CN111517170A - Wiring device of inverted U-shaped prestress braiding - Google Patents
Wiring device of inverted U-shaped prestress braiding Download PDFInfo
- Publication number
- CN111517170A CN111517170A CN202010264470.4A CN202010264470A CN111517170A CN 111517170 A CN111517170 A CN 111517170A CN 202010264470 A CN202010264470 A CN 202010264470A CN 111517170 A CN111517170 A CN 111517170A
- Authority
- CN
- China
- Prior art keywords
- wiring pipe
- main wiring
- pipe
- main
- auxiliary
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000009954 braiding Methods 0.000 title description 2
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 28
- 239000010959 steel Substances 0.000 claims abstract description 28
- 238000000034 method Methods 0.000 description 19
- 238000010276 construction Methods 0.000 description 3
- 238000009941 weaving Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 230000000694 effects Effects 0.000 description 1
- 230000002349 favourable effect Effects 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65H—HANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
- B65H75/00—Storing webs, tapes, or filamentary material, e.g. on reels
- B65H75/02—Cores, formers, supports, or holders for coiled, wound, or folded material, e.g. reels, spindles, bobbins, cop tubes, cans, mandrels or chucks
- B65H75/04—Kinds or types
- B65H75/16—Cans or receptacles, e.g. sliver cans
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65H—HANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
- B65H2701/00—Handled material; Storage means
- B65H2701/30—Handled filamentary material
- B65H2701/35—Ropes, lines
Landscapes
- Rod-Shaped Construction Members (AREA)
- Reinforcement Elements For Buildings (AREA)
Abstract
The wiring device comprises a wiring pipe, wherein the wiring pipe is positioned between an outer wall body and an inner wall body, and an inlet is formed in the outer wall body; the wiring pipe comprises an auxiliary wiring pipe A, an auxiliary wiring pipe B, a main wiring pipe A and a main wiring pipe B, wherein the auxiliary wiring pipe A and the auxiliary wiring pipe B are bound together with the main wiring pipe A and the main wiring pipe B, the main wiring pipe A and the main wiring pipe B are fixed on the support, steel beam walking rollers are arranged on the inner side wall body, and the steel beam walking rollers comprise two vertically arranged rollers. Wherein, the auxiliary wiring pipe A and the auxiliary wiring pipe B are bound with the main wiring pipe A and the main wiring pipe B through steel wires. The main wiring pipe A and the main wiring pipe B are fixed on the bracket through buckles.
Description
Technical Field
The technology relates to the field of wiring devices, in particular to a wiring device for an inverted U-shaped prestress bundling.
Background
An inverted U-shaped prestressed steel bundle is arranged in an inner-layer containment vessel in the third-generation nuclear power technology 'Hualong I' independently researched and developed and designed in China, the number of the inverted U-shaped steel bundles is 94 in total, each bundle is composed of 55 steel strands with the nominal diameter of 1x7 of 15.7mm, the overall weight is about 10t, and the construction process is overall traction. The bundling process and the traction head treatment process are required to be carried out before the whole traction bundling process, the bundling process is required to be smooth in order to ensure that each process can be well connected in time and avoid the phenomenon of partial work types of waiting, and the progress meets the requirements of subsequent processes.
The bundling is to braid 55 steel strands into a complete steel bundle through a bundling pipeline surrounding the inner side of the gallery. Two problems are faced in construction: 1) because the number of the steel strands is large, the length of the steel strand is long (more than 200m), and the diameter of the pipeline is close to that of the steel strand, the initial single-pipeline binding steel strand is seriously clamped, the clamping is generally generated when more than 40 steel strands are penetrated, the continuity of subsequent processes is seriously restricted, and the clamped steel strand needs to be pulled out and scrapped after the clamping, so that more time is consumed, and materials are wasted. 2) According to the statistics of field construction experience, the time of the bundling process is 6-8 hours, the bundling process is generally 3-4 hours, and the next bundling process needs to be carried out after the steel bundle is pulled away from the wiring pipeline, which means that the bundling requirement cannot be met by bundling one by one, and the bundling need to wait for each other. Aiming at the problems, four wiring pipelines with two sizes are manufactured on site to solve the two problems, so that the smoothness of the weaving is guaranteed, and the time difference of each process of the weaving is well matched.
Disclosure of Invention
The invention aims to: the smooth and easy bundle of the prestress of the type of falling U of guarantee, avoid laying wire in-process frequent card pause to appear, promote to compile and restraint efficiency, let compile and restraint the link up that two processes can be fine in time.
The technical scheme of the invention is as follows: the wiring device comprises a wiring pipe, wherein the wiring pipe is positioned between an outer wall body and an inner wall body, and an inlet is formed in the outer wall body;
the wiring pipes comprise an auxiliary wiring pipe A, an auxiliary wiring pipe B, a main wiring pipe A and a main wiring pipe B, wherein the auxiliary wiring pipe A and the auxiliary wiring pipe B are bound with the main wiring pipe A and the main wiring pipe B, the main wiring pipe A and the main wiring pipe B are fixed on the bracket,
and steel beam walking rollers are arranged on the inner side wall body and comprise two rollers which are vertically arranged.
Wherein, the auxiliary wiring pipe A and the auxiliary wiring pipe B are bound with the main wiring pipe A and the main wiring pipe B through steel wires.
The main wiring pipe A and the main wiring pipe B are fixed on the bracket through buckles.
The number of the brackets is 48.
The support is uniformly fixed through a caliper gauge pre-buried in the concrete.
The inlets of the auxiliary wiring pipe A and the auxiliary wiring pipe B are at the same position.
The invention has the following remarkable effects:
1) and the blockage can not occur in the bundling process, so that the working efficiency is greatly improved, and the steel strand material is saved.
2) The two sets of wiring pipelines can ensure the continuous operation of the weaving and bundling and also ensure the continuous subsequent bundling process.
3) The method is favorable for specialized division of labor of the prestressed gallery operation, and the bunching and threading procedures are strictly separated and are well matched with each other in time.
4) Because the steel strand can not be clamped and repeatedly dragged, the quality of the steel strand damaged in the dragging process is avoided.
Drawings
FIG. 1 is a schematic top view of an inverted U-shaped pre-stressed bundled wire routing device according to the present invention;
FIG. 2 is a view AA of FIG. 1;
in the figure: 1 entry, 2 outside wall bodies, 3 inside wall bodies, 4 wiring pipes, 5 supplementary wiring pipes A, 6 supplementary wiring pipes B, 7 main wiring pipes A, 8 main wiring pipes B, 9 buckles, 10 supports, 11 steel beam walking gyro wheels
Detailed Description
An inverted U-shaped prestress binding wiring device, as shown in figure 1, comprises a wiring pipe 4, the wiring pipe 4 is positioned between an outer wall 2 and an inner wall 3, an inlet 1 is arranged on the outer wall 2,
as shown in fig. 1, the wiring duct 4 includes an auxiliary wiring duct a5, an auxiliary wiring duct B6, a main wiring duct a7, and a main wiring duct B8, wherein the auxiliary wiring duct a5 and the auxiliary wiring duct B6 are bound to the main wiring duct a7 and the main wiring duct B8 by steel wires, the main wiring duct a7 and the main wiring duct B8 are fixed on the bracket 10 by the buckle 9, and the total number of the brackets 10 is 48, and the brackets are uniformly fixed by a clamp embedded in concrete.
The steel beam walking rollers 11 are arranged on the inner side wall body 3, the steel beam walking rollers 11 comprise two rollers which are vertically arranged,
the inlets of the auxiliary wiring pipe A5 and the auxiliary wiring pipe B6 are in the same position, and the operation is to ensure the position of the beam penetrating machine to be fixed and avoid the influence of repeated movement on work efficiency. And the terminal points of the auxiliary wiring pipe A5 and the auxiliary wiring pipe B6 are staggered by about 2m, so that the steel strands of the two sets of wiring pipes cannot be wound in a crossed manner when being discharged from the pipeline.
Claims (6)
1. The utility model provides a wiring arrangement that bundle was compiled to type of falling U prestressing force which characterized in that: the wiring pipe (4) is positioned between the outer side wall body (2) and the inner side wall body (3), and an inlet (1) is formed in the outer side wall body (2);
the wiring pipe (4) comprises an auxiliary wiring pipe A (5), an auxiliary wiring pipe B (6), a main wiring pipe A (7) and a main wiring pipe B (8), wherein the auxiliary wiring pipe A (5) and the auxiliary wiring pipe B (6) are bound with the main wiring pipe A (7) and the main wiring pipe B (8), the main wiring pipe A (7) and the main wiring pipe B (8) are fixed on a bracket (10),
steel beam walking rollers (11) are arranged on the inner side wall body (3), and each steel beam walking roller (11) comprises two rollers which are vertically arranged.
2. The inverted U-shaped pre-stressed bundled wire routing device of claim 1, wherein: wherein, the auxiliary wiring pipe A (5) and the auxiliary wiring pipe B (6) are bound with the main wiring pipe A (7) and the main wiring pipe B (8) through steel wires.
3. The inverted U-shaped pre-stressed bundled wire routing device of claim 1, wherein: the main wiring pipe A (7) and the main wiring pipe B (8) are fixed on the bracket (10) through a buckle (9).
4. The inverted U-shaped pre-stressed bundled wire routing device of claim 3, wherein: the number of the brackets (10) is 48.
5. The inverted U-shaped pre-stressed bundled wire routing device of claim 4, wherein: the support (10) is uniformly fixed through a caliper gauge pre-embedded in concrete.
6. The inverted U-shaped pre-stressed bundled wire routing device of claim 1, wherein: the inlets of the auxiliary wiring pipe A (5) and the auxiliary wiring pipe B (6) are at the same position.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010264470.4A CN111517170B (en) | 2020-04-07 | 2020-04-07 | Wiring device of inverted U-shaped prestress braiding beam |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010264470.4A CN111517170B (en) | 2020-04-07 | 2020-04-07 | Wiring device of inverted U-shaped prestress braiding beam |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111517170A true CN111517170A (en) | 2020-08-11 |
CN111517170B CN111517170B (en) | 2024-08-09 |
Family
ID=71902404
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010264470.4A Active CN111517170B (en) | 2020-04-07 | 2020-04-07 | Wiring device of inverted U-shaped prestress braiding beam |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111517170B (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07252939A (en) * | 1994-11-17 | 1995-10-03 | Sumitomo Electric Ind Ltd | Fixing method of un-bonded pc-steel stranded wire |
CN102003072A (en) * | 2010-10-08 | 2011-04-06 | 天津滨海盈信投资有限公司 | Steel strand bundle-weaving and crossing construction method |
CN102003073A (en) * | 2010-12-11 | 2011-04-06 | 中冶建工有限公司 | Constructing method for threading pre-stress structure steel strands |
CN107762238A (en) * | 2017-10-13 | 2018-03-06 | 中国水利水电第十工程局有限公司 | A kind of king-post prestressed strand lifts position control method |
JP2018199963A (en) * | 2017-05-29 | 2018-12-20 | 神鋼鋼線工業株式会社 | Wiring method of PC steel material |
CN212503411U (en) * | 2020-04-07 | 2021-02-09 | 福建福清核电有限公司 | Wiring device of inverted U-shaped prestress braiding |
-
2020
- 2020-04-07 CN CN202010264470.4A patent/CN111517170B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07252939A (en) * | 1994-11-17 | 1995-10-03 | Sumitomo Electric Ind Ltd | Fixing method of un-bonded pc-steel stranded wire |
CN102003072A (en) * | 2010-10-08 | 2011-04-06 | 天津滨海盈信投资有限公司 | Steel strand bundle-weaving and crossing construction method |
CN102003073A (en) * | 2010-12-11 | 2011-04-06 | 中冶建工有限公司 | Constructing method for threading pre-stress structure steel strands |
JP2018199963A (en) * | 2017-05-29 | 2018-12-20 | 神鋼鋼線工業株式会社 | Wiring method of PC steel material |
CN107762238A (en) * | 2017-10-13 | 2018-03-06 | 中国水利水电第十工程局有限公司 | A kind of king-post prestressed strand lifts position control method |
CN212503411U (en) * | 2020-04-07 | 2021-02-09 | 福建福清核电有限公司 | Wiring device of inverted U-shaped prestress braiding |
Also Published As
Publication number | Publication date |
---|---|
CN111517170B (en) | 2024-08-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212503411U (en) | Wiring device of inverted U-shaped prestress braiding | |
CN102383377A (en) | Construction method utilizing steel-strand strand pulling machine to perform fast strand pulling during construction of prestress structures | |
CN113756201B (en) | T-structure continuous beam prestressed steel strand pulling method and pulling device thereof | |
CN105568856B (en) | A kind of dilute cable stayed-cable bridge Suo Liang method for synchronously constructing | |
CN106081836A (en) | Vertical shaft head rope and tail rope replacing options | |
US3942238A (en) | Method for reinforcing structures | |
CN106087759B (en) | A kind of threading method of prestressed strand threader and prestressed strand | |
CN112726404A (en) | Steel strand whole bundle weaving method and system | |
CN111517170A (en) | Wiring device of inverted U-shaped prestress braiding | |
CN115045512B (en) | Integral beam penetrating device and method for prestressed ultra-long circumferential steel beam of nuclear power station | |
CN211142840U (en) | Suspension bridge main push-towing rope erects system | |
CN106012834B (en) | A kind of spatial warping curve abnormal shape antisymmetry steel king-tower inner support and tensioning system | |
CN114645619B (en) | Construction method for integrally pulling Gamma steel strand of containment vessel of nuclear power station | |
CN205114690U (en) | Old wire recycling device | |
CN211228143U (en) | Steel strand combing device | |
CN112482227B (en) | Low-tower cable-stayed bridge cable penetrating system and method thereof | |
CN205975368U (en) | Prestressed steel beam threading device | |
CN111509623B (en) | Conveying device for cable pipe-penetrating laying and cable pipe-penetrating laying method | |
CN214573360U (en) | Steel strand aligning and bundling device | |
CN215405640U (en) | Traction system is worn to restraint by suspension casting box girder longitudinal direction prestressing tendons in general | |
HU189019B (en) | Method and production line for producing supporting meshes serving for mine supporting purpose | |
CN107938517B (en) | A kind of cable-stayed bridge prestressed concrete beam ring anchor construction method | |
CN220434257U (en) | Integral traction device for high-altitude prestress horizontal steel beam | |
CN111517239A (en) | Pulley block device for adjusting penetrating angle of inverted U-shaped prestressed steel beam | |
CN110193567A (en) | A kind of architectural engineering spiral stirrup forming device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |