CN111517170B CN202010264470.4A CN202010264470A CN111517170B CN 111517170 B CN111517170 B CN 111517170B CN 202010264470 A CN202010264470 A CN 202010264470A CN 111517170 B CN111517170 B CN 111517170B
Authority
CN
China
Prior art keywords
wiring
tube
wiring tube
main
main wiring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202010264470.4A
Other languages
Chinese (zh)
Other versions
CN111517170A (en
Inventor
曹钟引
周赛军
刘斌
陈辉
杨艺精
李珊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CNNC Fujian Nuclear Power Co Ltd
Original Assignee
CNNC Fujian Nuclear Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNNC Fujian Nuclear Power Co Ltd filed Critical CNNC Fujian Nuclear Power Co Ltd
Priority to CN202010264470.4A priority Critical patent/CN111517170B/en
Publication of CN111517170A publication Critical patent/CN111517170A/en
Application granted granted Critical
Publication of CN111517170B publication Critical patent/CN111517170B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H75/00Storing webs, tapes, or filamentary material, e.g. on reels
    • B65H75/02Cores, formers, supports, or holders for coiled, wound, or folded material, e.g. reels, spindles, bobbins, cop tubes, cans, mandrels or chucks
    • B65H75/04Kinds or types
    • B65H75/16Cans or receptacles, e.g. sliver cans
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2701/00Handled material; Storage means
    • B65H2701/30Handled filamentary material
    • B65H2701/35Ropes, lines

Landscapes

  • Rod-Shaped Construction Members (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

The wiring device of the inverted U-shaped prestress braided beam comprises a wiring pipe, wherein the wiring pipe is positioned between an outer wall body and an inner wall body, and an inlet is formed in the outer wall body; the wiring pipe includes supplementary wiring pipe A, supplementary wiring pipe B, main wiring pipe A, main wiring pipe B, and wherein supplementary wiring pipe A, supplementary wiring pipe B are in the same place with main wiring pipe A, main wiring pipe B ligature, and main wiring pipe A, main wiring pipe B are fixed on the support, arrange the walking gyro wheel of steel bundle on the inboard wall body, and the gyro wheel of steel bundle walking includes two gyro wheels of perpendicular arranging. Wherein the auxiliary wiring tube A and the auxiliary wiring tube B are bound with the main wiring tube A and the main wiring tube B through steel wires. The main wiring tube A and the main wiring tube B are fixed on the bracket through buckles.

Description

Wiring device of inverted U-shaped prestress braiding beam
Technical Field
The technology relates to the field of wiring devices, in particular to a wiring device of an inverted U-shaped prestress braiding beam.
Background
The three-generation nuclear power technology 'Hualong No. I' of independent research and development design in China is provided with inverted U-shaped prestress steel bundles in an inner containment, the inverted U-shaped steel bundles are 94 in total, each bundle consists of 55 steel strands with 1x7 nominal diameter of 15.7mm, the whole weight is about 10t, and the construction technology is whole traction. The beam braiding process and the traction head treatment process are needed before the whole traction beam threading, so that the time connection of the processes can be well ensured, the phenomenon that part of work types lean against each other is avoided, the beam braiding process can be ensured to be smooth, and the progress meets the requirements of the subsequent processes.
The bundling is to bundle 55 steel strands into a complete steel bundle through a bundling pipeline surrounding the inner side of the gallery. Two problems are faced in construction: 1) Because the number of the steel strands is large, the length of the steel strands is longer (more than 200 m), and the diameter of the pipeline is close to that of the steel strands, the original single-pipeline bunching steel strands are seriously clamped, and generally more than 40 steel strands are penetrated, clamping can occur, the continuity of the subsequent process is seriously restricted, and the clamped steel strands are required to be pulled out and scrapped after clamping, so that more time is required to be consumed, and materials are wasted. 2) According to the statistics of site construction experience, the beam-forming process needs 6-8 hours, the beam-forming process is generally 3-4 hours, and the next beam-forming process needs to be performed after the steel beam is pulled away from the wiring pipeline, which means that the beam-forming cannot meet the beam-forming requirement, and the beam-forming and beam-forming need to wait each other. In order to solve the problems, two large wiring pipelines, two small wiring pipelines and four wiring pipelines are manufactured on site, so that smooth beam braiding is ensured, and the time difference of each beam penetrating process is well matched.
Disclosure of Invention
The invention aims at: the inverted U-shaped prestress beam braiding is guaranteed to be smooth, clamping is avoided frequently in the wiring process, beam braiding efficiency is improved, and two procedures of beam braiding and beam penetrating can be well connected in time.
The technical scheme of the invention is as follows: the wiring device of the inverted U-shaped prestress braided beam comprises a wiring pipe, wherein the wiring pipe is positioned between an outer wall body and an inner wall body, and an inlet is formed in the outer wall body;
The wiring tube comprises an auxiliary wiring tube A, an auxiliary wiring tube B, a main wiring tube A and a main wiring tube B, wherein the auxiliary wiring tube A and the auxiliary wiring tube B are bound with the main wiring tube A and the main wiring tube B, the main wiring tube A and the main wiring tube B are fixed on a bracket,
And steel bundle walking rollers are arranged on the inner wall body and comprise two rollers which are vertically arranged.
Wherein the auxiliary wiring tube A and the auxiliary wiring tube B are bound with the main wiring tube A and the main wiring tube B through steel wires.
The main wiring tube A and the main wiring tube B are fixed on the bracket through buckles.
The total number of the brackets is 48.
The bracket is uniformly fixed by a clamping gauge pre-embedded in the concrete.
The inlets of the auxiliary wiring pipe A and the auxiliary wiring pipe B are positioned at the same position.
The invention has the remarkable effects that:
1) The binding process can not be blocked, so that the work efficiency is greatly improved, and the steel strand materials are saved.
2) The two sets of wiring pipelines can ensure continuous operation of bundling, and simultaneously ensure continuous bundle penetrating procedures.
3) The method is favorable for specialized division of prestress gallery operation, and the beam braiding and beam penetrating procedures are strictly separated and well matched with each other in time.
4) Because the clamping and repeated dragging of the steel strand cannot occur, the quality of the steel strand is prevented from being damaged in the dragging process.
Drawings
FIG. 1 is a schematic top view of a wiring device of an inverted U-shaped prestress braid according to the present invention;
FIG. 2 is a view of AA of FIG. 1;
In the figure: 1 inlet, 2 outside wall, 3 inside wall, 4 wiring tube, 5 auxiliary wiring tube A, 6 auxiliary wiring tube B, 7 main wiring tube A, 8 main wiring tube B, 9 buckle, 10 bracket and 11 steel beam walking roller
Detailed Description
The wiring device of the inverted U-shaped prestress braiding beam, as shown in figure 1, comprises a wiring tube 4, wherein the wiring tube 4 is positioned between an outer wall body 2 and an inner wall body 3, an inlet 1 is arranged on the outer wall body 2,
As shown in fig. 1, the wiring tube 4 comprises an auxiliary wiring tube A5, an auxiliary wiring tube B6, a main wiring tube A7 and a main wiring tube B8, wherein the auxiliary wiring tube A5 and the auxiliary wiring tube B6 are bound together with the main wiring tube A7 and the main wiring tube B8 through steel wires, the main wiring tube A7 and the main wiring tube B8 are fixed on a bracket 10 through buckles 9, 48 brackets 10 are counted, and the auxiliary wiring tube is uniformly fixed through calipers embedded in concrete.
A steel bundle walking roller 11 is arranged on the inner wall body 3, the steel bundle walking roller 11 comprises two rollers which are vertically arranged,
The inlets of the auxiliary wiring tube A5 and the auxiliary wiring tube B6 are all positioned at the same position, so that the position of the beam penetrating machine is ensured to be fixed, and the influence on work efficiency caused by repeated movement is avoided. The end points of the auxiliary wiring pipes A5 and B6 are staggered by about 2m, so that the steel strands of the two sets of wiring pipes are prevented from being wound in a crossing manner when being out of the pipeline.

Claims (6)

1. The utility model provides a wiring arrangement of back U type prestressing force bundle which characterized in that: the novel wall comprises a wiring pipe (4), wherein the wiring pipe (4) is positioned between an outer wall body (2) and an inner wall body (3), and an inlet (1) is formed in the outer wall body (2);
The wiring tube (4) comprises an auxiliary wiring tube A (5), an auxiliary wiring tube B (6), a main wiring tube A (7) and a main wiring tube B (8), wherein the auxiliary wiring tube A (5), the auxiliary wiring tube B (6) and the main wiring tube A (7) and the main wiring tube B (8) are bound together, the main wiring tube A (7) and the main wiring tube B (8) are fixed on a bracket (10),
And steel bundle traveling rollers (11) are arranged on the inner wall body (3), and the steel bundle traveling rollers (11) comprise two vertically arranged rollers.
2. The wiring device of the inverted U-shaped prestress stitch as in claim 1, wherein: wherein the auxiliary wiring tube A (5) and the auxiliary wiring tube B (6) are bound with the main wiring tube A (7) and the main wiring tube B (8) through steel wires.
3. The wiring device of the inverted U-shaped prestress stitch as in claim 1, wherein: the main wiring tube A (7) and the main wiring tube B (8) are fixed on the bracket (10) through the buckle (9).
4. A wiring device for inverted U-shaped prestress strands as claimed in claim 3, wherein: the total number of the brackets (10) is 48.
5. The wiring device of the inverted U-shaped prestress stitch as in claim 4, wherein: the bracket (10) is uniformly fixed by a calliper embedded in the concrete.
6. The wiring device of the inverted U-shaped prestress stitch as in claim 1, wherein: the inlets of the auxiliary wiring pipe A (5) and the auxiliary wiring pipe B (6) are positioned at the same position.
CN202010264470.4A 2020-04-07 2020-04-07 Wiring device of inverted U-shaped prestress braiding beam Active CN111517170B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010264470.4A CN111517170B (en) 2020-04-07 2020-04-07 Wiring device of inverted U-shaped prestress braiding beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010264470.4A CN111517170B (en) 2020-04-07 2020-04-07 Wiring device of inverted U-shaped prestress braiding beam

Publications (2)

Publication Number Publication Date
CN111517170A CN111517170A (en) 2020-08-11
CN111517170B true CN111517170B (en) 2024-08-09

Family

ID=71902404

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010264470.4A Active CN111517170B (en) 2020-04-07 2020-04-07 Wiring device of inverted U-shaped prestress braiding beam

Country Status (1)

Country Link
CN (1) CN111517170B (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN212503411U (en) * 2020-04-07 2021-02-09 福建福清核电有限公司 Wiring device of inverted U-shaped prestress braiding

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2612425B2 (en) * 1994-11-17 1997-05-21 住友電気工業株式会社 Fixing method of unbonded PC steel strand
CN102003072B (en) * 2010-10-08 2012-07-04 天津滨海盈信投资有限公司 Steel strand bundle-weaving and crossing construction method
CN102003073B (en) * 2010-12-11 2012-09-26 中冶建工有限公司 Constructing method for threading pre-stress structure steel strands
JP6927489B2 (en) * 2017-05-29 2021-09-01 神鋼鋼線工業株式会社 Wiring method for PC steel
CN107762238B (en) * 2017-10-13 2019-05-10 中国水利水电第十一工程局有限公司 A kind of king-post prestressed strand lifting position control method

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN212503411U (en) * 2020-04-07 2021-02-09 福建福清核电有限公司 Wiring device of inverted U-shaped prestress braiding

Also Published As

Publication number Publication date
CN111517170A (en) 2020-08-11

Similar Documents

Publication Publication Date Title
CN102383377A (en) Construction method utilizing steel-strand strand pulling machine to perform fast strand pulling during construction of prestress structures
CN107299595A (en) A kind of bridge prestress pipeline tube drawing lashing chassis
CN212503411U (en) Wiring device of inverted U-shaped prestress braiding
CN103410125A (en) Integral U-shaped anchor rope embedded duct and mounting method thereof
CN111517170B (en) Wiring device of inverted U-shaped prestress braiding beam
CN112813712B (en) Method and device for making rope by using micro steel wire
CN106087759B (en) A kind of threading method of prestressed strand threader and prestressed strand
CN106356770B (en) Cable discharges and passes through barrier constructing device
CN101004096A (en) Steel strand retractor
CN211142840U (en) Suspension bridge main push-towing rope erects system
CN201942371U (en) Horizontal concrete tube wire winding device
CN106012834B (en) A kind of spatial warping curve abnormal shape antisymmetry steel king-tower inner support and tensioning system
CN114645619B (en) Construction method for integrally pulling Gamma steel strand of containment vessel of nuclear power station
CN207193772U (en) A kind of cord clip spanning apparatus of wire-wrapping machine for stowing rope
CN112482227B (en) Low-tower cable-stayed bridge cable penetrating system and method thereof
CN100476075C (en) Tie bar cable system with wire separating ring and construction method thereof
CN111509623B (en) Conveying device for cable pipe-penetrating laying and cable pipe-penetrating laying method
CN205975368U (en) Prestressed steel beam threading device
CN211228143U (en) Steel strand combing device
CN201075612Y (en) Cable laying equipment
CN214573360U (en) Steel strand aligning and bundling device
CN107938517B (en) A kind of cable-stayed bridge prestressed concrete beam ring anchor construction method
CN205818148U (en) The threader of prestressed box girder steel strand wires
CN111517239A (en) Pulley block device for adjusting penetrating angle of inverted U-shaped prestressed steel beam
CN213976466U (en) Lead mechanism of stretcher

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant