CN111677158A - An entrance column stone connection system for stone curtain wall - Google Patents
An entrance column stone connection system for stone curtain wall Download PDFInfo
- Publication number
- CN111677158A CN111677158A CN202010484344.XA CN202010484344A CN111677158A CN 111677158 A CN111677158 A CN 111677158A CN 202010484344 A CN202010484344 A CN 202010484344A CN 111677158 A CN111677158 A CN 111677158A
- Authority
- CN
- China
- Prior art keywords
- stone
- curtain wall
- keel
- cylindrical
- panel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/88—Curtain walls
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/41—Connecting devices specially adapted for embedding in concrete or masonry
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/41—Connecting devices specially adapted for embedding in concrete or masonry
- E04B1/4114—Elements with sockets
- E04B1/4135—Elements with sockets receiving removal bolt heads
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/88—Curtain walls
- E04B2/96—Curtain walls comprising panels attached to the structure through mullions or transoms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/88—Curtain walls
- E04B2/96—Curtain walls comprising panels attached to the structure through mullions or transoms
- E04B2/967—Details of the cross-section of the mullions or transoms
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Load-Bearing And Curtain Walls (AREA)
Abstract
本发明涉及幕墙领域,尤其是一种石材幕墙的入口圆柱石材连接系统,该系统包括圆柱竖向龙骨、圆柱横向龙骨、第一挂件、圆柱面板;圆柱竖向龙骨为竖向设置的槽钢,每个圆柱竖向龙骨上连接有多对横向支撑,多对横向支撑上下排列分布,每对横向支撑包括两个圆柱横向龙骨。该系统解决了圆柱状幕墙的安装,且安装方式简单可靠。
The invention relates to the field of curtain walls, in particular to an entrance cylindrical stone material connection system of a stone curtain wall. The system comprises a cylindrical vertical keel, a cylindrical horizontal keel, a first pendant and a cylindrical panel; the cylindrical vertical keel is a vertically arranged channel steel, Each cylindrical vertical keel is connected with a plurality of pairs of lateral supports, the plurality of pairs of lateral supports are arranged up and down, and each pair of lateral supports includes two cylindrical lateral keels. The system solves the installation of the cylindrical curtain wall, and the installation method is simple and reliable.
Description
技术领域technical field
本发明涉及幕墙领域,尤其是一种石材幕墙的入口圆柱石材连接系统。The invention relates to the field of curtain walls, in particular to an entrance column stone connection system of a stone curtain wall.
背景技术Background technique
随着工程造型越来越复杂,一些幕墙节点需要采用非平直面的安装方式,对幕墙施工提出了更高的要求。例如公开号为CN203531193U(公开日为2014.04.09)的中国实用新型专利中公开的一种弧形石材幕墙,包括墙体预埋件、转接件、竖龙骨、横龙骨及弧形石材板,所述竖龙骨通过转接件与墙体预埋件连接固定于墙体上,所述横龙骨包括第一横龙骨与第二横龙骨,分别对应固定于竖龙骨的上下两端,所述弧形石材板背面的上下两侧分别对应固定于第一横龙骨及第二横龙骨上。As the engineering modeling becomes more and more complex, some curtain wall nodes need to be installed with non-flat surfaces, which puts forward higher requirements for curtain wall construction. For example, a curved stone curtain wall disclosed in the Chinese utility model patent with publication number CN203531193U (publication date: 2014.04.09) includes wall embedded parts, adapter parts, vertical keels, horizontal keels and curved stone slabs. The vertical keel is connected and fixed on the wall through the adapter and the wall embedded part. The horizontal keel includes a first horizontal keel and a second horizontal keel, which are respectively fixed on the upper and lower ends of the vertical keel. The upper and lower sides of the back of the shaped stone slab are respectively fixed on the first horizontal keel and the second horizontal keel.
现有的石材幕墙存在以下的问题:(1)对圆柱状的幕墙难以进行安装;(2)现有的安装形式无法保证幕墙安装的稳定性。The existing stone curtain wall has the following problems: (1) it is difficult to install the cylindrical curtain wall; (2) the existing installation form cannot guarantee the stability of the curtain wall installation.
发明内容SUMMARY OF THE INVENTION
为了解决上述现有的石材幕墙存在的无法对圆柱状幕墙进行安装和安装稳定性差的问题,本发明的目的是提供一种可以对圆柱状幕墙进行安装以及安装稳定性好的石材幕墙的入口圆柱石材连接系统。In order to solve the problem that the cylindrical curtain wall cannot be installed and the installation stability is poor in the existing stone curtain wall, the purpose of the present invention is to provide an entrance column that can install the cylindrical curtain wall and has a good installation stability of the stone curtain wall. Stone connection system.
为本发明的目的,采用以下技术方案予以实施:一种石材幕墙的入口圆柱石材连接系统,该系统包括圆柱竖向龙骨、圆柱横向龙骨、第一挂件、圆柱面板;所述的圆柱竖向龙骨为竖向设置的槽钢,每个圆柱竖向龙骨上连接有多对横向支撑,多对横向支撑上下排列分布,每对横向支撑包括两个圆柱横向龙骨;所述的圆柱横向龙骨包括第一连接条和第一延伸条,第一连接条和第一延伸条连接形成L型,第一延伸条贴合安装在圆柱竖向龙骨上,第一连接条水平设置,每个第一连接条上均通过螺栓固定连接有一个第一挂件;所述的第一挂件包括连接部和折弯部;所述的连接部水平固定安装在第一连接条上;所述的折弯部位于连接部的一端,折弯部和连接部形成一个夹角,折弯部用于连接圆柱面板;所述的圆柱面板的内侧面上设有第一连接槽,第一连接槽的形状与折弯部相匹配,每个第一连接槽均对应连接一个第一挂件,圆柱面板的上方为石材幕墙;所述的石材幕墙包括幕墙竖向龙骨、幕墙横向龙骨、第二挂件、石材面板和装饰面板;所述的幕墙竖向龙骨为竖向设置的槽钢,幕墙竖向龙骨通过预埋组件固定安装在墙体上;所述的幕墙横向龙骨有多个,幕墙横向龙骨包括第二连接条和第二延伸条;所述的第二连接条和第二延伸条连接形成L型,第二连接条水平设置,第二连接条的中部通过螺栓固定连接有辅助固定角码;所述的辅助固定角码上连接有槽钢复板;所述的槽钢复板固定安装在幕墙竖向龙骨槽钢的开口处;所述的第二挂件包括第三连接条和第三延伸条;第三连接条和第三延伸条连接形成T型,第三连接条通过螺栓固定连接在第二连接条上方,第三连接条的左端延伸到第二连接条左端之外;所述的第三延伸条用于连接石材面板的端部;所述的石材面板内侧面上设有第二连接槽和第三连接槽,第二连接槽的形状与折弯部匹配,第三连接槽的形状与第三延伸条匹配,石材面板通过第一挂件和第二挂件固定连接在幕墙横向龙骨上;所述的装饰面板设置在相邻的两块石材面板之间,装饰面板和石材面板连接处涂有耐候密封胶和防水涂层。For the purpose of the present invention, adopt the following technical scheme to implement: a kind of entrance column stone material connection system of stone curtain wall, the system includes column vertical keel, column horizontal keel, first pendant, column panel; described column vertical keel It is a vertically arranged channel steel, each cylindrical vertical keel is connected with multiple pairs of lateral supports, and the multiple pairs of lateral supports are arranged up and down, and each pair of lateral supports includes two cylindrical lateral keels; the cylindrical lateral keel includes a first The connecting strip and the first extending strip are connected to form an L-shape, the first extending strip is fitted and installed on the vertical keel of the column, the first connecting strips are arranged horizontally, and each first connecting strip is A first hanging piece is fixedly connected by bolts; the first hanging piece includes a connecting part and a bending part; the connecting part is horizontally fixed and installed on the first connecting bar; the bending part is located on the connecting part. At one end, the bending part and the connecting part form an included angle, and the bending part is used to connect the cylindrical panel; the inner surface of the cylindrical panel is provided with a first connecting groove, and the shape of the first connecting groove matches the bending part , each first connection groove is correspondingly connected to a first pendant, and the top of the cylindrical panel is a stone curtain wall; the stone curtain wall includes a vertical keel of the curtain wall, a horizontal keel of the curtain wall, a second pendant, a stone panel and a decorative panel; the The vertical keel of the curtain wall is a vertically arranged channel steel, and the vertical keel of the curtain wall is fixedly installed on the wall through the embedded components; the horizontal keel of the curtain wall has multiple, and the horizontal keel of the curtain wall includes a second connecting strip and a second extension The second connecting bar and the second extension bar are connected to form an L-shape, the second connecting bar is arranged horizontally, and the middle part of the second connecting bar is connected with an auxiliary fixed angle code by bolts; the auxiliary fixed angle code is on the A channel steel double plate is connected; the channel steel double plate is fixedly installed at the opening of the vertical keel channel steel of the curtain wall; the second hanging piece includes a third connecting strip and a third extending strip; The three extension bars are connected to form a T-shape, the third connection bar is fixedly connected above the second connection bar by bolts, and the left end of the third connection bar extends beyond the left end of the second connection bar; the third extension bar is used to connect the stone The end of the panel; the inner surface of the stone panel is provided with a second connection groove and a third connection groove, the shape of the second connection groove matches the bending part, and the shape of the third connection groove matches the third extension strip, The stone panel is fixedly connected to the horizontal keel of the curtain wall through the first pendant and the second pendant; the decorative panel is arranged between two adjacent stone panels, and the connection between the decorative panel and the stone panel is coated with weather-resistant sealant and waterproof coating Floor.
作为优选,所述的预埋组件包括结构预埋件、龙骨连接件和龙骨连接螺栓;所述的结构预埋件横向固定在墙体内部;所述的龙骨连接件有两个,龙骨连接件为L型,两个龙骨连接件分别连接在幕墙竖向龙骨的两侧,两个龙骨连接件和幕墙竖向龙骨之间通过龙骨连接螺栓固定。Preferably, the pre-embedded components include structural pre-embedded parts, keel connecting parts and keel connecting bolts; the structural pre-embedded parts are laterally fixed inside the wall; there are two keel connecting parts, one keel connecting part It is L-shaped, and two keel connectors are respectively connected on both sides of the vertical keel of the curtain wall, and the two keel connectors and the vertical keel of the curtain wall are fixed by keel connecting bolts.
作为优选,所述的圆柱面板上有用于装饰的凹槽;圆柱面板为锈石荔枝面;凹槽为锈石亚光面。Preferably, the cylindrical panel is provided with a groove for decoration; the cylindrical panel is a rust stone lychee surface; the groove is a rust stone matte surface.
作为优选,所述的石材面板为锈石荔枝面。Preferably, the stone panel is a rust stone lychee surface.
作为优选,所述的装饰面板为锈石亚光面。Preferably, the decorative panel is a rust stone matte surface.
作为优选,所述的圆柱竖向龙骨、圆柱横向龙骨、幕墙竖向龙骨和幕墙横向龙骨均镀锌处理。Preferably, the cylindrical vertical keel, the cylindrical transverse keel, the vertical keel of the curtain wall and the transverse keel of the curtain wall are all galvanized.
综上所述,本发明的技术效果是圆柱面板采用滑动安装的形式安装在第一挂件上,便于工人对圆柱面板的安装;多个第一挂件对圆柱面板进行固定,保证了圆柱面板安装的稳定性。石材面板采用滑动安装的形式固定在第一挂件和第二挂件上,使得石材面板易于安装和拆卸,便于损坏后的更换;在石材面板和幕墙竖向龙骨之间留出间隙,避免热胀冷缩对幕墙造成损害。To sum up, the technical effect of the present invention is that the cylindrical panel is installed on the first pendant in the form of sliding installation, which is convenient for workers to install the cylindrical panel; a plurality of first hanging parts fix the cylindrical panel to ensure the installation of the cylindrical panel. stability. The stone panel is fixed on the first pendant and the second pendant in the form of sliding installation, which makes the stone panel easy to install and disassemble, and facilitates replacement after damage; leave a gap between the stone panel and the vertical keel of the curtain wall to avoid thermal expansion and cooling Shrinkage causes damage to the curtain wall.
附图说明Description of drawings
图1为本发明的纵剖结构示意图。FIG. 1 is a schematic diagram of a longitudinal section of the present invention.
图2为本发明的横剖结构示意图。FIG. 2 is a schematic diagram of a cross-sectional structure of the present invention.
图3为圆柱横向龙骨的结构示意图。Figure 3 is a schematic structural diagram of a cylindrical transverse keel.
图4为第一挂件的结构示意图。FIG. 4 is a schematic structural diagram of a first pendant.
图5为幕墙横向龙骨的结构示意图。Figure 5 is a schematic structural diagram of a transverse keel of a curtain wall.
图6为第二挂件的结构示意图。FIG. 6 is a schematic structural diagram of the second pendant.
图7为预埋组件的结构示意图。FIG. 7 is a schematic structural diagram of a pre-embedded component.
具体实施方式Detailed ways
如图1和图2所示,一种石材幕墙的入口圆柱石材连接系统,该系统包括圆柱竖向龙骨1、圆柱横向龙骨2、第一挂件3、圆柱面板4。圆柱竖向龙骨1和圆柱横向龙骨2均镀锌处理,这样有利于提高抗氧化性和耐腐蚀性,延长使用寿命。圆柱竖向龙骨1为竖向设置的槽钢,每个圆柱竖向龙骨1上连接有2对横向支撑,保证支撑的平稳性,2对横向支撑上下排列分布,每对横向支撑包括两个圆柱横向龙骨2。如图3所示,圆柱横向龙骨2包括第一连接条21和第一延伸条22,第一连接条21和第一延伸条22连接形成L型,第一延伸条22贴合安装在圆柱竖向龙骨1上,第一连接条21水平设置,每个第一连接条21上均通过螺栓固定连接有一个第一挂件3。第一挂件3包括连接部31和折弯部32。连接部31水平固定安装在第一连接条21上。折弯部32位于连接部31的一端,折弯部32和连接部31形成一个夹角,折弯部32用于连接圆柱面板4。圆柱面板4的内侧面上设有第一连接槽41,第一连接槽41的形状与折弯部32相匹配,每个第一连接槽41均对应连接一个第一挂件3;圆柱面板4上有用于装饰的凹槽。圆柱面板4为锈石荔枝面。凹槽为锈石亚光面。圆柱面板4的上方为石材幕墙。As shown in Figures 1 and 2, an entrance cylindrical stone material connection system for a stone curtain wall, the system includes a cylindrical
圆柱面板4采用滑动安装的形式安装在第一挂件3上,便于工人对圆柱面板4的安装;多个第一挂件3对圆柱面板4进行固定,保证了圆柱面板4安装的稳定性。The
石材幕墙包括幕墙竖向龙骨5、幕墙横向龙骨6、第二挂件7、石材面板8和装饰面板9。幕墙竖向龙骨5和幕墙横向龙骨6均镀锌处理,这样有利于提高抗氧化性和耐腐蚀性,延长使用寿命。幕墙竖向龙骨5为竖向设置的槽钢,幕墙竖向龙骨5通过预埋组件51固定安装在墙体上。幕墙横向龙骨6有多个,幕墙横向龙骨6包括第二连接条61和第二延伸条62。第二连接条61和第二延伸条62连接形成L型,第二连接条61水平设置,第二连接条61的中部通过螺栓固定连接有辅助固定角码63。辅助固定角码63上连接有槽钢复板64。槽钢复板64固定安装在幕墙竖向龙骨5槽钢的开口处。第二挂件7包括第三连接条71和第三延伸条72。第三连接条71和第三延伸条72连接形成T型,第三连接条71通过螺栓固定连接在第二连接条61上方,第三连接条71的左端延伸到第二连接条61左端之外,使得石材面板8和幕墙竖向龙骨5之间留出间隙,避免热胀冷缩对幕墙造成损害。第三延伸条72用于连接石材面板8的端部。石材面板8为锈石荔枝面。石材面板8内侧面上设有第二连接槽81和第三连接槽82,第二连接槽81的形状与折弯部32匹配,第三连接槽82的形状与第三延伸条72匹配,石材面板8通过第一挂件3和第二挂件7固定连接在幕墙横向龙骨6上。装饰面板9为锈石亚光面。装饰面板9设置在相邻的两块石材面板8之间,装饰面板9和石材面板8连接处涂有耐候密封胶和防水涂层。The stone curtain wall includes a
石材面板8采用滑动安装的形式固定在第一挂件3和第二挂件7上,使得石材面板8易于安装和拆卸,便于损坏后的更换;在石材面板8和幕墙竖向龙骨5之间留出间隙,避免热胀冷缩对幕墙造成损害。The
预埋组件51包括结构预埋件511、龙骨连接件512和龙骨连接螺栓513。结构预埋件511横向固定在墙体内部。龙骨连接件512有两个,龙骨连接件512为L型,两个龙骨连接件512分别连接在幕墙竖向龙骨5的两侧,两个龙骨连接件512和幕墙竖向龙骨5之间通过龙骨连接螺栓513固定。The embedded
本发明的圆柱面板4采用滑动安装的形式安装在第一挂件3上,便于工人对圆柱面板4的安装;多个第一挂件3对圆柱面板4进行固定,保证了圆柱面板4安装的稳定性。石材面板8采用滑动安装的形式固定在第一挂件3和第二挂件7上,使得石材面板8易于安装和拆卸,便于损坏后的更换;在石材面板8和幕墙竖向龙骨5之间留出间隙,避免热胀冷缩对幕墙造成损害。The
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202010484344.XA CN111677158B (en) | 2020-06-01 | 2020-06-01 | An entrance column stone connection system for stone curtain wall |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202010484344.XA CN111677158B (en) | 2020-06-01 | 2020-06-01 | An entrance column stone connection system for stone curtain wall |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN111677158A true CN111677158A (en) | 2020-09-18 |
| CN111677158B CN111677158B (en) | 2021-10-22 |
Family
ID=72453252
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202010484344.XA Active CN111677158B (en) | 2020-06-01 | 2020-06-01 | An entrance column stone connection system for stone curtain wall |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN111677158B (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112942642A (en) * | 2021-01-29 | 2021-06-11 | 阿郎装饰股份有限公司 | Combined curtain wall |
| CN114687489A (en) * | 2022-05-26 | 2022-07-01 | 中国建筑第五工程局有限公司 | Assembly type structure curtain mounting structure |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2778927Y (en) * | 2005-02-18 | 2006-05-10 | 程新明 | Energy-saving and temperature-keeping stone curtain wall |
| CN203514711U (en) * | 2013-10-24 | 2014-04-02 | 广东蒙娜丽莎新型材料集团有限公司 | Curtain wall dry cladding structure with lightweight ceramic thin plate |
| CN203531193U (en) * | 2013-10-12 | 2014-04-09 | 中建八局第三建设有限公司 | Arc-shaped stone curtain wall |
| CN207959633U (en) * | 2018-03-13 | 2018-10-12 | 浙江爱居装饰股份有限公司 | A kind of stone curtain wall |
| CN208379869U (en) * | 2018-06-15 | 2019-01-15 | 中建远泰幕墙装饰工程有限公司 | A kind of cylindrical stone curtain wall |
| CN109577532A (en) * | 2018-12-28 | 2019-04-05 | 苏州金螳螂幕墙有限公司 | A kind of large size curved arc acrylic installing structure of stone curtain wall |
-
2020
- 2020-06-01 CN CN202010484344.XA patent/CN111677158B/en active Active
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2778927Y (en) * | 2005-02-18 | 2006-05-10 | 程新明 | Energy-saving and temperature-keeping stone curtain wall |
| CN203531193U (en) * | 2013-10-12 | 2014-04-09 | 中建八局第三建设有限公司 | Arc-shaped stone curtain wall |
| CN203514711U (en) * | 2013-10-24 | 2014-04-02 | 广东蒙娜丽莎新型材料集团有限公司 | Curtain wall dry cladding structure with lightweight ceramic thin plate |
| CN207959633U (en) * | 2018-03-13 | 2018-10-12 | 浙江爱居装饰股份有限公司 | A kind of stone curtain wall |
| CN208379869U (en) * | 2018-06-15 | 2019-01-15 | 中建远泰幕墙装饰工程有限公司 | A kind of cylindrical stone curtain wall |
| CN109577532A (en) * | 2018-12-28 | 2019-04-05 | 苏州金螳螂幕墙有限公司 | A kind of large size curved arc acrylic installing structure of stone curtain wall |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112942642A (en) * | 2021-01-29 | 2021-06-11 | 阿郎装饰股份有限公司 | Combined curtain wall |
| CN114687489A (en) * | 2022-05-26 | 2022-07-01 | 中国建筑第五工程局有限公司 | Assembly type structure curtain mounting structure |
| CN114687489B (en) * | 2022-05-26 | 2023-11-03 | 中国建筑第五工程局有限公司 | A kind of prefabricated building curtain wall installation structure |
Also Published As
| Publication number | Publication date |
|---|---|
| CN111677158B (en) | 2021-10-22 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN202390925U (en) | Composite decorative concrete | |
| CN105756243B (en) | Antiseismic building exterior wall cladding | |
| CN108978975B (en) | Integrated furred ceiling system of modularization quick assembly disassembly | |
| CN206308878U (en) | Based on T-shaped and Z-type suspension member stone material aluminium honeycomb composite plate ceiling construction structure | |
| CN112064876A (en) | Z-shaped edge folding process for light steel keel | |
| CN111677158B (en) | An entrance column stone connection system for stone curtain wall | |
| CN114396147A (en) | Groove strip insertion type wood floor structure and installation method | |
| CN111173172B (en) | Aluminum alloy window frame unit body for mounting stone curtain wall and mounting method | |
| CN106368368A (en) | Stone material aluminum honeycomb composite slab suspended ceiling construction method based on T-shaped and Z-shaped hanging parts | |
| CN202658773U (en) | Bamboo-board curtain wall system | |
| CN223135189U (en) | An underground cavern assembled decoration structure | |
| CN206769124U (en) | A kind of super-big and overweight glass curtain wall complexity connecting joint structure | |
| CN108385895A (en) | A kind of fast-assembling walling system | |
| CN111691587A (en) | Window wrap connecting system of stone curtain wall | |
| CN218990608U (en) | Connecting structure of hanging concrete large-plate curtain wall | |
| CN202299033U (en) | Back bolt stone curtain wall system | |
| CN111236513A (en) | Connecting assembly and connecting method for stone curtain wall | |
| CN111705974B (en) | Railing connecting system of stone curtain wall | |
| CN109594731B (en) | Unit type face brick system | |
| CN211850552U (en) | Assembled operating room electrolytic steel plate connection structure | |
| CN120231403B (en) | Installation structure of four-in-one back-bolt stone curtain wall pendant | |
| CN209891633U (en) | An angle splicing profile | |
| CN108360784B (en) | Assembled indoor dry-hanging wall brick and construction method thereof | |
| CN219274960U (en) | Welding processing auxiliary fixtures | |
| CN206844428U (en) | The hanger structure of clay plate curtain wall |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TA01 | Transfer of patent application right | ||
| TA01 | Transfer of patent application right |
Effective date of registration: 20211009 Address after: 310000 No. 3-2, building 55, Jingfang Third District, Jianggan District, Hangzhou City, Zhejiang Province Applicant after: Zhejiang Dong Ye Construction Co.,Ltd. Address before: 325207 room 1301, unit 1, building 1, Dongfeng Jiayuan, Feiyun street, Rui'an City, Wenzhou City, Zhejiang Province Applicant before: Wenzhou Ruixiang Decoration Engineering Co.,Ltd. |
|
| CP02 | Change in the address of a patent holder | ||
| CP02 | Change in the address of a patent holder |
Address after: 310000 No. 3-2, building 55, Jingfang Third District, Shangcheng District, Hangzhou City, Zhejiang Province Patentee after: Zhejiang Dong Ye Construction Co.,Ltd. Address before: 310000 no.3-2, building 55, Jingfang No.3 District, Jianggan District, Hangzhou City, Zhejiang Province Patentee before: Zhejiang Dong Ye Construction Co.,Ltd. |
|
| CP03 | Change of name, title or address | ||
| CP03 | Change of name, title or address |
Address after: 310000 Zhejiang Province Hangzhou City Qiu Tao North Road 83 Room 1517 Patentee after: Zhejiang Dong Ye Construction Co.,Ltd. Country or region after: China Address before: 310000 No. 3-2, building 55, Jingfang Third District, Shangcheng District, Hangzhou City, Zhejiang Province Patentee before: Zhejiang Dong Ye Construction Co.,Ltd. Country or region before: China |
