CN111563658A - Visual online checking method and device for pressing plate in secondary safety measure - Google Patents

Visual online checking method and device for pressing plate in secondary safety measure Download PDF

Info

Publication number
CN111563658A
CN111563658A CN202010281421.1A CN202010281421A CN111563658A CN 111563658 A CN111563658 A CN 111563658A CN 202010281421 A CN202010281421 A CN 202010281421A CN 111563658 A CN111563658 A CN 111563658A
Authority
CN
China
Prior art keywords
safety measure
pressing plate
secondary safety
soft pressing
ticket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010281421.1A
Other languages
Chinese (zh)
Inventor
马艳
汤建华
王成化
杨军伟
吕晓健
孙学军
陈滢滢
武新宇
蒋伟
张陆胜
顾浩
周亚
陈前臣
黄浩
张怡文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chuzhou Power Supply Co of State Grid Anhui Electric Power Co Ltd
Original Assignee
Chuzhou Power Supply Co of State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chuzhou Power Supply Co of State Grid Anhui Electric Power Co Ltd filed Critical Chuzhou Power Supply Co of State Grid Anhui Electric Power Co Ltd
Priority to CN202010281421.1A priority Critical patent/CN111563658A/en
Publication of CN111563658A publication Critical patent/CN111563658A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Educational Administration (AREA)
  • Marketing (AREA)
  • Development Economics (AREA)
  • Health & Medical Sciences (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Public Health (AREA)
  • Primary Health Care (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention provides a visual online checking method and a visual online checking device for a pressure plate in a secondary safety measure, wherein the method comprises the following steps: analyzing the SCD file, and automatically generating associated IED information, reference information and transformer substation interval information after instantiating all channels; defining virtual terminal tables of various IEDs at different levels, and determining the corresponding relation between a virtual circuit and a soft pressing plate; generating a secondary safety measure expert intelligent diagnosis library according to the relay protection safety measures and the safety measure execution flow; and generating a secondary safety measure ticket through the secondary safety measure expert intelligent diagnosis library, and performing online check according to the generated secondary safety measure ticket. The scheme solves the problems of large workload and high error rate based on manual configuration in the conventional graphical virtual circuit and soft pressing plate, realizes automatic display of the virtual circuit and the soft pressing plate, saves manual configuration time and cost, and improves the accuracy of secondary safety measure pressing plate check.

Description

Visual online checking method and device for pressing plate in secondary safety measure
Technical Field
The invention relates to the field of secondary safety measures of transformer substations, in particular to a visual online checking method and device for a pressing plate in a secondary safety measure.
Background
In the later stage of construction and operation of the intelligent substation, in order to ensure safe, stable and economic operation of the intelligent power grid, regular maintenance, defect elimination, technical improvement and other work need to be carried out. The secondary safety measure is used as an important ring in the maintenance operation and maintenance work, and generally, modes of putting in a maintenance pressing plate, withdrawing a device soft pressing plate, an outlet hard pressing plate, disconnecting a connecting optical fiber between devices and the like can be adopted to realize the safety isolation of the maintenance device and the operation device.
In order to realize automatic generation, automatic execution and real-time checking of safety measures and more intuitively display the state information of the pressing plate, a secondary virtual circuit and a soft pressing plate need to be presented in a graphical form, and at present, because the corresponding relation between the virtual circuit and the soft pressing plate is mainly artificially cultivated, the process of graphically presenting the state information of the pressing plate and the virtual circuit has larger workload and high error rate.
Disclosure of Invention
In view of this, the embodiment of the invention provides a method and a device for visual online checking of a pressure plate in secondary safety measures, so as to solve the problems of too large workload and too high error rate of the existing graphical display of status information of the pressure plate and a virtual circuit.
In a first aspect of the embodiments of the present invention, a method for visual online checking of a platen in a secondary safety measure is provided, including:
analyzing the SCD file, and automatically generating associated IED information, reference information and transformer substation interval information after instantiating all channels;
defining virtual terminal tables of various IEDs at different levels, and determining the corresponding relation between a virtual circuit and a soft pressing plate;
generating a secondary safety measure expert intelligent diagnosis library based on the corresponding relation between the virtual circuit and the soft pressing plate;
and generating a secondary safety measure ticket through the secondary safety measure expert intelligent diagnosis library, and performing online check according to the generated secondary safety measure ticket.
In a second aspect of the embodiments of the present invention, there is provided a secondary safety measure intermediate pressure plate visualization online checking device, including:
the analysis module is used for analyzing the SCD file, and automatically generating associated IED information, reference information and transformer substation interval information after instantiating all channels;
the definition module is used for defining virtual terminal tables of various IEDs at different levels and determining the corresponding relation between a virtual circuit and a soft pressing plate;
the generating module is used for generating a secondary safety measure expert intelligent diagnosis library according to the relay protection safety measures and the safety measure execution flow;
and the checking module is used for generating a secondary safety measure ticket through the secondary safety measure expert intelligent diagnosis library and performing online checking according to the generated secondary safety measure ticket.
In the embodiment of the invention, the information of the associated IED, the quoting information and the transformer substation interval information are automatically generated by analyzing the SCD file configured in the total station, the virtual terminal tables of various IEDs in different levels are defined, the corresponding relation between a virtual circuit and a soft pressing plate is determined, then a secondary safety measure expert intelligent diagnosis library is generated based on the relay protection safety measures and the safety measure execution flow, a secondary safety measure ticket is generated through the secondary safety measure expert intelligent diagnosis library, and online checking is carried out according to the generated secondary safety measure ticket, so that the visual online checking in the form of graphic presentation is realized. The method comprises the steps of determining corresponding criteria of a virtual circuit and a soft pressing plate and a graphical display method, summarizing rules by using knowledge and experience based on a secondary safety measure intelligent diagnosis technology, and obtaining results through logical operation reasoning, so that an intelligent diagnosis library of an intelligent substation secondary safety measure expert is established, pressing plates needing to be operated in each step can be prompted according to a safety measure sequence in a graphical mode, field personnel can visually see the operation needed in each step, misoperation of the pressing plates is prevented to the maximum extent, the problems of large workload and high error rate of the existing graphical display pressing plate and virtual circuit state information process are solved, graphs corresponding to the virtual circuit and the soft pressing plate can be automatically displayed in the graphical mode, manual configuration time is saved, operation of each step is executed according to user operation, the pressing plates needing to be operated at present are flickered, and operation accuracy is improved.
Drawings
In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings needed to be used in the embodiments or the prior art descriptions will be briefly described below, and it is obvious that the drawings described below are only some embodiments of the present invention, and it is obvious for those skilled in the art to obtain other drawings based on these drawings without creative efforts.
FIG. 1 is a schematic flow chart of a platen visualization online verification method in a secondary safety measure according to an embodiment of the present invention;
FIG. 2 is a schematic view of a visual interface of a platen visual online checking method in a secondary safety measure according to an embodiment of the present invention;
fig. 3 is a schematic structural diagram of a device for visual online checking of a platen in a secondary safety measure according to an embodiment of the present invention.
Detailed Description
In order to make the objects, features and advantages of the present invention more obvious and understandable, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the embodiments described below are only a part of the embodiments of the present invention, and not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by persons skilled in the art without any inventive work shall fall within the protection scope of the present invention, and the principle and features of the present invention shall be described below with reference to the accompanying drawings.
The terms "comprises" and "comprising," when used in this specification and claims, and in the accompanying drawings and figures, are intended to cover non-exclusive inclusions, such that a process, method or system, or apparatus that comprises a list of steps or elements is not limited to the listed steps or elements.
Referring to fig. 1, fig. 1 is a schematic flow chart of a platen visualization online checking method in a secondary safety measure according to an embodiment of the present invention, including:
s101, analyzing the SCD file of the configuration of the whole station, and automatically generating associated IED information, quoting information and transformer substation interval information after instantiating all channels;
the method comprises the steps of sequentially analyzing the SCD file, sequentially and respectively analyzing parts such as 'Header', 'status', 'Communication', 'IED', 'DataTypetemplates', and the like, processing the parts, instantiating all channels, automatically generating associated IED information, automatically generating reference information, automatically generating transformer Substation interval information, and converting the generated information into a configuration file of a current device.
S102, defining virtual terminal tables of various IEDs at different levels, and determining the corresponding relation between a virtual circuit and a soft pressing plate;
according to the standardized design specifications of line protection and auxiliary devices, the standardized design specifications of transformers, high-voltage shunt reactors and bus protection and auxiliary devices and the like, SV input virtual terminal tables, GOOSE input virtual terminal tables and GOOSE output virtual terminal tables of various IEDs at different levels can be defined, and the virtual terminal tables can be used as the alignment criteria of the soft pressing plates and the virtual circuits.
Generally, one SV link needs to correspond to one SV receiving soft pressing plate, and the virtual terminal table describes the pairing relation between SV input virtual terminal signal names and the soft pressing plates.
For example, in the case of a 3/2 breaker wiring protection device, part of SV is input into a virtual terminal table as follows:
Figure BDA0002446719400000041
table 1 SV input virtual terminal table
Specifically, according to the corresponding relationship in the virtual terminal table, the corresponding virtual terminal table can be searched and the name of the soft pressing plate can be determined by the signal name of the SV output link, and the corresponding soft pressing plate can be found in the data set. When the corresponding soft pressing plate cannot be found through the output link signal, a user-defined soft pressing plate can be set.
When any keyword of the intelligent terminal, the merging unit and the intelligent integration is contained in the description of the sending equipment, the GOOSE sending soft pressing plate is not set. And for other link signals, setting the soft pressing plate according to the virtual terminal table information in the standard.
For example, taking 3/2 breaker wiring protection device as an example, the partial GOOSE output virtual terminal table is as follows:
Figure BDA0002446719400000051
table 2 GOOSE output virtual terminal table
The operation process is as follows:
finding out signals of which all reference paths meet the requirement of PTRC and Tr, and classifying according to suffix node suffixes of the logical nodes;
finding soft pressing plates matched with PTRC and TrStrp in the data set, wherein the soft pressing plates with the suffixes of the same logic nodes are the soft pressing plates of the GOOSE output signals;
if any keyword of the intelligent terminal, the merging unit and the intelligent integration is contained in the description of the receiving equipment, the GOOSE receiving soft pressing plate is not set. When the soft pressing plates are matched, the corresponding signals are searched according to the signal name keywords, and then the corresponding soft pressing plates are searched according to the soft pressing plate keywords. If both the signal and the soft pressing plate can be found, the soft pressing plate is the receiving soft pressing plate of the GOOSE input signal. For bus protection and transformer protection equipment, when the signal description contains a 'failure' keyword, if a corresponding soft pressing plate is not found in a keyword matching mode, adding a soft pressing plate which is automatically received by GOOSE.
S103, generating a secondary safety measure expert intelligent diagnosis library according to the relay protection safety measures and the safety measure execution flow;
specifically, the relay protection safety measures, namely secondary safety measures, are used for summarizing and analyzing the secondary safety measures of the intelligent substation;
illustratively, the secondary security measures include:
(1) when the relay protection device is used for on-site checking, defect elimination and other work, the reliable connection of AC sampling, closing, tripping, starting failure and the like of the device with the relevant operation equipment is ensuredIsolation ofAnd the safety measures are ensured not to influence the normal operation of other equipment.
(2) When a single set of configured relay protection device works in field verification, defect elimination and the like, related primary equipment is requiredOut of service. When the relay protection device with double configuration works on site for checking, eliminating defects and the like, primary equipment can continue to operate, but reliable isolation of the checking and eliminating defects equipment is required to be made, so that the primary equipment is prevented from being stopped by mistake, and meanwhile, the operation protection is prevented from being stopped by mistake, so that the primary equipment is not operated in a protection mode.
(3) Relates to an intelligent transformer substationIsolation of the secondary circuit should be doneDouble measuresAnd performing reliable isolation, wherein if the GOOSE sending soft pressing plate in the overhauling device is withdrawn, the corresponding GOOSE receiving soft pressing plate in the related running device is also withdrawn.
(4) For a dualized merging unit, when performing field verification, defect elimination and other work on a single device, the relevant primary device can continue to operate, but should exit the line protection, bus protection and the like associated with the merging unit.
(5) When the single set of configured merging units is verified and eliminated, the related primary equipment which runs at the interval is required to be out of service.
(6) Under the condition that primary equipment is out of service, if the on-site verification, defect elimination and other work of the merging unit are carried out, the SV soft pressing plate on the line protection of the interval and the SV soft pressing plate corresponding to the interval on the bus protection need to be withdrawn.
(7) For the dual-configuration intelligent terminal, when the single equipment works in field verification, defect elimination and the like, the related primary equipment can continue to operate, but the related protection reclosing function, the tripping and closing pressing plate of the intelligent terminal and the related devices which are possibly influenced are quitted according to the requirements.
(8) When a single set of configured intelligent terminals are subjected to field verification, defect elimination and other work, the running related primary equipment needs to be stopped, and meanwhile, the related devices which are possibly affected are quitted according to the needs.
(9) Before the protection device is operated to set the maintenance hard pressure plate, the protection device is changed into a signal state, and the soft pressure plate of the secondary circuit of the operation protection device such as the bus differential protection related to the protection device is withdrawn, such as the corresponding starting failure soft pressure plate.
(10) Under the condition that primary equipment is not in service, the interval protection device is changed into a signal or is stopped before the interval merging unit is put into service to arrange a maintenance hard pressing plate. Particularly, for the bus merging unit, under the condition that the bus is not in service, the bus merging unit is processed according to the abnormal condition of the bus voltage, and the merging unit can be put into service to overhaul the pressing plate after the bus voltage is switched.
(11) Under the condition that primary equipment is not in service, before the interval intelligent terminal is put into the maintenance hard pressing plate, the circuit breaker tripping and closing hard pressing plate of the intelligent terminal is withdrawn; exiting the reclosing function of the interval protection device; after the isolated isolation switch is forced to be closed on the bus protection corresponding to the intelligent terminal, the intelligent terminal can be put into the maintenance pressing plate.
The above 11 items are system summaries of relay protection safety measure principles, wherein the 1 st to 3 items are a general principle, the 4 th to 6 items are a safety measure principle when a merging unit is overhauled, the 7 th to 8 items are a safety measure principle when an intelligent terminal is overhauled, and the 9 th to 11 items are a safety measure principle of a relay protection device 'maintenance hard pressing plate'.
Determining the operation sequence of the pressing plate in the secondary safety measure,
for example, (1) when the primary equipment is out of service, if the secondary equipment needs to be exited, the operation should be performed according to the following process:
i, quitting an SV soft pressing plate at the interval in the related operation protection device or putting the SV soft pressing plate at the interval;
II, exiting the GOOSE receiving soft pressure plate (such as starting failure) of the interval in the related operation protection device;
III, withdrawing the GOOSE sending soft pressing plate (such as a tripping pressing plate, a closing pressing plate and a starting failure pressing plate) of the protection of the interval;
IV, withdrawing the hard pressing plate at the outlet of the intelligent terminal at the interval;
v, putting the intelligent terminal, the merging unit and the protection device in the interval to be maintained and a hard pressing plate.
(2) When the secondary equipment is in a re-service state, the secondary equipment is put into operation, and the plate pressing operation is carried out according to the following process:
i, quitting an SV soft pressing plate at the interval in the related operation protection device or putting the SV soft pressing plate at the interval;
II, withdrawing the intelligent terminal, the merging unit and the protection device of the interval, and arranging a maintenance hard pressing plate;
III, putting the intelligent terminal outlet hard pressing plate at the interval;
IV, throwing the GOOSE sending soft pressing plate (such as a tripping pressing plate, a closing pressing plate and a starting failure pressing plate) of the interval protection device; v, putting the 'GOOSE receiving soft pressure plate' of the interval in the related operation protection device (such as start failure);
and VI, throwing the SV soft pressing plate or the SV soft pressing plate into the related operation protection device at intervals.
Furthermore, when equipment breaks down, the fault needs to be isolated timely to ensure normal and safe operation of other equipment. And setting a corresponding isolation principle to obtain a secondary safety measure expert intelligent diagnosis library based on the difference of fault isolation ranges when the transformer substation equipment fails. The secondary safety measure expert intelligent diagnosis library can generate pressing plate switching strategies aiming at different maintenance faults, and different pressing plate switching strategies are adopted for maintenance in different fault types based on the corresponding relation between the virtual circuit and the soft pressing plate.
Illustratively, taking the example of the change of the 220kV master into different modes, the method includes:
national grid 92 mode: merging unit faults, protecting, merging, maintaining, exiting a GOOSE outlet, and operating a terminal; the protection unit fails, the GOOSE outlet is withdrawn, the combination and the terminal can continue to operate, and the terminal joint debugging is withdrawn after the defects are processed; the intelligent terminal is failed, the terminal is arranged for maintenance, an exit hard pressing plate is combined and protected to operate, a GOOSE exit is withdrawn, and after the defects are treated, the protection joint debugging is withdrawn;
and (3) associating shutdown modes: merging unit faults, protecting, merging, maintaining, exiting a GOOSE outlet, and operating a terminal; protecting any fault of the terminal, protecting the terminal, maintaining the terminal, pressing a hard pressing plate at an exit, and merging the operation; (merging unit failure, loss of protection, and accompanying and stopping protection due to joint debugging requirement; protection unit failure, possibly having the condition that a pressing plate cannot be operated and a terminal needs accompanying and stopping; terminal failure, loss of protection, and accompanying and stopping protection due to joint debugging requirement.)
Outlet shut down mode: merging unit faults, protecting, merging, overhauling, pressing a hard pressing plate at an exit, and overhauling and running the terminal (considering hand opening and closing, malfunction tripping and primary equipment position acquisition to the maximum); protecting any fault of the terminals, protecting the terminals, arranging and overhauling the terminals, pressing a hard pressing plate at an exit, and operating a merging unit;
the complete shutdown mode: any device has a fault, combination, protection, terminal maintenance and exit hard pressing plate.
According to the four specific modes, the secondary safety measure expert intelligent diagnosis library can be generated according to different interval types such as line intervals, bus intervals, main transformer intervals and the like. Preferably, the secondary safety measure expert intelligent expert library can adjust and perfect the isolation principle and the isolation scheme according to actual isolation requirements.
According to the pressing plate commissioning and refunding strategies in the modes of normal operation maintenance, associated shutdown mode, national network 92 mode, export shutdown mode, complete shutdown mode and the like generated in the intelligent expert database, and the pressing plate commissioning and refunding strategies can be exported in a standard secondary safety measure ticket format.
And S104, generating a secondary safety measure ticket through the secondary safety measure expert intelligent diagnosis library, and performing online check according to the generated secondary safety measure ticket.
The pressing plates and the switching states related to the safety measure ticket and the switching sequence among the pressing plates can be read through the generated secondary safety measure ticket, the execution process is automatically monitored by a program according to the pressing plate switching strategy corresponding to the safety measure ticket by monitoring the pressing plate states, early warning is carried out in advance to prompt the next operation, the actual operation process is normal if the actual operation process is the same as the prompt, and otherwise warning is carried out; the pressing plate required to be operated at each step is prompted according to the operation sequence in a graphical mode, field personnel can visually see the operation required at each step, misoperation of the pressing plate is prevented to the maximum extent, and abnormal operation is timely alarmed.
Specifically, a secondary safety measure ticket needing to be executed currently is selected, the corresponding soft pressing plate is operated in a flashing mode according to each operation of a user based on a virtual terminal and soft pressing plate mixed view, the MMS network data of the station control layer are collected and analyzed, and the current pressing plate switching state is displayed.
When the sequence of putting and withdrawing the pressing plate by the user is inconsistent with the sequence of the currently executed secondary safety measure ticket, the pressing plate is alarmed to flash, the maintenance personnel is prompted to be abnormal in time, and the automatic generation, the automatic execution and the real-time check of the safety measures are realized.
Further, performing real-time monitoring on the state of the pressing plate by precaution rehearsal, giving an early warning if the operation steps are different from the safety precaution ticket steps, prompting an operator whether to operate according to the safety precaution ticket, recording the operation after the step if the operator considers that the operation is correct, and prompting the operator whether to modify the safety precaution strategy steps. Illustratively, (1) selecting a selection strategy at the platen map interface; (2) clicking and uploading after selecting corresponding equipment and safety measure process; (3) when the safety measure is played, a user can operate the hard pressing plate or the soft pressing plate at the yellow flashing position according to the prompt of the system, wherein yellow represents the soft pressing plate which should be operated at the moment; (4) when the SV is closed according to the prompt to receive the soft pressing plate, the original yellow flashing position of the operated pressing plate is changed into green (not flashing), the situation that the operated pressing plate has no problem is shown, and the system automatically jumps to the next pressing plate to be operated according to the sequence of the safety measure tickets; (5) when an operator thinks that the safety measure strategy sequence in the software expert library is incorrect, the operator can directly skip the operation of the pressing plate to perform other pressing plate operations, and the zero-sequence overcurrent protection soft pressing plate is put into the operation, at the moment, the system thinks that the operator does not operate according to the safety measure steps, and turns the zero-sequence overcurrent protection soft pressing plate to red (not flash); (6) the operator can click the right button of the mouse, choose to confirm the alarm and can skip the alarm, as shown in fig. 2, continue to carry on the precaution according to the tactical step, if the pressing plate state of jumping to the position is exactly the same as pressing plate state in the ticket of the safety precaution, skip the pressing plate, jump to the next pressing plate directly and carry on the state comparison, until moving to the final position of the ticket of the safety precaution.
In the embodiment, the secondary safety measure expert intelligent diagnosis library of the intelligent substation based on different voltage levels can automatically display the corresponding graphs of the virtual circuit and the soft pressing plate in a graphical mode, so that the manual configuration time is saved, the operation condition of each step is executed according to the operation of a user, and the pressing plate needing to be operated at present is flickered.
It should be understood that, the sequence numbers of the steps in the foregoing embodiments do not imply an execution sequence, and the execution sequence of each process should be determined by its function and inherent logic, and should not constitute any limitation to the implementation process of the embodiments of the present invention.
Fig. 3 is a schematic structural diagram of a visual online checking device for a pressing plate in a secondary safety measure, provided by an embodiment of the present invention, where the device includes:
the analysis module 310 is configured to analyze the total station configuration SCD file, and after instantiating all the channels, automatically generate associated IED information, reference information, and transformer substation interval information;
a defining module 320, configured to define virtual terminal tables of various IEDs at different levels, and determine a correspondence between a virtual circuit and a soft pressing plate;
optionally, the method includes the steps of searching a corresponding virtual terminal table and determining the name of a soft pressing plate through the signal name of an SV output link, and finding the corresponding soft pressing plate in a data set; and when the corresponding soft pressing plate name cannot be found in the virtual terminal table, setting a self-defined soft pressing plate.
The generating module 330 is configured to generate a secondary safety measure expert intelligent diagnosis library according to the relay protection safety measures and the safety measure execution flow;
and the checking module 340 is configured to generate a secondary safety measure ticket through the secondary safety measure expert intelligent diagnosis library, and perform online checking according to the generated secondary safety measure ticket.
Specifically, a secondary safety measure ticket needing to be executed currently is selected, based on a mixed view of a virtual terminal and a soft pressing plate, the soft pressing plate corresponding to each operation of a user is flickered, station control layer MMS network data is collected and analyzed, and the current pressing plate switching state is displayed;
when the sequence of putting and withdrawing the pressing plates by the user is inconsistent with the sequence of the currently executed secondary safety measure tickets, the pressing plates are alarmed to flash, and the maintainers are prompted to be abnormal in time.
In the above embodiments, the descriptions of the respective embodiments have respective emphasis, and reference may be made to the related descriptions of other embodiments for parts that are not described or illustrated in a certain embodiment.
The above-mentioned embodiments are only used for illustrating the technical solutions of the present invention, and not for limiting the same; although the present invention has been described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; and such modifications or substitutions do not depart from the spirit and scope of the corresponding technical solutions of the embodiments of the present invention.

Claims (8)

1. A secondary safety measure intermediate pressure plate visual online checking method is characterized by comprising the following steps:
analyzing the SCD file, and automatically generating associated IED information, reference information and transformer substation interval information after instantiating all channels;
defining virtual terminal tables of various IEDs at different levels, and determining the corresponding relation between a virtual circuit and a soft pressing plate;
generating a secondary safety measure expert intelligent diagnosis library according to the relay protection safety measures and the safety measure execution flow;
and generating a secondary safety measure ticket through the secondary safety measure expert intelligent diagnosis library, and performing online check according to the generated secondary safety measure ticket.
2. The method of claim 1, wherein the defining a virtual terminal table for various IEDs at different levels, and wherein determining the correspondence between virtual circuits and soft compression plates further comprises:
searching a corresponding virtual terminal table and determining the name of a soft pressing plate according to the signal name of an SV output link, and finding the corresponding soft pressing plate in a data set;
and when the corresponding soft pressing plate name cannot be found in the virtual terminal table, setting a self-defined soft pressing plate.
3. The method of claim 1, wherein the generating a secondary safety measure expert intelligent diagnosis library according to the relay protection safety measure and the safety measure execution flow comprises:
obtaining a relay protection safety measure and determining the operation sequence of the switching on and off of the pressing plate;
and setting a corresponding isolation principle to obtain a secondary safety measure expert intelligent diagnosis library based on the difference of fault isolation ranges when the transformer substation equipment fails.
4. The method according to claim 1, wherein the secondary safety measure ticket is generated through the secondary safety measure expert intelligent diagnosis library, and the online checking according to the generated secondary safety measure ticket specifically comprises:
selecting a secondary safety measure ticket needing to be executed currently, flashing the corresponding soft pressing plate based on a mixed view of the virtual terminal and the soft pressing plate and each operation of a user, acquiring and analyzing MMS network data of a station control layer, and displaying the current pressing plate switching state;
when the sequence of putting and withdrawing the pressing plates by the user is inconsistent with the sequence of the currently executed secondary safety measure tickets, the pressing plates are alarmed to flash, and the maintainers are prompted to be abnormal in time.
5. The utility model provides a visual online device of checking of clamp plate in secondary safety measure which characterized in that includes:
the analysis module is used for analyzing the SCD file, and automatically generating associated IED information, reference information and transformer substation interval information after instantiating all channels;
the definition module is used for defining virtual terminal tables of various IEDs at different levels and determining the corresponding relation between a virtual circuit and a soft pressing plate;
the generating module is used for generating a secondary safety measure expert intelligent diagnosis library according to the relay protection safety measures and the safety measure execution flow;
and the checking module is used for generating a secondary safety measure ticket through the secondary safety measure expert intelligent diagnosis library and performing online checking according to the generated secondary safety measure ticket.
6. The apparatus of claim 5, wherein the virtual terminal table defining various IEDs at different levels, and wherein determining the correspondence between virtual circuits and soft platens further comprises:
searching a corresponding virtual terminal table and determining the name of a soft pressing plate according to the signal name of an SV output link, and finding the corresponding soft pressing plate in a data set;
and when the corresponding soft pressing plate name cannot be found in the virtual terminal table, setting a self-defined soft pressing plate.
7. The apparatus of claim 5, wherein the generating of the secondary safety measure expert intelligent diagnosis library according to the relay protection safety measure and the safety measure execution process comprises:
obtaining a relay protection safety measure and determining the operation sequence of the switching on and off of the pressing plate;
and setting a corresponding isolation principle to obtain a secondary safety measure expert intelligent diagnosis library based on the difference of fault isolation ranges when the transformer substation equipment fails.
8. The device according to claim 5, wherein the secondary safety measure ticket is generated through the secondary safety measure expert intelligent diagnosis library, and the online checking according to the generated secondary safety measure ticket specifically comprises:
selecting a secondary safety measure ticket needing to be executed currently, flashing the corresponding soft pressing plate based on a mixed view of the virtual terminal and the soft pressing plate and each operation of a user, acquiring and analyzing MMS network data of a station control layer, and displaying the current pressing plate switching state;
when the sequence of putting and withdrawing the pressing plates by the user is inconsistent with the sequence of the currently executed secondary safety measure tickets, the pressing plates are alarmed to flash, and the maintainers are prompted to be abnormal in time.
CN202010281421.1A 2020-04-10 2020-04-10 Visual online checking method and device for pressing plate in secondary safety measure Pending CN111563658A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010281421.1A CN111563658A (en) 2020-04-10 2020-04-10 Visual online checking method and device for pressing plate in secondary safety measure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010281421.1A CN111563658A (en) 2020-04-10 2020-04-10 Visual online checking method and device for pressing plate in secondary safety measure

Publications (1)

Publication Number Publication Date
CN111563658A true CN111563658A (en) 2020-08-21

Family

ID=72070496

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010281421.1A Pending CN111563658A (en) 2020-04-10 2020-04-10 Visual online checking method and device for pressing plate in secondary safety measure

Country Status (1)

Country Link
CN (1) CN111563658A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112165167A (en) * 2020-09-25 2021-01-01 国家电网有限公司技术学院分公司 Intelligent substation relay protection maintenance auxiliary system and method
CN112949271A (en) * 2021-02-07 2021-06-11 国网安徽省电力有限公司宣城供电公司 Maintenance safety measure analysis method and system
CN113449044A (en) * 2021-05-25 2021-09-28 国网河北省电力有限公司邯郸供电分公司 Intelligent station equipment maintenance safety measure automatic generation method and device based on learning inference machine
CN114362372A (en) * 2022-01-12 2022-04-15 国网安徽省电力有限公司宣城供电公司 Secondary safety measure automatic checking system and method based on online monitoring data
CN116561638A (en) * 2023-05-24 2023-08-08 南京电力设计研究院有限公司 Protective pressing plate non-correspondence checking method based on neural network learning and state evaluation
CN117110690A (en) * 2023-10-23 2023-11-24 广东电网有限责任公司东莞供电局 Intelligent substation pressure plate potential measurement method and system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107045663A (en) * 2016-11-30 2017-08-15 国网江苏省电力公司 Secondary safety measure operation order visualizes online nucleus correcting system and method
CN107147214A (en) * 2017-03-02 2017-09-08 许继集团有限公司 A kind of secondary peace suitable for intelligent substation arranges monitoring system
CN107563717A (en) * 2017-07-26 2018-01-09 国网安徽省电力公司 A kind of secondary system of intelligent substation safety measure visualization system
CN109962443A (en) * 2017-12-26 2019-07-02 上海毅昊信息科技股份有限公司 A kind of protection maintenance peace based on SCD arranges tactful automatic creation system and method
CN110650049A (en) * 2019-09-25 2020-01-03 国网江苏省电力有限公司泰州供电分公司 Visual matching method for soft pressing plate and virtual circuit
CN110956283A (en) * 2019-11-14 2020-04-03 国网安徽省电力有限公司 Method and system for matching SCD (System configuration description) file with soft pressing plate

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107045663A (en) * 2016-11-30 2017-08-15 国网江苏省电力公司 Secondary safety measure operation order visualizes online nucleus correcting system and method
CN107147214A (en) * 2017-03-02 2017-09-08 许继集团有限公司 A kind of secondary peace suitable for intelligent substation arranges monitoring system
CN107563717A (en) * 2017-07-26 2018-01-09 国网安徽省电力公司 A kind of secondary system of intelligent substation safety measure visualization system
CN109962443A (en) * 2017-12-26 2019-07-02 上海毅昊信息科技股份有限公司 A kind of protection maintenance peace based on SCD arranges tactful automatic creation system and method
CN110650049A (en) * 2019-09-25 2020-01-03 国网江苏省电力有限公司泰州供电分公司 Visual matching method for soft pressing plate and virtual circuit
CN110956283A (en) * 2019-11-14 2020-04-03 国网安徽省电力有限公司 Method and system for matching SCD (System configuration description) file with soft pressing plate

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张志朋;彭桂喜;卞海波;毕宏图;张国辉;: "智能变电站二次检修安全措施自动生成方法研究" *
郭炎福;黄文英;宋福海;郭健生;: "基于专家系统的智能变电站二次检修安措票自动生成技术" *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112165167A (en) * 2020-09-25 2021-01-01 国家电网有限公司技术学院分公司 Intelligent substation relay protection maintenance auxiliary system and method
CN112165167B (en) * 2020-09-25 2022-05-31 国家电网有限公司技术学院分公司 Intelligent substation relay protection maintenance auxiliary system and method
CN112949271A (en) * 2021-02-07 2021-06-11 国网安徽省电力有限公司宣城供电公司 Maintenance safety measure analysis method and system
CN113449044A (en) * 2021-05-25 2021-09-28 国网河北省电力有限公司邯郸供电分公司 Intelligent station equipment maintenance safety measure automatic generation method and device based on learning inference machine
CN114362372A (en) * 2022-01-12 2022-04-15 国网安徽省电力有限公司宣城供电公司 Secondary safety measure automatic checking system and method based on online monitoring data
CN116561638A (en) * 2023-05-24 2023-08-08 南京电力设计研究院有限公司 Protective pressing plate non-correspondence checking method based on neural network learning and state evaluation
CN116561638B (en) * 2023-05-24 2024-05-31 南京电力设计研究院有限公司 Protective pressing plate non-correspondence checking method based on neural network learning and state evaluation
CN117110690A (en) * 2023-10-23 2023-11-24 广东电网有限责任公司东莞供电局 Intelligent substation pressure plate potential measurement method and system

Similar Documents

Publication Publication Date Title
CN111563658A (en) Visual online checking method and device for pressing plate in secondary safety measure
KR102218268B1 (en) Substation Automation Operating Device Equipped with Automatic Generation of Failure Judgment and Failure Recovery Scenarios
CN108551401B (en) Virtual-real loop correlation mapping and diagnosis method of virtual-real diagnosis system of intelligent substation
CN113364120B (en) Method, device and equipment for checking control process of intelligent substation and storage medium
CN109245300B (en) Automatic checking method for 500kV intelligent substation pressure plate
CN105305365A (en) Power grid relay protection emergency management system
CN108847655B (en) Sequence control method and system for intelligent substation protection device based on operation task
CN113343446B (en) Data analysis and verification method and system for transformer substation monitoring system
CN108448718B (en) One-key sequential control method and system for intelligent substation protection device
CN109978500A (en) A kind of nuclear power station power loss trial system
CN107275963B (en) A kind of intelligent substation secondary maintenance safety measure automatic generation method
CN108963841B (en) Secondary equipment sequence control method and system related to running state of primary equipment
CN111722041A (en) Intelligent detection method and system for low-voltage distribution board
CN112216174A (en) AC/DC power supply fault simulation system
CN111369020A (en) Automatic control system and method for cascade hydropower station group control signals
CN108493906B (en) Decentralized bus protection handset repair method and decentralized bus protection system
CN114692787B (en) Multi-source data-based three-winding main transformer event analysis processing method and system
CN113394778B (en) Configuration mode-based system-level debugging system and method for secondary equipment of transformer substation
CN114416660A (en) Visual display method for secondary circuit based on virtual and real circuit layering
CN109600116B (en) Movable photovoltaic grid-connected detection system
CN112255481A (en) Target equipment anti-error detection method and device, storage medium and electronic device
CN106709158B (en) Performance improvement method of power grid feeder automation system
Jun et al. Engineering Practice of On-Line Monitoring and Intelligent Diagnosis System for Secondary Equipment in Smart Substation
CN112332530B (en) Remote control debugging method for disconnecting link
CN109191327B (en) Intelligent substation secondary safety measure implementation process recording and playback method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20200821

RJ01 Rejection of invention patent application after publication