CN107034853A - 一种过流式泥石流拦挡坝及坝群 - Google Patents
一种过流式泥石流拦挡坝及坝群 Download PDFInfo
- Publication number
- CN107034853A CN107034853A CN201710359515.4A CN201710359515A CN107034853A CN 107034853 A CN107034853 A CN 107034853A CN 201710359515 A CN201710359515 A CN 201710359515A CN 107034853 A CN107034853 A CN 107034853A
- Authority
- CN
- China
- Prior art keywords
- dam
- rock flow
- drainage hole
- overflow
- aerial drainage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B7/00—Barrages or weirs; Layout, construction, methods of, or devices for, making same
- E02B7/02—Fixed barrages
- E02B7/04—Dams across valleys
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B8/00—Details of barrages or weirs ; Energy dissipating devices carried by lock or dry-dock gates
- E02B8/06—Spillways; Devices for dissipation of energy, e.g. for reducing eddies also for lock or dry-dock gates
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Sewage (AREA)
Abstract
本发明公开了一种过流式泥石流拦挡坝及坝群,包括过流式泥石流拦挡坝及由若干过流式泥石流拦挡坝组成的坝群;所述过流式泥石流拦挡坝由主坝体、溢流堰、泄流洞组成,溢流堰位于主坝体上方,泄流洞为若干个,设置在主坝体底部,溢流堰流量、泄流洞流量应满足以下条件:溢流堰及泄流洞过流能力满足保证拦挡坝安全的泥石流最大流量;泄流洞下泄流量小于保证下游防护区安全的最大下泄安全流量;泄流洞最小宽度能保证沟道内过流中最大石块粒径及清淤车辆及设备通过;拦挡坝及坝群总库容能有效拦挡设防标准下泥石流最大一次总冲出量。本发明的有益效果是结构安全、清淤方便,拦蓄库容可多次重复利用,防灾减灾效果明显。
Description
技术领域
本发明属于地质灾害防治技术领域,涉及一种过流式泥石流拦挡坝及坝群。
背景技术
目前,泥石流拦挡坝作用一般以拦挡为主,其目的主要为拦载水沙,改变输水、输沙条件,调节下泄水量和输沙量,稳定斜坡和沟谷。当拦挡坝内有效库容被泥砂淤满,将失去拦蓄、调节功能,防灾减灾功能大大减弱。
拦挡坝内有效库容被泥砂淤满后,将大量固体松散物质储存在沟道内,拦挡坝承受的泥石流堆积物压力大,拦挡坝一旦发生溃决,固体松散物质集中、充分补给,形成更大的泥石流,一旦造成下游各级拦挡坝逐级放大效应,致灾能力大大加强,从而形成新的隐患。
发明内容
本发明的目的在于提供一种过流式泥石流拦挡坝及坝群,解决了拦挡坝内有效库容被淤满后,拦蓄、调节功能失效问题及拦挡坝内有效库容被泥砂淤满后承受的泥石流堆积物压力大,拦挡坝容易发生溃决的问题。
本发明所采用的技术方案是包括过流式泥石流拦挡坝及由若干过流式泥石流拦挡坝组成的坝群;所述过流式泥石流拦挡坝由主坝体、溢流堰、泄流洞组成,溢流堰位于主坝体上方,泄流洞为若干个,设置在主坝体底部,溢流堰流量、泄流洞流量应满足以下条件:
(1)溢流堰及泄流洞过流能力满足保证拦挡坝安全的泥石流最大流量;
(2)泄流洞下泄流量小于保证下游防护区安全的最大下泄安全流量;
(3)泄流洞最小宽度能保证沟道内过流中最大石块粒径及清淤车辆及设备通过;
所述坝群由多个过流式泥石流拦挡坝组成,坝群总库容应满足下列条件:拦挡坝及坝群总库容能有效拦挡设防标准下泥石流最大一次总冲出量。
进一步,泄流洞最小宽度与过流中最大石块粒径的比值为1.5-2.0。
进一步,主坝体上设有泄水孔,泄水孔位于泄流洞上方。
本发明的有益效果是结构安全、清淤方便,拦蓄库容可多次重复利用。
附图说明
图1为本发明的拦挡坝结构示意图;
图2为本发明的拦挡坝群平面布置示意图。
具体实施方式
下面结合具体实施方式对本发明进行详细说明。
如图1所示,过流式泥石流拦挡坝由主坝体、溢流堰、泄流洞组成,溢流堰位于主坝体上方,泄流洞为若干个,设置在主坝体底部,溢流堰流量、泄流洞流量应满足以下条件:
1.溢流堰及泄流洞过流能力满足拦挡坝安全的泥石流最大流量;
Q溢+∑Q泄≥Qmax;
2.泄流洞下泄流量应小于保证下游防护区安全的最大下泄安全流量;
∑Q泄≤QS;
泄流洞最小宽度能保证沟道内过流中最大石块粒径及清淤车辆及设备通过;优选
3.主坝体上还可以设有泄水孔,泄水孔位于泄流洞上方。进一步加强泄水能力。
Q溢—溢流堰流量;Q泄—泄流洞流量;Qmax—泥石流设防流量;Qs—下泄安全流量;d—泄流洞最小宽度;Dmax为过流中最大石块粒径。
过流式泥石流拦挡坝群,由多个过流式泥石流拦挡坝组成坝群,坝群总库容应满足下列条件:
拦挡坝及坝群总库容能有效拦挡设防标准下泥石流最大一次总冲出量;
∑Vi≥Vmax;
式中i为自然数,Vmax为设计频率下泥石流沟最大一次总冲出量。
如图2所示,两个过流式泥石流拦挡坝组成的坝群,V1—1#库区库容;V2—2#库区库容。
拦挡坝及坝群布置,间距及坝体长度、坝高等参数可根据沟道实际情况进行选择。
泥石流发生时,设计频率下泥石流安全通过上游拦挡坝溢流堰及泄流洞,泥石流沟最大一次总冲出量全部被暂时拦挡滞留于两个拦挡坝库区,并通过泄流洞向下游排泄,最下一级拦挡坝库区泥石流仅通过泄流洞下泄,下泄流量小于下游防护区安全流量,保证下游防护区安全,从而实现防灾减灾目的。
泥石流结束后,拦挡坝群各库区暂时拦滞的泥石流绝大部分通过下部泄流洞下泄,库区淤积固体松散物质较少。这些淤积物可在后期洪水或小规模泥石流冲刷携带下通过泄流洞自然清理,从而清空库容,保证拦载水沙,改变输水、输沙条件,调节下泄水量和输沙量功能的实现,达到长效防灾减灾的目的。对部分超径块体及树木、高杆植物,可通过泄流洞人工清理运输。
需要说明的是,只有当泥石流流量大于下游防护区安全流量时,拦挡坝内才有泥石流暂时拦蓄,当泥石流流量小于下游防护区流量时,泥石流流量全部通过过流式拦挡坝下部泄流洞全部安全下泄。
由于泄流洞尺寸大,通过能力强,库区永久淤积固体物质少,固体松散物质对拦挡坝压力基本不存在,从而保证拦挡坝安全运行。
拦挡坝的数量可根据该地区泥石流的发生频率和流量大小合理选择;拦挡坝坝型可在满足稳定前提及前述尺寸及过流能力、库容等条件下合理选择。
综上,本发明的有益效果在于:泥石流拦挡坝坝型结构简单,拦蓄能力强,下泄流量安全可靠,库内淤积物自然清理,拦蓄库容可重复利用,沟道内临时交通畅通,不需另设绕坝道路,后期清淤方便,拦挡坝基本不承受的泥石流堆积物压力,对泥石流沟道的自然演化过程影响较小,防灾减灾效果明显。
本发明提供的过流式泥石流滞洪拦挡坝及坝群采取滞流与泄流相结合的方式,坝体拦挡、溢流堰及泄流洞泄洪同时进行。各级拦挡坝形成有效拦蓄库容,拦载水沙,改变输水、输沙条件,延长泥石流下泄时间,保证下泄水量满足下游防护区安全;泥石流过后淤积的少量松散固体物质,通过后期较小洪水或泥石流多次冲刷携带下泄,库区淤积物自行清理,保证有效库容能够拦滞设防标准下泥石流最大一次冲出量,实现拦蓄泥石流,调节下泄流量功能,拦蓄库容可多次重复利用,增加拦挡坝及坝群的防灾减灾能力。泄流洞尺寸方便后期车辆及设备的通过和清淤作业。对于库区淤积部分超大粒径及树木、高杆植物等影响泄流洞过流能力的物质,可通过泄流洞通道人工依次清理及运走,在同一泥石流拦挡坝及坝群防治体系内做到“拦蓄、滞流、泄流、清淤”多位一体,实现防灾减灾的目的。
以上所述仅是对本发明的较佳实施方式而已,并非对本发明作任何形式上的限制,凡是依据本发明的技术实质对以上实施方式所做的任何简单修改,等同变化与修饰,均属于本发明技术方案的范围内。
Claims (3)
1.一种过流式泥石流拦挡坝及坝群,其特征在于:包括过流式泥石流拦挡坝及由若干过流式泥石流拦挡坝组成的坝群;
所述过流式泥石流拦挡坝由主坝体、溢流堰、泄流洞组成,溢流堰位于主坝体上方,泄流洞为若干个,设置在主坝体底部,溢流堰流量、泄流洞流量应满足以下条件:
(1)溢流堰及泄流洞过流能力满足保证拦挡坝安全的泥石流最大流量;
(2)泄流洞下泄流量小于保证下游防护区安全的最大下泄安全流量;
(3)泄流洞最小宽度能保证沟道内过流中最大石块粒径及清淤车辆及设备通过;
所述坝群由多个过流式泥石流拦挡坝组成,坝群总库容应满足下列条件:
拦挡坝及坝群总库容能有效拦挡设防标准下泥石流最大一次总冲出量。
2.按照权利要求1所述一种过流式泥石流拦挡坝及坝群,其特征在于:所述泄流洞最小宽度与过流中最大石块粒径的比值为1.5-2.0。
3.按照权利要求1所述一种过流式泥石流拦挡坝及坝群,其特征在于:所述主坝体上设有泄水孔,泄水孔位于泄流洞上方。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710359515.4A CN107034853A (zh) | 2017-05-19 | 2017-05-19 | 一种过流式泥石流拦挡坝及坝群 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710359515.4A CN107034853A (zh) | 2017-05-19 | 2017-05-19 | 一种过流式泥石流拦挡坝及坝群 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107034853A true CN107034853A (zh) | 2017-08-11 |
Family
ID=59539183
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710359515.4A Pending CN107034853A (zh) | 2017-05-19 | 2017-05-19 | 一种过流式泥石流拦挡坝及坝群 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107034853A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108442332A (zh) * | 2018-05-25 | 2018-08-24 | 中国电建集团成都勘测设计研究院有限公司 | 用于拦截滞流的梳齿状挡排结构 |
CN110952508A (zh) * | 2019-12-16 | 2020-04-03 | 北京师范大学 | 一种用于山洪、泥石流灾害的防治方法及装置 |
CN111608139A (zh) * | 2020-06-20 | 2020-09-01 | 中国科学院、水利部成都山地灾害与环境研究所 | 超大规模洪水泥石流防治方法 |
CN111639445A (zh) * | 2020-06-19 | 2020-09-08 | 中国科学院、水利部成都山地灾害与环境研究所 | 泥石流坝前回淤堆积体在拦挡坝拆除中危险性测算方法、应用 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102162229A (zh) * | 2011-02-21 | 2011-08-24 | 中国科学院水利部成都山地灾害与环境研究所 | 一种防御大规模低频率泥石流的拦砂坝 |
CN103306242A (zh) * | 2013-07-02 | 2013-09-18 | 中国科学院、水利部成都山地灾害与环境研究所 | 一种调节洪峰流量的泥石流控流坝及其设计方法和应用 |
CN205077452U (zh) * | 2015-08-12 | 2016-03-09 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种泥石流沟治理的拦挡坝结构 |
CN205259142U (zh) * | 2015-12-28 | 2016-05-25 | 四川农业大学 | 防治泥石流格子坝 |
-
2017
- 2017-05-19 CN CN201710359515.4A patent/CN107034853A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102162229A (zh) * | 2011-02-21 | 2011-08-24 | 中国科学院水利部成都山地灾害与环境研究所 | 一种防御大规模低频率泥石流的拦砂坝 |
CN103306242A (zh) * | 2013-07-02 | 2013-09-18 | 中国科学院、水利部成都山地灾害与环境研究所 | 一种调节洪峰流量的泥石流控流坝及其设计方法和应用 |
CN205077452U (zh) * | 2015-08-12 | 2016-03-09 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种泥石流沟治理的拦挡坝结构 |
CN205259142U (zh) * | 2015-12-28 | 2016-05-25 | 四川农业大学 | 防治泥石流格子坝 |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108442332A (zh) * | 2018-05-25 | 2018-08-24 | 中国电建集团成都勘测设计研究院有限公司 | 用于拦截滞流的梳齿状挡排结构 |
CN110952508A (zh) * | 2019-12-16 | 2020-04-03 | 北京师范大学 | 一种用于山洪、泥石流灾害的防治方法及装置 |
CN110952508B (zh) * | 2019-12-16 | 2021-01-29 | 北京师范大学 | 一种用于山洪、泥石流灾害的防治方法 |
CN111639445A (zh) * | 2020-06-19 | 2020-09-08 | 中国科学院、水利部成都山地灾害与环境研究所 | 泥石流坝前回淤堆积体在拦挡坝拆除中危险性测算方法、应用 |
CN111639445B (zh) * | 2020-06-19 | 2023-02-28 | 中国科学院、水利部成都山地灾害与环境研究所 | 泥石流坝前回淤堆积体在拦挡坝拆除中危险性测算方法、应用 |
CN111608139A (zh) * | 2020-06-20 | 2020-09-01 | 中国科学院、水利部成都山地灾害与环境研究所 | 超大规模洪水泥石流防治方法 |
WO2021253635A1 (zh) * | 2020-06-20 | 2021-12-23 | 中国科学院、水利部成都山地灾害与环境研究所 | 超大规模洪水泥石流防治方法 |
US20230002992A1 (en) * | 2020-06-20 | 2023-01-05 | Institute Of Mountain Hazards And Environment Chinese Academy Of Sciences | Method for prevention and control of super large-scale floods and debris flows |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107034853A (zh) | 一种过流式泥石流拦挡坝及坝群 | |
CN105350498B (zh) | 一种节水的尾矿排放方法 | |
CN103397645B (zh) | 一种干堆与湿排相结合的尾矿堆排方法 | |
CN104912087B (zh) | 一种应用模袋的中线式尾矿筑坝法 | |
CN106801403B (zh) | 一种预防泥石流灾害及泥石流产物再利用的方法 | |
CN206887895U (zh) | 一种过流式泥石流拦挡坝群 | |
CN108797652B (zh) | 一种磷石膏库调节回水方法 | |
CN112709233A (zh) | 矿山废石与浓缩尾砂协同处置系统及施工方法 | |
KR101250185B1 (ko) | 자체 토사 조절기능을 갖는 사방댐 | |
CN205954559U (zh) | 用于大型拦渣场的沟水处理结构 | |
Peng et al. | Techniques of debris flow prevention in national parks | |
JPH10252042A (ja) | ダム貯水池の排砂機構と排砂方法 | |
CN104963379A (zh) | 用于山区河道上的取水结构 | |
CN106013007B (zh) | 适用于直线型陡槽溢洪道的水沙分离建筑物 | |
KR20150118727A (ko) | 생태환경 보전 사방댐 | |
JP2012140845A (ja) | 上下2段構造の分流装置 | |
CN109577268A (zh) | 不淤积水库 | |
CN112982318A (zh) | 一种底部排渗与排洪设施相结合的系统 | |
Dixon-Hardy et al. | Methods for the disposal and storage of mine tailings | |
Argimbaev et al. | Erection methods and constructions of primary tailing dike | |
Skrzypczak et al. | Construction of dams using the hydraulic fill method, discussion of the methodology of the Tailings Storage Facility Żelazny Most | |
CN112459552B (zh) | 一种大型砂石骨料加工系统生产废渣防护结构及施工方法 | |
Surjono et al. | Geo-disaster Laharic Flow along Putih River, Central Jawa, Indonesia | |
RU2413051C1 (ru) | Способ поярусного складирования зернистых отходов в гидроотвал, дренированный у основания пляжной зоны | |
CN108797650B (zh) | 一种山谷型磷石膏库的安全、环保堆排方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170811 |