CN111646247B - Bridge type ship unloader operation method - Google Patents

Bridge type ship unloader operation method Download PDF

Info

Publication number
CN111646247B
CN111646247B CN202010461079.3A CN202010461079A CN111646247B CN 111646247 B CN111646247 B CN 111646247B CN 202010461079 A CN202010461079 A CN 202010461079A CN 111646247 B CN111646247 B CN 111646247B
Authority
CN
China
Prior art keywords
cabin
cabins
area
grabbing
loader
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202010461079.3A
Other languages
Chinese (zh)
Other versions
CN111646247A (en
Inventor
赵兵
孙波
王涛
胡乃栋
管辉
尹崇志
王政
杨凯
吕树仁
黄蒙恩
封文峰
张坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Port Dongjiakou Ore Terminal Co ltd
Qingdao Port International Co Ltd
Original Assignee
Qingdao Port Dongjiakou Ore Terminal Co ltd
Qingdao Port International Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Port Dongjiakou Ore Terminal Co ltd, Qingdao Port International Co Ltd filed Critical Qingdao Port Dongjiakou Ore Terminal Co ltd
Priority to CN202010461079.3A priority Critical patent/CN111646247B/en
Publication of CN111646247A publication Critical patent/CN111646247A/en
Application granted granted Critical
Publication of CN111646247B publication Critical patent/CN111646247B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G67/00Loading or unloading vehicles
    • B65G67/60Loading or unloading ships
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G67/00Loading or unloading vehicles
    • B65G67/60Loading or unloading ships
    • B65G67/606Loading or unloading ships using devices specially adapted for bulk material

Landscapes

  • Engineering & Computer Science (AREA)
  • Ocean & Marine Engineering (AREA)
  • Aviation & Aerospace Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Ship Loading And Unloading (AREA)

Abstract

The invention discloses a bridge ship unloader operation method, which comprises cabin opening operation, cabin expansion operation and cabin cleaning operation; in the cabin opening operation, the grab bucket firstly carries out grabbing operation on even cabins and then carries out grabbing operation on odd cabins; in the cabin expansion operation, selecting the cabin expansion positions of odd cabins, expanding the selected cabin expansion positions, and hoisting the selected cabin expansion positions into a loader after the cabin expansion operation is finished; selecting the cabin expansion positions of the even numbered cabins during the feeding period of the loader in the odd numbered cabins, expanding the cabins at the selected cabin expansion positions, and hoisting the expanded cabins into the loader at the cabin expansion positions after the cabin expansion is finished; in the cabin cleaning operation, the grab bucket is controlled to alternately perform grabbing operation on odd cabins and grabbing operation on even cabins; when grabbing operation is carried out on the odd numbered cabins, the loader in the even numbered cabins carries out feeding operation; when grabbing operation is carried out on the even numbered cabins, the loader in the odd numbered cabins carries out feeding operation; the number of times of changing the cabin of the ship unloader is reduced, the cabin changing time is shortened, the ship unloading operation efficiency is improved, and the ship unloading operation is safe and efficient.

Description

Bridge type ship unloader operation method
Technical Field
The invention belongs to the technical field of ship unloading, and particularly relates to a bridge type ship unloader operation method.
Background
At present, on a wharf for ore transportation, an intermittent loading and unloading machine mainly comprises a bucket door machine and a grab bridge type ship unloader, wherein the bridge type grab ship unloader has obvious advantages in the aspects of adaptability to ore materials and ships, operation cost, avoidance of damage to the ship unloader caused by ship jolt caused by waves and the like, so that the bridge type grab ship unloader is most widely applied to the use of the ship unloader formed in recent years.
The bridge type grab ship unloader is main equipment for receiving and unloading bulk cargos at a port, has the advantages of mature technology, high efficiency, high automation degree and the like, is more and more favored by modern wharfs, and accords with the concept of the modern wharf of 'large wharf, large equipment, high efficiency and high automation'.
However, the existing ship unloading method has the problems that the space in the front cabin and the rear cabin is small, and the cabin cleaning is difficult due to the friction inclined plane, in the ship unloading process, the operation sequence of the ship unloader cabin is frequently changed, key cabins are easy to generate, the cabin cleaning operation is difficult, the waiting time of the ship unloader during corner cleaning is prolonged, and the operation efficiency is seriously influenced.
Disclosure of Invention
The invention provides an operation method of a bridge ship unloader, which improves the operation efficiency.
In order to solve the technical problems, the invention adopts the following technical scheme:
a bridge ship unloader operation method comprises cabin opening operation, cabin expansion operation and cabin cleaning operation;
(1) the cabin opening operation comprises the following steps:
dividing the cabin into an odd cabin and an even cabin from the bow to the stern;
controlling the grab bucket to grab the even numbered cabins, and grabbing the odd numbered cabins after grabbing the materials with the set weight to grab the materials with the set weight;
(2) the cabin expanding operation comprises the following steps:
selecting the cabin expansion positions of odd cabins, expanding the cabins of the selected cabin expansion positions, and after the cabin expansion is finished, hoisting the cabin expansion positions into a loader, wherein the loader performs feeding operation;
selecting the cabin expansion positions of even numbered cabins during the feeding period of a loader in the odd numbered cabins, expanding the cabins at the selected cabin expansion positions, hoisting the expanded cabins into the loader at the cabin expansion positions after the cabin expansion is finished, and feeding the loader;
(3) the cabin cleaning operation comprises the following steps:
controlling the grab bucket to alternately grab the odd numbered cabins and the even numbered cabins;
when grabbing operation is carried out on the odd numbered cabins, the loader in the even numbered cabins carries out feeding operation;
when grabbing operation is carried out on the even numbered cabins, the loader in the odd numbered cabin carries out feeding operation.
Further, the selecting the cabin expansion position of the odd-numbered cabin and expanding the cabin of the selected cabin expansion position specifically include: and selecting the bilge position corresponding to the hatchway opening of the odd number of cabins as a cabin expanding position, and expanding the cabin at the cabin expanding position by using a grab bucket.
Still further, the selecting the cabin expansion position of the even-numbered cabin and expanding the cabin of the selected cabin expansion position specifically include: and selecting the front half part of the bilge of the even number of the cabins or the rear half part of the bilge as a cabin expansion position, and utilizing a grab bucket to expand the cabin at the cabin expansion position.
Furthermore, during the cabin cleaning operation, when the odd-numbered cabin is subjected to grabbing operation, the loader in the odd-numbered cabin stops at a position close to the sea and far away from the grabbing range of the grab bucket in the cabin; and after the grabbing is finished, the loader performs feeding operation again.
And further, during the cabin cleaning operation, when the even-numbered cabins are subjected to grabbing operation, the loading machines and the grab buckets in the even-numbered cabins are subjected to subarea feeding operation.
Furthermore, during cabin cleaning operation, when grabbing operation is performed on even number of cabins, the grabbing range of the grab bucket is divided into a sea side grabbing range and a land side grabbing range, the sea side grabbing range is firstly grabbed, and after grabbing is completed, grabbing operation is performed on the land side grabbing range; during the grabbing operation of the sea side grabbing range, after the grab bucket of the ship unloader leaves the hatch range, the loader carries out intermittent feeding operation, and the motion area of the loader avoids the sea side grabbing range; during grabbing operation on the land side grabbing range, the loader continuously supplies materials in the sea side grabbing range, and the motion area of the loader is avoided from the land side grabbing range.
Further, when the grabbing operation is performed on the even numbered compartments during the cabin cleaning operation, the loader in the even numbered compartments performs the feeding operation after the grab bucket leaves above the hatch.
Furthermore, when the grab bucket enters and exits the hatch, the distance between the grab bucket and the edge of the hatch is obtained, and if the distance is smaller than the set distance, an alarm is given.
Furthermore, a laser scanner is installed at the bottom of the cab, and a controller, an alarm and a display screen are installed in the cab; the laser scanner scans image information at the hatch opening and sends the image information to the controller, the controller processes the received image information to obtain the distance between the hatch opening edge and the grab bucket, and when the distance is smaller than a set distance, the alarm is controlled to give an alarm; and the controller processes the received image information and sends the processed image information to the display screen for display.
Furthermore, each cabin is divided into nine areas which are arranged in three rows and three columns, and the nine areas are a first column area, a second column area and a third column area in sequence from the bow to the stern; the first column region comprises a region A11, a region A21 and a region A31; the second column of regions comprises region A12, region A22, region A32; the third column region comprises region A13, region A23, region A33; the first row area, the second row area and the third row area are arranged in sequence from the sea side to the land side; the first row region comprises region A11, region A12, region A13; the second row of regions comprises region A21, region A22, region A23; the third row region includes region A31, region A32, region A33; the central position of the cabin top of each cabin is a hatch; the area below the hatch is area A22, and area A22 comprises three sub-areas which are sequentially arranged from the bow to the stern: a region a221, a region a222, and a region a 223; during the cabin opening operation, firstly, grabbing operation is carried out on an A22 area of an even cabin, after materials with set weight are grabbed, grabbing operation is carried out on an A22 area of an odd cabin, and the materials with set weight are grabbed; during the cabin expansion operation, selecting an A22 area of an odd cabin as a cabin expansion position; selecting an A21 area, an A221 area and an A222 area of the even number cabin as cabin expansion positions, or selecting an A222 area, an A223 area and an A23 area of the even number cabin as cabin expansion positions; during the cabin cleaning operation, when the odd-numbered cabin is subjected to grabbing operation, the loader in the odd-numbered cabin is stopped at the A21 area or the A23 area; during cabin cleaning operation, when even number of cabins are grabbed, the grabbing range of the grab bucket is divided into a sea side grabbing range and a land side grabbing range, the sea side grabbing range is grabbed firstly, and after grabbing is finished, the land side grabbing range is grabbed; during the grabbing operation of the sea side grabbing range, if the cabin expanding positions are an A21 area, an A221 area and an A222 area, the operation area of the loader is divided into an A11 area, an A12 area, an A21 area, an A31 area and an A32 area; if the expansion positions are A222, A223 and A23, the operation areas of the loader are A12, A13, A32 and A33; during the grabbing operation of the land side grabbing range, the operation areas of the loader are area A31, area A32 and area A33.
Compared with the prior art, the invention has the advantages and positive effects that: the bridge ship unloader operation method of the invention designs cabin opening operation, cabin expansion operation and cabin cleaning operation; in the cabin opening operation, the grab bucket is controlled to firstly grab the even numbered cabins, grab the materials with the set weight, and then grab the odd numbered cabins to grab the materials with the set weight; in the cabin expansion operation, selecting the cabin expansion positions of odd cabins, expanding the selected cabin expansion positions, and after the cabin expansion is finished, hoisting the cabin expansion positions into a loader for feeding operation; selecting the cabin expansion positions of the even numbered cabins during the feeding period of the loader in the odd numbered cabins, expanding the cabins at the selected cabin expansion positions, and hoisting the expanded cabins into the loader at the cabin expansion positions for feeding operation after the cabin expansion is finished; in the cabin cleaning operation, the grab bucket is controlled to alternately perform grabbing operation on odd cabins and grabbing operation on even cabins; when grabbing operation is carried out on the odd numbered cabins, the loader in the even numbered cabins carries out feeding operation; when grabbing operation is carried out on the even numbered cabins, the loader in the odd numbered cabins carries out feeding operation; the number of times of changing the cabin of the ship unloader is reduced, the cabin changing time is shortened, the ship unloading operation efficiency is improved, and the ship unloading operation is safe and efficient.
Other features and advantages of the present invention will become more apparent from the detailed description of the embodiments of the present invention when taken in conjunction with the accompanying drawings.
Drawings
FIG. 1 is a schematic flow chart diagram of one embodiment of a bridge ship unloader operation method according to the present invention;
FIG. 2 is a schematic view of the operation of opening the cabin of the ship unloader in the operation method of the bridge ship unloader according to the present invention;
FIG. 3 is a schematic illustration of the operation of the bridge ship unloader for clearing the ship from the ship;
FIG. 4 is a distribution diagram of the ship's hold;
FIG. 5 is a schematic view of the zone division of each hold;
FIG. 6 is a schematic view of the extended position of the odd numbered compartments;
FIG. 7 is a schematic view of an embodiment of the extended position of the even numbered compartments;
FIG. 8 is a schematic view of another embodiment of the bay expansion position for an even number of bays.
Reference numerals:
1. a traveling mechanism; 2. a trolley; 3. a grab bucket; 4. a material receiving mechanism; 5. a driver's cab; 6. a loader.
Detailed Description
The following describes embodiments of the present invention in further detail with reference to the accompanying drawings.
The ship unloader mainly comprises a travelling mechanism 1, a trolley 2, a grab bucket 3, a receiving mechanism 4, a cab 5 and the like, and is shown in figures 2 and 3; the travelling mechanism 1 drives the whole ship unloader to move, and the trolley 2 drives the grab bucket 3 to move; an operating handle and a control panel are arranged in the cab 5 and used for controlling the traveling mechanism 1 and the trolley 2 to move by a driver so as to drive the grab bucket 3 to move, the driver operates the operating handle, the operating handle transmits an operating signal to the control panel, and the control panel controls the opening and closing actions of the grab bucket 3 to realize grabbing operation; after grabbing the material, the grab bucket 3 moves to the position above the material receiving mechanism 4, the grab bucket 3 is opened, and the material falls into the material receiving mechanism 4.
The operation method of the bridge ship unloader mainly comprises cabin opening operation, cabin expansion operation and cabin cleaning operation, and is shown in figure 1.
Step S1: and (5) opening the cabin.
S11: the hold is divided into odd and even holds from bow to stern.
The number of cabins of a ship is typically odd. The ship is assumed to have nine cabins, and the directions from the bow to the stern are as follows: odd, even, odd, even, and odd compartments, as shown in fig. 4. The hatch of the cabin is generally located in the center of the cabin roof, and the grab bucket enters from the hatch and grabs the material below the hatch.
S12: and controlling the grab bucket to grab the even numbered cabins, and after grabbing the materials with the set weight, grabbing the odd numbered cabins to grab the materials with the set weight.
The number of grab buckets of the ship unloader is larger than the number of even numbered cabins and the number of odd numbered cabins, so that the grab operation on the even numbered cabins or the odd numbered cabins is ensured simultaneously.
The control grab bucket grabs the material in the even number cabin first, and after every even number cabin is grabbed the material of settlement weight, running gear removes, drives the grab bucket and removes near odd number cabin, and the control grab bucket snatchs the material in the odd number cabin again, and every odd number cabin is grabbed the material of settlement weight.
When the grab bucket snatchs the operation, mainly snatch the material in the hatch below scope. On the premise of ensuring the safe distance between the grab bucket and the cabin, the grabbing range is expanded as much as possible. The gripping range of the hopper is generally the range below the hatch.
S2: and (5) carrying out cabin expansion operation.
Because the grab bucket is near the odd-numbered cabin when the cabin opening operation is finished, the odd-numbered cabin is expanded first and then the even-numbered cabin is expanded when the cabin is expanded, so that frequent cabin position exchange is avoided. And (4) cabin expansion, namely cleaning the selected cabin expansion position by using a grab bucket. The material supply operation is that the loader 6 conveys the materials at other positions of the cabin to the grabbing range of the hopper (generally, the position below the hatch).
S21: and selecting the cabin expansion position of the odd-numbered cabin, expanding the selected cabin expansion position, hoisting the expanded cabin position into a loader after the cabin expansion is finished, feeding by the loader, and conveying the materials in other areas in the odd-numbered cabin to the hopper grabbing range.
In this step, the cabin expansion position of the odd number of cabins is selected, and the cabin expansion is performed on the selected cabin expansion position, which specifically includes: and selecting the bilge position corresponding to the hatchway opening of the odd number of cabins as a cabin expanding position, and expanding the cabin at the cabin expanding position by using the grab bucket. The hatch is positioned at the center of the top of the cabin, so that the cabin expanding position of the odd-numbered cabin is positioned in the middle of the cabin, the stability of the whole ship can be ensured, and the completion of cabin cleaning of the even-numbered cabin can be insisted.
S22: and selecting the cabin expansion position of the even-numbered cabin during the feeding period of the loader in the odd-numbered cabin, expanding the cabin at the selected cabin expansion position, hoisting the expanded cabin at the cabin expansion position into the loader after the cabin expansion is finished, feeding by the loader, and conveying materials in other areas in the even-numbered cabin to the hopper grabbing range.
In this step, the cabin expansion position of the even number of cabins is selected, and the cabin expansion is performed on the selected cabin expansion position, which specifically includes: and selecting the front half part (close to the bow) of the bilge of the even number of the cabins or the rear half part (close to the stern) of the bilge as a cabin expanding position, and expanding the cabin at the cabin expanding position by using a grab bucket. That is to say, the cabin expanding position of the even-numbered cabin is the front half part or the rear half part, so that the materials in the even-numbered cabin can be discharged as soon as possible.
During the expansion of the even numbered compartments, the loaders in the odd numbered compartments perform the feeding operation. And at the end of the cabin expansion of the even numbered cabins, the loading machines in the odd numbered cabins finish the feeding operation.
S3: and (5) clearing the cabin.
When the cabin expanding operation of the even-numbered cabin is finished, the loader in the odd-numbered cabin finishes the feeding operation, so that the grab bucket moves to the position near the odd-numbered cabin, and the grabbing operation is firstly carried out on the odd-numbered cabin until the material cannot be grabbed; then, grabbing operation is carried out on the even number of cabins until the materials cannot be grabbed; then carrying out grabbing operation on the odd cabins; and circulating in sequence until the materials in the cabin are completely discharged.
Therefore, when the cabin is cleaned, the grab bucket is controlled to alternately grab the odd numbered cabins and grab the even numbered cabins; when grabbing operation is carried out on the odd numbered cabins, the loader in the even numbered cabins carries out feeding operation; when grabbing operation is carried out on the even numbered cabins, the loader in the odd numbered cabins carries out feeding operation so as to improve operation efficiency.
In the embodiment, during the cabin cleaning operation, when the odd-numbered cabin is subjected to grabbing operation, the loader in the odd-numbered cabin stops at a position close to the sea and far away from the grabbing range of the grab bucket in the cabin; after the grabbing is finished, the loader performs feeding operation again; so as to avoid the cross operation of the grab bucket and the loader and ensure the safety of the loader.
In this embodiment, during the cabin cleaning operation, when the even-numbered cabin is subjected to the grabbing operation, the loader and the grab bucket in the even-numbered cabin perform the partitioned feeding operation, that is, the mode of feeding and grabbing is adopted simultaneously, so as to increase the cabin cleaning speed of the even-numbered cabin. But the loader and the grab bucket work in a partitioning mode, and cross operation is strictly forbidden to ensure safety.
As another preferred design scheme of this embodiment, during the cabin cleaning operation, when the even number of cabins are grabbed, the grab bucket grabbing range is divided into a sea side grabbing range and a land side grabbing range, the sea side grabbing range is grabbed first, and after the grabbing is finished, the land side grabbing range is grabbed; during grabbing operation on the sea side grabbing range, the loaders in even numbered cabins perform intermittent feeding operation after the grab bucket leaves the hatch opening position, and the moving area of the loaders avoids the sea side grabbing range, so that cross operation is avoided, and cabin cleaning efficiency is guaranteed; during grabbing operation on the land side grabbing range, the loaders in the even numbered cabins continuously feed in the sea side grabbing range, and the moving areas of the loaders avoid the land side grabbing range, so that cross operation is avoided, and cabin cleaning efficiency is guaranteed.
As another preferable configuration of this embodiment, when the even-numbered compartments are subjected to the grabbing operation during the cabin cleaning operation, the loader in the even-numbered compartments is subjected to the feeding operation after the grab bucket leaves above the hatch. When only the materials on the side of the land side cabin are left in the even number of cabins, the partitioned operation of the grab bucket and the loader cannot be realized in space, and at the moment, when continuous operation is needed for key ships or key cabins, the operation of the grab bucket and the loader needs to be staggered in time, so that the loader performs feeding operation (including material taking operation and material dumping operation) after the grab bucket leaves the position above the hatch.
When the grab bucket passes in and out of the hatch of the cabin, the distance between the grab bucket and the hatch edge is obtained, if the distance is smaller than the set distance, an alarm is given to remind a driver, the position of the grab bucket is corrected, and the grab bucket and the hatch are prevented from colliding so as to ensure the safety of the grab bucket and the cabin.
In the embodiment, a laser scanner is installed at the bottom of a cab, and a controller, an alarm and a display screen are installed in the cab; laser scanner scans the image information of hatch department to send to the controller, the controller is handled received image information, obtains the distance between hatch edge and the grab bucket, when this distance is less than the settlement distance, the control alarm reports to the police to remind the driver, in time correct the grab bucket position, prevent grab bucket and hatch collision. Meanwhile, the controller processes the received image information and sends the image information to the display screen for display, and the display screen displays the image information at the hatch so as to be convenient for a driver to observe.
The bridge ship unloader operation method of the embodiment comprises the steps of designing cabin opening operation, cabin expansion operation and cabin cleaning operation; in the cabin opening operation, the grab bucket is controlled to firstly grab the even numbered cabins, grab the materials with the set weight, and then grab the odd numbered cabins to grab the materials with the set weight; in the cabin expansion operation, selecting the cabin expansion positions of odd cabins, expanding the selected cabin expansion positions, and after the cabin expansion is finished, hoisting the cabin expansion positions into a loader for feeding operation; selecting the cabin expansion positions of the even numbered cabins during the feeding period of the loader in the odd numbered cabins, expanding the cabins at the selected cabin expansion positions, and hoisting the expanded cabins into the loader at the cabin expansion positions for feeding operation after the cabin expansion is finished; in the cabin cleaning operation, the grab bucket is controlled to alternately perform grabbing operation on odd cabins and grabbing operation on even cabins; when grabbing operation is carried out on the odd numbered cabins, the loader in the even numbered cabins carries out feeding operation; when grabbing operation is carried out on the even numbered cabins, the loader in the odd numbered cabins carries out feeding operation; the number of times of changing the cabin of the ship unloader is reduced, the cabin changing time is shortened, the ship unloading efficiency is improved, and the ship unloading operation is safe and efficient.
The operation method of the bridge ship unloader is mainly used for unloading ships of open bulk cargo ships, and can effectively solve the problem of difficult cabin cleaning caused by small space in the cabin at the head and the tail and friction inclined planes; difficult key cabin that produces during the operation of unloading the ship, the waiting time of ship unloaders when having reduced clear cabin operation period corner, each link links up closely, scientific and reasonable, and the work thinking is ingenious novel, and practical application is safe high-efficient, when improving enterprise economic benefits, can guarantee safety in production again, and the commonality is strong, the facilitate promotion.
The operation method of the bridge ship unloader can utilize the cooperation between the ship unloader and the loader to the maximum extent, save the adjustment operation time of the ship unloader, improve the ship unloading efficiency and maximize the enterprise benefit.
In a preferred embodiment, each hold may be divided into nine zones: region a11, region a12, region a13, region a21, region a22, region a23, region a31, region a32, region a33, nine regions arranged in three rows and three columns.
The ship comprises a first row of areas, a second row of areas and a third row of areas in sequence from the bow to the stern; the first column of regions includes regions a11, a21, and a31, the second column of regions includes regions a12, a22, and a32, and the third column of regions includes regions a13, a23, and a33, as shown in fig. 5.
The first row area, the second row area and the third row area are arranged in sequence from the sea side to the land side; the first row of regions includes regions a11, a12, and a13, the second row of regions includes regions a21, a22, and a23, and the third row of regions includes regions a31, a32, and a33, as shown in fig. 5.
The central position of the cabin top of each cabin is a hatch; the area below the hatch is area A22, and area A22 comprises three sub-areas which are sequentially arranged from the bow to the stern: region a221, region a222, and region a 223.
When the cabin is opened, firstly, grabbing operation is carried out on an A22 area of an even cabin, after a material with a set weight is grabbed in each even cabin, grabbing operation is carried out on an A22 area of an odd cabin, and a material with a set weight is grabbed in each odd cabin; on the premise of ensuring the safe distance between the grab bucket and the cabin, the grabbing space is expanded as much as possible, particularly the areas A12 and A32 of the cabin are grabbed as much as possible, and the problem that the working efficiency is influenced because the cabin expanding stage is advanced due to well digging and mountain reserving is avoided.
During the cabin expansion operation, the A22 area of the odd-numbered cabin is selected as a cabin expansion position to ensure the stability of the whole ship, as shown in figure 6. During the cabin expansion operation, the areas A21, A221 and A222 of the even-numbered cabins (namely the front half parts of the cabins) are selected as the cabin expansion positions, and the positions are shown in figure 7, so that the even-numbered cabins are unloaded as soon as possible; alternatively, the a222, a223 and a23 areas of the even-numbered tanks (i.e. the rear half of the tank) are selected as the expansion positions, see fig. 8, so that the even-numbered tanks are unloaded as soon as possible.
During the cabin cleaning operation, when the odd-numbered cabin is subjected to grabbing operation, the loader in the odd-numbered cabin is stopped at the A21 area or the A23 area; after the grabbing is finished, the loader performs feeding operation again; so as to avoid the cross operation of the grab bucket and the loader and ensure the safety of the loader. The loader firstly conveys the materials in the A21 area or the A23 area and the A12 area to the hopper grabbing range, then conveys the materials in the A11 area and the A13 area to the hopper grabbing range, and finally conveys the materials in the A32 area, the A31 area and the A33 area to the hopper grabbing range.
During the cabin cleaning operation, when the grabbing operation is carried out on even number cabins, the grabbing range of the grab bucket is divided into two parts: the sea side grabbing range (near the sea side) and the land side grabbing range (near the land side) are firstly grabbed, and after grabbing is finished, the land side grabbing range is grabbed.
During the grabbing operation of the sea side grabbing range, if the cabin expanding positions are an A21 area, an A221 area and an A222 area, the operation areas of the loader are an A11 area, an A12 area, an A21 area, an A31 area and an A32 area; if the cabin expansion positions are an A222 area, an A223 area and an A23 area, the operation areas of the loader are an A12 area, an A13 area, an A32 area and an A33 area so as to avoid the sea side grabbing range and avoid cross operation.
During grabbing operation of the land side grabbing range, the operation areas of the loader are an area A31, an area A32 and an area A33 so as to avoid the land side grabbing range and avoid cross operation.
During the cabin cleaning operation, if the A21 area, the A221 area and the A222 area of even numbered cabins are selected as cabin expanding positions, the loader firstly conveys the materials in the A21 area and the A12 area to the hopper grabbing range, then conveys the materials in the A11 area and the A32 area to the hopper grabbing range, and finally conveys the materials in the A13 area, the A23 area and the A33 area to the hopper grabbing range.
During the cabin cleaning operation, if the A222 area, the A223 area and the A23 area of even numbered cabins are selected as cabin expanding positions, the loader firstly conveys the materials in the A23 area and the A12 area to the hopper grabbing range, then conveys the materials in the A32 area and the A33 area to the hopper grabbing range, and finally conveys the materials in the A11 area, the A21 area and the A31 area to the hopper grabbing range.
The above examples are only intended to illustrate the technical solution of the present invention, but not to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that various changes may be made and equivalents may be substituted for elements thereof; and such modifications or substitutions do not depart from the spirit and scope of the corresponding technical solutions.

Claims (9)

1. A bridge ship unloader operation method is characterized in that: the method comprises cabin opening operation, cabin expansion operation and cabin cleaning operation;
(1) the cabin opening operation comprises the following steps:
dividing the cabin into an odd cabin and an even cabin from the bow to the stern;
controlling the grab bucket to grab the even numbered cabins, and grabbing the odd numbered cabins after grabbing the materials with the set weight to grab the materials with the set weight;
(2) the cabin expanding operation comprises the following steps:
selecting the cabin expansion positions of odd cabins, expanding the cabins of the selected cabin expansion positions, and after the cabin expansion is finished, hoisting the cabin expansion positions into a loader, wherein the loader performs feeding operation;
selecting the cabin expansion positions of even numbered cabins during the feeding period of a loader in the odd numbered cabins, expanding the cabins at the selected cabin expansion positions, hoisting the expanded cabins into the loader at the cabin expansion positions after the cabin expansion is finished, and feeding the loader;
(3) the cabin cleaning operation comprises the following steps:
controlling the grab bucket to alternately grab the odd numbered cabins and the even numbered cabins;
when grabbing operation is carried out on the odd numbered cabins, the loader in the even numbered cabins carries out feeding operation;
when grabbing operation is carried out on the even numbered cabins, the loader in the odd numbered cabins carries out feeding operation;
each hold is divided into nine zones arranged in three rows and three columns,
the ship comprises a first row of areas, a second row of areas and a third row of areas in sequence from the bow to the stern;
the first column region comprises a region A11, a region A21 and a region A31;
the second column of regions comprises region A12, region A22, region A32;
the third column region comprises region A13, region A23, region A33;
the first row area, the second row area and the third row area are arranged in sequence from the sea side to the land side;
the first row region comprises region A11, region A12, region A13;
the second row of regions comprises region A21, region A22, region A23;
the third row region includes region A31, region A32, region A33;
the central position of the cabin top of each cabin is a hatch; the area below the hatch is area A22, and area A22 comprises three sub-areas which are sequentially arranged from the bow to the stern: a region a221, a region a222, and a region a 223;
during the cabin opening operation, firstly, grabbing operation is carried out on an A22 area of an even cabin, after materials with set weight are grabbed, grabbing operation is carried out on an A22 area of an odd cabin, and the materials with set weight are grabbed;
during the cabin expansion operation, selecting an A22 area of an odd cabin as a cabin expansion position; selecting an A21 area, an A221 area and an A222 area of the even number cabin as cabin expansion positions, or selecting an A222 area, an A223 area and an A23 area of the even number cabin as cabin expansion positions;
during the cabin cleaning operation, when the odd-numbered cabin is subjected to grabbing operation, the loader in the odd-numbered cabin is stopped at the A21 area or the A23 area;
during cabin cleaning operation, when even number of cabins are grabbed, the grabbing range of the grab bucket is divided into a sea side grabbing range and a land side grabbing range, the sea side grabbing range is grabbed firstly, and after grabbing is finished, the land side grabbing range is grabbed;
during the grabbing operation of the sea side grabbing range, if the cabin expanding positions are an A21 area, an A221 area and an A222 area, the operation area of the loader is divided into an A11 area, an A12 area, an A21 area, an A31 area and an A32 area; if the expansion positions are A222, A223 and A23, the operation areas of the loader are A12, A13, A32 and A33;
during the grabbing operation of the land side grabbing range, the operation areas of the loader are area A31, area A32 and area A33.
2. The bridge ship unloader operating method according to claim 1, wherein: the selecting of the cabin expansion position of the odd-numbered cabin for cabin expansion of the selected cabin expansion position specifically comprises the following steps:
and selecting the bilge position corresponding to the hatchway opening of the odd number of cabins as a cabin expanding position, and expanding the cabin at the cabin expanding position by using a grab bucket.
3. The bridge ship unloader operating method according to claim 1, wherein: the selecting of the cabin expansion position of the even number of cabins, and the cabin expansion of the selected cabin expansion position, specifically comprises:
and selecting the front half part of the bilge of the even number of the cabins or the rear half part of the bilge as a cabin expansion position, and utilizing a grab bucket to expand the cabin at the cabin expansion position.
4. The bridge ship unloader operating method according to claim 1, wherein: during the cabin cleaning operation, when the odd-numbered cabin is grabbed, the loader in the odd-numbered cabin is parked at a position close to the sea and far away from the grabbing range of the grab bucket in the cabin; and after the grabbing is finished, the loader performs feeding operation again.
5. The bridge ship unloader operating method according to claim 1, wherein: during the cabin cleaning operation, when the even-numbered cabin is grabbed, the loader and the grab bucket in the even-numbered cabin carry out feeding operation in a partitioning mode.
6. The bridge ship unloader operating method according to claim 1, wherein: during cabin cleaning operation, when even number of cabins are grabbed, the grabbing range of the grab bucket is divided into a sea side grabbing range and a land side grabbing range, the sea side grabbing range is grabbed firstly, and after grabbing is finished, the land side grabbing range is grabbed;
during the grabbing operation of the sea side grabbing range, after the grab bucket leaves the hatch opening position, the loader carries out intermittent feeding operation, and the motion area of the loader avoids the sea side grabbing range;
during grabbing operation on the land side grabbing range, the loader continuously supplies materials in the sea side grabbing range, and the motion area of the loader is avoided from the land side grabbing range.
7. The bridge ship unloader operating method according to claim 1, wherein: during the cabin cleaning operation, when the even-numbered cabin is subjected to grabbing operation, the loader in the even-numbered cabin performs feeding operation after the grab bucket leaves the position above the hatch.
8. The bridge ship unloader operating method according to claim 1, wherein: when the grab bucket enters and exits the hatch, the distance between the grab bucket and the edge of the hatch is obtained, and if the distance is smaller than a set distance, an alarm is given.
9. The bridge ship unloader operating method according to claim 1, wherein: the bottom of the cab is provided with a laser scanner, and the cab is provided with a controller, an alarm and a display screen;
the laser scanner scans image information at the hatch opening and sends the image information to the controller, the controller processes the received image information to obtain the distance between the hatch opening edge and the grab bucket, and when the distance is smaller than a set distance, the alarm is controlled to give an alarm;
and the controller processes the received image information and sends the processed image information to the display screen for display.
CN202010461079.3A 2020-05-27 2020-05-27 Bridge type ship unloader operation method Active CN111646247B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010461079.3A CN111646247B (en) 2020-05-27 2020-05-27 Bridge type ship unloader operation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010461079.3A CN111646247B (en) 2020-05-27 2020-05-27 Bridge type ship unloader operation method

Publications (2)

Publication Number Publication Date
CN111646247A CN111646247A (en) 2020-09-11
CN111646247B true CN111646247B (en) 2021-08-31

Family

ID=72352655

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010461079.3A Active CN111646247B (en) 2020-05-27 2020-05-27 Bridge type ship unloader operation method

Country Status (1)

Country Link
CN (1) CN111646247B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2491442B1 (en) * 1980-10-03 1985-12-13 Engelbrecht & Lemmerbrock PNEUMATIC SUCTION DEVICE COMPRISING AGITATION ORGANS FOR THE MATERIAL TO BE CARRIED
CN1498834A (en) * 2002-11-06 2004-05-26 天津港第五港埠公司 Technical method and facilites for loading and unloading goods at berth in hundred thousand tunnage
CN101112961A (en) * 2006-07-25 2008-01-30 包起帆 Bulk cargo automatic ship-unloading system and method thereof
CN104379490A (en) * 2012-05-04 2015-02-25 吉列尔莫·博本利斯吉利奥 System for loading and unloading during port operations, comprising a crane, and a base located in the body of the crane that supports and stacks hatchway covers
CN108622679A (en) * 2018-03-20 2018-10-09 曹妃甸港矿石码头股份有限公司 A kind of novel bridge type ship unloaders operational method
CN109665340A (en) * 2017-10-13 2019-04-23 中冶宝钢技术服务有限公司 Large-scale bulk goods wheel cabin material method for cleaning
CN110817490A (en) * 2019-11-15 2020-02-21 中冶宝钢技术服务有限公司 Grab ship unloader and operation method thereof

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR930000575B1 (en) * 1990-10-31 1993-01-25 삼성전관 주식회사 Plasma display device and manufacturing method
CN204777759U (en) * 2015-07-21 2015-11-18 青岛港国际股份有限公司 Ship unloaders grab bucket
CN108438953B (en) * 2018-02-26 2020-02-04 青岛港国际股份有限公司 Automatic wharf loading and unloading control method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2491442B1 (en) * 1980-10-03 1985-12-13 Engelbrecht & Lemmerbrock PNEUMATIC SUCTION DEVICE COMPRISING AGITATION ORGANS FOR THE MATERIAL TO BE CARRIED
CN1498834A (en) * 2002-11-06 2004-05-26 天津港第五港埠公司 Technical method and facilites for loading and unloading goods at berth in hundred thousand tunnage
CN101112961A (en) * 2006-07-25 2008-01-30 包起帆 Bulk cargo automatic ship-unloading system and method thereof
CN104379490A (en) * 2012-05-04 2015-02-25 吉列尔莫·博本利斯吉利奥 System for loading and unloading during port operations, comprising a crane, and a base located in the body of the crane that supports and stacks hatchway covers
CN109665340A (en) * 2017-10-13 2019-04-23 中冶宝钢技术服务有限公司 Large-scale bulk goods wheel cabin material method for cleaning
CN108622679A (en) * 2018-03-20 2018-10-09 曹妃甸港矿石码头股份有限公司 A kind of novel bridge type ship unloaders operational method
CN110817490A (en) * 2019-11-15 2020-02-21 中冶宝钢技术服务有限公司 Grab ship unloader and operation method thereof

Also Published As

Publication number Publication date
CN111646247A (en) 2020-09-11

Similar Documents

Publication Publication Date Title
CN105383955B (en) Harbour bulk goods unloading and shipment transhipment all-in-one
KR102557059B1 (en) How to operate the new bridge-type unloading machine
CN101112944B (en) Floating type ship unloading equipment
CN110182622A (en) A kind of unmanned bucket continuous ship unloader automatic material taking method
CN102730158B (en) A kind of boats and ships dock container loading and unloading system
US3687309A (en) Device for transloading floating containers
CN108275476A (en) Container terminal horizontal transport vehicle dispatch system
CN111646247B (en) Bridge type ship unloader operation method
CN113682841B (en) Ten-thousand-ton ship unloading operation method
CN110104119A (en) SCR denitration reaction device installation method and the ship installed using it
CN111634366B (en) Typical cargo hold layout of large bulk carrier
CN109335961A (en) The gantry crane transferring platform and control method and gantry crane that can be directly interacted with AGV
WO2017091860A1 (en) Super shallow draft bulk carrier
US4556112A (en) Mobile conveyor arrangement
KR101149499B1 (en) Unloading system and method of container
CN1062830C (en) Equipment and technology of loading and unloading system for harbour container
CN100556793C (en) Integrated large loading-unloading volume container shore bridge
US2827181A (en) Universal self-unloading unit for bulk cargo vessels
CN106741657A (en) Bulk freighter device for discharging
CN207683716U (en) A kind of cargo hold system suitable for kiloton all electric propulsion bulk freighter
CN201056432Y (en) Floating type vessel removing device
KR101044915B1 (en) Loading and unloading system for ship using the crane
CN212608166U (en) Wharf bulk cargo shipment system
Chen Bucket Chain Ship Unloaders
CN114506689B (en) Operation method and system for container terminal

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: No.12 Jingba Road, Huangdao District, Qingdao City, Shandong Province

Applicant after: QINGDAO PORT INTERNATIONAL Co.,Ltd.

Applicant after: QINGDAO PORT DONGJIAKOU ORE TERMINAL Co.,Ltd.

Address before: The city of north port green road 266011 Shandong city of Qingdao province No. 6

Applicant before: QINGDAO PORT INTERNATIONAL Co.,Ltd.

Applicant before: QINGDAO PORT DONGJIAKOU ORE TERMINAL Co.,Ltd.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant