CN111639865A - High-speed rail line meteorological disaster occurrence risk analysis method - Google Patents

High-speed rail line meteorological disaster occurrence risk analysis method Download PDF

Info

Publication number
CN111639865A
CN111639865A CN202010490181.6A CN202010490181A CN111639865A CN 111639865 A CN111639865 A CN 111639865A CN 202010490181 A CN202010490181 A CN 202010490181A CN 111639865 A CN111639865 A CN 111639865A
Authority
CN
China
Prior art keywords
risk
meteorological
comprehensive
index
sample sequence
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010490181.6A
Other languages
Chinese (zh)
Other versions
CN111639865B (en
Inventor
郭建侠
张子曰
康家琦
王佳
刘圆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CMA Meteorological Observation Centre
Original Assignee
CMA Meteorological Observation Centre
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CMA Meteorological Observation Centre filed Critical CMA Meteorological Observation Centre
Priority to CN202010490181.6A priority Critical patent/CN111639865B/en
Publication of CN111639865A publication Critical patent/CN111639865A/en
Application granted granted Critical
Publication of CN111639865B publication Critical patent/CN111639865B/en
Priority to PCT/CN2021/097241 priority patent/WO2021244472A1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Economics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Educational Administration (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Development Economics (AREA)
  • General Health & Medical Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Train Traffic Observation, Control, And Security (AREA)

Abstract

The invention relates to a high-speed rail line meteorological disaster occurrence risk analysis method, which comprises the following steps: step S1: carrying out normalization processing on each meteorological element sample sequence; step S2: calculating a comprehensive risk index of the construction period, and performing reselection of the primary selection track based on the feedback of the comprehensive risk index of the construction period; step S3: and calculating the comprehensive risk index of the operation period, and carrying out lattice monitoring adjustment and risk early warning based on the index. The comprehensive disaster occurrence risk analysis method can simultaneously integrate and consider various meteorological elements to carry out comprehensive disaster occurrence risk analysis; adjusting meteorological element monitoring based on the analysis result, and giving a suggestion of track selection in the construction period; and respectively analyzing risk areas at different stages along the railway according to different sensitivities of the railway construction period and the operation period to meteorological elements.

Description

High-speed rail line meteorological disaster occurrence risk analysis method
[ technical field ] A method for producing a semiconductor device
The invention belongs to the technical field of rail transit, and particularly relates to a method for analyzing risk of meteorological disaster happening along a high-speed rail.
[ background of the invention ]
Traffic has a very close relation with weather, and particularly railways are highly sensitive industries of weather disasters. The research for refining the climate background and the meteorological disasters is difficult, the railway construction and railway operation are supported less, particularly, the terrain fluctuation in some areas is severe, the fall is large, even the large terrain fluctuation with the altitude of 500 to 5000 meters is experienced, the meteorological conditions face more unknown factors, and the method has very important significance for track setting and monitoring point setting aiming at the meteorological disaster occurrence risk analysis along the high-speed rail. Therefore, it is very important to develop the risk of disaster occurrence along the railway. The comprehensive disaster occurrence risk analysis method can simultaneously integrate and consider various meteorological elements to carry out comprehensive disaster occurrence risk analysis; adjusting meteorological element monitoring based on the analysis result, and giving a suggestion of track selection in the construction period; and respectively analyzing risk areas at different stages along the railway according to different sensitivities of the railway construction period and the operation period to meteorological elements. Selecting partial meteorological elements to carry out risk analysis in the operation period through sensitivity judgment; the data analysis can be carried out according to the grid points, the actual terrain condition is considered at the same time, the data analysis based on the track is carried out, and the depth and the precision of the analysis are greatly improved.
[ summary of the invention ]
In order to solve the above problems in the prior art, the present invention provides a method for analyzing risk of occurrence of meteorological disasters along a high-speed rail, the method comprising:
step S1: carrying out normalization processing on each meteorological element sample sequence;
step S2: calculating a comprehensive risk index of the construction period, and performing reselection of the primary selection track based on the feedback of the comprehensive risk index of the construction period;
step S3: and calculating the comprehensive risk index of the operation period, and carrying out lattice monitoring adjustment and risk early warning based on the index.
Further, the step s1 specifically includes: normalization is performed by adopting a formula (1);
Figure BDA0002520656450000011
wherein x isiIs original meteorological element sample sequence, x'iIs a normalized meteorological element sample sequence,
Figure BDA0002520656450000021
is the minimum value of the sample sequence and,
Figure BDA0002520656450000022
is the maximum value of the sample sequence
Further, the step S2 is specifically: calculating by adopting a formula (2);
Figure BDA0002520656450000023
wherein, RIi,jIs the corresponding construction period comprehensive risk index (NI) on the grid point (i, j)i,j)kIs the normalized value, W, corresponding to the kth meteorological element at the grid point (i, j)kThe weight value is corresponding to the kth meteorological element.
Further, the step S3 is specifically: selecting operation period sensitive meteorological elements, calculating an operation period comprehensive risk index based on the operation period sensitive meteorological elements, carrying out lattice monitoring adjustment based on the operation period comprehensive risk index and the risk index, and further carrying out risk top alarm.
Further, automatic filling of missing values in the sample sequence and consistency check are performed before normalization processing.
Further, the automatic filling is as follows: carrying out n-dimensional space fitting on the normalized meteorological element sample sequence, wherein n is the number of meteorological element types, and automatically filling missing values based on corresponding values of fitting points in an n-dimensional space fitting curve; before fitting, the sample sequence is segmented, and n-dimensional space fitting and automatic filling are respectively carried out on each segment of sample sequence.
Further, a dynamic mapping table is set to map the comprehensive risk index and the risk level.
Further, meteorological elements are classified, and comprehensive risk fat numbers are established based on the classified meteorological elements.
Further, one or more primary factors are selected and refined to a plurality of secondary factors for each primary factor.
Further, the primary factors correspond to meteorological element types, and the plurality of secondary factors are directly parameter-measurable.
The beneficial effects of the invention include: comprehensive disaster occurrence risk analysis can be carried out by simultaneously integrating and considering various meteorological elements; adjusting meteorological element monitoring based on the analysis result, and giving a suggestion of track selection in the construction period; and respectively analyzing risk areas at different stages along the railway according to different sensitivities of the railway construction period and the operation period to meteorological elements. Selecting partial meteorological elements to carry out risk analysis in the operation period through sensitivity judgment; the data analysis can be carried out according to the grid points, the actual terrain condition is considered at the same time, the data analysis based on the track is carried out, and the depth and the precision of the analysis are greatly improved.
[ description of the drawings ]
The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this application, and are not to be considered limiting of the invention, in which:
fig. 1 is a schematic view of the method for analyzing risk of occurrence of meteorological disasters along a high-speed rail according to the invention.
FIG. 2 is a comprehensive meteorological risk fat number distribution diagram in a railway construction period.
Fig. 3 is a comprehensive meteorological risk fat distribution diagram in railway operation period.
[ detailed description ] embodiments
The present invention will now be described in detail with reference to the drawings and specific embodiments, wherein the exemplary embodiments and descriptions are provided only for the purpose of illustrating the present invention and are not to be construed as limiting the present invention.
The invention adopts a Chinese meteorological office Chinese ground meteorological element daily data set (V3.0) with the time range of 1951-2017, which comprises temperature (highest, lowest and average daily temperature), precipitation, wind (average daily wind speed, maximum daily wind direction and maximum wind speed), relative humidity, ground temperature (shallow layer and deep layer) and station metadata. Live lattice data is based on the Space-time multiscale Analysis System (STMAS). The system adopts a multiple grid sequential variation method and carries out the analysis and optimization process of data by analysis methods of different scales. The method can effectively capture short wave information and propagation information in the land, and adopts different capture modes under different weather dynamics limiting conditions. The time resolution is 15 minutes, the horizontal space resolution is 5km multiplied by 5km, the vertical direction is divided into 21 layers which are not equidistant, and the time range of the data is the data of a year and a year.
The analysis method comprises the following steps:
step S1: carrying out normalization processing on each meteorological element sample sequence; specifically, normalization is performed by adopting a formula (1);
Figure BDA0002520656450000031
wherein x isiIs original meteorological element sample sequence, x'iIs a normalized meteorological element sample sequence,
Figure BDA0002520656450000032
is the minimum value of the sample sequence and,
Figure BDA0002520656450000033
is the maximum value of the sample sequence; preferably: the meteorological elements comprise thunder, temperature, precipitation, wind and the like;
preferably: before normalization processing, automatic filling and consistency check of missing values in a sample sequence are carried out;
the automatic filling is as follows: carrying out n-dimensional space fitting on the normalized meteorological element sample sequence, wherein n is the number of meteorological element types, and automatically filling missing values based on corresponding values of fitting points in an n-dimensional space fitting curve; before fitting, sample sequences need to be segmented, and n-dimensional space fitting and automatic filling are respectively carried out on each segment of sample sequences; in fact, the loss of meteorological element sample sequences is very common, but in the prior art, the sample sequences are not processed, mainly because the number of the sample sequences is too complicated, manual filling cannot be performed, and the overall fitting basically cannot obtain an effective fitting curve; actually, the deviation of the following data is necessarily brought by not processing the sample sequence; the present invention therefore solves this problem by a segmented approach; in fact, the sample sequence values of meteorological elements are always in strong continuity, so that the filling accuracy of data after automatic filling is high; the segmentation is based on natural time periods and meteorological element change rules for division; one way of doing this is: dividing the variation phases of the sample sequences of the meteorological elements according to the sequence values, finding out the minimum value of the variation phases for various sample sequences in the same period, and performing piecewise fitting based on the minimum value of the variation phases; the range of variation of the sequence values within the same variation phase is limited or regular;
the consistency check is: for the sample sequence subjected to n-dimensional space fitting, determining the number of samples of which the distance from a fitting curve exceeds a preset range, and determining that the meteorological element sample sequence does not pass consistency check when the number of samples exceeds an upper discrete limit; the analysis result of the sample sequence which fails the consistency check may have a large deviation; the complexity of the sample sequence inspection is simplified through the analysis of the number of discrete points;
step S2: calculating a comprehensive risk index of the construction period, and performing reselection of the primary selection track based on the feedback of the comprehensive risk index of the construction period; specifically, the formula (2) is adopted for calculation;
Figure BDA0002520656450000041
wherein, RIi,jIs the corresponding construction period comprehensive risk index (NI) on the grid point (i, j)i,j)kIs the normalized value, W, corresponding to the kth meteorological element at the grid point (i, j)kIs as followsAnd the weighted values corresponding to the k meteorological elements. Through the comprehensive risk index in the construction period, a high-risk area formed by overlapping a plurality of elements can be shown. A closer to 1 of the composite risk indicates a higher degree of influence by the composite meteorological factors on the grid point (i, j), and a closer to 0 indicates a lower degree of influence by the meteorological factors. The high risk area is the meteorological monitoring key area. The feedback can be feedback to a user to perform manual re-screening or machine selection alternative, and a feedback suggestion is given based on the construction position of the track to be selected;
preferably: grading meteorological elements, and establishing a comprehensive risk index based on the graded meteorological elements; specifically, the method comprises the following steps: selecting one or more primary factors according to the sensitivity of the construction period to meteorological disasters, and refining each primary factor into a plurality of secondary factors, wherein the primary factors correspond to meteorological element types, and the secondary factors are directly measured by parameters; calculating a first-level summary and index based on the second-level factor, and calculating a summary and risk index based on the first-level summary and index; for example: the first-level factors comprise thunder, temperature, precipitation and wind, and the second-level factors corresponding to the thunder are thunderstorm days and thunder density; the secondary factors corresponding to the temperature are the temperature, the daily worse and the maximum frozen soil depth; the secondary factor corresponding to the wind is the maximum wind pressure and the large wind day number; the second-level factors corresponding to precipitation are the maximum daily precipitation and the accumulated snow depth;
Figure BDA0002520656450000051
wherein (FNI)i,j)fkFor the fkth first-order summary index, FWkThe weight value corresponding to the fkth primary factor;
Figure BDA0002520656450000052
wherein, SNIi,jIs a normalized value corresponding to the sk secondary factor, FWskThe weight value corresponding to the sk secondary factor;
as can be seen from fig. 2, the comprehensive risk index of the location areas of the area 1 and the area 2 is relatively high during the railway line construction process from the area 1 to the area 2, and is an area to be monitored in an important way. The combined risk index for the region bordering location area 1 and location area 2 and for most of the basin of area 2 during the line construction phase is relatively low. From the distribution of the primary route, the high-value risk index area is basically avoided.
Preferably: setting a dynamic mapping table to map the comprehensive risk index and the risk grade; considering that index ranges corresponding to different regional risk levels can be dynamically changed in different construction periods, the method sets a dynamic mapping table, automatically selects the dynamic mapping table based on mapping influence factors such as seasons, time, construction periods, regions and the like, and maps the comprehensive risk index into a corresponding risk level based on the selected dynamic mapping table; the specific index is invisible to the user through a form dynamic selection mode, and the user can only see the converted grade, so that the user experience is greatly improved.
Li,j=Tabled(RIi,j) Wherein L isi,jIs the risk level, Table, at grid point (i, j)d() Is the d table mapping function, based on the mapping image factor to select the table mapping function; for example: training based on historical data to obtain a selection method;
preferably: continuously monitoring according to the summary and risk indexes, and adjusting and reselecting the track construction position according to the continuous monitoring result, specifically: determining whether the comprehensive risk level of the corresponding construction period on the grid point (i, j) exceeds a first risk threshold value, if so, selecting an adjacent grid point of the grid point (i, j) as a construction position of the track to be selected; otherwise, the original sample sequence xiDividing into m sub-sample sequences xi1,xi2…ximNormalizing each subsample sequence again and calculating the corresponding sub-composite risk index Rl thereof respectivelyi,j,pAnd if p is the p-th sub-sample sequence, and the number of the continuous sub-comprehensive risk indexes with the continuous sub-comprehensive risk indexes larger than the second risk threshold is larger than the second number threshold, feeding back to reselect the initial selection track, and selecting the adjacent grid points of the grid points (i, j) as the tracks to be selectedBuilding a position; wherein, the continuous length is limited, for example, the continuous length of the continuous sub-integrated risk lipid number is greater than mz, wherein mz is a preset value; preferably: the m word sample sequences are mutually overlapped, wherein m is a preset value; the first risk threshold is greater than the second risk threshold; in the case that the independent risk index exceeds a large value, the risk analysis is easy to achieve, but actually, the occurrence of risks can be avoided in the process of track construction, the risks need to be reckoned based on time continuity to predict the risks more accurately, and the accuracy of prediction can be improved by splitting a sample sequence under the condition that continuous risks easily cause risk accumulation on time although an extreme risk does not appear;
preferably: the value of m is chosen in a trade-off way according to the length of the sample sequence and the running capacity of the computer;
step S3: calculating an operation period comprehensive risk index, and carrying out lattice monitoring adjustment and risk early warning based on the index, wherein the method specifically comprises the following steps: selecting operation period sensitive meteorological elements, calculating an operation period comprehensive risk index based on the operation period sensitive meteorological elements, carrying out lattice monitoring adjustment based on the operation period comprehensive risk index and the risk index, and further carrying out risk early warning;
the railway operation stage is mainly influenced by short-time extreme meteorological elements and cannot uniformly process the construction period and the operation period; the selection of the sensitive meteorological elements in the operation period specifically comprises the following steps: judging whether each of the plurality of primary comprehensive indexes obtained in the construction period is higher than the basic risk fat number, and if so, determining the meteorological elements corresponding to the primary comprehensive indexes as the selected operation period sensitive meteorological elements; wherein: different primary summary indexes correspond to different basic risk thresholds; the basic risk threshold value is a preset value, and is a low-value threshold value which is not easy to meet, and the meteorological elements basically without risk are screened out in such a way and are not considered; for example: through the calculation of the primary comprehensive sum index, the influence of the temperature on the operation period is small, and the primary factor temperature is screened out in the evaluation process of the railway operation periods of the area A and the area B, so that the influence of the temperature factor is not considered for sensitive meteorological elements in the operation period; by the mode, the number of parameters for evaluation is reduced, and the influence of invalid parameters on the whole index is reduced, so that the index sensitivity, the prediction accuracy and the prediction sensitivity are improved.
The calculation of the comprehensive risk fat number in the operation period based on the sensitive meteorological elements in the operation period specifically comprises the following steps: determining whether an operation period risk grid point exists, if so, enhancing the monitoring of the operation period risk grid point, and carrying out risk early warning on a region corresponding to the operation period risk grid point; further, whether an operation period risk track exists is determined, if yes, joint monitoring of a grid point set corresponding to the operation period risk track is enhanced, and risk early warning is carried out on an area corresponding to the operation period risk track;
the enhancing the monitoring of the operation period risk lattice point specifically comprises the following steps: increasing the monitoring frequency of the operation period risk grid points;
the determining whether the operation period risk lattice exists specifically includes: selecting first-level factors corresponding to the sensitive meteorological elements in the operation period and second-level factors corresponding to the sensitive meteorological elements in the operation period respectively, and substituting the first-level factors and the second-level factors into the formulas (3) and (4) to calculate the comprehensive risk index in the operation period; if the operation period comprehensive risk lipid number is larger than an operation period risk threshold, taking a lattice point corresponding to the operation period comprehensive risk index as an operation period risk lattice point; the risk threshold value in the operation period is a preset value;
for example: the first-level factor and the second-level factor are respectively a lightning factor, a wind factor and a precipitation factor, and a thunderstorm day number and a lightning density of the second-level factor respectively corresponding to the lightning factor, the wind pressure, the wind day number, the precipitation maximum value and the snow accumulation depth;
the determining whether the operation period risk track exists specifically includes: for each grid point (i, j), calculating a first-level comprehensive sum index corresponding to each sensitive meteorological element; for each meteorological element, determining a primary comprehensive index track, determining whether the primary comprehensive index track corresponding to the meteorological element is a risk track, and if so, enhancing the joint monitoring of a grid point set corresponding to the operation period risk track; considering that for the operation period, although the conditions may be severe for specific meteorological elements, the influence of the train and the track thereof in the operation period is discontinuous, comprehensive meteorological conditions related to the terrain are not formed among the meteorological elements, and the risk avoidance of the operation period can be effectively carried out by considering the continuous performance of the meteorological elements on the terrain in combination with the combination of the terrain;
the determining of the first-level comprehensive index track specifically comprises the following steps: acquiring all grid points with the first-stage comprehensive index larger than a track grid point threshold value as grid points to be communicated, and if two grid points to be communicated are adjacent, connecting the two grid points to be communicated to form communicated grid points; all the connected grid points form one or more first-level comprehensive and exponential tracks; wherein: the trace grid points are preset values, and when the trace grid points are larger than the preset values, continuous meteorological elements possibly cause risks of matching with terrain;
the determining whether the first-level comprehensive index track corresponding to the meteorological element is a risk track specifically includes: comparing each primary comprehensive index track with the risk track template, and if the primary comprehensive index track is matched with the risk track template, determining that the primary comprehensive index track is a risk track; otherwise, determining that the primary comprehensive index track is not a risk track; the risk track template is obtained through intelligent learning according to topographic data and meteorological element influence conditions; or obtaining the data from the cloud;
the enhancing the joint monitoring of the grid point set corresponding to the operation period risk track specifically comprises: splitting grid points in the grid point set to increase the number of grid points covered by the operation period risk track;
it can be seen from fig. 3 that the areas between region 1 and region 2 where the integrated weather risk is higher during the railway operations are located in the basin of region 2, the north of location area C, and the west of location area D; the current route selection of the railway focuses on the section position of some position areas in the operation period.
As can be seen by comparing the attached drawings 2 and 3, the meteorological risk of the basin in the region 2 is lower in the construction process, the risk index is raised during later-period operation, the meteorological risk index is higher in the middle of the position region C during construction, the risk lipid number is reduced during operation, and the risk index part from the position region D to the position region E is lower no matter whether the construction or the later-period operation is carried out. Therefore, attention is paid to strengthen the monitoring of the corresponding meteorological risk factors in the high-value risk index areas at different stages.
The above description is only a preferred embodiment of the present invention, and all equivalent changes or modifications of the structure, characteristics and principles described in the present invention are included in the scope of the present invention.

Claims (10)

1. A method for analyzing risk of meteorological disaster occurrence along a high-speed rail is characterized by comprising the following steps:
step S1: carrying out normalization processing on each meteorological element sample sequence;
step S2: calculating a comprehensive risk index of the construction period, and performing reselection of the primary selection track based on the feedback of the comprehensive risk index of the construction period;
step S3: and calculating the comprehensive risk index of the operation period, and carrying out lattice monitoring adjustment and risk early warning based on the index.
2. The method for analyzing the risk of occurrence of meteorological disasters along high-speed rails according to claim 1, wherein the step S1 specifically comprises: normalization is performed by adopting a formula (1);
Figure FDA0002520656440000011
wherein x isiIs original meteorological element sample sequence, x'iIs a normalized meteorological element sample sequence,
Figure FDA0002520656440000012
is the minimum value of the sample sequence and,
Figure FDA0002520656440000013
is the maximum value of the sample sequence.
3. The method for analyzing the risk of occurrence of meteorological disasters along high-speed rails according to claim 2, wherein the step S2 specifically comprises: calculating by adopting a formula (2);
Figure FDA0002520656440000014
wherein, RIi,jIs the corresponding construction period comprehensive risk index (NI) on the grid point (i, j)i,j)kIs the normalized value, W, corresponding to the kth meteorological element at the grid point (i, j)kThe weight value is corresponding to the kth meteorological element.
4. The method for analyzing the risk of occurrence of meteorological disasters along high-speed rails according to claim 3, wherein the step S3 specifically comprises: selecting operation period sensitive meteorological elements, calculating an operation period comprehensive risk index based on the operation period sensitive meteorological elements, carrying out lattice monitoring adjustment based on the operation period comprehensive risk index and the risk index, and further carrying out risk early warning.
5. The method for analyzing risks of occurrence of meteorological disasters along high-speed rails according to claim 4, wherein automatic filling and consistency check of missing values in a sample sequence are performed before normalization processing.
6. The method for analyzing risk of occurrence of meteorological disasters along high-speed rails according to claim 5, wherein the automatic filling comprises the following steps: carrying out n-dimensional space fitting on the normalized meteorological element sample sequence, wherein n is the number of meteorological element types, and automatically filling missing values based on corresponding values of fitting points in an n-dimensional space fitting curve; before fitting, the sample sequence is segmented, and n-dimensional space fitting and automatic filling are respectively carried out on each segment of sample sequence.
7. The method for analyzing the risk of occurrence of meteorological disasters along high-speed rails according to claim 6, wherein a dynamic mapping table is set for mapping between the comprehensive risk index and the risk level.
8. The method for analyzing the risk of occurrence of meteorological disasters along high-speed rails according to claim 7, wherein meteorological elements are classified, and a comprehensive risk index is established based on the classified meteorological elements.
9. The method for analyzing the risk of occurrence of meteorological disasters along high-speed rails according to claim 8, wherein the dividing is dynamic: one or more primary factors are selected and refined to a plurality of secondary factors for each primary factor.
10. The method according to claim 9, wherein the primary factors correspond to meteorological element types, and the plurality of secondary factors are directly parametrically measurable.
CN202010490181.6A 2020-06-02 2020-06-02 High-speed rail line meteorological disaster occurrence risk analysis method Active CN111639865B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN202010490181.6A CN111639865B (en) 2020-06-02 2020-06-02 High-speed rail line meteorological disaster occurrence risk analysis method
PCT/CN2021/097241 WO2021244472A1 (en) 2020-06-02 2021-05-31 Risk analysis method for meteorological disaster along high-speed railway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010490181.6A CN111639865B (en) 2020-06-02 2020-06-02 High-speed rail line meteorological disaster occurrence risk analysis method

Publications (2)

Publication Number Publication Date
CN111639865A true CN111639865A (en) 2020-09-08
CN111639865B CN111639865B (en) 2021-03-19

Family

ID=72331368

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010490181.6A Active CN111639865B (en) 2020-06-02 2020-06-02 High-speed rail line meteorological disaster occurrence risk analysis method

Country Status (2)

Country Link
CN (1) CN111639865B (en)
WO (1) WO2021244472A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113516406A (en) * 2021-07-30 2021-10-19 中国气象局气象探测中心 High-speed rail line rainfall measurement point arrangement method based on real-time observation and analysis
WO2021244472A1 (en) * 2020-06-02 2021-12-09 中国气象局气象探测中心 Risk analysis method for meteorological disaster along high-speed railway

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114970175A (en) * 2022-06-02 2022-08-30 南京航空航天大学 Method for analyzing response of clear sky jolt to climate change under future change situation
CN115953034B (en) * 2023-03-14 2023-05-30 南京航天宏图信息技术有限公司 Method and device for evaluating and zoning hazard risk of strong wind disaster, electronic equipment and medium

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2062071A1 (en) * 2006-09-04 2009-05-27 Geosystem S.r.l. Method for building velocity models for pre-stack depth migration via the simultaneous joint inversion of seismic, gravity and magnetotelluric data
WO2013089840A1 (en) * 2011-12-14 2013-06-20 The Government Of The United States Of America, As Represented By The Secretary Of The Navy Multi-layer ocean vertical gradient constraints
US20150039228A1 (en) * 2012-02-13 2015-02-05 State Grid Corporation Of China Ultra-short-term forecasting method including real-time monitoring of the effect of upper and lower courses
CN108269016A (en) * 2018-01-18 2018-07-10 中山大学 A kind of small watershed mountain flood risk analysis method based on diffusion of information
CN108960599A (en) * 2018-06-22 2018-12-07 国网湖南省电力有限公司 Transmission line of electricity Rainfall Disaster fining prediction technique and system based on inversion algorithm
CN109146230A (en) * 2018-06-29 2019-01-04 中国电力科学研究院有限公司 A kind of electric line typhoon wind damage caused by waterlogging evil is short to face method for early warning and device
CN110070199A (en) * 2018-01-23 2019-07-30 中国电力科学研究院有限公司 A kind of power grid typhoon disaster method for early warning and system

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120144828A1 (en) * 2012-02-16 2012-06-14 Lazaris Spyros J Multi-resource renewable energy installation and method of maximizing operational capacity of same
BR112019004994B1 (en) * 2016-09-19 2023-01-17 Instituto Tecnológico De Aeronáutica - Ita DECISION SUPPORT METHOD FOR ISSUING ALERTS AND SELECTING MITIGATION ACTIONS PARAMETERIZED BY METEOROLOGICAL-CLIMATE DECISION INDEX BASED ON USER PREFERENCES
TW201835607A (en) * 2017-03-17 2018-10-01 日商東芝股份有限公司 Weather forecasting device, weather forecasting method, and program
CN108537367A (en) * 2018-03-20 2018-09-14 广东电网有限责任公司惠州供电局 Power transmission line comprehensive methods of risk assessment under a kind of more meteorological disasters
CN108876184A (en) * 2018-06-29 2018-11-23 中车建设工程有限公司 A kind of security risk evaluations and method for early warning of Railway Tunnel operation phase
CN110009226B (en) * 2019-04-03 2021-06-01 中国科学院地理科学与资源研究所 Site pollution risk level evaluation and sensitive receptor influence identification system
CN110910045A (en) * 2019-12-05 2020-03-24 广东省气象公共安全技术支持中心 Meteorological disaster defense method and system
CN111639865B (en) * 2020-06-02 2021-03-19 中国气象局气象探测中心 High-speed rail line meteorological disaster occurrence risk analysis method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2062071A1 (en) * 2006-09-04 2009-05-27 Geosystem S.r.l. Method for building velocity models for pre-stack depth migration via the simultaneous joint inversion of seismic, gravity and magnetotelluric data
WO2013089840A1 (en) * 2011-12-14 2013-06-20 The Government Of The United States Of America, As Represented By The Secretary Of The Navy Multi-layer ocean vertical gradient constraints
US20150039228A1 (en) * 2012-02-13 2015-02-05 State Grid Corporation Of China Ultra-short-term forecasting method including real-time monitoring of the effect of upper and lower courses
CN108269016A (en) * 2018-01-18 2018-07-10 中山大学 A kind of small watershed mountain flood risk analysis method based on diffusion of information
CN110070199A (en) * 2018-01-23 2019-07-30 中国电力科学研究院有限公司 A kind of power grid typhoon disaster method for early warning and system
CN108960599A (en) * 2018-06-22 2018-12-07 国网湖南省电力有限公司 Transmission line of electricity Rainfall Disaster fining prediction technique and system based on inversion algorithm
CN109146230A (en) * 2018-06-29 2019-01-04 中国电力科学研究院有限公司 A kind of electric line typhoon wind damage caused by waterlogging evil is short to face method for early warning and device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张子曰: "川藏铁路沿线气象风险特征分析", 《中国优秀硕士学位论文全文数据库基础科学辑》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021244472A1 (en) * 2020-06-02 2021-12-09 中国气象局气象探测中心 Risk analysis method for meteorological disaster along high-speed railway
CN113516406A (en) * 2021-07-30 2021-10-19 中国气象局气象探测中心 High-speed rail line rainfall measurement point arrangement method based on real-time observation and analysis

Also Published As

Publication number Publication date
CN111639865B (en) 2021-03-19
WO2021244472A1 (en) 2021-12-09

Similar Documents

Publication Publication Date Title
CN111639865B (en) High-speed rail line meteorological disaster occurrence risk analysis method
CN111582755B (en) Mountain torrent disaster comprehensive risk dynamic assessment method based on multi-dimensional set information
CN112070286B (en) Precipitation forecast and early warning system for complex terrain river basin
Wang et al. Climatology and changes of extratropical cyclone activity: Comparison of ERA-40 with NCEP–NCAR reanalysis for 1958–2001
CN108961688B (en) Geological disaster monitoring and early warning method under support of big data
CN108960599B (en) Power transmission line rainstorm disaster refined prediction method and system based on inversion algorithm
Guzzetti et al. The rainfall intensity–duration control of shallow landslides and debris flows: an update
Guzzetti et al. Estimating the quality of landslide susceptibility models
CN104899437A (en) Early-warning method for heavy-rainfall type landslide hazard
Brugnara et al. High-resolution analysis of daily precipitation trends in the central Alps over the last century.
CN102999694B (en) A kind of mountain region disaster takes place frequently district's Risk Evaluation of Debris Flow method
Dixon et al. Objective identification of tornado seasons and ideal spatial smoothing radii
Mascaro et al. Temporal downscaling and statistical analysis of rainfall across a topographic transect in northwest Mexico
Gámiz-Fortis et al. Spatio-temporal variability in Ebro river basin (NE Spain): Global SST as potential source of predictability on decadal time scales
Casellas et al. Surface precipitation phase discrimination in complex terrain
CN113987813A (en) Landslide sensitivity mapping model based on multi-parameter decision and analytic hierarchy process
El Rafei et al. Analysis of extreme wind gusts using a high-resolution Australian regional reanalysis
Feser et al. North Atlantic winter storm activity in modern reanalyses and pressure-based observations
DeBock et al. Reliability-based design snow loads. I: Site-specific probability models for ground snow loads
CN103487804B (en) Based on the semi-automatic recognition methods in lake under the Antarctic Ice of ice Radar Technology
Lai et al. Waterlogging risk assessment based on self-organizing map (SOM) artificial neural networks: a case study of an urban storm in Beijing
Wu et al. Characterization and indexing of heavy rainstorms in H ong K ong
Mandal et al. Precipitation forecast verification of the Indian summer monsoon with intercomparison of three diverse regions
Wei Examining El Niño–Southern Oscillation effects in the subtropical zone to forecast long-distance total rainfall from typhoons: A case study in Taiwan
KR101865791B1 (en) Typhoon risk analysis system and typhoon risk analysis method using the same

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant