the second core holder along with the time by using a pressure sensor, and synchronously monitoring the change curve of the gas flow in the flowmeter along with the time until the production is finished;
the differential pressure of the system production is delta P ═ P1-P3When P is>P1The gas well production simulation system is in a stable production stage, and when P is P1Then, the gas well production simulation system begins to change from a stable production stage to a decreasing stage, and P are at the moment1While decreasing, when P ═ P1=P3And stopping simulating production by the gas well production simulation system.
7. The method of claim 6, wherein the method comprises: the preparation method of the first core and the second core comprises the following steps: and drying the core to constant weight, placing the core in a cooler, cooling the core to room temperature, measuring the length and the diameter of the core, wherein the permeability of the second core is lower than that of the first core.
8. The method of claim 6, wherein the method comprises: before production is simulated, the first core holder and the second core holder are pre-filled with gas so as to ensure the continuity of experimental data.
9. The method of claim 6, wherein the method comprises: and the gas production rule of the dry gas well is obtained by changing the production pressure difference and carrying out production simulation for multiple times.
CN202010618882.3A 2020-07-01 2020-07-01 Dry gas well production simulation device and method based on fixed-yield production Active CN111720109B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010618882.3A CN111720109B (en) 2020-07-01 2020-07-01 Dry gas well production simulation device and method based on fixed-yield production

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010618882.3A CN111720109B (en) 2020-07-01 2020-07-01 Dry gas well production simulation device and method based on fixed-yield production

Publications (2)

Publication Number Publication Date
CN111720109A true CN111720109A (en) 2020-09-29
CN111720109B CN111720109B (en) 2022-08-02

Family

ID=72570772

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010618882.3A Active CN111720109B (en) 2020-07-01 2020-07-01 Dry gas well production simulation device and method based on fixed-yield production

Country Status (1)

Country Link
CN (1) CN111720109B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114021821A (en) * 2021-11-08 2022-02-08 四川省科源工程技术测试中心 Gas reservoir recovery rate prediction method based on multiple regression

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020084074A1 (en) * 2000-04-24 2002-07-04 De Rouffignac Eric Pierre In situ thermal processing of a hydrocarbon containing formation to increase a porosity of the formation
US20030178191A1 (en) * 2000-04-24 2003-09-25 Maher Kevin Albert In situ recovery from a kerogen and liquid hydrocarbon containing formation
CN101667353A (en) * 2008-09-03 2010-03-10 中国石油天然气股份有限公司 Gas reservoir development dynamic physical simulation method and device thereof
CN103556993A (en) * 2013-11-07 2014-02-05 中国石油大学(北京) Simulation experimental analog method for low permeability oilfield planar five-spot well pattern carbon dioxide flooding
CN104612674A (en) * 2015-01-29 2015-05-13 中国石油大学(北京) Simulate fracture-cavity type carbonate reservoir huff and puff test device and method
CN105300866A (en) * 2015-10-12 2016-02-03 中国石油天然气股份有限公司 Variable-pressure soaking double-medium long core experiment method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020084074A1 (en) * 2000-04-24 2002-07-04 De Rouffignac Eric Pierre In situ thermal processing of a hydrocarbon containing formation to increase a porosity of the formation
US20030178191A1 (en) * 2000-04-24 2003-09-25 Maher Kevin Albert In situ recovery from a kerogen and liquid hydrocarbon containing formation
CN101667353A (en) * 2008-09-03 2010-03-10 中国石油天然气股份有限公司 Gas reservoir development dynamic physical simulation method and device thereof
CN103556993A (en) * 2013-11-07 2014-02-05 中国石油大学(北京) Simulation experimental analog method for low permeability oilfield planar five-spot well pattern carbon dioxide flooding
CN104612674A (en) * 2015-01-29 2015-05-13 中国石油大学(北京) Simulate fracture-cavity type carbonate reservoir huff and puff test device and method
CN105300866A (en) * 2015-10-12 2016-02-03 中国石油天然气股份有限公司 Variable-pressure soaking double-medium long core experiment method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张冲等: "龙凤山特低孔特低渗凝析气藏反凝析伤害实验研究", 《西安石油大学学报(自然科学版)》 *
胡勇: "致密砂岩气藏储层渗流机理研究", 《中国优秀硕士学位论文数据库信息科技1辑》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114021821A (en) * 2021-11-08 2022-02-08 四川省科源工程技术测试中心 Gas reservoir recovery rate prediction method based on multiple regression

Also Published As

Publication number Publication date
CN111720109B (en) 2022-08-02

Similar Documents

Publication Publication Date Title
CN105510176B (en) A kind of coal sample gas negative pressure desorption experiment system
CN109975140B (en) Supercritical carbon dioxide pulse fracturing and permeability testing integrated experimental device and method
CN2677612Y (en) Evaluation surveying device for delay well cementation analogue cenmentation quality
CN114354809B (en) Experimental system and experimental evaluation method for replacing methane by carbon dioxide pulse displacement
CN109883889B (en) Simulation of CO2Experimental device for compact matrix-crack diffusion and leading edge prediction method
CN106872328A (en) A kind of test device and method of testing of flow in low permeability core porosity and permeability
CN207586099U (en) A kind of driving device mutually oozed using steady state method measure air water
CN110847894B (en) Method for determining flow pressure of underground throttling gas well
CN111720109B (en) Dry gas well production simulation device and method based on fixed-yield production
CN115628032A (en) Experimental device and method for simulating fractured formation multilayer leakage under directional well gas invasion condition
CN206957670U (en) System for simulating carbon dioxide gas drive to blind end oil micro-displacement process
CN205844145U (en) A kind of shale high temperature imbibition measurement apparatus
CN111720111B (en) Production simulation device and method for water and gas producing well based on fixed-yield production
CN108169098B (en) Reasonable drainage and production speed simulation device for single-phase flow stage of coalbed methane vertical well
CN114352238A (en) Device and method for testing flow conductivity of natural gas hydrate production increasing seam
CN111720110B (en) Pressure automatic tracking control gas well production simulation yield control device and method
CN205374217U (en) Coal sample gas negative pressure desorption experimental system
CN111794729B (en) Sulfur-containing gas well production simulation device and method based on fixed-yield production
CN116448615A (en) Mud medium gas desorption rule experimental device and experimental method thereof
CN111042801A (en) Device and method for measuring annulus cement slurry weight loss
CN208043584U (en) A kind of coal petrography gas adsorption desorption simulation test device
CN105717255A (en) Composite solvent soaking huff-puff circulation experiment device and simulated mining method
CN106932189A (en) A kind of method and system for measuring water seal arrangement dynamic trap seal loss
CN210155008U (en) Triaxial coal petrography gas single-phase seepage flow experimental apparatus under residual water state
CN110672468B (en) Fluid viscosity measuring device and method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant