CN109191327B CN201811021739.5A CN201811021739A CN109191327B CN 109191327 B CN109191327 B CN 109191327B CN 201811021739 A CN201811021739 A CN 201811021739A CN 109191327 B CN109191327 B CN 109191327B
Authority
CN
China
Prior art keywords
state
ied
safety measure
optical fiber
entry
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201811021739.5A
Other languages
Chinese (zh)
Other versions
CN109191327A (en
Inventor
陈刚
赵轩
付同福
韩业虹
施武作
任亚军
张礼波
王文华
黄照厅
雷鸣
聂星
沈立胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Power Grid Co Ltd
Original Assignee
Guizhou Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Power Grid Co Ltd filed Critical Guizhou Power Grid Co Ltd
Priority to CN201811021739.5A priority Critical patent/CN109191327B/en
Publication of CN109191327A publication Critical patent/CN109191327A/en
Application granted granted Critical
Publication of CN109191327B publication Critical patent/CN109191327B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B3/00Apparatus specially adapted for the manufacture, assembly, or maintenance of boards or switchgear
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Abstract

The invention discloses a recording and playback method for an implementation process of secondary safety measures of an intelligent substation, which comprises the steps of extracting an IED data set; creating an intelligent substation IED equipment safety measure library; configuring IED equipment safety measure items to centralize intelligent substation secondary safety measure items; configuring an IED device panel indicator light entry; selecting an IED equipment safety measure item set to carry out initial state check and start to implement; recording a received state change report of an IED equipment safety measure entry; and making a playback file and playing back the file. The invention is convenient for carrying out the trace tracking of the safety measures after the accident, analyzing the accident reason and improving the operation and maintenance efficiency.

Description

Intelligent substation secondary safety measure implementation process recording and playback method
Technical Field
The invention belongs to the field of operation maintenance and overhaul of secondary systems of intelligent substations in intelligent power grids. In particular to a method for recording and replaying the implementation process of secondary safety measures of an intelligent substation.
Background
The traditional transformer substation is provided with a plurality of hard pressure plates with protection functions and hard pressure plates for protecting outlets, the intelligent transformer substation greatly reduces the number of the hard pressure plates, only two hard pressure plates which are operated/overhauled and are in a remote/local position are reserved, and other soft pressure plate modes which are realized by invisible and untouchable software are adopted. When the traditional transformer substation secondary equipment is overhauled or rebuilt, safety operation tickets or safety operation cards are used for setting safety measures, and the safety measure setting is an important process and technical means for overhauling, rebuilding and expanding equipment and ensuring personal safety. The implementation of the secondary safety measures of the traditional transformer substation mainly comprises the steps of switching on and off of a hard pressure plate with a protection function, short-circuiting of a current terminal, blocking of a voltage terminal, switching on and off of a hard pressure plate at an outlet and the like, wherein obvious breaking points exist in the switching on and off of the pressure plate, the breaking points can be directly checked by human eyes, the on-off of the connection points and the checking of the presence or absence of a voltage current value can also be carried out by means of instruments, and the safety measures are intuitive in operation. The intelligent substation protection function pressing plate and the GOOSE outlet pressing plate are soft pressing plates, and the short circuit and breaking operation of current and voltage becomes the switching on and off of the SV input pressing plate. In addition, the intelligent substation is additionally provided with two IEDs which are not available in the traditional substation, the protection unit, the merging unit and the intelligent terminal are additionally provided with operation/maintenance hard pressing plates, the inconsistent maintenance of the two IEDs is also a means for safety measure operation, and meanwhile, in partial regions and partial occasions, the plugging and unplugging of the optical fiber can also be used as a way for safety measure isolation.
Because observability and measurability of safety measure setting of the intelligent substation are poor, operation habits and thinking modes are greatly changed compared with the traditional substation, so that correctness guarantee of the safety measure implementation process is always a difficult problem in operation and maintenance work, and maintenance, reconstruction and expansion work is carried out in partial areas by adopting a large-range power failure mode or even a total station power failure mode, so that continuity and reliability of power supply are seriously influenced. Therefore, how to improve the safety and reliability of the safety measure operation is a new topic after the large-scale popularization and application of the intelligent substation.
The invention records the initial state of all safety measure items in the safety measure item set of the IED equipment and the changed data items in the implementation process and forms a playback file. The playback file can be opened, the whole secondary safety measure implementation process is completely played back by taking the occurrence sequence of the change data as a time axis, the trace tracking of the safety measure implementation is convenient to carry out afterwards, the accident reason is analyzed, and the operation and maintenance certainty is improved.
Disclosure of Invention
The invention aims to solve the problems in the prior art, and provides a method for recording and playing back the implementation process of secondary safety measures of an intelligent substation, which records the initial states of all safety measure entries in an IED equipment safety measure entry set and the changed data entries in the implementation process and forms a playback file. The playback file can be opened, the whole secondary safety measure implementation process is completely played back by taking the occurrence sequence of the change data as a time axis, and the judgment result is obtained. The method solves the problems that the implementation process of safety measures at the present stage is not recorded and supervised, and the implementation process of the backtracking measures cannot be realized, facilitates the trace tracking of the safety measures after the incident, facilitates the analysis of the accident reason, and improves the operation and maintenance efficiency.
A recording and playback method for an implementation process of secondary safety measures of an intelligent substation comprises the following steps:
step 1, analyzing the SCD file, extracting each IED data set, wherein the IED data set comprises a pressure plate data set related to an IED pressure plate, a panel indicator lamp data set related to an IED panel indicator lamp and a communication working condition data set related to an IED communication working condition signal,
the pressing plate data in the pressing plate data set comprises the description information of the pressing plate and the reference address of the pressing plate;
the panel indicating lamp data in the panel indicating lamp data set comprises description information of the panel indicating lamps and reference addresses of the state values of the panel indicating lamps;
the communication working condition data in the communication working condition data set comprises description information of the optical fiber and an optical fiber on-off state value reference address;
step 2, creating an intelligent substation IED equipment safety measure library,
the intelligent substation IED device security measure library comprises a number of sets of IED device security measure entries,
each set of IED device security measure entries comprises a number of intelligent substation secondary security measure entries of configurable execution order, an IED device platen data entry or an IED inter-device fiber connection status data entry operable for a protection device,
the IED device platen data entry operable by the protection device includes: entry number of the press plate, description information of the press plate, SCD mapping path of the press plate, initial setting state of the press plate, and change setting state of the press plate,
the inter-IED device fiber connection status data entry includes: the method comprises the steps of mapping paths of optical fiber item numbers, optical fiber description information, optical fiber on-off state values SCD, optical fiber initial setting states and optical fiber change setting states;
step 3, associating IED device platen data entries operable by the protection device:
according to the description information of the pressure plate, associating an IED device pressure plate data entry operable by the protection device with the pressure plate data, associating an SCD mapping path of the pressure plate in the IED device pressure plate data entry operable by the protection device with a reference address of the pressure plate of the corresponding pressure plate data, and configuring an entry number, an initial setting state and a change setting state of the pressure plate of the IED device pressure plate data entry;
and 4, associating optical fiber connection state data entries among IED devices:
the method comprises the steps of associating an inter-IED optical fiber connection state data entry with communication working condition data according to description information of optical fibers, associating an optical fiber on-off state value SCD mapping path of the inter-IED optical fiber connection state data entry with an optical fiber on-off state value reference address in the communication working condition data, configuring an optical fiber entry number, an optical fiber initial setting state and an optical fiber change setting state in the inter-IED optical fiber connection state data entry,
step 5, configuring and associating IED equipment panel indicator lamp entries:
IED equipment panel indicator lamp list includes: panel indicating lamp number, description information of panel indication, panel indication state value SCD mapping path, panel indicating lamp initial setting state, panel indicating lamp change setting state,
associating the IED device panel indicator light entry with the panel indicator light data according to the description information of the panel indicator light, associating the panel indication state value SCD mapping path in the description information of the panel indicator light with the panel indicator light state value reference address in the panel indicator light data, configuring the panel indicator light number of the IED device panel indicator light bar, the panel indicator light initial setting state, the panel indicator light change setting state,
step 6, selecting an IED device safety measure entry set to perform initial state check and start implementation, specifically:
step 6.1, selecting a set of IED device security entry from the library of IED device security entry,
step 6.2, before implementation, comparing the initial state of the pressing plate associated with the SCD mapping path of the pressing plate of the IED device pressing plate data entry operable by the protection device of the IED device safety measure entry set with the initial setting state of the pressing plate, and if the initial state is different, performing inconsistent alarm; if the two are the same, performing step 6.3;
step 6.3, comparing the optical fiber initial state associated with the optical fiber on-off state value SCD mapping path of the optical fiber connection state data entry between the IED equipment in the IED equipment safety measure entry set with the optical fiber initial setting state, and if the optical fiber initial state and the optical fiber initial setting state are different, alarming the inconsistency of the initial states; if the two are the same, performing step 6.4;
6.4, comparing the initial state of the panel indicator lamp associated with the panel indication state value SCD mapping path of the panel indicator lamp bar of the IED equipment with the initial setting state of the panel indicator lamp, and if the initial state is different, giving an alarm of inconsistency of the initial states; if the IED device security measure entries are the same, implementing the IED device security measure entry set;
step 7, during the implementation of the IED equipment safety measure entry set, recording the received state change report, wherein the state change report comprises a state change value reference address, a report state change value and a report state change time,
identify state change value reference address:
if the state change value reference address is the same as the SCD mapping path of the pressing plate, recording the pressing plate state change value and the pressing plate state change time of the intelligent substation secondary safety measure entry corresponding to the SCD mapping path of the pressing plate as a report state change value and a report state change time respectively, and recording the safety measure implementation sequence number of the intelligent substation secondary safety measure entry corresponding to the SCD mapping path of the pressing plate;
if the state change value reference address is the same as the optical fiber on-off state value SCD mapping path, recording the optical fiber state change value and the optical fiber state change time of the intelligent substation secondary safety measure entry corresponding to the optical fiber on-off state value SCD mapping path as a report state change value and a report state change time respectively, and recording the safety measure implementation sequence number of the intelligent substation secondary safety measure entry corresponding to the optical fiber on-off state value SCD mapping path;
if the state change value reference address is the same as the panel indication state value SCD mapping path, recording the state change value and the state change time of an indicator lamp of an IED equipment panel indicator light bar corresponding to the panel indication state value SCD mapping path as a report state change value and a report state change time;
otherwise, an operation error alarm is carried out,
after the IED equipment safety measure entry sets are implemented, after all state change reports are received, the safety measure implementation sequence numbers and the corresponding intelligent substation secondary safety measure entries are compared with the implemented IED equipment safety measure entry sets, if the safety measure implementation sequence numbers and the corresponding intelligent substation secondary safety measure entries are the same, the IED equipment safety measure entry sets are implemented correctly, if the safety measure implementation sequence numbers and the corresponding intelligent substation secondary safety measure entries are different, an error execution alarm is given,
step 8, making a playback file, wherein the playback file comprises:
6, selecting an intelligent substation secondary safety measure entry of the IED equipment safety measure entry set, an execution sequence of the intelligent substation secondary safety measure entries, an IED equipment panel indicator light entry, a pressing plate initial state and an optical fiber initial state of the intelligent substation secondary safety measure entry, and a panel indicator light initial state of the IED equipment panel indicator light bar;
the safety measure implementation sequence number, the pressing plate state change value, the pressing plate state change time, the optical fiber state change value and the optical fiber state change time of the implemented secondary safety measure entry of the intelligent substation determined by the state change report in the step 7 are also included;
the method also comprises the steps of determining an indicator light state change value and an indicator light state change time of an indicator light bar of the panel of the IED equipment through the state change report in the step 7;
the method also comprises initial state inconsistency alarm, operation error alarm and error execution alarm;
and 9, performing playback, wherein the playback comprises two stages:
the first stage shows the intelligent substation secondary safety measure items, the execution sequence of the intelligent substation secondary safety measure items, the IED equipment panel indicator light items, the pressing plate initial state and the optical fiber initial state of the intelligent substation secondary safety measure items and the panel indicator light initial state of the IED equipment panel indicator light bars of the IED equipment safety measure item set selected in the step 6, and marks inconsistent alarms of the initial states;
and in the second stage, the implementation process of the secondary safety measure items of the intelligent substation determined by the state change report in the step 7 is sequentially displayed according to the sequence of a time axis, the pressing plate state change value, the pressing plate state change time, the optical fiber state change value and the optical fiber state change time of the secondary safety measure items of the intelligent substation are displayed, the state change value and the state change time of an indicator lamp of an indicator light bar on an IED (intelligent electronic device) panel are displayed, and operation error alarm and error execution alarm are marked.
Compared with the prior art, the invention has the following beneficial effects:
1. at the present stage, in the implementation process of the safety measures, no good means is provided for recording the execution process of the safety measures. The invention exactly solves the gap, completely records the safety measure implementation process to generate the playback file, is beneficial to checking the complete process of the safety measure operation afterwards, and carries out the after-the-fact analysis on the problem caused by the misoperation to search the root of the problem.
2. The complete playback secondary security implementation process is divided into two stages: the method comprises the steps that in the first stage, the initial states of all safety measure items in an IED equipment safety measure item set are shown; and in the second stage, the whole secondary safety measure implementation process is completely played back by taking the change according to the safety measure data occurrence sequence as a time axis, and if errors occur in the real-time process, the reason for executing the errors is prompted. Therefore, trace tracking of secondary safety measures is facilitated, and accident reasons are analyzed.
Detailed Description
The present invention will be described in further detail with reference to examples for the purpose of facilitating understanding and practice of the invention by those of ordinary skill in the art, and it is to be understood that the present invention has been described in the illustrative embodiments and is not to be construed as limited thereto.
A recording and playback method for an implementation process of secondary safety measures of an intelligent substation mainly comprises an SCD analysis process, a safety measure configuration process, an optical fiber information configuration process, an IED equipment state indicator lamp configuration process, a recording safety measure checking process and a safety measure process for completely playing back the record. The specific implementation process comprises the following steps:
step 1, analyzing an SCD file and extracting each IED data set;
analyzing the SCD file, and extracting each IED data set, wherein the IED data set comprises:
1. a platen data set associated with the IED platen. The platen dataset corresponds to a dataset name in the SCD file, which is "dsRelayEna"; the platen data in the platen data set includes platen description information, and a reference address of the platen.
2. A panel indicator light dataset associated with the IED panel indicator light. The panel indicator light is not matched with a directly associated data set, but the state of the panel indicator light can be represented by sending data in the data set through an alarm data set or a GOOSE, so that the data set names 'dsAlarm', 'dsWarneng', 'dsGOOSE' in the SCD file are extracted to be used as the panel indicator light data set; the panel indicator light data in the panel indicator light data set comprises description information of the panel indicator light and a reference address of the state value of the panel indicator light.
3. And a communication working condition data set related to the IED communication working condition signal, wherein the communication working condition data set corresponds to a data set name 'dsCommState' in the SCD file. The communication working condition data in the communication working condition data set comprises description information of the optical fiber and reference addresses of on-off state values of the optical fiber.
Step 2, creating an intelligent substation IED equipment safety measure library;
the intelligent substation IED equipment safety measure library comprises a plurality of IED equipment safety measure entry sets, and each IED equipment safety measure entry set comprises a plurality of intelligent substation secondary safety measure entries with configurable execution sequences. In an intelligent substation, a bay type may create multiple sets of IED device security measure entries per voltage class.
The intelligent substation secondary safety measure entry is an IED device pressure plate data entry or an IED device-to-IED optical fiber connection state data entry which can be operated by the protection device.
The IED device platen data entry operable with each protection device includes: the entry number of the pressing plate, the description information of the pressing plate, the SCD mapping path of the pressing plate, the initial setting state of the pressing plate and the change setting state of the pressing plate.
Each IED inter-device fiber connection status data entry includes: the method comprises the steps of optical fiber item number, optical fiber description information, an optical fiber on-off state value SCD mapping path, an optical fiber initial setting state and an optical fiber change setting state.
Step 3, associating IED device pressure plate data items operable by the protection device;
an IED device pressure plate operable with a protection device includes: GOOSE input pressing plate, GOOSE output pressing plate, SV input pressing plate, functional pressing plate and hard pressing plate.
GOOSE input platen includes: starting a failure pressing plate;
the GOOSE output platen includes: tripping the soft pressing plate, starting the failure soft pressing plate, locking the reclosing soft pressing plate and reclosing the soft pressing plate;
the SV input platen comprises: SV receives the soft pressing plate;
the hard pressing plate comprises: the maintenance pressing plate, the outlet hard pressing plate and the remote on-site pressing plate.
The instantiation process is as follows: according to the description information of the pressure plate, associating an IED device pressure plate data entry operable by the protection device with the pressure plate data, associating an SCD mapping path of the pressure plate in the IED device pressure plate data entry operable by the protection device with a reference address of the pressure plate of the corresponding pressure plate data, and configuring an entry number, an initial setting state and a change setting state of the pressure plate of the IED device pressure plate data entry;
step 4, associating optical fiber connection state data items among IED devices;
the status of the fiber connection between the IED devices is determined according to whether the transceiving ports of the IED devices are normal, and the on-off status of the transceiving ports of the IED devices has a specific SCD data set entry corresponding thereto, that is, the parsing SCD extracts the entry in the communication condition data set related to the IED communication condition signal in step 1,
the instantiation process is as follows: and associating the optical fiber connection state data entry between the IED devices with the communication working condition data according to the description information of the optical fiber, associating an optical fiber on-off state value SCD mapping path of the optical fiber connection state data entry between the IED devices with an optical fiber on-off state value reference address in the communication working condition data, and configuring an optical fiber entry number, an optical fiber initial setting state and an optical fiber change setting state in the optical fiber connection state data entry between the IED devices.
Step 5, configuring and associating IED equipment panel indicator lamp entries;
IED equipment panel pilot lamp includes: an operation lamp, an abnormal lamp, a maintenance lamp, various warning lamps and an action lamp. The operating conditions of the protection equipment are directly fed back by the IED equipment panel indicator lamps, the change process of the indicator lamps is visually shown in the safety measure implementation process, the equipment state can be more accurately positioned, and the human-computer interaction process is facilitated.
IED equipment panel indicator lamp list includes: the panel indicating lamp number, the description information of the panel indication, the panel indication state value SCD mapping path, the initial setting state of the panel indicating lamp and the change setting state of the panel indicating lamp.
The method comprises the steps of associating an IED device panel indicator lamp entry with panel indicator lamp data according to description information of the panel indicator lamp, associating a panel indication state value SCD mapping path in the description information of the panel indicator lamp with a panel indicator lamp state value reference address in the panel indicator lamp data, and configuring a panel indicator lamp number of an IED device panel indicator lamp bar, an initial setting state of the panel indicator lamp and a change setting state of the panel indicator lamp.
Step 6, selecting an IED equipment safety measure item set to carry out initial state check and start to implement;
step 6.1, selecting an IED device safety measure entry set from the IED device safety measure entry library in an automatic matching or manual searching mode according to the voltage class and the interval type,
step 6.2, before implementation, comparing the initial state of the pressing plate associated with the SCD mapping path of the pressing plate of the IED device pressing plate data entry operable by the protection device of the IED device safety measure entry set with the initial setting state of the pressing plate, and if the initial state is different, performing inconsistent alarm; if the two are the same, performing step 6.3;
step 6.3, comparing the optical fiber initial state associated with the optical fiber on-off state value SCD mapping path of the optical fiber connection state data entry between the IED equipment in the IED equipment safety measure entry set with the optical fiber initial setting state, and if the optical fiber initial state and the optical fiber initial setting state are different, alarming the inconsistency of the initial states; if the two are the same, performing step 6.4;
6.4, comparing the initial state of the panel indicator lamp associated with the panel indication state value SCD mapping path of the panel indicator lamp bar of the IED equipment with the initial setting state of the panel indicator lamp, and if the initial state is different, giving an alarm of inconsistency of the initial states; if the IED device security measure entries are the same, implementing the IED device security measure entry set;
step 7, during the implementation of the IED equipment safety measure entry set, recording the received state change report, wherein the state change report comprises a state change value reference address, a report state change value and a report state change time,
identify state change value reference address:
if the state change value reference address is the same as the SCD mapping path of the pressing plate, recording the pressing plate state change value and the pressing plate state change time of the intelligent substation secondary safety measure entry corresponding to the SCD mapping path of the pressing plate as a report state change value and a report state change time respectively, and recording the safety measure implementation sequence number of the intelligent substation secondary safety measure entry corresponding to the SCD mapping path of the pressing plate;
if the state change value reference address is the same as the optical fiber on-off state value SCD mapping path, recording the optical fiber state change value and the optical fiber state change time of the intelligent substation secondary safety measure entry corresponding to the optical fiber on-off state value SCD mapping path as a report state change value and a report state change time respectively, and recording the safety measure implementation sequence number of the intelligent substation secondary safety measure entry corresponding to the optical fiber on-off state value SCD mapping path;
if the state change value reference address is the same as the panel indication state value SCD mapping path, recording the state change value and the state change time of an indicator lamp of an IED equipment panel indication lamp bar corresponding to the panel indication state value SCD mapping path as a report state change value and a report state change time;
otherwise, an operation error alarm is carried out.
After the IED equipment safety measure entry sets are implemented, after all state change reports are received, safety measure implementation sequence numbers and corresponding intelligent substation secondary safety measure entries are compared with the implemented IED equipment safety measure entry sets, if the safety measure implementation sequence numbers and the corresponding intelligent substation secondary safety measure entries are the same, the IED equipment safety measure entry sets are implemented correctly, and if the safety measure implementation sequence numbers and the corresponding intelligent substation secondary safety measure entries are different, false execution alarms are conducted, generally, sequence errors and missing entries are wrong.
Step 8, making a playback file, wherein the playback file comprises:
6, selecting an intelligent substation secondary safety measure entry of the IED equipment safety measure entry set, an execution sequence of the intelligent substation secondary safety measure entries, an IED equipment panel indicator light entry, a pressing plate initial state and an optical fiber initial state of the intelligent substation secondary safety measure entry, and a panel indicator light initial state of the IED equipment panel indicator light bar;
the safety measure implementation sequence number, the pressing plate state change value, the pressing plate state change time, the optical fiber state change value and the optical fiber state change time of the implemented secondary safety measure entry of the intelligent substation determined by the state change report in the step 7 are also included;
the method also comprises the steps of determining an indicator light state change value and an indicator light state change time of an indicator light bar of the panel of the IED equipment through the state change report in the step 7;
the method also comprises initial state inconsistency alarm, operation error alarm and error execution alarm;
and 9, performing playback, wherein the playback comprises two stages:
the first stage shows the intelligent substation secondary safety measure items, the execution sequence of the intelligent substation secondary safety measure items, the IED equipment panel indicator light items, the pressing plate initial state and the optical fiber initial state of the intelligent substation secondary safety measure items and the panel indicator light initial state of the IED equipment panel indicator light bars of the IED equipment safety measure item set selected in the step 6, and marks inconsistent alarms of the initial states;
and in the second stage, the implementation process of the secondary safety measure items of the intelligent substation determined by the state change report in the step 7 is sequentially displayed according to the sequence of a time axis, the pressing plate state change value, the pressing plate state change time, the optical fiber state change value and the optical fiber state change time of the secondary safety measure items of the intelligent substation are displayed, the state change value and the state change time of an indicator lamp of an indicator light bar on an IED (intelligent electronic device) panel are displayed, and operation error alarm and error execution alarm are marked.
The specific embodiments described herein are merely illustrative of the invention. Various modifications, additions and substitutions may be made by those skilled in the art to the specific embodiments described without departing from the spirit of the invention or exceeding the scope of the claims defined below.

Claims (1)

1. A recording and playback method for an implementation process of secondary safety measures of an intelligent substation comprises the following steps:
step 1, analyzing the SCD file, extracting each IED data set, wherein the IED data set comprises a pressure plate data set related to an IED pressure plate, a panel indicator lamp data set related to an IED panel indicator lamp and a communication working condition data set related to an IED communication working condition signal,
the pressing plate data in the pressing plate data set comprises the description information of the pressing plate and the reference address of the pressing plate;
the panel indicating lamp data in the panel indicating lamp data set comprises description information of the panel indicating lamps and reference addresses of the state values of the panel indicating lamps;
the communication working condition data in the communication working condition data set comprises description information of the optical fiber and an optical fiber on-off state value reference address;
step 2, creating an intelligent substation IED equipment safety measure library,
the intelligent substation IED device security measure library comprises a number of sets of IED device security measure entries,
each set of IED device security measure entries comprises a number of intelligent substation secondary security measure entries of configurable execution order, an IED device platen data entry or an IED inter-device fiber connection status data entry operable for a protection device,
the IED device platen data entry operable by the protection device includes: entry number of the press plate, description information of the press plate, SCD mapping path of the press plate, initial setting state of the press plate, and change setting state of the press plate,
the inter-IED device fiber connection status data entry includes: the method comprises the steps of mapping paths of optical fiber item numbers, optical fiber description information, optical fiber on-off state values SCD, optical fiber initial setting states and optical fiber change setting states;
step 3, associating IED device platen data entries operable by the protection device:
according to the description information of the pressure plate, associating an IED device pressure plate data entry operable by the protection device with the pressure plate data, associating an SCD mapping path of the pressure plate in the IED device pressure plate data entry operable by the protection device with a reference address of the pressure plate of the corresponding pressure plate data, and configuring an entry number, an initial setting state and a change setting state of the pressure plate of the IED device pressure plate data entry;
and 4, associating optical fiber connection state data entries among IED devices:
the method comprises the steps of associating an inter-IED optical fiber connection state data entry with communication working condition data according to description information of optical fibers, associating an optical fiber on-off state value SCD mapping path of the inter-IED optical fiber connection state data entry with an optical fiber on-off state value reference address in the communication working condition data, configuring an optical fiber entry number, an optical fiber initial setting state and an optical fiber change setting state in the inter-IED optical fiber connection state data entry,
step 5, configuring and associating IED equipment panel indicator lamp entries:
IED equipment panel indicator lamp list includes: panel indicating lamp number, description information of panel indication, panel indication state value SCD mapping path, panel indicating lamp initial setting state, panel indicating lamp change setting state,
associating the IED device panel indicator light entry with the panel indicator light data according to the description information of the panel indicator light, associating the panel indication state value SCD mapping path in the description information of the panel indicator light with the panel indicator light state value reference address in the panel indicator light data, configuring the panel indicator light number of the IED device panel indicator light bar, the panel indicator light initial setting state, the panel indicator light change setting state,
step 6, selecting an IED device safety measure entry set to perform initial state check and start implementation, specifically:
step 6.1, selecting a set of IED device security entry from the library of IED device security entry,
step 6.2, before implementation, comparing the initial state of the pressing plate associated with the SCD mapping path of the pressing plate of the IED device pressing plate data entry operable by the protection device of the IED device safety measure entry set with the initial setting state of the pressing plate, and if the initial state is different, performing inconsistent alarm; if the two are the same, performing step 6.3;
step 6.3, comparing the optical fiber initial state associated with the optical fiber on-off state value SCD mapping path of the optical fiber connection state data entry between the IED equipment in the IED equipment safety measure entry set with the optical fiber initial setting state, and if the optical fiber initial state and the optical fiber initial setting state are different, alarming the inconsistency of the initial states; if the two are the same, performing step 6.4;
6.4, comparing the initial state of the panel indicator lamp associated with the panel indication state value SCD mapping path of the panel indicator lamp bar of the IED equipment with the initial setting state of the panel indicator lamp, and if the initial state is different, giving an alarm of inconsistency of the initial states; if the IED device security measure entries are the same, implementing the IED device security measure entry set;
step 7, during the implementation of the IED equipment safety measure entry set, recording the received state change report, wherein the state change report comprises a state change value reference address, a report state change value and a report state change time,
identify state change value reference address:
if the state change value reference address is the same as the SCD mapping path of the pressing plate, recording the pressing plate state change value and the pressing plate state change time of the intelligent substation secondary safety measure entry corresponding to the SCD mapping path of the pressing plate as a report state change value and a report state change time respectively, and recording the safety measure implementation sequence number of the intelligent substation secondary safety measure entry corresponding to the SCD mapping path of the pressing plate;
if the state change value reference address is the same as the optical fiber on-off state value SCD mapping path, recording the optical fiber state change value and the optical fiber state change time of the intelligent substation secondary safety measure entry corresponding to the optical fiber on-off state value SCD mapping path as a report state change value and a report state change time respectively, and recording the safety measure implementation sequence number of the intelligent substation secondary safety measure entry corresponding to the optical fiber on-off state value SCD mapping path;
if the state change value reference address is the same as the panel indication state value SCD mapping path, recording the state change value and the state change time of an indicator lamp of an IED equipment panel indicator light bar corresponding to the panel indication state value SCD mapping path as a report state change value and a report state change time;
otherwise, an operation error alarm is carried out,
after the IED equipment safety measure entry sets are implemented, after all state change reports are received, the safety measure implementation sequence numbers and the corresponding intelligent substation secondary safety measure entries are compared with the implemented IED equipment safety measure entry sets, if the safety measure implementation sequence numbers and the corresponding intelligent substation secondary safety measure entries are the same, the IED equipment safety measure entry sets are implemented correctly, if the safety measure implementation sequence numbers and the corresponding intelligent substation secondary safety measure entries are different, an error execution alarm is given,
step 8, making a playback file, wherein the playback file comprises:
6, selecting an intelligent substation secondary safety measure entry of the IED equipment safety measure entry set, an execution sequence of the intelligent substation secondary safety measure entries, an IED equipment panel indicator light entry, a pressing plate initial state and an optical fiber initial state of the intelligent substation secondary safety measure entry, and a panel indicator light initial state of the IED equipment panel indicator light bar;
the safety measure implementation sequence number, the pressing plate state change value, the pressing plate state change time, the optical fiber state change value and the optical fiber state change time of the implemented secondary safety measure entry of the intelligent substation determined by the state change report in the step 7 are also included;
the method also comprises the steps of determining an indicator light state change value and an indicator light state change time of an indicator light bar of the panel of the IED equipment through the state change report in the step 7;
the method also comprises initial state inconsistency alarm, operation error alarm and error execution alarm;
and 9, performing playback, wherein the playback comprises two stages:
the first stage shows the intelligent substation secondary safety measure items, the execution sequence of the intelligent substation secondary safety measure items, the IED equipment panel indicator light items, the pressing plate initial state and the optical fiber initial state of the intelligent substation secondary safety measure items and the panel indicator light initial state of the IED equipment panel indicator light bars of the IED equipment safety measure item set selected in the step 6, and marks inconsistent alarms of the initial states;
and in the second stage, the implementation process of the secondary safety measure items of the intelligent substation determined by the state change report in the step 7 is sequentially displayed according to the sequence of a time axis, the pressing plate state change value, the pressing plate state change time, the optical fiber state change value and the optical fiber state change time of the secondary safety measure items of the intelligent substation are displayed, the state change value and the state change time of an indicator lamp of an indicator light bar on an IED (intelligent electronic device) panel are displayed, and operation error alarm and error execution alarm are marked.
CN201811021739.5A 2018-09-03 2018-09-03 Intelligent substation secondary safety measure implementation process recording and playback method Active CN109191327B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811021739.5A CN109191327B (en) 2018-09-03 2018-09-03 Intelligent substation secondary safety measure implementation process recording and playback method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811021739.5A CN109191327B (en) 2018-09-03 2018-09-03 Intelligent substation secondary safety measure implementation process recording and playback method

Publications (2)

Publication Number Publication Date
CN109191327A CN109191327A (en) 2019-01-11
CN109191327B true CN109191327B (en) 2021-07-09

Family

ID=64912286

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811021739.5A Active CN109191327B (en) 2018-09-03 2018-09-03 Intelligent substation secondary safety measure implementation process recording and playback method

Country Status (1)

Country Link
CN (1) CN109191327B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100820923B1 (en) * 2007-01-30 2008-04-11 명지대학교 산학협력단 Apparatus and method for detecting ied abnormal state on-line in substation automation system based on iec61850
CN103439612A (en) * 2013-09-02 2013-12-11 上海毅昊自动化有限公司 Intelligent transformer substation automatic testing system based on SCD
CN104145258A (en) * 2011-09-09 2014-11-12 石器公司 Method and apparatus for server side remote desktop recordation and playback
CN106159759A (en) * 2016-07-13 2016-11-23 国网四川省电力公司电力科学研究院 A kind of method automatically generating secondary system of intelligent substation maintenance safety measure
CN107292524A (en) * 2017-06-28 2017-10-24 国网黑龙江省电力有限公司电力科学研究院 Intelligent substation secondary safety measure automatic generation method and device
CN206948803U (en) * 2017-07-17 2018-01-30 贵州电网有限责任公司六盘水供电局 A kind of supervisory control of substation rack that can reduce supervisory control of substation machine fault rate

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3967691B2 (en) * 2003-03-31 2007-08-29 株式会社東芝 Information storage medium, information reproducing apparatus, and information recording / reproducing apparatus

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100820923B1 (en) * 2007-01-30 2008-04-11 명지대학교 산학협력단 Apparatus and method for detecting ied abnormal state on-line in substation automation system based on iec61850
CN104145258A (en) * 2011-09-09 2014-11-12 石器公司 Method and apparatus for server side remote desktop recordation and playback
CN103439612A (en) * 2013-09-02 2013-12-11 上海毅昊自动化有限公司 Intelligent transformer substation automatic testing system based on SCD
CN106159759A (en) * 2016-07-13 2016-11-23 国网四川省电力公司电力科学研究院 A kind of method automatically generating secondary system of intelligent substation maintenance safety measure
CN107292524A (en) * 2017-06-28 2017-10-24 国网黑龙江省电力有限公司电力科学研究院 Intelligent substation secondary safety measure automatic generation method and device
CN206948803U (en) * 2017-07-17 2018-01-30 贵州电网有限责任公司六盘水供电局 A kind of supervisory control of substation rack that can reduce supervisory control of substation machine fault rate

Also Published As

Publication number Publication date
CN109191327A (en) 2019-01-11

Similar Documents

Publication Publication Date Title
CN107045663B (en) Visual online checking system and method for secondary safety measure operation ticket
CN108847968B (en) Monitoring accident and abnormal event identification and multidimensional analysis method
CN110829595B (en) Intelligent power station relay protection equipment overhaul safety isolation measure execution method and system
CN106340818B (en) Intelligent substation relay protection device maintenance peace arranges assistant analysis method for early warning
CN107045706B (en) Automatic generation method for secondary safety measure operation ticket of intelligent substation
CN109962443B (en) SCD-based protection, overhaul and safety measure automatic generation system and method
CN106990321A (en) Distribution line failure identifying device based on voltage monitoring
CN108551401B (en) Virtual-real loop correlation mapping and diagnosis method of virtual-real diagnosis system of intelligent substation
CN111563658A (en) Visual online checking method and device for pressing plate in secondary safety measure
CN106292499B (en) Safety error prevention method and device for operation and maintenance operation object of secondary equipment of intelligent substation
CN107015123A (en) A kind of accurate decision method of transmission line malfunction based on recorder data
CN105956245B (en) Intelligent substation SCD model interval decoupling method
CN108448718B (en) One-key sequential control method and system for intelligent substation protection device
CN109191327B (en) Intelligent substation secondary safety measure implementation process recording and playback method
CN113343446B (en) Data analysis and verification method and system for transformer substation monitoring system
CN104391188A (en) Relay protection recessive fault detection method based on protection signal parsing model
CN109634849B (en) Visual signal interaction intelligent substation reconstruction and extension virtual testing device and method
CN114977486A (en) Anti-misoperation system and method for remote control soft pressing plate of combined intelligent substation
CN104682564B (en) Relay protecting and mis-operation preventing device and system
CN112949271A (en) Maintenance safety measure analysis method and system
CN109510308B (en) Third-generation intelligent substation switching value local module test system and application method thereof
Hong et al. Research on Intelligent Diagnosis Strategy of Secondary Device Abnormity in Smart Substation
CN112255481A (en) Target equipment anti-error detection method and device, storage medium and electronic device
CN103746351B (en) Consider the electric power system fault alarm method of digitalized substation secondary loop signal
CN110956283A (en) Method and system for matching SCD (System configuration description) file with soft pressing plate

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20201104

Address after: 550002 No. 17 Binhe Road, Nanming District, Guizhou, Guiyang

Applicant after: GUIZHOU POWER GRID Corp.

Address before: 553001 No. 45 middle Zijin Mountain Road, Liupanshui, Guizhou

Applicant before: LIUPANSHUI POWER SUPPLY BUREAU OF GUIZHOU POWER GRID Co.,Ltd.

Applicant before: WUHAN KEMOV ELECTRIC Co.,Ltd.

GR01 Patent grant