CN107275963B - A kind of intelligent substation secondary maintenance safety measure automatic generation method - Google Patents

A kind of intelligent substation secondary maintenance safety measure automatic generation method Download PDF

Info

Publication number
CN107275963B
CN107275963B CN201710533409.3A CN201710533409A CN107275963B CN 107275963 B CN107275963 B CN 107275963B CN 201710533409 A CN201710533409 A CN 201710533409A CN 107275963 B CN107275963 B CN 107275963B
Authority
CN
China
Prior art keywords
pressing plate
safety measure
equipment
judgement
repair apparatus
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710533409.3A
Other languages
Chinese (zh)
Other versions
CN107275963A (en
Inventor
张志朋
王慎杰
刘兆阳
许皖宁
曹北建
郭新
毕宏图
何海航
彭桂喜
陈丽艳
马璐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Tianjin Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201710533409.3A priority Critical patent/CN107275963B/en
Publication of CN107275963A publication Critical patent/CN107275963A/en
Application granted granted Critical
Publication of CN107275963B publication Critical patent/CN107275963B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B3/00Apparatus specially adapted for the manufacture, assembly, or maintenance of boards or switchgear

Abstract

The invention discloses a kind of intelligent substation secondary maintenance safety measure automatic generation methods comprising following steps: S1, selecting object equipment, power failure type, job category;S2, maintenance interval judgement, judge whether power failure of equipment in the same interval is consistent, continue if consistent, if inconsistent prompt reports an error and returns to gravity treatment;S3, isolating points judgement: when the equipment of both sides of the link is there are when running equipment, consideration safety measure is on the contrary not consider;S4, safety measure order policies: traversal chooses equipment, parsing mapping connection, analysis isolating points;S5, cut-off point is sequentially listed according to the connection of rule of correspondence mapped device according to input information matches safety measure production rule, generating safety measure simultaneously terminates.The present invention is capable of field management and the required level of service of powerful support intelligent substation secondary O&M service personnel, and intelligent station operating efficiency is made to be significantly improved, and improves intelligent substation management level.

Description

A kind of intelligent substation secondary maintenance safety measure automatic generation method
Technical field
The present invention relates to intelligent substation O&M field, especially a kind of intelligent substation secondary maintenance safety measure is automatic Generation method.
Background technique
Intelligent substation has larger difference compared with normal station in terms of O&M maintenance, brings difficulty to fortune inspection business, It is primarily present following problems:
(1) virtual circuit is difficult to intuitively be observed, and multiple virtual circuits are usually contained in simple optical fiber, and operation maintenance personnel is checked It has difficulties with operation secondary circuit.
(2) intelligent station uses soft pressing plate instead of hard pressing plate in design, and secondary device can not disconnect means by physics Xegregating unit;Smart machine is interconnected extensively by network simultaneously, and overhaul of the equipments needs the safety measure taken to greatly increase, safety The formulation and confirmation of measure become complicated difficult.
(3) O&M, service personnel's level of skill are generally difficult to adapt to the needs of intelligent substation fast development, secondary circuit There are security risks.
Summary of the invention
A kind of intelligent substation secondary maintenance safety measure is provided it is an object of the invention to solve above-mentioned technical problem Automatic generation method, this method can assist O&M service personnel intuitively to check virtual circuit, determine overhaul of the equipments safety measure, It checks safety measure executive condition, mitigates O&M service personnel operating pressure, eliminate the security risk of smart machine service work.
In order to solve the above-mentioned technical problem, the present invention adopts the following technical scheme:
A kind of intelligent substation secondary maintenance safety measure automatic generation method, comprising the following steps:
S1, selecting object equipment, power failure type, job category;
S2, maintenance interval judgement, judge whether power failure of equipment in the same interval consistent, if consistent after Continuous, prompt reports an error and returns to gravity treatment if inconsistent;
S3, isolating points judgement
(1) SCD file is parsed, repair apparatus is successively analyzed, all send and receive is analyzed centered on repair apparatus Link;
(2) when the equipment of both sides of the link is repair apparatus, safety measure is not considered and is terminated;
(3) when both sides of the link equipment side is repair apparatus, and side is running equipment, consider safety measure;
S4, safety measure order policies
(1) all repair apparatus chosen are traversed for the first time, analyze isolating points, and the SV of equipment out of service receives soft pressure Plate;
(2) all repair apparatus chosen are traversed for the second time, analyze isolating points, and the GOOSE of equipment out of service receives soft Pressing plate;
(3) all repair apparatus chosen are traversed for the third time, analyze isolating points, and the GOOSE transmission for exiting repair apparatus is soft Pressing plate;
(4) optical fiber circuit between link is disconnected and runs if needed, if isolating points repair apparatus side is without the soft pressure of transmission Plate then disconnects the optical fiber circuit of isolating points;
(5) if the interval primary equipment does not have a power failure, interval intelligent terminal outlet hard pressing plate is exited;
(6) the maintenance pressing plate of repair apparatus is put into;
(7) if the interval primary equipment has a power failure, electric current is disconnected and is shorted, and voltage disconnects;
S5, it is sequentially listed according to input information matches safety measure production rule according to the connection of rule of correspondence mapped device Cut-off point generates safety measure and terminates.
Power failure type indicates that corresponding primary equipment has a power failure or do not have a power failure in the step S1, and job category includes overhaul plan And defect processing.
Maintenance interval judgement includes the judgement of 500kV switch gap, the judgement of 500kV line segregation, 500kV in the step S2 The judgement of main transformer interval, the judgement of 500kV bus interval, the judgement of 220kV line segregation, the judgement of 220kV main transformer interval and 220kV bus Interval judgement.
The beneficial effects of the present invention are: the present invention is capable of the scene of powerful support intelligent substation secondary O&M service personnel Management and required level of service, make intelligent station operating efficiency be significantly improved, and improve intelligent substation management level.
Detailed description of the invention
Fig. 1 is a kind of flow chart of intelligent substation secondary maintenance safety measure automatic generation method of the present invention.
Specific embodiment
The present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments:
Referring to Fig. 1, the present invention relies on technology of Internet of things, proposes that a kind of intelligent substation secondary maintenance safety measure is given birth to automatically At method, secondary circuit safety measure, main logic can be automatically generated are as follows:
(1) selecting object equipment, power failure type (corresponding primary equipment has a power failure or do not have a power failure), job category (are overhauled or are lacked Fall into processing);
(2) connection for parsing object-based device and other running equipments, analyzes available logic cut-off point (soft pressing plate) and object It manages cut-off point (hard pressing plate);
(3) safety measure production rule is formulated according to [2015] No. 92 documentation requirements of tune, it is regular according to input information matches, It is connected according to rule of correspondence mapped device;
(4) cut-off point is sequentially listed, safety measure is generated.
Embodiment
1. selection mode
(1) working method: defect elimination, verification, technological transformation is selected.
(2) it selects secondary repair apparatus: being parsed by SCD file.
(3) corresponding primary equipment power failure: whether corresponding each secondary device selection primary equipment has a power failure.
2. maintenance interval is analyzed
The judgement of 2.1 500kV switch gaps
(1) if containing " breaker " and " protection " and " 500 " in IED description, there are 500kV switch gap, this IED It is expressed as KGBH (switch protection);
(2) it in the SV receives link of KGBH, receives and contains " electric current " in virtual terminator, to switch combining unit, this IED table It is shown as KGMU (switch MU);
(3) in the GOOSE transmission link of KGBH, send terminal ref in containing " Tr.phsA " and " Tr.phsB ", " Tr.phsC's ", to switch intelligent terminal, this IED is expressed as KGST (switch intelligent terminal);
(4) KGBH, KGMU, KGST belong to 500kV switch gap simultaneously.
The judgement of 2.2 500kV line segregations
(1) if containing " line " and " protection " and " 500 " in IED description, contain " PL " in name, there are 500kV lines Road interval, this IED are expressed as XLBH (route protection);
(2) it in the SV receives link of XLBH, receives and contains " voltage " in virtual terminator, be route PT combining unit, this IED It is expressed as XLMU (route MU);
(3) in the GOOSE transmission link of XLBH, send terminal ref in containing " Tr.phsA " and " Tr.phsB ", " Tr.phsC " is route intelligent terminal, this IED is expressed as XLST (route intelligent terminal);
(4) XLBH, XLMU, XLST belong to 500kV line segregation simultaneously.
The judgement of 2.3 500kV main transformer intervals
(1) if containing { " main transformer " or " transformer " } and " protection " and " 500 " in IED description, there are 500kV main transformers Interval, this IED are expressed as ZBBH (main transformer protection);
(2) it in the SV receives link of ZBBH, receives and contains " high pressure " and " voltage " in virtual terminator, be on high-tension side merging Unit, this IED are expressed as ZBHMU (high-pressure side PT combining unit);
(3) ZBBH, ZBMU belong to 500kV main transformer interval simultaneously.
The judgement of 2.4 500kV bus intervals
(1) if there are between 500kV bus containing { " bus " or " female poor " } and " protection " and " 500 " in IED description Every this IED is expressed as MXBH (bus protection).
The judgement of 2.5 220kV line segregations
(1) if containing " line " and " protection " and " 220 " in IED description, contain " PL " in name, there are 220kV lines Road interval, this IED are expressed as XLBH (route protection);
It (2) is route combining unit in the SV receives link of XLBH, this IED is expressed as XLMU (route MU);
(3) in the GOOSE transmission link of XLBH, send terminal ref in containing " Tr.phsA " and " Tr.phsB ", " Tr.phsC " is route intelligent terminal, this IED is expressed as XLST (route intelligent terminal);
(4) XLBH, XLMU, XLST belong to 220kV line segregation simultaneously.
The judgement of 2.6 220kV main transformer intervals
(1) if containing { " main transformer " or " transformer " } and " protection " and " 220 " in IED description, there are 220kV main transformers Interval, this IED are expressed as ZBBH (main transformer protection);
(2) it in the SV receives link of ZBBH, receives in virtual terminator and contains " middle pressure ", be the combining unit of medium voltage side, this IED It is expressed as ZBMMU (medium voltage side combining unit);
(3) it in the GOOSE transmission link of ZBBH, sends terminal description and contains " jump " and " medium voltage side ", ZBMST is (in main transformer Press side intelligent terminal);
(4) ZBBH, ZBMMU, ZBMST belong to 220kV main transformer interval simultaneously.
The judgement of 2.7 220kV bus intervals
(1) if there are between 220kV bus containing { " bus " or " female poor " } and " protection " and " 220 " in IED description Every this IED is expressed as MXBH (bus protection);
(2) if containing " bus " and " combining unit " and " 220 " in IED description, there are 220kV buses to merge list Member, this IED are expressed as MXMU (bus combining unit);
(3) MXBH, MXMU belong to 220kV bus interval simultaneously.
3. maintenance interval logic judgment
Power failure of equipment in the same interval should be consistent, inconsistent to prompt to report an error, and returns to gravity treatment.
4. peace arranges strategy
4.1 the overall principle
(1) it is obtained by analysis SCD file using repair apparatus as the logic relation picture at visual angle, analyzes logic relation picture one by one In running equipment and repair apparatus isolating points, carry out peace automatically and arrange strategy generating.
(2) corresponding relationship for the positioning and empty circuit that sending side soft pressing plate can be accurate according to 1396 specifications, does not have Have and is described according to the fuzzy sentence of use of 1396 specification modelings;The correspondence in empty circuit can not be accurately positioned in receiving side soft pressing plate Relationship will be described by the sentence of vague description.
(3) all to provide the soft pressing plate combobox of dsRelayEna using what fuzzy sentence was described, pass through Manual type carries out accurate correlation, then generates accurately peace and arranges operation order and XML file, non-manual association's passes through Vague language Generation is described in sentence.
(4) after all logical relations are formed, it should be that unit arranges again according to equipment, merge the soft pressing plate of redundant link (for part trip(ping) circuit and failure circuit shared module soft pressing plate, software temporarily be cannot be distinguished, and need manually to carry out DsRelayEna mapping).
(5) in view of SSD file does not have in each substation, artificial is needed, this project considers all using SCD File generated.
The judgement of 4.2 isolating points
(1) SCD file is parsed, repair apparatus is successively analyzed, all send and receive is analyzed centered on repair apparatus Link.
(2) when the equipment of both sides of the link is repair apparatus, do not consider that peace is arranged.
(3) when both sides of the link equipment side is repair apparatus, and side is running equipment, consider that peace is arranged.
4.3 peaces arrange order policies
(1) all repair apparatus chosen are traversed for the first time, analyze isolating points, and the SV of equipment out of service receives soft pressure Plate.
(2) all repair apparatus chosen are traversed for the second time, analyze isolating points, and the GOOSE of equipment out of service receives soft Pressing plate (only main transformer failure, which is opened, opens into bus failure into soft pressing plate).
(3) all repair apparatus chosen are traversed for the third time, analyze isolating points, and the GOOSE transmission for exiting repair apparatus is soft Pressing plate (tripping, combined floodgate, start failure protection etc.).
(4) optical fiber circuit between link is disconnected and runs if needed (if isolating points repair apparatus side is without the soft pressure of transmission Plate then disconnects the optical fiber circuit of isolating points).
(5) if the interval primary equipment does not have a power failure, interval intelligent terminal outlet hard pressing plate is exited.
(6) the maintenance pressing plate of repair apparatus is put into.
(7) if the interval primary equipment has a power failure, electric current is disconnected and is shorted, and voltage disconnects.
4.3.1 peace arranges logic strategy (A ticket) before secondary device stops using as a servant
4.3.1.1 GOOSE, SV judge
SV link and GOOSE link are distinguished according to the reference name for receiving virtual terminator, is then SV link if it is SVIN prefix, It is then GOOSE link if it is GOIN prefix.
I, if it is SV link
One SV link needs receiving corresponding SV reception soft pressing plate, i.e., finds in soft pressing plate data set corresponding SV receive soft pressing plate, since empty circuit and soft pressing plate information do not have corresponding relationship, it is therefore desirable to artificial corresponding.
II, if it is GOOSE link
(1) it sends or receiving device contains " observing and controlling " keyword, be not provided with GOOSE and send and receive soft pressing plate.
(2) it is the link of sending device to intelligent terminal, is not provided with GOOSE and sends and receives soft pressing plate.
(3) other GOOSE links should be arranged GOOSE in sending side and send soft pressing plate.Three types are divided to be illustrated:
A) if sending side be route, breaker protection, mapping method:
If virtual terminator description contains " jump ", the corresponding pressing plate of virtual terminator is tripping soft pressing plate, i.e., in soft pressing plate data set The middle reference name for finding PTRC*.TrStrap, and virtual terminator is identical with the instance number of soft pressing plate;
If virtual terminator description is containing " lock-reclosing lock ", " jumping forever ", " combined floodgate is thought highly of in open circuit in locking ", " locking side is disconnected Think highly of combined floodgate in road ", the corresponding pressing plate of virtual terminator is lock-reclosing soft pressing plate, i.e., finds PTRC* in soft pressing plate data set .BlkRecStrp reference name, and virtual terminator is identical with the instance number of soft pressing plate;
If virtual terminator description contains " failure ", the corresponding pressing plate of virtual terminator is start failure protection soft pressing plate, i.e., in soft pressing plate The reference name of PTRC*.StrBFStrp is found in data set, and virtual terminator is identical with the instance number of soft pressing plate;
If virtual terminator description contains " reclosing ", the corresponding pressing plate of virtual terminator is reclosing soft pressing plate, i.e., in soft pressing plate The reference name of RREC*.OpStrp is found in data set, and virtual terminator is identical with the instance number of soft pressing plate.
B) if sending side is bus, mapping method:
If virtual terminator description contains " jump ", the corresponding pressing plate of virtual terminator is tripping soft pressing plate, i.e., in soft pressing plate data set The middle reference name for finding PTRC*.TrStrap, and virtual terminator is identical with the instance number of soft pressing plate;
If virtual terminator description contains " start failure protection ", the corresponding pressing plate of virtual terminator is start failure protection soft pressing plate, i.e., soft The reference name of PTRC*.StrBFStrp is found in pressing plate data set, and virtual terminator is identical with the instance number of soft pressing plate;
If virtual terminator description contains " failure shunt tripping ", the corresponding pressing plate of virtual terminator is failure shunt tripping soft pressing plate, i.e., soft The reference name of RBRF*.TrStrap is found in pressing plate data set, and virtual terminator is identical with the instance number of soft pressing plate.
C) if sending side is transformer, mapping method:
If virtual terminator description contains " jump ", the corresponding pressing plate of virtual terminator is tripping soft pressing plate, i.e., in soft pressing plate data set The middle reference name for finding PTRC*.TrStrap, and virtual terminator is identical with the instance number of soft pressing plate;
If virtual terminator description contains " start failure protection ", the corresponding pressing plate of virtual terminator is start failure protection soft pressing plate, i.e., soft The reference name of PTRC*.StrBFStrp is found in pressing plate data set, and virtual terminator is identical with the instance number of soft pressing plate;
If virtual terminator description contains " prepared auto restart ", the corresponding pressing plate of virtual terminator is failure shunt tripping soft pressing plate, i.e., in soft pressure The reference name of GGIO*.TrStrap is found in plate data set, and virtual terminator is identical with the instance number of soft pressing plate.
(4) if receiving device is the failure circuit of bus or main transformer protection, it is further added by reception soft pressing plate, i.e., in soft pressing plate Corresponding failure is found in data set to open into soft pressing plate, since empty circuit and soft pressing plate information do not have corresponding relationship, is needed It manually to correspond to.Such as " 1 failure of high-pressure side open into " correspondence " 1 side failure of high pressure is opened into soft pressing plate ".
(5) if sending device is bus protection, receiving device is intelligent terminal or side switch, tripping and start failure protection It is to share trip pressing plate, i.e., finds corresponding tripping soft pressing plate in soft pressing plate data set.
4.3.1.2 optical fiber is disconnected
Disconnect and run if needed the optical fiber circuit between link.
4.3.1.3 hard pressing plate is exported
If the corresponding primary equipment of intelligent terminal has a power failure, intelligent terminal exits outlet hard pressing plate.
4.3.1.4 hard pressing plate is overhauled
Put into the maintenance pressing plate of repair apparatus.
4.3.1.5 Current Voltage terminal
If the corresponding primary equipment of combining unit has a power failure, current loop is disconnected and is shorted in combining unit terminal block, Voltage circuit disconnects.
4.3.2 transmission test peace arranges logic strategy (B ticket)
(1) all repair apparatus isolating points are traversed, exit tripping outlet hard pressing plate if it is " intelligent terminal ";If not " intelligent terminal " exits (except this interval) outlet the GOOSE soft pressing plate of running equipment.
(2) this running equipment is put into maintenance pressing plate.
5. peace arranges ticket Word to generate
Secondary work safety ticket
Unit: maintenance branch companySubstation equipment maintenance and repair centerWork draft bank: _ _ _ _ _ _ _ _ _ _ _
5.1 tested device titles
Execute one equipment of a ticket, IED title+IED description.
5.2 action
IED title+IED description+producer's model+working method.
5.3 circuit classifications
(1) failure shunt tripping switchs
Sending side is " { switch or breaker } and protects and 500 ", and the virtual terminator of sending side is described as " failure and 500 ", receiving side is " intelligent terminal and 500 ".
(2) the female difference tripping of unsuccessful reason
Sending side is " { switch or breaker } and protects and 500 ", and the virtual terminator of sending side is described as " failure ", connects Receiving side is " { mother difference or bus } and protection ".
(3) each side of failure shunt tripping main transformer
Sending side is " { switch or breaker } and protection ", and the virtual terminator of sending side is described as " failure ", and receiving side is " { main transformer or transformer } and protection ".
(4) hard contact point signal
Contain " hard contact ".
(5) inspecting state
Contain " maintenance pressing plate ".
6. peace, which is arranged, executes message (XML) generation
6.1 file format
<Precaution>
<IED desc=" tranformer protection " name=" PT2201A " ipaddr=" 198.120.0.19 "/>
< Entry desc=" investment tranformer protection overhauls pressing plate " ref=" LD0/GGIO1.SPCSO1.stVal " Expect=" 1 "/>
< Entry desc=" exits middle failure releasing and presses off the outlet lock GOOSE soft pressing plate again " ref=" LD0/ GGIO1.SPCSO2.stVal " expect=" 0 "/>
< Entry desc=" exiting the outlet starting medium voltage side breaker failure GOOSE soft pressing plate " ref=" LD0/ GGIO1.SPCSO3.stVal " expect=" 0 "/>
< Entry desc=" exits and jumps the outlet medium voltage side mother GOOSE soft pressing plate " " ref=" LD0/ GGIO1.SPCSO4.stVal " expect=" 0 "/>
< Entry desc=" exits and jumps the outlet medium voltage side segmentation 1GOOSE soft pressing plate " ref=" LD0/ GGIO1.SPCSO5.stVal " expect=" 0 "/>
< Entry desc=" exits and jumps the outlet medium voltage side segmentation 2GOOSE soft pressing plate " ref=" LD0/ GGIO1.SPCSO6.stVal " expect=" 0 "/>
<Entry desc=" maintenance hard pressing plate " ref=" LD0/GGIO1.Ind1.stVal " expect=" 1 "/>
</IED>
</Precaution>
(1) Precaution root element indicates that peace is arranged and executes entry.
(2) IED element indicates device information.One Precaution element includes one or more IED element, and IED belongs to Property has desc, name, ipaddr.Desc indicates device descriptive information, and name indicates the title of IED, and ipaddr indicates the IP of IED Address.
(3) Entry element indicates the entry of safety measure.One IED element includes one or more Entry element, Entry attribute has desc, ref, expect.Desc indicates that peace arranges content to describe;Ref indicates that this peace arranges the signal of information to quote Name;Expect indicates that this peace arranges the desired value of information.
6.2 generating
It, can be by by the logic the invention proposes the logic that intelligent substation secondary maintenance safety measure automatically generates Job category is corresponded to automatically according to power failure equipments and working range and generates safety measure, determines that secondary device isolating points and isolation are arranged It applies, mitigates O&M service personnel operating pressure, eliminate the security risk of smart machine service work.
In conclusion the contents of the present invention are not limited in the above embodiments, those skilled in the art can be It is proposed other embodiments within technological guidance's thought of the invention, but these embodiments be included in the scope of the present invention it It is interior.

Claims (2)

1. a kind of intelligent substation secondary maintenance safety measure automatic generation method, which comprises the following steps:
S1, selection repair apparatus, power failure type, job category, wherein power failure type indicates that corresponding primary equipment has a power failure or do not stop Electricity, job category include overhaul plan and defect processing;
S2, maintenance interval judgement, judge whether power failure of equipment in the same interval is consistent, continue if consistent, Prompt reports an error and returns to gravity treatment if inconsistent;
S3, isolating points judgement
(1) SCD file is parsed, repair apparatus is successively analyzed, is analyzed centered on repair apparatus and all sends and receives link;
(2) when the equipment of both sides of the link is repair apparatus, safety measure is not considered and is terminated;
(3) when both sides of the link equipment side is repair apparatus, and side is running equipment, consider safety measure;
S4, safety measure order policies
(1) all repair apparatus chosen are traversed for the first time, analyze isolating points, and the SV of equipment out of service receives soft pressing plate;
(2) all repair apparatus chosen are traversed for the second time, analyze isolating points, and the GOOSE of equipment out of service receives soft pressing plate;
(3) all repair apparatus chosen are traversed for the third time, analyze isolating points, and the GOOSE for exiting repair apparatus sends soft pressing plate;
(4) if needed then disconnect and run link between optical fiber circuit, if isolating points repair apparatus side without send soft pressing plate, Then disconnect the optical fiber circuit of isolating points;
(5) if the interval primary equipment does not have a power failure, interval intelligent terminal outlet hard pressing plate is exited;
(6) the maintenance pressing plate of repair apparatus is put into;
(7) if the interval primary equipment has a power failure, electric current is disconnected and is shorted, and voltage disconnects;
S5, disconnection is sequentially listed according to the connection of rule of correspondence mapped device according to input information matches safety measure production rule Point generates safety measure and terminates.
2. a kind of intelligent substation secondary maintenance safety measure automatic generation method described in accordance with the claim 1, feature exist In maintenance interval judgement includes the judgement of 500kV switch gap, the judgement of 500kV line segregation, 500kV main transformer in the step S2 Interval judgement, the judgement of 500kV bus interval, the judgement of 220kV line segregation, the judgement of 220kV main transformer interval and 220kV bus interval Judgement.
CN201710533409.3A 2017-07-03 2017-07-03 A kind of intelligent substation secondary maintenance safety measure automatic generation method Active CN107275963B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710533409.3A CN107275963B (en) 2017-07-03 2017-07-03 A kind of intelligent substation secondary maintenance safety measure automatic generation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710533409.3A CN107275963B (en) 2017-07-03 2017-07-03 A kind of intelligent substation secondary maintenance safety measure automatic generation method

Publications (2)

Publication Number Publication Date
CN107275963A CN107275963A (en) 2017-10-20
CN107275963B true CN107275963B (en) 2019-05-31

Family

ID=60070906

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710533409.3A Active CN107275963B (en) 2017-07-03 2017-07-03 A kind of intelligent substation secondary maintenance safety measure automatic generation method

Country Status (1)

Country Link
CN (1) CN107275963B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108492660A (en) * 2018-04-02 2018-09-04 国网青海省电力公司 Substation's peace arranges analogy method, device and system
CN111143630B (en) * 2019-11-26 2022-09-09 南京国电南自电网自动化有限公司 Intelligent substation overhaul safety measure execution state checking method and device
CN112039211B (en) * 2020-09-07 2022-03-01 国网四川省电力公司电力科学研究院 Optimization method for reliability and complexity of secondary safety measure of intelligent substation

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106159759A (en) * 2016-07-13 2016-11-23 国网四川省电力公司电力科学研究院 A kind of method automatically generating secondary system of intelligent substation maintenance safety measure
CN106384304A (en) * 2016-10-20 2017-02-08 许继集团有限公司 Intelligent substation secondary equipment safety measure bill automatic construction method and device
CN106680634A (en) * 2016-12-30 2017-05-17 国家电网公司 Intelligent relay protection safety measure warning method for intelligent substations

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106159759A (en) * 2016-07-13 2016-11-23 国网四川省电力公司电力科学研究院 A kind of method automatically generating secondary system of intelligent substation maintenance safety measure
CN106384304A (en) * 2016-10-20 2017-02-08 许继集团有限公司 Intelligent substation secondary equipment safety measure bill automatic construction method and device
CN106680634A (en) * 2016-12-30 2017-05-17 国家电网公司 Intelligent relay protection safety measure warning method for intelligent substations

Also Published As

Publication number Publication date
CN107275963A (en) 2017-10-20

Similar Documents

Publication Publication Date Title
CN107045663B (en) Visual online checking system and method for secondary safety measure operation ticket
KR102218268B1 (en) Substation Automation Operating Device Equipped with Automatic Generation of Failure Judgment and Failure Recovery Scenarios
CN101432947B (en) Intelligent electronic device configuration inspection
CN107275963B (en) A kind of intelligent substation secondary maintenance safety measure automatic generation method
CN108155717A (en) The anti-error methods of calibration of distribution main website FA based on operation of power networks data
CN108376966B (en) Method and system for analyzing correlation relationship between misoperation-preventive locking logic intervals of intelligent substation
CN105379135B (en) The system and method diagnosed automatically in real time in power network
CN107045706A (en) Intelligent substation secondary safety measure operation order automatic generation method
CN112834865B (en) Quick fault finder for secondary circuit of power system
CN103730894B (en) EMS image checking mehtod and device
CN109962443A (en) A kind of protection maintenance peace based on SCD arranges tactful automatic creation system and method
CN107067081A (en) Substation secondary maintenance safety measure generation method based on many object models
CN111563658A (en) Visual online checking method and device for pressing plate in secondary safety measure
CN111143630A (en) Method and device for checking maintenance safety measure execution state of intelligent substation
CN110674282A (en) Expert knowledge rule base-based one-key sequential control operation order intelligent simulation method
CN106451384A (en) Power grid self-healing decision support system based on scheduling emergency plan
CN101860002B (en) Computing method of preventive control measure for short-circuit current in electric power system
CN107871176A (en) The safety-optimized method and system of secondary device applied to IEC61850 information modelings
CN108304947A (en) The safety-optimized method and system of secondary device based on SCD file object model
CN110489729A (en) The automatic switching method and system of disaster-ridden kind of the power grid of D5000-matpower coupling cascading failure model
CN110460037B (en) Line-to-table topology abnormity identification method for connection mode of bijection type cable distribution network
CN107871030A (en) Substation secondary maintenance safety measure generation method based on SCD file object model
CN107871168A (en) Intelligent substation secondary maintenance safety measure generation method
Yunguang et al. Research on secondary circuit identification technology and condition-based maintenance mode of intelligent substation
CN112949271A (en) Maintenance safety measure analysis method and system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant