CN111625891B CN202010460499.XA CN202010460499A CN111625891B CN 111625891 B CN111625891 B CN 111625891B CN 202010460499 A CN202010460499 A CN 202010460499A CN 111625891 B CN111625891 B CN 111625891B
Authority
CN
China
Prior art keywords
department
information
construction
party
acquisition equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202010460499.XA
Other languages
Chinese (zh)
Other versions
CN111625891A (en
Inventor
吴钦城
蔡瑞洪
吴钦鸿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Jinshengshi Ecological Environment Co ltd
Original Assignee
Guangdong Jinshengshi Ecological Environment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Jinshengshi Ecological Environment Co ltd filed Critical Guangdong Jinshengshi Ecological Environment Co ltd
Priority to CN202010460499.XA priority Critical patent/CN111625891B/en
Publication of CN111625891A publication Critical patent/CN111625891A/en
Application granted granted Critical
Publication of CN111625891B publication Critical patent/CN111625891B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T17/00Three dimensional [3D] modelling, e.g. data description of 3D objects
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T19/00Manipulating 3D models or images for computer graphics
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L63/00Network architectures or network communication protocols for network security
    • H04L63/08Network architectures or network communication protocols for network security for authentication of entities
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/12Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T2200/00Indexing scheme for image data processing or generation, in general
    • G06T2200/08Indexing scheme for image data processing or generation, in general involving all processing steps from image acquisition to 3D model generation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T2210/00Indexing scheme for image generation or computer graphics
    • G06T2210/04Architectural design, interior design

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Geometry (AREA)
  • General Engineering & Computer Science (AREA)
  • Signal Processing (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Computing Systems (AREA)
  • Software Systems (AREA)
  • Computer Graphics (AREA)
  • Architecture (AREA)
  • Health & Medical Sciences (AREA)
  • Medical Informatics (AREA)
  • Computer Security & Cryptography (AREA)
  • General Health & Medical Sciences (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Computational Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to the technical field of BIM, in particular to a virtual garden landscape digital modeling method of information acquisition equipment based on BIM technology, which comprises the information acquisition equipment, a central system, a supervision department, a construction party, a PC (personal computer) terminal and a gateway, wherein the information acquisition equipment comprises a GIS (geographic information System) data acquisition module, a picture acquisition module, a laser scanning acquisition module and a manual acquisition department, the manual acquisition department comprises a handheld three-dimensional scanner, the information acquisition equipment is connected with a calibration department through the PC terminal, the information acquisition equipment is connected with the central system through the PC terminal and the gateway, and the central system comprises a computer cluster, a storage module, an image processing module, a wireless communication module and an identity authentication module. According to the invention, the error rate is lower by arranging the checking department, the owner supervision party, the public supervision party, the opinion integration department and the acquisition error reporting department, and the construction progress monitoring and displaying system has the functions of real-time supervision and displaying and is convenient for opinion integration.

Description

BIM technology-based virtual garden landscape digital modeling method for information acquisition equipment
Technical Field
The invention relates to the technical field of BIM, in particular to a virtual garden landscape digital modeling method of information acquisition equipment based on BIM technology.
Background
Building information model, abbreviated as BIM, is a new tool of architecture, engineering and civil engineering, it is to form those to regard three-dimensional figure as the main, article direction, computer aided design that the architecture is relevant, BIM is the representative of the building information model of the datamation, it is the data base of the whole building engineering project, there is irreplaceable advantage in the component code aspect, BIM component code system is the important basis to realize that BIM technology permeates the whole life cycle of the building engineering project, through BIM component code system, can realize high-efficient management and information transfer of BIM model data, wisdom garden and tram in the prior art are building the facility industry process, there is no real-time supervision and show function, it is inconvenient for owners and public personnel to supervise and visit the construction progress, and the inside layout of garden and tram, rail route, station position are all designed by the construction side, thus may appear the problem that the owner uses inconveniently, cause can't obtain the affirmation of owners and personnel, for this, we have proposed a digital equipment of collecting digital landscape based on BIM technology, is used for solving the above-mentioned problem.
Disclosure of Invention
The invention aims to solve the problems that in the prior art, the intelligent park and the tramcar in the prior art have no real-time supervision and display functions in the process of building facilities and workers, the owners and the public are inconvenient to supervise and visit the construction progress, and the layout inside the park, the track route and the station position of the tramcar are designed by a construction party, so that the owners are inconvenient to use, and the affirmation of most of the owners and the public can not be obtained.
In order to achieve the purpose, the invention adopts the following technical scheme:
the utility model provides an information acquisition equipment based on BIM technique, includes information acquisition equipment, central system, supervisory department, construction side, PC end, gateway, a serial communication port, information acquisition equipment includes GIS data acquisition module, picture collection module, laser scanning collection module, artifical collection department includes hand-held type three-dimensional scanner, information acquisition equipment is equipped with the school department through the PC end connection, information acquisition equipment pass through PC end, gateway with central system is connected, central system includes computer cluster, storage module, image processing module, wireless communication module, authentication module, storage module image processing module authentication module all with computer cluster is as the operation carrier, central system pass through the gateway with supervisory department is connected, supervisory department includes the public prison management side, opinion integration department, the owner supervisory side includes information display screen, owner APP, the construction side includes holographic projection table, supervision side, construction side, design PC end, the public prison management side, the construction side is connected with APP department through construction side construction department.
Preferably, the checking department comprises a computer checking module and a manual checking department, and the checking department is connected with the PC end.
Preferably, the central system is connected with the owner supervisor and the public supervisor through gateways.
Preferably, the owner supervisor and the public supervisor are both connected with the opinion integration department.
Preferably, the opinion integration department is connected with the construction party through a gateway.
Preferably, the construction party is provided with an acquisition error reporting department through a gateway connection, and the acquisition error reporting department is connected with the information acquisition equipment.
Preferably, the central system is in wireless communication connection with the information acquisition equipment, the supervision department and the constructor through a wireless communication module.
Preferably, the image processing module is one of Revit series software, bentley series software, archicaD series software, CATIA series software, magicaD series software and Rhino series software,
a virtual garden landscape digital modeling method of information acquisition equipment based on BIM technology comprises the following steps when in use:
s1, collecting site information by information collection equipment;
s2, the information acquisition equipment transmits the acquired site information to a PC (personal computer) terminal, then the PC terminal transmits the site information to a checking department for data checking and inspection, and the checking department transmits the site information to the central system through a gateway after the inspection is finished;
s3, when the central system receives the site information, the identity authentication module performs identity authentication, after the identity authentication is passed, the central system inputs the site information into the storage module, then the storage module transmits the site information to the image processing module for image processing, and then the central system transmits the processed site information to a construction party through the gateway;
s4, after receiving the field information, the construction party checks and checks the field and the field information, if the field and the field information do not conform, the construction party transmits error information to an acquisition error reporting department through a gateway, then the acquisition error reporting department transmits the error information to information acquisition equipment, the information acquisition equipment transmits the field information to the construction party in the same step after modifying the field information, and the construction party performs construction after the field and the field information conform;
s5, when a construction party carries out construction, the information acquisition equipment can acquire a field in real time, then the field real-time information is transmitted to the central system through the PC end and the gateway, an image processing module of the central system can process the field real-time information, and then the processed field real-time information is transmitted to a supervision department through the gateway;
s6, after receiving the processed site real-time information, the supervision department can display and supervise the construction progress and the construction model in real time through an owner supervisor and a public supervisor;
and S7, the owner supervision party and the public supervision party feed back the construction suggestions to an opinion integration department, the opinion integration department integrates the construction suggestions, and the integrated construction suggestions are communicated with the construction party through a gateway by the opinion integration department.
Preferably, in S3, the image processing module is CATIA software, and the specific steps of the CATIA software for performing image processing include:
s1, establishing a three-dimensional terrain modeling model in CATIA software according to the site size data of the garden;
s2, storing the established three-dimensional terrain modeling model as a three-dimensional model in a CATIA (computer-graphics aided three-dimensional interactive application) format in CATIA software;
s3, adding and generating a three-dimensional model component of a seat, a street lamp, a tree or a pond in the three-dimensional model in the CATPArt format by using CATIA software;
s4, editing and adjusting the material and color of the three-dimensional model component in CATIA software;
and s5, transcoding the edited and adjusted three-dimensional model by using CATIA software and storing the three-dimensional model into the STL format three-dimensional modeling model.
The invention provides a virtual garden landscape digital modeling method of information acquisition equipment based on BIM technology, which has the advantages that: the method is characterized in that a checking department is arranged, the information collected by the information collecting equipment can be checked preliminarily, the error rate can be greatly reduced, the error rate is lower, a proprietor supervision party and a public supervision party are arranged, the information has the functions of supervising and displaying the construction progress in real time, the proprietor and the public staff can supervise and visit the engineering progress in real time, an opinion integration department is arranged, the opinion integration is facilitated, construction suggestions of the proprietor and the public staff are conveniently communicated with a constructor, the layout of a smart park and the track route of a tramcar and the station position can be planned according to the opinions of the proprietor and the public staff during construction, the proprietor and the public staff are more convenient in the using process, the affirmation of most proprietors and the public staff is obtained, the problems encountered in the information collection can be solved quickly by arranging a collection error declaration department, and the engineering progress is accelerated.
Drawings
FIG. 1 is a schematic overall flow chart of a virtual garden landscape digital modeling method of information acquisition equipment based on BIM technology according to the present invention;
FIG. 2 is a schematic diagram of a proofreading department in the virtual garden landscape digital modeling method of the information acquisition device based on the BIM technology;
FIG. 3 is a schematic diagram of an image processing module provided in the digital modeling method for virtual garden landscape of an information acquisition device based on BIM technology according to the present invention;
fig. 4 is a schematic diagram of a manual collection department in the virtual garden landscape digital modeling method of the information collection device based on the BIM technology provided by the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
Referring to fig. 1-4, an information collecting device based on BIM technology comprises an information collecting device, a central system, a supervision department, a construction party, a PC terminal and a gateway, wherein the information collecting device comprises a GIS data collecting module, a picture collecting module, a laser scanning collecting module and a manual collecting department, the manual collecting department comprises a handheld three-dimensional scanner, the information collecting device is connected with a proofreading department through the PC terminal, the information collecting device can carry out preliminary proofreading and inspection on the information collected by the information collecting device, the error rate can be greatly reduced, the error rate is lower, the proofreading department comprises a computer proofreading module and a manual proofreading department, the checking department is connected with the PC end, the information acquisition equipment is connected with the central system through the PC end and the gateway, the central system comprises a computer cluster, a storage module, an image processing module, a wireless communication module and an identity authentication module, the storage module, the image processing module and the identity authentication module all use the computer cluster as an operation carrier, the central system is in wireless communication connection with the information acquisition equipment, a supervision department and a construction party through the wireless communication module, and the image processing module comprises Revit series software, bentley series software, archicad series software, CATIA series software, magiCAD series software and Rhino series software.
The central system is connected with supervision department through gateway, the supervision department includes owner's supervision party, public supervision party, opinion integration department, make it have real-time supervision and show the function of construction progress, it is convenient for owner and public personnel to supervise and visit the construction progress in real time, it is convenient for its opinion integration, make owner's and public personnel's construction suggestion convenient for communicate with the constructor, thus can plan the overall arrangement of the wisdom garden and the track route of the tram, station position according to owner's and public personnel's opinion during the construction, thereby make owner's and public personnel more convenient in the use, thus obtain the affirmation of most owner and public personnel, owner's supervision party, public supervision party all is connected with the integration department, the opinion integration department is connected with the constructor through gateway, the central system all is connected with owner's supervision party through gateway, the public supervision party is connected through gateway, owner's supervision party includes information display screen, owner's supervision party includes projection table, purchase, the public supervision party includes PC end, design the public supervision party, the construction supervision department is connected with the construction supervision department, the APP information acquisition of construction department is connected through the construction end, it is connected with the APP information acquisition of construction department, thereby it can be solved the problem of the construction progress through the APP acquisition of the construction error of the construction end, it, thereby it is connected with the acquisition of the APP acquisition of the construction end, it, thereby it is connected with the APP acquisition of the construction system, it can be connected with the APP acquisition of the construction end, thereby it, it can be connected with the APP acquisition of the construction system, thereby it can be solved.
A virtual garden landscape digital modeling method of information acquisition equipment based on BIM technology comprises the following steps when in use:
s1, information acquisition equipment acquires site information;
s2, the information acquisition equipment transmits the acquired site information to a PC (personal computer) terminal, then the PC terminal transmits the site information to a checking department for data checking and inspection, and the checking department transmits the site information to the central system through a gateway after the inspection is finished;
s3, when the central system receives the site information, the identity authentication module performs identity authentication, after the identity authentication is passed, the central system inputs the site information into the storage module, then the storage module transmits the site information to the image processing module for image processing, and then the central system transmits the processed site information to a construction party through the gateway;
s4, after receiving the field information, the construction party checks and checks the field and the field information, if the field and the field information do not conform, the construction party transmits error information to an acquisition error reporting department through a gateway, then the acquisition error reporting department transmits the error information to information acquisition equipment, the information acquisition equipment transmits the field information to the construction party in the same step after modifying the field information, and the construction party performs construction after the field and the field information conform;
s5, when a construction party carries out construction, the information acquisition equipment can acquire a site in real time, then the site real-time information is transmitted to the central system through the PC end and the gateway, an image processing module of the central system can process the site real-time information, and the site real-time information which is processed later can be transmitted to a supervision department through the gateway;
s6, after receiving the processed site real-time information, the supervision department can display and supervise the construction progress and the construction model in real time through an owner supervisor and a public supervisor;
and S7, the owner supervision party and the public supervision party feed back the construction suggestions to an opinion integration department, the opinion integration department integrates the construction suggestions, and the integrated construction suggestions are communicated with the construction party through a gateway by the opinion integration department.
In S3, the image processing module is CATIA software, and the specific steps of the CATIA software for image processing are as follows:
s1, establishing a three-dimensional terrain modeling model in CATIA software according to the site size data of the garden;
s2, storing the established three-dimensional terrain modeling model as a three-dimensional model in a CATIA (computer-graphics aided three-dimensional interactive application) format in CATIA (computer-graphics aided three-dimensional interactive application) software;
s3, adding and generating a three-dimensional model component of a seat, a street lamp, a tree or a pond in the three-dimensional model in the CATPArt format by using CATIA software;
s4, editing and adjusting the material and color of the three-dimensional model component in CATIA software;
and s5, transcoding the edited and adjusted three-dimensional model by using CATIA software and storing the three-dimensional model into the STL format three-dimensional modeling model.
The invention can carry out preliminary proofreading and inspection on the information collected by the information collecting equipment by arranging a proofreading department during use, can greatly reduce the error rate of the information, and ensure that the error rate is lower, has the functions of real-time supervision and displaying construction progress by arranging a proprietor supervision party and a public supervision party, is convenient for proprietors and public personnel to supervise and visit the construction progress in real time, is convenient for integrating the opinions by arranging an opinion integration department, and ensures that the construction suggestions of the proprietors and the public personnel are convenient for communicating with a construction party, thereby planning the layout of a smart park and the track route and the station position of a tramcar according to the opinions of the proprietors and the public personnel during construction, thereby ensuring that the proprietors and the public personnel are more convenient in the use process, ensuring that most of the proprietors and the public personnel can solve the problems encountered in the information collection rapidly by arranging a collection error declaration department, and accelerating the construction progress.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and the technical solutions and the inventive concepts thereof according to the present invention should be equivalent or changed within the scope of the present invention.

Claims (9)

1. A BIM technology-based virtual garden landscape digital modeling method of information acquisition equipment comprises the information acquisition equipment, a central system, a supervision department, a construction party, a PC end and a gateway, and is characterized in that the information acquisition equipment comprises a GIS data acquisition module, a picture acquisition module, a laser scanning acquisition module and a manual acquisition department, the manual acquisition department comprises a handheld three-dimensional scanner, the information acquisition equipment is provided with a checking department through PC end connection, the information acquisition equipment is connected with the central system through the PC end and the gateway, the central system comprises a computer cluster, a storage module, an image processing module, a wireless communication module and an identity authentication module, the storage module, the image processing module and the identity authentication module all use the computer cluster as an operation carrier, the central system is connected with the supervision department through the gateway, the supervision department comprises a main supervision party, a public supervision party and an opinion integration department, the main supervision party comprises an information display screen and a main supervision party, the public supervision party comprises a projection table and a supervision department, the purchasing party comprises a public PC end, a construction party and an APP end, and the construction end are connected with the central system through the PC end and the construction department,
the information acquisition equipment comprises the following steps when in use:
s1, information acquisition equipment acquires site information;
s2, the information acquisition equipment transmits the acquired site information to a PC (personal computer) terminal, then the PC terminal transmits the site information to a checking department for data checking and inspection, and the checking department transmits the site information to the central system through a gateway after the inspection is finished;
s3, when the central system receives the site information, the identity authentication module performs identity authentication, after the identity authentication is passed, the central system inputs the site information into the storage module, then the storage module transmits the site information to the image processing module for image processing, and then the central system transmits the processed site information to a construction party through a gateway;
s4, after receiving the field information, the construction party checks and checks the field and the field information, if the field and the field information do not conform, the construction party transmits error information to an acquisition error reporting department through a gateway, then the acquisition error reporting department transmits the error information to information acquisition equipment, the information acquisition equipment transmits the field information to the construction party in the same step after modifying the field information, and the construction party performs construction after the field and the field information conform;
s5, when a construction party carries out construction, the information acquisition equipment can acquire a field in real time, then the field real-time information is transmitted to the central system through the PC end and the gateway, an image processing module of the central system can process the field real-time information, and then the processed field real-time information is transmitted to a supervision department through the gateway;
s6, after receiving the processed site real-time information, the supervision department can display and supervise the construction progress and the construction model in real time through an owner supervisor and a public supervisor;
and S7, the owner supervision party and the public supervision party feed back the construction suggestions to an opinion integration department, the opinion integration department integrates the construction suggestions, and the integrated construction suggestions are communicated with the construction party through a gateway by the opinion integration department.
2. The virtual garden landscape digital modeling method of information acquisition equipment based on BIM technology as claimed in claim 1, wherein the proofreading department comprises a computer proofreading module and a manual proofreading department, and the proofreading department is connected with the PC terminal.
3. The method as claimed in claim 1, wherein the central system is connected to the owner supervisor and the public supervisor through gateways.
4. The digital modeling method for virtual garden landscape of information collection equipment based on BIM technology as claimed in claim 1, wherein the owner supervisor and the public supervisor are both connected with the opinion integration department.
5. The virtual garden landscape digital modeling method of information collection equipment based on the BIM technology as claimed in claim 1, wherein the opinion integration department is connected with the construction party through a gateway.
6. The method as claimed in claim 1, wherein the construction side is connected with an acquisition error declaration department through a network, and the acquisition error declaration department is connected with the information acquisition equipment.
7. The method as claimed in claim 1, wherein the central system is connected with the information collection device, the supervision department and the construction party through wireless communication via a wireless communication module.
8. The digital modeling method for the virtual garden landscape of the information acquisition equipment based on the BIM technology as claimed in claim 1, wherein the image processing module is one of Revit series software, bentley series software, archicaD series software, CATIA series software, magiCAD series software, and Rhino series software.
9. The digital modeling method for the virtual garden landscape of the information acquisition equipment based on the BIM technology as claimed in claim 1, wherein the image processing module in S3 is CATIA software, and the specific steps of the CATIA software for image processing are as follows:
s1, establishing a three-dimensional terrain modeling model in CATIA software according to the site size data of the garden;
s2, storing the established three-dimensional terrain modeling model as a three-dimensional model in a CATIA (computer-graphics aided three-dimensional interactive application) format in CATIA (computer-graphics aided three-dimensional interactive application) software;
s3, adding and generating a three-dimensional model component of a seat, a street lamp, a tree or a pond in the three-dimensional model in the CATPArt format by using CATIA software;
s4, editing and adjusting the material and color of the three-dimensional model component in CATIA software;
and s5, transcoding the edited and adjusted three-dimensional model by using CATIA software and storing the three-dimensional model into the STL format three-dimensional modeling model.
CN202010460499.XA 2020-05-27 2020-05-27 Virtual garden landscape digital modeling method of information acquisition equipment based on BIM technology Active CN111625891B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010460499.XA CN111625891B (en) 2020-05-27 2020-05-27 Virtual garden landscape digital modeling method of information acquisition equipment based on BIM technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010460499.XA CN111625891B (en) 2020-05-27 2020-05-27 Virtual garden landscape digital modeling method of information acquisition equipment based on BIM technology

Publications (2)

Publication Number Publication Date
CN111625891A CN111625891A (en) 2020-09-04
CN111625891B true CN111625891B (en) 2023-02-07

Family

ID=72271339

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010460499.XA Active CN111625891B (en) 2020-05-27 2020-05-27 Virtual garden landscape digital modeling method of information acquisition equipment based on BIM technology

Country Status (1)

Country Link
CN (1) CN111625891B (en)

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10959107B2 (en) * 2015-04-14 2021-03-23 ETAK Systems, LLC Systems and methods for delivering a close out package for work done at a telecommunications site
CN109146331A (en) * 2018-09-28 2019-01-04 天津理工大学 A kind of contaminated site repair intelligence control platform based on technology of Internet of things
CN109447479B (en) * 2018-10-31 2021-12-21 广西路桥工程集团有限公司 Project management system based on three-dimensional visualization
CN110298627B (en) * 2019-06-18 2023-09-12 浏阳市恒信烟花制造有限公司 Intelligent cloud platform system and method for safety production supervision of firework and firecracker industry

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《BIM技术在风景园林专业中的应用》;何昕;《智能建筑与智慧城市》;20191225;65-67 *

Also Published As

Publication number Publication date
CN111625891A (en) 2020-09-04

Similar Documents

Publication Publication Date Title
CN112232761B (en) Infrastructure application system and method
CN104680320A (en) BIM-based project management system and method
CN106056349A (en) Province-city-county three-level power grid programming GIS drawing system and method
CN109190962A (en) Project process supervision control system
CN111444568A (en) Engineering monitoring BIM cooperative platform based on Internet of things
CN111027834A (en) Power cable informatization management system and method based on three-dimensional detection technology
CN112258159B (en) BIM + GIS-based hydraulic structure management system and method
CN109523424A (en) A kind of assembled architecture Information Management System and method based on BIM
CN111967077A (en) Engineering construction management digital platform based on BIM technology
CN106919987B (en) Method for manufacturing and managing operation and maintenance information model of high-speed railway passenger dedicated line equipment in virtual reality environment
CN111089560A (en) Subway structure health monitoring and early warning system based on three-dimensional live-action model
CN113177768A (en) Intelligent engineering platform based on comprehensive digital management of capital construction whole process
CN109272571A (en) A kind of system and method that PDS three-dimensional data is converted to Flowmaster model
CN109491735A (en) Integrated data generates the comprehensively monitoring human-machine interface configuration implementation method with verification
CN111651818A (en) BIM model rapid change method
CN112734370A (en) BIM-based project supervision information management method and system
CN114443793A (en) Method for designing detailed planning three-dimensional scene of space-time data visualization homeland space
CN111667575A (en) Method for creating accurate model of rail traffic engineering based on standard
CN109299504A (en) A kind of wisdom Project Management System based on BIM platform
CN114003998A (en) Steel structure digital factory cooperation system and method based on digital twin technology
CN112381692A (en) Comprehensive management evaluation system for teaching and life inside and outside school of students
CN111625891B (en) Virtual garden landscape digital modeling method of information acquisition equipment based on BIM technology
CN115511322A (en) Intelligent construction site and intelligent construction management system
CN110232558A (en) Engineering project progress msg monitoring method
CN107590601A (en) Communication scheme produces accessory system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 516000 3b, 3rd floor, self built workshop, building 21, Sanxin Datian Industrial Zone, Jiangbei, Huicheng District, Huizhou City, Guangdong Province

Patentee after: Guangdong jinshengshi ecological environment Co.,Ltd.

Address before: No. 04, Floor 10, Unit 3, Building B, Phase II, Jiazhaoye Center, No. 11, Huizhou Avenue, Huicheng District, Huizhou City, Guangdong Province, 516000

Patentee before: Guangdong jinshengshi ecological environment Co.,Ltd.

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A Virtual Landscape Digital Modeling Method Based on BIM Technology for Information Collection Equipment