CN111691290B - 横梁立柱对接方法 - Google Patents
横梁立柱对接方法 Download PDFInfo
- Publication number
- CN111691290B CN111691290B CN202010643242.8A CN202010643242A CN111691290B CN 111691290 B CN111691290 B CN 111691290B CN 202010643242 A CN202010643242 A CN 202010643242A CN 111691290 B CN111691290 B CN 111691290B
- Authority
- CN
- China
- Prior art keywords
- steel
- steel plate
- hole
- head
- cross beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/02—Piers; Abutments ; Protecting same against drifting ice
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010643242.8A CN111691290B (zh) | 2020-07-07 | 2020-07-07 | 横梁立柱对接方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010643242.8A CN111691290B (zh) | 2020-07-07 | 2020-07-07 | 横梁立柱对接方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111691290A CN111691290A (zh) | 2020-09-22 |
CN111691290B true CN111691290B (zh) | 2021-10-29 |
Family
ID=72485366
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010643242.8A Active CN111691290B (zh) | 2020-07-07 | 2020-07-07 | 横梁立柱对接方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111691290B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112376410B (zh) * | 2020-11-13 | 2022-04-05 | 重庆交通大学 | 一种自平衡式防落梁支座 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104278641A (zh) * | 2014-10-16 | 2015-01-14 | 中铁七局集团第三工程有限公司 | 系杆拱桥吊杆预埋孔对中装置及其对中方法 |
CN209941508U (zh) * | 2019-04-16 | 2020-01-14 | 中铁建大桥工程局集团第三工程有限公司 | 一种薄壁空心墩墩身钢筋的定位辅助装置 |
Family Cites Families (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CH680303A5 (zh) * | 1990-02-16 | 1992-07-31 | Syma Intercontinental Sa | |
JP3750850B2 (ja) * | 2001-11-19 | 2006-03-01 | 東日本旅客鉄道株式会社 | 鉄筋コンクリート部材の補強方法 |
CN101718117A (zh) * | 2009-11-26 | 2010-06-02 | 高原荣之 | 用于轨道板预埋件定位抗浮的装置 |
CN103452039B (zh) * | 2013-09-13 | 2015-12-16 | 上海市城市建设设计研究总院 | 现浇式倒t型盖梁及桥墩及其桥墩施工工艺 |
CN203878461U (zh) * | 2014-06-18 | 2014-10-15 | 上海市城市建设设计研究总院 | 用于预制拼装桥墩立柱与盖梁连接部位的湿接缝构造 |
CN104404869A (zh) * | 2014-11-26 | 2015-03-11 | 天津港航工程有限公司 | 桩柱式混凝土空心桩桥墩结构 |
CN105019352B (zh) * | 2015-07-31 | 2017-03-08 | 华侨大学 | 一种根部设置防屈曲耗能结构的方法及箱形钢桥墩 |
CN107675895A (zh) * | 2017-09-22 | 2018-02-09 | 中集模块化建筑投资有限公司 | 定位连接装置、定位连接系统、建筑模块装置和连接方法 |
CN209125348U (zh) * | 2018-09-27 | 2019-07-19 | 杭州昌鼎机械有限公司 | 一种浮动式定位锥销机构 |
CN109505254A (zh) * | 2018-12-24 | 2019-03-22 | 中铁三局集团有限公司 | 一种适用于大跨度连续梁桥的临时固结施工方法 |
CN109610671B (zh) * | 2019-01-25 | 2020-01-03 | 黄淮学院 | 一种双向隔震支座 |
CN210031519U (zh) * | 2019-04-02 | 2020-02-07 | 山东科达基建有限公司 | 一种可调节桥梁施工支撑装置 |
CN110735389B (zh) * | 2019-11-04 | 2024-01-23 | 江西科技学院 | 装配式混凝土桥墩及其装配方法 |
-
2020
- 2020-07-07 CN CN202010643242.8A patent/CN111691290B/zh active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104278641A (zh) * | 2014-10-16 | 2015-01-14 | 中铁七局集团第三工程有限公司 | 系杆拱桥吊杆预埋孔对中装置及其对中方法 |
CN209941508U (zh) * | 2019-04-16 | 2020-01-14 | 中铁建大桥工程局集团第三工程有限公司 | 一种薄壁空心墩墩身钢筋的定位辅助装置 |
Also Published As
Publication number | Publication date |
---|---|
CN111691290A (zh) | 2020-09-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108505433B (zh) | 一种桥墩结构及其施工方法 | |
CN211036679U (zh) | 一种装配式桥梁预制墩柱与承台的承插连接构造 | |
CN108442237B (zh) | 一种预制桥墩和预制承台快速拼接的构造及其施工方法 | |
KR102166504B1 (ko) | 랜딩 잔교 구조물 및 이의 시공방법 | |
CN109235662B (zh) | 一种包含多重剪力键的柱板连接装置 | |
CN207130606U (zh) | 屈曲抑制圆端型钢管混凝土桥墩及与承台连接结构 | |
CN114592436B (zh) | 一种桥墩盖梁下部支撑体系及其施工方法 | |
CN111691290B (zh) | 横梁立柱对接方法 | |
CN212200051U (zh) | 连接桥梁的装配式钢筋混凝土侧边防撞护栏 | |
CN107386098B (zh) | 屈曲抑制圆端型钢管混凝土桥墩及与承台连接结构和方法 | |
CN113653180B (zh) | 一种“v”型型钢混凝土斜柱混合结构及其施工方法 | |
CN111364356A (zh) | 连接桥梁装配式钢筋混凝土侧边防撞护栏 | |
CN105649248B (zh) | 装配式预应力混凝土空心板与现浇梁一体化施工方法 | |
CN106381810B (zh) | 用梁柱式支架现浇悬灌梁的方法 | |
CN112030720A (zh) | 预制盖梁与墩柱承插式连接结构及施工方法 | |
CN111691310B (zh) | 造桥方法 | |
CN215857171U (zh) | 一种预制拼装桥墩的连接结构 | |
CN209323555U (zh) | 铁路桥梁大直径管桩与承台的抗弯连接结构及基础结构 | |
CN212200050U (zh) | 连接桥梁装配式钢筋混凝土侧边防撞护栏 | |
CN111719414B (zh) | 内焊外浇筑式桥墩横梁连接结构及横梁桥墩对接方法 | |
CN113565212A (zh) | 一种钢框架模块化建筑基础与预制模壳承台的连接结构 | |
CN113668773A (zh) | 一种y型铸钢柱及其安装工艺 | |
CN111691309B (zh) | 桥梁的桥墩与横梁的连接方法 | |
CN111733691A (zh) | 一种预制圆柱与桩基的连接结构及方法 | |
CN112095487A (zh) | 一种深水桥梁桩基及其施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Peng Xingwang Inventor after: Wu Dandan Inventor after: Zhang Long Inventor after: Gui Zhongxin Inventor after: Zheng Qionghua Inventor before: Zheng Qionghua |
|
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20211012 Address after: 101101 Building 1, No. 568, Xuxing Road, Tongzhou District, Beijing Applicant after: HAIWEI ENGINEERING CONSTRUCTION CO LTD OF FIRST HIGHWAY ENGINEERING Co.,Ltd. OF CCCC Address before: No. 004, group 8, Xihu village, Xiapu Town, Tongshan County, Xianning City, Hubei Province Applicant before: Zheng Qionghua |
|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20211129 Address after: 100020 Zhou Jiajing, Guanzhuang, Chaoyang District, Beijing Patentee after: CCCC FIRST HIGHWAY ENGINEERING GROUP Co.,Ltd. Patentee after: HAIWEI ENGINEERING CONSTRUCTION CO LTD OF FIRST HIGHWAY ENGINEERING Co.,Ltd. OF CCCC Address before: 101101 Building 1, No. 568, Xuxing Road, Tongzhou District, Beijing Patentee before: HAIWEI ENGINEERING CONSTRUCTION CO LTD OF FIRST HIGHWAY ENGINEERING Co.,Ltd. OF CCCC |