CN111639445B - 泥石流坝前回淤堆积体在拦挡坝拆除中危险性测算方法、应用 - Google Patents
泥石流坝前回淤堆积体在拦挡坝拆除中危险性测算方法、应用 Download PDFInfo
- Publication number
- CN111639445B CN111639445B CN202010567888.2A CN202010567888A CN111639445B CN 111639445 B CN111639445 B CN 111639445B CN 202010567888 A CN202010567888 A CN 202010567888A CN 111639445 B CN111639445 B CN 111639445B
- Authority
- CN
- China
- Prior art keywords
- dam
- debris flow
- accumulation body
- removal
- silt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/10—Complex mathematical operations
- G06F17/18—Complex mathematical operations for evaluating statistical data, e.g. average values, frequency distributions, probability functions, regression analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Geometry (AREA)
- Computational Mathematics (AREA)
- Data Mining & Analysis (AREA)
- Computer Hardware Design (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- Mathematical Physics (AREA)
- Evolutionary Computation (AREA)
- Bioinformatics & Cheminformatics (AREA)
- Probability & Statistics with Applications (AREA)
- Structural Engineering (AREA)
- Bioinformatics & Computational Biology (AREA)
- Architecture (AREA)
- Evolutionary Biology (AREA)
- Operations Research (AREA)
- Life Sciences & Earth Sciences (AREA)
- Algebra (AREA)
- Civil Engineering (AREA)
- Databases & Information Systems (AREA)
- Software Systems (AREA)
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010567888.2A CN111639445B (zh) | 2020-06-19 | 2020-06-19 | 泥石流坝前回淤堆积体在拦挡坝拆除中危险性测算方法、应用 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010567888.2A CN111639445B (zh) | 2020-06-19 | 2020-06-19 | 泥石流坝前回淤堆积体在拦挡坝拆除中危险性测算方法、应用 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111639445A CN111639445A (zh) | 2020-09-08 |
CN111639445B true CN111639445B (zh) | 2023-02-28 |
Family
ID=72331721
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010567888.2A Active CN111639445B (zh) | 2020-06-19 | 2020-06-19 | 泥石流坝前回淤堆积体在拦挡坝拆除中危险性测算方法、应用 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111639445B (zh) |
Citations (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103088791A (zh) * | 2013-02-27 | 2013-05-08 | 中国科学院水利部成都山地灾害与环境研究所 | 一种消能式排导拦挡结合的泥石流拦砂坝 |
CN103276687A (zh) * | 2013-05-31 | 2013-09-04 | 中国科学院、水利部成都山地灾害与环境研究所 | 一种拦砂坝后泥石流回淤形态测算方法及应用 |
CN103321190A (zh) * | 2013-06-21 | 2013-09-25 | 中国科学院、水利部成都山地灾害与环境研究所 | 一种泥石流拦砂坝溢流口过流流量测算方法及其应用 |
WO2014166145A1 (zh) * | 2013-04-10 | 2014-10-16 | 中国科学院、水利部成都山地灾害与环境研究所 | 自动分配排导量和停淤量的泥石流分流坝及其设计方法 |
CN104652370A (zh) * | 2014-12-31 | 2015-05-27 | 中国科学院、水利部成都山地灾害与环境研究所 | 一种偏心荷载作用下泥石流拦挡坝设计的优化方法 |
CN106096216A (zh) * | 2016-08-15 | 2016-11-09 | 中国科学院、水利部成都山地灾害与环境研究所 | 梁式格栅坝闭塞表现判别方法、应用 |
CN106202770A (zh) * | 2016-07-19 | 2016-12-07 | 成都理工大学 | 一种泥石流拦砂坝后回淤坡度的计算方法及应用 |
CN107034853A (zh) * | 2017-05-19 | 2017-08-11 | 兰州大学 | 一种过流式泥石流拦挡坝及坝群 |
CN107142891A (zh) * | 2017-05-22 | 2017-09-08 | 中国科学院、水利部成都山地灾害与环境研究所 | 粘性泥石流实体拦砂坝稳定性测算方法及其应用 |
CN107169615A (zh) * | 2017-07-19 | 2017-09-15 | 四川建筑职业技术学院 | 一种基于沟道纵比降和沟道宽度的拦砂坝淤满条件下泥石流流速衰减值的计算方法 |
CN108108561A (zh) * | 2017-12-22 | 2018-06-01 | 广州地理研究所 | 基于动力过程及能谱分析的泥石流综合减灾方法 |
CN108221845A (zh) * | 2018-01-08 | 2018-06-29 | 云南林业职业技术学院 | 一种干热河谷区泥石流治理方法 |
CN208039180U (zh) * | 2018-01-09 | 2018-11-02 | 云南林业职业技术学院 | 一种泥石流防治装置 |
CN108867569A (zh) * | 2018-07-12 | 2018-11-23 | 中国地质科学院探矿工艺研究所 | 一种自然清淤的泥石流拦砂坝及其应用 |
CN208395782U (zh) * | 2018-05-02 | 2019-01-18 | 中国电建集团华东勘测设计研究院有限公司 | 采用动态停淤库容分离泥石流的排导结构 |
CN210636383U (zh) * | 2019-05-28 | 2020-05-29 | 中国电建集团华东勘测设计研究院有限公司 | 一种带清渣排水通道的泥石流拦挡坝 |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6863807B2 (en) * | 2002-09-25 | 2005-03-08 | Crawford, Iii William Randall | Method and apparatus for remediation and prevention of fouling of recirculating water systems by detritus and other debris |
ITTO20130200A1 (it) * | 2013-03-15 | 2014-09-16 | Aronne Armanini | Struttura di ritenuta dei sedimenti in corsi d'acqua |
-
2020
- 2020-06-19 CN CN202010567888.2A patent/CN111639445B/zh active Active
Patent Citations (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103088791A (zh) * | 2013-02-27 | 2013-05-08 | 中国科学院水利部成都山地灾害与环境研究所 | 一种消能式排导拦挡结合的泥石流拦砂坝 |
WO2014166145A1 (zh) * | 2013-04-10 | 2014-10-16 | 中国科学院、水利部成都山地灾害与环境研究所 | 自动分配排导量和停淤量的泥石流分流坝及其设计方法 |
CN103276687A (zh) * | 2013-05-31 | 2013-09-04 | 中国科学院、水利部成都山地灾害与环境研究所 | 一种拦砂坝后泥石流回淤形态测算方法及应用 |
CN103321190A (zh) * | 2013-06-21 | 2013-09-25 | 中国科学院、水利部成都山地灾害与环境研究所 | 一种泥石流拦砂坝溢流口过流流量测算方法及其应用 |
CN104652370A (zh) * | 2014-12-31 | 2015-05-27 | 中国科学院、水利部成都山地灾害与环境研究所 | 一种偏心荷载作用下泥石流拦挡坝设计的优化方法 |
CN106202770A (zh) * | 2016-07-19 | 2016-12-07 | 成都理工大学 | 一种泥石流拦砂坝后回淤坡度的计算方法及应用 |
CN106096216A (zh) * | 2016-08-15 | 2016-11-09 | 中国科学院、水利部成都山地灾害与环境研究所 | 梁式格栅坝闭塞表现判别方法、应用 |
CN107034853A (zh) * | 2017-05-19 | 2017-08-11 | 兰州大学 | 一种过流式泥石流拦挡坝及坝群 |
CN107142891A (zh) * | 2017-05-22 | 2017-09-08 | 中国科学院、水利部成都山地灾害与环境研究所 | 粘性泥石流实体拦砂坝稳定性测算方法及其应用 |
CN107169615A (zh) * | 2017-07-19 | 2017-09-15 | 四川建筑职业技术学院 | 一种基于沟道纵比降和沟道宽度的拦砂坝淤满条件下泥石流流速衰减值的计算方法 |
CN108108561A (zh) * | 2017-12-22 | 2018-06-01 | 广州地理研究所 | 基于动力过程及能谱分析的泥石流综合减灾方法 |
CN108221845A (zh) * | 2018-01-08 | 2018-06-29 | 云南林业职业技术学院 | 一种干热河谷区泥石流治理方法 |
CN208039180U (zh) * | 2018-01-09 | 2018-11-02 | 云南林业职业技术学院 | 一种泥石流防治装置 |
CN208395782U (zh) * | 2018-05-02 | 2019-01-18 | 中国电建集团华东勘测设计研究院有限公司 | 采用动态停淤库容分离泥石流的排导结构 |
CN108867569A (zh) * | 2018-07-12 | 2018-11-23 | 中国地质科学院探矿工艺研究所 | 一种自然清淤的泥石流拦砂坝及其应用 |
CN210636383U (zh) * | 2019-05-28 | 2020-05-29 | 中国电建集团华东勘测设计研究院有限公司 | 一种带清渣排水通道的泥石流拦挡坝 |
Non-Patent Citations (2)
Title |
---|
冕宁县白泥巴沟泥石流特征及治理对策;郭宁;《南水北调与水利科技》;20151030(第05期);全文 * |
大渡河上游八步里沟泥石流防治中的资源综合利用研究;黄海等;《长江流域资源与环境》;20151215(第12期);全文 * |
Also Published As
Publication number | Publication date |
---|---|
CN111639445A (zh) | 2020-09-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Atkinson | The feasibility of flushing sediment from reservoirs | |
Sumi et al. | Reservoir sedimentation management with bypass tunnels in Japan | |
CN110219277B (zh) | 坝系溃坝洪水分析系统及分析方法 | |
CN110532682B (zh) | 一种泥石流堰塞坝溃决时流深预测方法 | |
Xia et al. | Prediction of recent bank retreat processes at typical sections in the Jingjiang Reach | |
Kantoush et al. | Impacts of sediment flushing on channel evolution and morphological processes: Case study of the Kurobe River, Japan | |
Wahl | Predicting embankment dam breach parameters-a needs assessment | |
CN111639385B (zh) | 一种泥石流拦砂坝设计高度的测算方法 | |
Bonelli et al. | Piping flow erosion in water retaining structures: inferring erosion rates from hole erosion tests and quantifying the failure time | |
CN111639445B (zh) | 泥石流坝前回淤堆积体在拦挡坝拆除中危险性测算方法、应用 | |
TALEB et al. | Flushing sediment through reservoirs | |
Prakash | Water Resources Engineering | |
Indrawati et al. | Diversion Canal to Decrease Flooding (Case Study: Kebon Jati-Kalibata Segment, Ciliwung River Basin) | |
Alonso et al. | STREAMBANK EROSION DUE TO BED DEGRADATION A MODEL CONCEPT | |
Sumi | Comprehensive reservoir sedimentation countermeasures in Japan | |
Gee | Comparison of dam breach parameter estimators | |
CN111639444B (zh) | 泥石流拦挡坝拦砂率测算方法、应用 | |
Borland et al. | Sediment problems of the lower Colorado River | |
Auel et al. | Sediment management in the Solis reservoir using a bypass tunnel | |
Sisinggih et al. | Evaluation of Sustainable Sediment Management in Sengguruh Reservoir Considering Age and Trapping Efficiency | |
Sakurai et al. | Burrowing-type sediment removal suction pipe for a sediment supply from reservoirs | |
Allam et al. | Reduction of Local Scour around Bridge Piers Using Different Countermeasures. | |
Legono et al. | Performance of Flushing Efficiency of Sediment Evacuation from Wlingi and Lodoyo Reservoirs | |
Klingeman | Hydrologic evaluations in bridge pier scour design | |
Mardwiono et al. | Integrated Sediment Management as a Sustainable Effort of Reservoir Function: A Case Study on the Sengguruh and Sutami Reservoirs |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Chen Jiangang Inventor after: Wang Xian Inventor after: Li Shuai Inventor after: Chen Xiaoqing Inventor after: Zhao Wanyu Inventor after: Chen Huayong Inventor before: Chen Jiangang Inventor before: Li Shuai Inventor before: Chen Xiaoqing Inventor before: Zhao Wanyu Inventor before: Chen Huayong Inventor before: Wang Xian |
|
GR01 | Patent grant | ||
GR01 | Patent grant |