CN111519627B - Sleeve valve pipe grouting method suitable for deep and thick covering layer permanent curtain - Google Patents

Sleeve valve pipe grouting method suitable for deep and thick covering layer permanent curtain Download PDF

Info

Publication number
CN111519627B
CN111519627B CN202010370194.XA CN202010370194A CN111519627B CN 111519627 B CN111519627 B CN 111519627B CN 202010370194 A CN202010370194 A CN 202010370194A CN 111519627 B CN111519627 B CN 111519627B
Authority
CN
China
Prior art keywords
grouting
induction
pressure
water
water injection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202010370194.XA
Other languages
Chinese (zh)
Other versions
CN111519627A (en
Inventor
宗敦峰
郭万红
孙亮
韩伟
肖恩尚
赵明华
徐文峰
喻云龙
唐玉书
蒋志勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Foundation Engineering Co Ltd
Original Assignee
Sinohydro Foundation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Foundation Engineering Co Ltd filed Critical Sinohydro Foundation Engineering Co Ltd
Priority to CN202010370194.XA priority Critical patent/CN111519627B/en
Publication of CN111519627A publication Critical patent/CN111519627A/en
Application granted granted Critical
Publication of CN111519627B publication Critical patent/CN111519627B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B1/00Equipment or apparatus for, or methods of, general hydraulic engineering, e.g. protection of constructions against ice-strains
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/12Restraining of underground water by damming or interrupting the passage of underground water
    • E02D19/16Restraining of underground water by damming or interrupting the passage of underground water by placing or applying sealing substances

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Civil Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Mechanical Engineering (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The application provides a sleeve valve pipe grouting method suitable for a permanent curtain of a deep covering layer, which comprises the following steps: inserting a blocking plug into a sleeve valve pipe of the current grouting section; opening a ring; inducing and injecting water: after the ring opening, continuously injecting high-pressure water into the grouting pipe at the water injection pressure which is greater than or equal to the induction pressure; when the induction water injection state is judged to reach the induction ending condition, ending the induction water injection; grouting according to the induction water injection condition. The requirement of grout under the complicated unknown geological condition has been satisfied in this application, adopts the induced water injection method, has both examined current geological environment, has opened the grout passageway again, has formed the curtain of enough thickness then under the single row hole condition, and owing to use the cover valve pipe, can repeatedly grout, does benefit to the whole long-term, safe, the steady operation of dam, satisfies the requirement of geological conditions analytic, open the grout passageway simultaneously, guide selection thick liquids material tripartite.

Description

Sleeve valve pipe grouting method suitable for deep and thick covering layer permanent curtain
Technical Field
The application relates to a sleeve valve pipe grouting method suitable for a permanent curtain of a deep covering layer.
Background
The curtain grouting is a grouting engineering which pours grout into cracks and pores of a rock mass or a soil layer to form a continuous waterproof curtain so as to reduce seepage flow and osmotic pressure.
Curtain grouting is a method of constructing an impervious curtain using grouting in a rock or sand gravel foundation of a gate dam. The top of the curtain is connected with the concrete gate bottom plate or dam body, and the bottom of the curtain is extended into the impervious rock stratum to a certain depth so as to prevent or reduce the permeation of underground water in the foundation, and can reduce the uplift pressure of the permeation water flow on the gate dam by the combined action of the curtain and a drainage system positioned at the downstream of the curtain.
For the project which has been constructed or grouted with the concrete impervious wall, when the project downstream has water gushing and sand gushing and needs to be supplemented with a curtain, the geological condition of the section to be irrigated is greatly different from the original state of the stratum. In the filling process, because the verticality of the pre-buried pipe left in the previous grouting is often poor, a great amount of pre-buried pipe drilling is difficult to perform; therefore, only one row of grouting holes of new cloth can be relied on during the filling, and therefore, a water-blocking curtain with enough thickness cannot be formed under the condition of a single row of holes by using the conventional grouting method. As the project in the filling is often operated for years, various stratums encountered by the row of holes are treated by the impervious wall and the original curtain grouting under the wall, which is different from the original geological state, so that no method is available for judging the actual conditions of the filled part and the filled body before the grouting. Therefore, the common grouting method cannot meet the grouting requirements of the filling engineering, and particularly under the high-difficulty conditions of high water head, flowing water, deep covering layer and the like, the waterproof curtain formed by the conventional grouting method has poor waterproof effect and reliability, and the problem of water burst and sand burst cannot be solved.
The casing valve pipe grouting is a bottom-to-top grouting method, wherein the casing valve pipe is put into a grouting hole, and casing materials are injected outside the casing valve pipe to ensure the verticality of the casing valve pipe; the grouting method can accurately perform grouting for specific sections in a segmented mode, and can avoid repeated hole sweeping, so that the efficiency is higher.
The sleeve valve pipe is sealed at the bottom, a pipeline with a plurality of grout outlet holes is annularly arranged, a grout stop ring is tightly hooped outside each grout outlet hole, the sleeve valve pipe needs to be opened at first in grouting, the operation step of opening the ring is to inject water between clamping plugs of the sleeve valve pipe, and water breaks through the grout stop ring on the sleeve valve pipe at first by pressurization and then breaks through sleeve shell materials to enter an original stratum. At this time, the pressure is rapidly reduced, and in the conventional grouting, water injection is stopped immediately after the ring opening and simple water pressing, and grouting is started until the completion.
Disclosure of Invention
In view of the above-mentioned defects or shortcomings in the prior art, it is desirable to provide a method for grouting a sleeve valve pipe suitable for a permanent curtain of a deep covering layer under difficult conditions such as high water head, dynamic water, deep covering layer and the like.
In a first aspect, the present application provides a method for grouting a sleeve valve pipe suitable for a permanent curtain of a deep covering layer, comprising the steps of:
inserting a blocking plug into a sleeve valve pipe of the current grouting section;
opening the ring: injecting water into the grouting pipe to reach the open-loop pressure, and injecting high-pressure water into the grouting pipe to reach the open-loop pressure so as to flush the grout stopping ring and the casing material outside the casing valve pipe and inject water into the stratum;
inducing and injecting water: after the ring is opened, high-pressure water is continuously injected into the grouting pipe by induced pressure so as to test the permeability of the current irrigated section, and an irrigation channel is formed by the impact of the current irrigated section with higher permeability; the induction pressure pgensing satisfies the following two formulas at the same time:
p induction is more than or equal to 1.5 × P water head + P resistance-P still water (formula I);
p induction is more than or equal to P water head +1 (MPa) + P resistance-P still water (formula II);
the P water head is the water head pressure born by the current irrigated section; p resistance is critical resistance of the sleeve valve pipe open loop; the P hydrostatic is the hydrostatic pressure in the current hole;
when the induction water injection state is judged to reach the induction ending condition, ending the induction water injection;
grouting according to the condition of induced water injection to form a thick waterproof curtain.
According to the technical scheme provided by the embodiment of the application, the induction end condition is as follows:
induction end conditions a: the water injection pressure does not reach the induction pressure, or,
induction end conditions b: the perfusion flow rate is close to or equal to the maximum of the grouting pump, or,
induction end conditions c: the water injection pressure is continuously kept near the induction pressure, and the induction water injection time reaches a set duration; the range of the set duration is more than or equal to 60 min.
According to the technical scheme provided by the embodiment of the application, the concrete grouting according to the induced water injection condition is as follows:
if the induction water injection is finished under the induction finishing condition a or the induction finishing condition b, injecting double-liquid slurry or sulphoaluminate cement-based underwater undispersed paste slurry into the grouting pipe;
if the induced water injection is finished under the induction finishing condition c and the perfusion flow during the induced water injection is larger than the set flow, injecting the portland cement-based underwater undispersed paste slurry into the grouting pipe;
and if the induction water injection is finished under the induction finishing condition c and the perfusion flow during the induction water injection is less than or equal to the set flow, injecting chemical grout materials into the grouting pipe.
According to the technical scheme provided by the embodiment of the application, if the induction water injection is finished under the induction finishing condition c, and the Portland cement-based underwater non-dispersed paste grouting or chemical grout material grouting is carried out; if the injection rate in grouting continuously rises and is more than 30L/min; the current grouting liquid is replaced by sulphoaluminate cement-based underwater undispersed paste or double-liquid-slurry high-pressure large-flow continuous injection.
According to the technical scheme provided by the embodiment of the application, the induction pressure is greater than or equal to 3 MPa.
According to the technical scheme provided by the embodiment of the application, the range of the set flow is less than or equal to 80L/min.
According to the technical scheme provided by the embodiment of the application, the double-liquid slurry is formed by adding 10-20% of water glass into common cement slurry in a weight ratio of 0.5: 1.
According to the technical scheme provided by the embodiment of the application, the final setting time of the sulphoaluminate cement-based underwater undispersed paste is 20-60 min. .
According to the technical scheme provided by the embodiment of the application, the initial setting time of the non-dispersed paste under the portland cement-based water is not more than 12h, and the final setting time is not more than 18 h.
According to the technical scheme provided by the embodiment of the application, the chemical pulp is environment-friendly acrylate chemical pulp or silica sol.
The invention has the advantages that:
1. the requirements of grouting projects with complex and unknown geological conditions are met, for example, the construction process of an early impervious wall and a curtain under the wall greatly influences the in-situ layer; when the water-saving type water-saving irrigation system runs under a high water head for many years, the durability of walls and curtains is problematic, but the geological condition during the filling is not clear, so that the complicated and high-difficulty engineering environment is formed; the application overturns the conventional operation of the conventional grouting engineering, and adopts an induced water injection method, namely, a high induced pressure impacts a grouted section for a long time, so that the current geological environment is tested, and a grouting channel is opened; no matter what the current stratum is, adopting high-pressure water to induce for more than 1 hour, if the current stratum can bear the impact of water under the induced pressure for a long time, then detecting that the peripheral irrigated stratum of the irrigated section is quite compact and has low permeability, and the stratum can be simply irrigated when the stratum is safe and assured under the long-term operation; on the contrary, if the fracture occurs under high-pressure water injection, the current stratum permeability is high, and a large injection channel can be formed by opening the fracture; the perfusion channel needs to be perfused and blocked during perfusion; therefore, the high-pressure induced water injection realizes the rapid homogenization of the filled stratum after the compactness and permeability of the stratum are checked, a cushion is made for the subsequent grouting, and the grouting effect and efficiency can be greatly improved; thereby forming an effective permanent water-blocking curtain; the overall grouting effect is inspected, and the actual linkage with the engineering is good; and the induction pressure can be adjusted according to the actual operation condition of the irrigated section, so that the method is convenient to popularize and apply.
2. Forming a curtain with enough thickness under the condition of a single row of holes, and according to the conventional grouting method, the waterproof curtain with enough thickness can be realized by more than 3 rows of grouting holes; in the scheme, a large pouring channel is formed in the induced water injection, so that a thick waterproof curtain is correspondingly formed during the grouting; and the longer the time of induced water injection is, the thicker grouting curtain can be formed, the higher the stratum compactness is, and the running safety of the grouting curtain is ensured.
3. Repeated grouting can be performed; as the sleeve valve pipe is adopted for grouting in the application, the whole grouting is finished, after the operation is carried out for a period of time (such as several years), if the operation monitoring is abnormal, the induction grouting can be carried out again through the embedded sleeve valve pipe, and the induction pressure used at the moment is higher than that used in the first grouting; the induction method is used for reinforcement, the operation monitoring data can be processed at the first time after the abnormality is found, and the method is very favorable for long-term, safe and stable operation of the whole dam.
In conclusion, the induced grouting method is adopted in the application, and the requirements of analyzing geological conditions, opening a grouting channel, guiding to select grouting materials and ensuring long-term safe and stable operation of the dam are met simultaneously.
Other features, objects and advantages of the present application will become more apparent upon reading of the following detailed description of non-limiting embodiments thereof, made with reference to the accompanying drawings in which:
FIGS. 1 and 2 are schematic structural views of a sleeve assembly of the present application;
FIG. 3 is a schematic view of the structural principle of the casing grouting in the present application;
FIG. 4 is a flow chart of grouting in the present application;
reference numbers in the figures: 2. a grout stopping ring; 3. a connecting socket; 21. a slurry outlet; 22. an elastic band; 10. a sleeve valve base pipe; 11. a bottom sleeve valve tube; 12. a common valve sleeve; 5. an expansion plug; 6. grouting pipes; 7. sheathing a shell material; 8. an earth formation; 23. and (7) fixing the belt.
Detailed Description
The present application will be described in further detail with reference to the following drawings and examples. It is to be understood that the specific embodiments described herein are merely illustrative of the relevant invention and not restrictive of the invention. It should be noted that, for convenience of description, only the portions related to the present invention are shown in the drawings.
It should be noted that the embodiments and features of the embodiments in the present application may be combined with each other without conflict. The present application will be described in detail below with reference to the embodiments with reference to the attached drawings.
In the following, this example illustrates the detailed process of the scheme of the present application in the following items:
a hydropower station stores water, the elevation of the dam crest is 1385m, the elevation of normal water storage is about 1375m, and the water and sand gushing condition occurs at the downstream, so the curtain filling is needed, and the grouting curtain needs enough thickness to ensure the durability of the curtain; normally, the coating reinforcement should be applied at the top of the dam. However, this cannot be done in practice. The dam seepage-proofing structure comprises galleries to cause separation between dam seepage-proofing and dam foundation seepage-proofing, and the cover layer is about 1156m at the deepest part, and when the dam top is implemented, the cover layer needs to be drilled and poured for about 230m, so that the requirements cannot be met by the current technical capability. Therefore, the implementation of the filling in the grouting gallery is the only feasible scheme, but the height of the bottom plate of the grouting gallery is 1311m, and the borne water head is 60-70 m; about 155 meters of irrigation needs to be drilled from the corridor. Such high heads and such deep drill-down depths are both higher and deeper than typical drapery-down drills.
Because the construction of the concrete impervious wall is already carried out above 1200 m. Although the diaphragm wall is not arranged below 1200m, the diaphragm wall is grouted, and the diaphragm wall is different from the original state of the stratum. The A hydropower station is provided with three rows of holes, two rows in the wall and one row at the downstream. From the implementation, because two rows of holes in the wall are implemented in the embedded pipe, the verticality of the embedded pipe is not good, and quite a plurality of embedded pipe drilling holes are difficult to perform. Therefore, in practice, drilling is completely reliant on only one row, i.e., a newly-placed row of grouting holes on the downstream side of the diaphragm wall.
The downstream drainage and grouting holes have the following characteristics: firstly, the vertical direction is through, the corridor bottom plate can completely penetrate a covering layer of 155m to 1156m from 1311m, the corridor bottom plate can continuously drill to a relative impermeable bed of bedrock from the interior of the pipe after a valve sleeve is arranged below the corridor bottom plate, full-hole full-section grouting is realized, two rows of walls are performed in a pre-buried pipe, grouting can be performed only under the wall (1200 m), and no effect is caused on 111m between 1200 sand-doped walls 1311; secondly, various stratums encountered by the drainage hole are treated by the impervious wall and the original curtain grouting under the wall, which is different from the original geological state, so that the actual conditions of a grouted part and a grouted body cannot be judged before grouting, and a grouting scheme capable of obtaining satisfactory effect under any geological conditions is needed.
For the drilling condition, grouting by using an orifice sealing method is adopted during primary drilling, and the failure is ended, so that the severe environment is not suitable for grouting by using the orifice sealing method; because: firstly, the orifice sealing method is full-hole compression, and accurate grouting cannot be performed for a specific section, so that the effect is poor; secondly, the hole opening sealing method needs too large repeated hole sweeping engineering amount, particularly a deep hole section with the depth of more than 100m, the hole is often swept and deviated due to the fact that water stones in the original hole are more complete than the stratum of the hole wall, and the drilling efficiency is greatly influenced; third, the common grouting method has poor power resistance and longer gelation time, so the retention rate is very low, the performance after consolidation is very poor, and the cement is finally and completely destroyed under the continuous flushing of power water.
According to the technical specification of the hydropower and hydraulic engineering covering layer grouting, each row of grouting holes can be divided into a first-order hole and a second-order hole, the second-order hole is positioned between the first-order holes, and the first-order holes are preferentially poured; the scheme of the scheme is also a grouting method suitable for the first-order hole.
In this embodiment, a sleeve valve pipe grouting method is adopted, and the following structure is optionally adopted for the sleeve valve pipe assembly: as shown in fig. 1: the slurry stopping device is composed of a plurality of connected sleeve valve pipes, wherein the slurry stopping rings 2 are arranged on the plurality of connected sleeve valve pipes at intervals of a preset distance, in the concrete implementation, the preset distance between the adjacent slurry stopping rings 2 is 300-350 mm, and the preset distance can be adjusted according to the actual engineering. Many cover valve pipes comprise bottom cover valve pipe 11 and several ordinary cover valve pipes 12 of connection in bottom cover valve pipe 11 top that are used for settling at the deep overburden hole bottom, and bottom cover valve pipe 11 and ordinary cover valve pipe 12 include: a sleeve valve base pipe 10; a grout stopping ring 2 arranged on the base pipe 10 of the sleeve valve; wherein, the bottom valve sleeve 11, the common valve sleeve 12 positioned above the bottom valve sleeve and the common valve sleeve 12 are welded together through the connecting socket 3.
As shown in fig. 1, the bottom end structure of the base sleeve pipe 10 of the bottom sleeve pipe 11 is a closed structure. As shown in fig. 2, each stop collar 2 on the bottom sleeve 11 comprises: the plurality of grout outlet holes 21 are circumferentially arranged along the sleeve valve base pipe 10, during specific implementation, 3-5 grout outlet holes 21 are generally formed, the probability that the grout outlet holes are blocked in the grouting process can be greatly reduced through the plurality of grout outlet holes, and subsequent open-loop and grouting construction can be effectively guaranteed to be smoothly carried out; an elastic hoop 22 wrapping the plurality of grout outlet holes 21; and the fixing belts 23 are wound on the upper end and the lower end of the elastic hoop 22 and fix the elastic hoop 22 on the base pipe 10 of the sleeve valve and are used for preventing the elastic hoop 22 from sliding off in the process of arranging the sleeve valve below the sleeve valve.
The diameter of the elastic hoop 22 is 1-3 mm smaller than that of the base pipe 10 of the sleeve valve, so that the elastic hoop 22 can be wrapped on the base pipe 10 of the sleeve valve. During specific construction, the elastic hoop 22 is a rubber hoop with proper elasticity, so that ring-opening grouting can be ensured under certain pressure, and the phenomenon that the grouting stop function is lost or the rubber hoop cannot be reused due to damage under the action of pressure can be avoided.
Specifically, the material and the pore size of the ordinary sleeve valve pipe 12 and the sleeve valve base pipe of the bottom sleeve valve pipe 11 are selected to be consistent. The structure of the grout stop ring 2 manufactured on the base pipe 10 of the common sleeve valve pipe 12 is also the same as the structure of the grout stop ring 2 manufactured on the base pipe of the bottom sleeve valve pipe 11, and the detailed description is omitted.
In this example, the valve sleeve and the jacket material were formed in the following manner: in the drilling process, when the hole is drilled to the bottom of the hole, the weighted wall protection slurry in the drilling process is switched into a casing material, and the casing material is ejected out of the weighted wall protection slurry in the hole after being injected, so that the casing material is fully injected into the whole hole; casing materials are supplemented at any time in the process of pulling out the drill; then a sleeve valve pipe is arranged below the lower part.
In other embodiments, pneumatic down-the-hole casing pipe-following drilling techniques may also be employed:
follow the pipe and creep into and accomplish with the lower cover valve pipe assembly after, will irritate two stopper cards of material to cover valve pipe assembly bottom, irritate two stopper of material and include: two expansion plugs; and the injection port is positioned between the two expansion plugs and is connected with the grouting pipe. A grout stopping ring at the bottom of the sleeve valve pipe assembly is positioned between two expansion plugs of the grouting double plugs, casing material is injected from a filling port positioned between the two expansion plugs, and the casing material is forced to open the grout stopping ring at the bottom of the sleeve valve pipe assembly under the action of high pressure and is injected into an annular gap between a heel pipe and the sleeve valve pipe assembly from a grout outlet of the grout stopping ring;
when casing material is ejected from a grout stop ring at the bottom of the valve casing assembly and rises to a certain height in an annular gap between the heel pipe and the valve casing assembly, the grouting double plug is clamped to the middle of the valve casing assembly, one grout stop ring in the middle of the valve casing assembly is positioned between two expansion plugs of the grouting double plug, the casing material is injected from a filling port positioned between the two expansion plugs, and the casing material is forced to open a grout stop ring in the middle of the valve casing assembly under the action of high pressure and is ejected into the annular gap between the heel pipe and the valve casing assembly from a grout outlet of the grout stop ring;
the key point of the valve casing method is that the valve casing method is arranged below, the existing engineering examples almost adopt a pneumatic down-the-hole casing pipe following drilling technology, 89mm valve casing pipes are arranged below 146mm casing pipes after the 146mm casing pipes are arranged at the bottom of a hole, then the method of injecting casing materials and simultaneously drawing out the 146mm casing pipes is adopted, the depth of the valve casing pipes is more than 70m level, and the deepest depth is not more than 100 m. It is worth noting that the 146mm casing pipe in engineering practice is mostly 6m (can be customized or cut, but the cost is high), the requirement of the pneumatic down-the-hole on the field is high, and the narrow field cannot be adopted. However, in the projects listed in this embodiment, the space in the gallery is narrow, and therefore, the pneumatic down-the-hole casing pipe-following drilling technology cannot be implemented.
The schematic diagram of the casing valve pipe grouting is shown in fig. 3, and after drilling and casing valve pipe running are completed, the drill hole is shown in fig. 3; during the pouring, at current grout section, go into the card stopper under the sleeve valve intraductal, as shown in fig. 2, in this embodiment, the card stopper is for irritating material double plug, and it includes to irritate the material double plug: two expansion plugs 5; the injection port is positioned between the two expansion plugs and is connected with the grouting pipe 6; the double plugs are clamped at the upper and lower positions of the grout outlet 21 of the sleeve valve base pipe 10 and correspond to the grout outlet 21 of the current ring; the base pipe 10 of the sleeve valve is sequentially provided with a sleeve material 7 and a stratum 8.
Referring to fig. 4, a method for grouting a sleeve valve pipe suitable for a permanent curtain of a deep covering layer provided in this embodiment includes the following steps:
it should be noted that the common steps of drilling, injecting casing material, and inserting casing pipe and grouting need to be performed before the following steps are performed, and as described above, the description is omitted here.
s1, inserting a plug into the sleeve valve pipe of the current grouting section; in the embodiment, the blocking plug is a filling double plug, so that a grout stop ring in the middle of the sleeve valve pipe is positioned between two expansion plugs of the filling double plug.
s2, open loop: injecting water into the grouting pipe to reach an open-loop pressure so as to flush a grout stopping ring and casing materials outside the casing valve pipe and inject water into the stratum; in this example, the ring-opening pressure is 3MPa to 6 MPa; after the high-pressure water breaks through the stratum, the high-pressure water enters the stratum along the arrow direction in the figure 3;
s3, induced water injection: and after the ring is opened, high-pressure water is continuously injected into the grouting pipe by induced pressure so as to check the permeability of the current irrigated section, and an irrigation channel is formed by the impact of the irrigated section with higher permeability. The induction pressure pgensing satisfies the following two formulas at the same time:
p induction is more than or equal to 1.5 × P water head + P resistance-P still water (formula I);
p induction is more than or equal to P water head +1 (MPa) + P resistance-P still water (formula II);
the P water head is the water head pressure born by the current irrigated section; p resistance is critical resistance of the sleeve valve pipe open loop; the P hydrostatic is the hydrostatic pressure in the current hole;
wherein, the P water head = [ dam water storage elevation (m) -irrigated section elevation (m) ]/100, the irrigated section elevation adopts the average elevation of the current irrigated section, for example, the length of the current irrigated section is 1.2 meters, the elevation of the current irrigated section is 1156-1157.2 from the bottom to the top, and the elevation of the current irrigated section is averaged to obtain an average value 1156.6; the dam impounded water height is 1375m, so the P water head of the current irrigation section = (1375-1156.6)/100 =2.184MPa;
the P resistance is critical resistance of the sleeve valve pipe open loop, a given pressure value can generate water injection flow after the sleeve valve pipe open loop, and the critical resistance value is 0.2-0.5 MPa through field tests, wherein in the embodiment, the P resistance is 0.35 MPa;
wherein pster water = [ aperture elevation (m) -irrigated section elevation (m) ]/100; for example, if the current irrigated segment is 1156-1157.2, then P still water = (1311-1156.6)/100 =1.544MPa;
then two values of the current irrigation section are respectively shown in the following table 1:
TABLE 1
1.5 × P head + P resistance-P still water P head +1 (MPa) + P resistance-P still water
2.082MPa 1.99MPa
The induction pressure is equal to or more than 2.082MPa according to the P induction; the induction pressure can be read from a pressure gauge on the grouting pump, so that the reading of the pressure gauge on the grouting pump is more than or equal to 2.082MPa when the induction pressure is given.
In the process of grouting the covering layer, splitting can be generated when the critical pressure Pcritical is exceeded and kept for a certain time, the critical pressure Pcritical is the pressure when the splitting is also the sudden change of the grouting coefficient, and the grouting coefficient is the ratio of the grouting flow to the grouting pressure; therefore, the practice of injecting water into the covering layer for a long time at a pressure exceeding the critical pressure is generally prohibited in the conventional engineering; in the technical scheme of the application, the limitation is broken through: the reason that the permeability change is large in a short distance due to poor geological condition uniformity of a complex stratum and the conventional grouting method has poor effect in the situation is that the geology with high permeability cannot withstand high flowing water impact, so that water gushing and sand gushing can occur after the grouting method is operated for a period of time; in the scheme, by setting the induction pressure to meet the two formulas, the water injection pressure is properly increased to a certain pressure value higher than the water head pressure of the induction pressure, the critical pressure of the stratum with high permeability can be broken through, and a grouting channel is opened in the stratum, so that the stratum can be homogenized through grouting; meanwhile, if no splitting occurs under the induction pressure, the stratum is detected to be a compact covering layer within a certain range, and the long-term operation is facilitated.
The upper limit of the P induction is not limited in the present application, but those skilled in the art should understand that the P induction cannot be increased arbitrarily, and based on the solution of the present application, aiming at breaking through a stratum with high permeability, aiming at homogenizing the stratum through grouting, according to the actual geological conditions of the project and the drilling and grouting depth, the P induction is adjusted up appropriately on the basis of satisfying the lower limit of the above formula,
the upper limit of the P induction should be within 1MPa of its lower limit.
And when the water injection pressure does not reach the induction pressure or the injection flow is close to or equal to the maximum value of the grouting pump, the permeability is high, and the injection channel can be formed by impact.
In this example, the induction pressure was 3 MPa; on the premise that the pressure does not generate mutation, the duration of the induced pressure is not shorter than 1 hour; therefore, the method can be used for testing regardless of the geological conditions of the current stratum, if the permeability of the current stratum is higher, splitting can occur under the impact of high-pressure water, so that the pressure cannot be kept or the perfusion flow rate is increased, and a large grouting channel is inevitably formed under the impact of the stratum; if the current stratum has small permeability, the pressure of high-pressure water injection can be maintained, the current stratum has small permeability through inspection, and long-term safe operation can be ensured through simple perfusion.
s4, when judging that the induction water injection state reaches the induction end condition, ending the induction water injection;
the induction end conditions are as follows:
induction end conditions a: the water injection pressure does not reach the induction pressure, or,
induction end conditions b: the perfusion flow rate is close to or equal to the maximum of the grouting pump, or,
induction end conditions c: the water injection pressure is continuously kept near the induction pressure, and the induction water injection time reaches a set duration;
in the process of inducing water injection, the induced pressure is used as the initial water injection pressure of the grouting pump, and the value of the water injection pressure can be read by a pressure gauge arranged on the grouting pump; the pouring flow rate is obtained by a flowmeter arranged on the grouting pipeline; when the water injection pressure does not reach the induction pressure or the injection flow is close to or equal to the maximum value of the grouting pump, the current grouting stratum is the weakest part at the periphery of the grouting section, the permeability is high, the rapid homogenization of the grouting stratum can be realized by the high-pressure water injection or the high-flow water injection, a grouting channel is flushed at the part, and a water-blocking curtain with enough thickness can be formed by grouting in the grouting channel; in this embodiment, the waterproof curtain formed by the single row of grouting holes is equal to the thickness of the waterproof curtain formed by the three rows of grouting holes in the normal grouting. The length of the induction time is directly related to the thickness of the formed grouting curtain, and the thicker the induction time is, the thicker the grouting curtain can be formed.
In the process of inducing water injection, the set duration is greater than or equal to 60min, and in this embodiment, the set duration is 60-120 min; that is, if the current grouted section can withstand the impact of high-pressure water for a long time, the grouted stratum around the grouted section is quite compact, and the grouting section is more reliable in long-term operation.
s5, grouting according to the induction water injection condition, which comprises the following steps:
if the induction water injection is finished under the induction finishing condition a or the induction finishing condition b, injecting double-liquid slurry or sulphoaluminate cement-based underwater undispersed paste slurry into the grouting pipe; when the water injection pressure does not reach the induction pressure or the injection flow is close to or equal to the maximum value of a grouting pump, the current grouting stratum is the weakest part at the periphery of a grouting section, the high-pressure water injection or the high-flow water injection can realize the rapid homogenization of the grouted stratum, and a grouting channel is injected at the part;
in this example, the two-fluid slurry is composed of a common cement slurry in a weight ratio of 0.5:1, with water glass added in a volume ratio of 10% to 20%. The sulphoaluminate cement-based underwater undispersed paste slurry is prepared by adding an additive into a composite grouting material serving as a base material. The composite grouting material is prepared by adding additives into sulphoaluminate cement serving as a base material, wherein the additives can be boric acid, lithium carbonate, polyacrylamide, cellulose ether and the like; in the embodiment, the final setting time of the sulphoaluminate cement-based underwater undispersed paste slurry is 20-60 min; preferably the 3d (after 3 days of construction) compressive strength is above 7 MPa; in other embodiments, the sulphoaluminate cement-based underwater non-dispersible paste can also be selected from other grouting liquids meeting the above conditions and capable of quickly condensing and plugging channel materials and proportioning.
In the embodiment, double-liquid-slurry grouting is adopted at the end of the induction end condition a or the induction end condition b, and grouting is ended when the grouting pressure reaches the preset pressure of 3.5MPa-4MPa and the grouting flow is less than 5L/min. In different projects, the criteria for ending the predetermined pressure and perfusion flow may be determined according to the project situation.
If the induced water injection is finished under the induction finishing condition c and the perfusion flow during the induced water injection is larger than the set flow, injecting the portland cement-based underwater undispersed paste slurry into the grouting pipe; setting the flow rate based on the constant flow rate, wherein if the filled section is a compact covering layer, the filling flow rate is basically constant under the constant filling pressure, and the filling flow rate at the moment is defined as the constant flow rate; when the perfusion pressure needs to be maintained by improving the perfusion flow, the compaction degree of the perfusion section is slightly poor, so that a grouting material suitable for the stratum characteristic needs to be adopted; in a general grouting project, the set flow is set according to the actual condition of the project, on one hand, the set flow is according to the grout sucking condition of the stratum, on the other hand, the set flow depends on the performance of a grouting pump, and the range of the common set flow is less than or equal to 80L/min; in the embodiment, the flow rate is set to be 30L/min, so that under the condition of keeping the induction pressure, if the pouring flow rate is increased to be more than 30L/min, the portland cement-based water is poured into the grouting pipe without dispersing the paste slurry; in the embodiment, the initial setting time of the portland cement-based underwater undispersed paste is not more than 12h, the final setting time is not more than 18h, and the preferable compressive strengths of 3d and 28d reach more than 5MPa and 10MPa respectively.
In the embodiment, when the portland cement-based underwater undispersed paste slurry is poured, the grouting is finished when the grouting pressure reaches the preset pressure of 3.5-4 MPa and the pouring flow is less than 2L/min. In different projects, the criteria for ending the predetermined pressure and perfusion flow may be determined according to the project situation.
In the pouring process of adopting the portland cement-based underwater undispersed paste slurry: if the situation of eating a large amount of pulp occurs, the appearance of eating a large amount of pulp is as follows: the injection rate continuously rises and is more than 30L/min; the sulphoaluminate cement-based underwater undispersed paste or cement-water glass double liquid and other materials are adopted for high-pressure large-flow continuous injection; when a large amount of slurry is eaten, the current stratum has an enlarged grouting channel, so that materials such as sulphoaluminate cement-based underwater undispersed paste slurry or cement-water-glass double liquid are required to be injected continuously at high pressure and large flow, and the channel is blocked.
And if the induction water injection is finished under the induction finishing condition c and the perfusion flow during the induction water injection is less than or equal to the set flow, injecting chemical grout materials into the grouting pipe. As mentioned above, in the process of inducing water injection, the injection pressure and the injection flow rate can be kept near the constant flow rate value and kept above 60min-120min, which indicates that the current injection section is compact, and the fine physical characteristics and better permeability of the chemical pulp can be well utilized to permeate into the tiny gaps of the injection section through the injection of the chemical pulp material.
The chemical pulp is environment-friendly acrylate chemical pulp or silica sol; in this example, acrylate chemical pulp is a series product XGELACRYL SR from De Neef, Belgium; in other embodiments, other environmentally friendly chemical grouting materials with low viscosity, high permeability, and high durability may also be used. In the process of pouring by using chemical grout: if the situation of eating a large amount of pulp occurs, the appearance of eating a large amount of pulp is as follows: the injection rate continuously rises and is more than 30L/min; the sulphoaluminate cement-based underwater undispersed paste or cement-water glass double liquid and other materials are used for high-pressure large-flow continuous injection; when a large amount of slurry is eaten, the current stratum has an enlarged grouting channel, so that materials such as sulphoaluminate cement-based underwater undispersed paste slurry or cement-water-glass double liquid are required to be injected continuously at high pressure and large flow, and the channel is blocked.
In the embodiment, when the chemical grout is poured, the grouting is finished when the grouting pressure reaches the preset pressure of 1.5MPa-2MPa, the pouring flow is less than 1L/min, and the duration is more than or equal to 10 min. In different projects, the criteria for determining the end of the predetermined pressure, perfusion flow rate and duration, etc. may be determined according to the situation of the project.
s6, checking; after grouting is finished, selecting to carry out inspection at a proper time according to the properties of grouting materials and the records of field construction, and the inspection is carried out for several days to several months; in the embodiment, original hole inspection and new hole opening inspection can be adopted for inspection, namely, after the original grouting hole is used for hole sweeping, a sleeve valve pipe does not need to be arranged below the original grouting hole, and injection can be carried out under the pressure of 3 MPa; the valve sleeve is required to be arranged under the drill hole again for the new hole opening detection, and the 3MPa pressure injection is also adopted; and (3) an induction method is adopted for inspection, and the stratum at the position can be preliminarily judged to basically meet the operation requirement from the operation angle as long as the 3MPa can be maintained.
As the sleeve valve pipe is adopted for grouting in the application, all grouting is finished, after the operation is carried out for a period of time (such as several years), if abnormal operation monitoring is found, the induction grouting can be carried out again through the embedded sleeve valve pipe, and the induction pressure used at the moment is higher than that used in the first grouting; the induction method is used for reinforcement, the operation monitoring data can be processed at the first time after the abnormality is found, and the method is very favorable for long-term, safe and stable operation of the whole dam.
In addition, the induced grouting method can also select proper grouting materials according to the induced water injection condition, namely according to the geological conditions of different grouting sections; the operation is very simple and feasible.
The induced grouting method is adopted to simultaneously meet the requirements of analyzing geological conditions, opening a grouting channel, guiding selection of grouting materials and ensuring long-term safe and stable operation of the dam. Grouting under high-difficulty conditions such as high water head, dynamic water, deep covering layer and the like is realized. The grouting method provided by the scheme is more targeted, the grouting effect is more reliable, and the permanence of the water-blocking curtain effect is technically guaranteed. The scheme of this application has realized the inspection to the overall effect of grout, has better linking with engineering actual operation moreover.
The induced grouting method is adopted in the construction of the inspection hole, so that the grouting quality inspection of the grouted part can be realized, and the connection with the operation is realized.
The above description is only a preferred embodiment of the application and is illustrative of the principles of the technology employed. It will be appreciated by a person skilled in the art that the scope of the invention as referred to in the present application is not limited to the embodiments with a specific combination of the above-mentioned features, but also covers other embodiments with any combination of the above-mentioned features or their equivalents without departing from the inventive concept. For example, the above features may be replaced with (but not limited to) features having similar functions disclosed in the present application.

Claims (10)

1. A method for grouting a sleeve valve pipe suitable for a permanent curtain of a deep covering layer is characterized by comprising the following steps:
inserting a blocking plug into a sleeve valve pipe of the current grouting section;
opening the ring: injecting water into the grouting pipe to reach an open-loop pressure so as to flush a grout stopping ring and casing materials outside the casing valve pipe and inject water into the stratum;
inducing and injecting water: after the ring is opened, high-pressure water is continuously injected into the grouting pipe by induced pressure so as to test the permeability of the current irrigated section, and an irrigation channel is formed by the impact of the current irrigated section with higher permeability; the induction pressure pgensing satisfies the following two formulas at the same time:
p induction is more than or equal to 1.5 × P water head + P resistance-P still water (formula I);
p induction is more than or equal to P water head +1 (MPa) + P resistance-P still water (formula II);
the P water head is the water head pressure born by the current irrigated section; p resistance is critical resistance of the sleeve valve pipe open loop; the P hydrostatic is the hydrostatic pressure in the current hole;
when the induction water injection state is judged to reach the induction ending condition, ending the induction water injection;
grouting according to the condition of induced water injection to form a thick waterproof curtain.
2. The method for grouting a sleeve valve pipe suitable for a permanent curtain of a deep covering layer according to claim 1, wherein the induction end condition is:
induction end conditions a: the water injection pressure does not reach the induction pressure, or,
induction end conditions b: the perfusion flow rate is close to or equal to the maximum of the grouting pump, or,
induction end conditions c: and the water injection pressure is continuously kept near the induction pressure, the induction water injection time reaches a set time length, and the set time length is more than or equal to 60 min.
3. The method for grouting a sleeve valve pipe suitable for a permanent curtain of a deep covering layer according to claim 2, wherein grouting according to the condition of induced water injection is specifically as follows:
if the induction water injection is finished under the induction finishing condition a or the induction finishing condition b, injecting double-liquid slurry or sulphoaluminate cement-based underwater undispersed paste slurry into the grouting pipe;
if the induced water injection is finished under the induction finishing condition c and the perfusion flow during the induced water injection is larger than the set flow, injecting the portland cement-based underwater undispersed paste slurry into the grouting pipe;
and if the induction water injection is finished under the induction finishing condition c and the perfusion flow during the induction water injection is less than or equal to the set flow, injecting chemical grout materials into the grouting pipe.
4. The method of grouting a sleeve valve pipe for a permanent curtain of a deep blanket according to claim 3,
and if the induction water injection is finished under the induction finishing condition c and the portland cement-based underwater undispersed paste slurry or chemical slurry material is injected, if the injection rate in the grouting is continuously increased and is more than 30L/min, replacing the current grouting liquid with sulphoaluminate cement-based underwater undispersed paste slurry or double-liquid slurry high-pressure large-flow continuous injection.
5. The method of grouting a sleeve valve pipe for a permanent curtain of a deep blanket according to any one of claims 1 to 4, wherein the induction pressure is 3MPa or more.
6. The method of grouting a sleeve valve pipe for a permanent curtain of a deep blanket according to claim 3 or 4, wherein the set flow rate is in a range of 80L/min or less.
7. The method for grouting a sleeve valve pipe suitable for a permanent curtain of a deep covering layer according to claim 3 or 4, wherein the two-fluid slurry is composed of common cement slurry mixed with 10-20% water glass by volume ratio in weight ratio of 0.5: 1.
8. The method for grouting a sleeve valve pipe suitable for the permanent curtain of the deep covering layer as claimed in claim 3 or 4, wherein the final setting time of the sulphoaluminate cement-based underwater undispersed paste slurry is 20min to 60 min.
9. A method of casing valve pipe grouting for a permanent curtain of deep overburden according to claim 3 or 4, wherein the portland cement-based underwater nondispersed paste has an initial setting time of not more than 12 hours and a final setting time of not more than 18 hours.
10. The method for grouting a sleeve valve pipe suitable for a permanent curtain of a deep covering layer according to claim 3 or 4, wherein the chemical grout is environment-friendly acrylate chemical grout or silica sol.
CN202010370194.XA 2020-04-30 2020-04-30 Sleeve valve pipe grouting method suitable for deep and thick covering layer permanent curtain Expired - Fee Related CN111519627B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010370194.XA CN111519627B (en) 2020-04-30 2020-04-30 Sleeve valve pipe grouting method suitable for deep and thick covering layer permanent curtain

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010370194.XA CN111519627B (en) 2020-04-30 2020-04-30 Sleeve valve pipe grouting method suitable for deep and thick covering layer permanent curtain

Publications (2)

Publication Number Publication Date
CN111519627A CN111519627A (en) 2020-08-11
CN111519627B true CN111519627B (en) 2021-01-12

Family

ID=71905394

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010370194.XA Expired - Fee Related CN111519627B (en) 2020-04-30 2020-04-30 Sleeve valve pipe grouting method suitable for deep and thick covering layer permanent curtain

Country Status (1)

Country Link
CN (1) CN111519627B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112392027A (en) * 2020-11-20 2021-02-23 四川华电泸定水电有限公司 Complex stratum comprehensive grouting method
CN117286835A (en) * 2021-08-10 2023-12-26 中印恒盛(北京)贸易有限公司 Novel pressurizing type spiral fixing device for dam

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1403857A (en) * 1964-05-15 1965-06-25 Soletanche Obturator for the injection of cement into a borehole intended for the consolidation of the soil or a masonry block
BR7705314A (en) * 1977-08-11 1978-07-11 W Vanderlinde IMPROVEMENTS IN THE METHOD AND DEVICE FOR THE EXECUTION OF ANCHORAGES IN THE FIXING OF TIE RODS ON SOILS OR ROCKS
CN101644048B (en) * 2009-06-03 2011-07-27 广东省航盛建设集团有限公司 Slurry injection technique of sleeve valve tube of cloth bag
CA2837863C (en) * 2011-06-03 2020-07-28 Darin R. Kruse Lubricated soil mixing systems and methods
CN202644538U (en) * 2011-12-28 2013-01-02 中铁十九局集团轨道交通工程有限公司 A grouting device used for a water-rich quicksand stratum
CN104674831B (en) * 2015-02-11 2017-01-11 中国水利水电第四工程局有限公司 Water-stopping curtain construction method
CN104711987B (en) * 2015-03-16 2016-04-27 中国水电基础局有限公司 A kind of deep covering layer sleeving valve tube method controllable grouting method

Also Published As

Publication number Publication date
CN111519627A (en) 2020-08-11

Similar Documents

Publication Publication Date Title
CN101638987B (en) Tunnel construction method for crossing high-pressure water-enriched fracture zone with curtain grouting and grout stopping wall
CN106837351A (en) Tunnel karst water detection and treatment method
CN111519627B (en) Sleeve valve pipe grouting method suitable for deep and thick covering layer permanent curtain
CN206627405U (en) The double embolism original position injection pressure water penetration detectors of expansion type
CN105350953A (en) Measuring method for coal seam gas pressure in complicated geological condition
CN104563164B (en) A kind of ground-connecting-wall seam leak detection and grouting for water plugging method
CN111519626B (en) Sleeve valve pipe reverse grouting method suitable for deep covering layer permanent curtain
CN111519605B (en) High-water-head dynamic-water-condition deep covering layer permanent curtain control grouting construction method
CN111119940A (en) Grouting construction treatment method
CN110374677A (en) Plateau rich water soft rock tunnel control drainage construction engineering method
CN107130918A (en) Dam Heavy Curtain Grouting impact pore-forming construction method
CN102011591A (en) Grouting process for working surface of deep well
CN106013078A (en) Construction method of strong permeable stratum reinforcing curtain structure
CN109024710A (en) A kind of method for blocking of deep-foundation pit engineering artesian water piping
CN110130324B (en) Steel pipe mini pile and construction method thereof
CN110241837A (en) A kind of construction method for preventing basement bottom board from cracking under high artesian geological conditions
CN110644461A (en) Foundation treatment method
CN113529683A (en) Strong rock water-dissolving treatment construction method for urban underground engineering
CN110821498B (en) Safe and rapid water plugging and reinforcing method in strong water-rich soft surrounding rock of operation tunnel
CN112557279A (en) Weathered bedrock hole-fracture vertical permeability testing device and method
CN112252339A (en) Upward full-length bonding anchor cable hole subsection grout stopping structure and method
CN112523170A (en) Seepage-proofing treatment method for deep-buried karst seepage channel of reservoir
CN108612546B (en) Horizontal grouting construction method in closed environment
CN114808923B (en) Cave grouting construction treatment method
CN108755694A (en) Grout stopping device and complete opening grouting method for multiple solution cavities

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210112

Termination date: 20210430

CF01 Termination of patent right due to non-payment of annual fee