CN111507614A CN202010295485.7A CN202010295485A CN111507614A CN 111507614 A CN111507614 A CN 111507614A CN 202010295485 A CN202010295485 A CN 202010295485A CN 111507614 A CN111507614 A CN 111507614A
Authority
CN
China
Prior art keywords
module
information acquisition
electrically connected
construction
input end
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010295485.7A
Other languages
Chinese (zh)
Inventor
方静燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Pengwei Software Co Ltd
Original Assignee
Jiangsu Pengwei Software Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Pengwei Software Co Ltd filed Critical Jiangsu Pengwei Software Co Ltd
Priority to CN202010295485.7A priority Critical patent/CN111507614A/en
Publication of CN111507614A publication Critical patent/CN111507614A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01DMEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
    • G01D21/00Measuring or testing not otherwise provided for
    • G01D21/02Measuring two or more variables by means not covered by a single other subclass
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06395Quality analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • General Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Physics & Mathematics (AREA)
  • Educational Administration (AREA)
  • Marketing (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Development Economics (AREA)
  • Theoretical Computer Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a green building construction information acquisition system which comprises a mobile terminal and a data transmission module, wherein the input end of a system login module is electrically connected with the mobile terminal and a PC terminal, the output end of the system login module is electrically connected with a login information recording module and a central processing module, the data transmission module is electrically connected with the input end of the central processing module, and the input end of the data transmission module is electrically connected with a constructor information acquisition module, a construction environment information acquisition module and a construction progress information acquisition module. According to the invention, the external environment condition in the building construction process can be collected and detected through the arranged construction environment information acquisition module, so that the green construction effect can be achieved, the problem that the surrounding environment is influenced due to construction is avoided, and meanwhile, the construction progress information acquisition module can be arranged to watch the construction process through images, so that the purpose of knowing the construction progress at any time can be achieved.

Description

Green building construction information acquisition system
Technical Field
The invention relates to the technical field of green building construction, in particular to a green building construction information acquisition system.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place. The method comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like. The site of the construction work is called a "construction site" or "job site", also called a worksite. In the whole life cycle, the method saves resources, protects the environment, reduces pollution, provides healthy, applicable and efficient use space for people, and realizes the high-quality building harmony and symbiosis between people and nature to the maximum extent. The green building evaluation is to follow the principle of local conditions, combine the characteristics of climate, environment, resources, economy, culture and the like of the region where the building is located, and comprehensively evaluate the performances of safety, durability, health, comfort, convenient life, resource conservation, environmental livability and the like in the whole life cycle of the building.
Inconvenient when the green building construction manages a large amount of constructors to through unable progress, the construction all ring edge borders of being under construction carry out information acquisition, still inconvenient the problem of carrying out remote guidance to the work progress simultaneously, for this reason, we propose a green building construction information acquisition system that the practicality is higher.
Disclosure of Invention
The invention aims to provide a green building construction information acquisition system, which solves the problems that a large number of construction personnel are inconvenient to manage during the construction of the existing green building, the construction progress and the construction surrounding environment cannot be acquired, and the construction process is inconvenient to remotely guide.
In order to achieve the purpose, the invention provides the following technical scheme: the utility model provides a green building construction information acquisition system, includes mobile terminal and data transmission module, the input electric connection that the system logged in the module has mobile terminal and PC terminal, and the output electric connection that the system logged in the module has information recording module and central processing module of logging in, data transmission module electric connection is in central processing module's input, and data transmission module's input electric connection has constructor information acquisition module, construction environment information acquisition module and construction progress information acquisition module, construction progress information acquisition module's input is connected with image information acquisition module, and image information acquisition module's input is connected with the camera, central processing module's output electric connection has data sending module, and data sending module's output electric connection has the commander to control the module.
Preferably, the output end of the command control module is electrically connected with an alarm module and a command module, and a parallel structure is formed between the alarm module and the command module.
Preferably, the output end of the alarm module is electrically connected with an alarm bell, and the type of the alarm bell is MA-501.
Preferably, the output end of the command module is electrically connected with a horn, and the model of the horn is DU-100.
Preferably, the input electric connection of constructor information acquisition module has constructor punching card module and ID card GPS orientation module on duty, and constitutes parallel structure between constructor punching card module on duty and the ID card GPS orientation module.
Preferably, the input end of the construction environment information acquisition module is electrically connected with a temperature and humidity detection module, a harmful gas detection module and a dust detection module, and the temperature and humidity detection module, the harmful gas detection module and the dust detection module form a parallel structure.
Preferably, the input end of the temperature and humidity detection module is electrically connected with a temperature and humidity sensor, and the model of the temperature and humidity sensor is VMS-300C 3-WS-GPRS.
Preferably, the input end of the harmful gas detection module is electrically connected with a harmful gas detector, and the model of the harmful gas detector is AS 8900.
Preferably, the input end of the dust detection module is electrically connected with a dust tester, and the model of the dust tester is DT-96/DT 96B.
Compared with the prior art, the invention has the following beneficial effects:
1. according to the invention, a user can conveniently log in the acquisition system through a mobile phone or a computer through the mobile terminal and the PC terminal, so that the user can conveniently know the construction information of the green building at any time, and meanwhile, the information of the user logging in the system can be recorded through the log-in information recording module, so that the customer service can conveniently return the information to the log-in person.
2. According to the invention, the constructor information acquisition module can be used for conveniently knowing the personal information of green building constructors, so that the construction workers can know the information of the constructors by landers, the landers can know that all workers are professional in construction, the problem of unqualified engineering quality is avoided, and meanwhile, the positions of the workers can be conveniently known at any time by the identity card GPS positioning module, so that unified management on the workers is facilitated.
3. According to the invention, the external environment condition in the building construction process can be collected and detected through the arranged construction environment information acquisition module, so that the green construction effect can be achieved, the problem that the surrounding environment is influenced due to construction is avoided, and meanwhile, the construction progress information acquisition module can be arranged to watch the construction process through images, so that the purpose of knowing the construction progress at any time can be achieved;
4. according to the invention, the remote control command can be conveniently carried out on the construction process through the command control module, so that the problem in the construction process can be avoided, meanwhile, the warning and reminding effects can be played through the warning bell, and when dangerous conditions occur, warning and dispersion can be carried out on constructors through the warning bell, so that the safety in building construction can be improved, and the practicability of the green building construction information acquisition system is greatly improved.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the operation flow of the command and control module according to the present invention;
FIG. 3 is a schematic view of the work flow of the constructor information collecting module according to the present invention;
FIG. 4 is a schematic diagram of a work flow of the construction environment information collection module according to the present invention.
In the figure: 1. a mobile terminal; 2. a PC terminal; 3. a system login module; 4. logging in an information recording module; 5. a central processing module; 6. a data transmission module; 7. a command control module; 8. a data transmission module; 9. a constructor information acquisition module; 10. a construction environment information acquisition module; 11. a construction progress information acquisition module; 12. an image information acquisition module; 13. an alarm module; 14. a command module; 15. an alarm bell; 16. a horn; 17. a constructor working card punching module; 18. an identity card GPS positioning module; 19. a temperature and humidity detection module; 20. a harmful gas detection module; 21. a dust detection module; 22. a temperature and humidity sensor; 23. a harmful gas detector; 24. a dust tester; 25. a camera is provided.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-4, a green building construction information collection system comprises a mobile terminal 1 and a data transmission module 8, wherein the input end of a system login module 3 is electrically connected with the mobile terminal 1 and a PC terminal 2, the output end of the system login module 3 is electrically connected with a login information recording module 4 and a central processing module 5, and a user can conveniently log in the collection system through a mobile phone or a computer through the arranged mobile terminal 1 and the PC terminal 2, so that the user can conveniently know the construction information of the green building at any time, and meanwhile, the login information recording module 4 can record the information of the user logging in the system, so that the customer service can conveniently return the information to the login user;
the data transmission module 8 is electrically connected with the input end of the central processing module 5, the input end of the data transmission module 8 is electrically connected with a constructor information acquisition module 9, a construction environment information acquisition module 10 and a construction progress information acquisition module 11, the input end of the constructor information acquisition module 9 is electrically connected with a constructor working card printing module 17 and an identity card GPS positioning module 18, a parallel structure is formed between the constructor working card printing module 17 and the identity card GPS positioning module 18, the constructor information acquisition module 9 can conveniently know the personal information of green building constructors, the information of the constructors can be known by the lander, the lander can know that the construction is carried out by the constructor, the problem of unqualified engineering quality can not be generated, and the position of the constructor can be conveniently known by the identity card GPS positioning module 18, the unified management of workers is facilitated;
the input end of the construction environment information acquisition module 10 is electrically connected with a temperature and humidity detection module 19, a harmful gas detection module 20 and a dust detection module 21, a parallel structure is formed among the temperature and humidity detection module 19, the harmful gas detection module 20 and the dust detection module 21, the input end of the temperature and humidity detection module 19 is electrically connected with a temperature and humidity sensor 22, the model of the temperature and humidity sensor 22 is VMS-300C3-WS-GPRS, the input end of the harmful gas detection module 20 is electrically connected with a harmful gas detector 23, the model of the harmful gas detector 23 is AS8900, the input end of the dust detection module 21 is electrically connected with a dust tester 24, the model of the dust tester 24 is DT-96/DT96B, and the external environment condition in the building construction process can be acquired and detected through the arranged construction environment information acquisition module 10, therefore, the effect of green construction can be achieved, the problem that the surrounding environment is affected due to construction is avoided, and meanwhile, the construction progress information acquisition module 11 can be arranged to watch the construction process through images, so that the purpose of knowing the construction progress constantly can be achieved;
the input end of the construction progress information acquisition module 11 is connected with an image information acquisition module 12, the input end of the image information acquisition module 12 is connected with a camera 25, the output end of the central processing module 5 is electrically connected with a data transmission module 6, the output end of the data transmission module 6 is electrically connected with a commanding and controlling module 7, the output end of the commanding and controlling module 7 is electrically connected with an alarm module 13 and a commanding module 14, a parallel structure is formed between the alarm module 13 and the commanding module 14, the output end of the alarm module 13 is electrically connected with an alarm bell 15, the model of the alarm bell 15 is MA-501, the output end of the commanding module 14 is electrically connected with a loudspeaker 16, the model of the loudspeaker 16 is DU-100, the remote control command on the construction process can be conveniently carried out through the arranged commanding and controlling module 7, so that the problem in the construction process can, simultaneously can play the effect that the warning was reminded through alarm bell 15, when the dangerous condition appears, can warn the dispersion through alarm bell 15 to constructor to security when can improving the building construction has improved this kind of green building construction information acquisition system's practicality greatly.
The working principle is as follows: for the green building construction information acquisition system, firstly, the system can be logged in through the mobile terminal 1 and the PC terminal 2, the system logging-in module 3 can bounce the page information of the system to log in, and simultaneously, the user can input logging-in information on the page to enter the working page of the system, the information filled in by logging-in of the user can be stored and recorded through the electrically connected logging-in information recording module 4, a camera 25 with the model of QBK-IP199 can be installed on a construction site to shoot the construction progress and can transmit the shot and acquired information to the image information acquisition module 12, the image information acquisition module 12 collects the scene data of each part and transmits the scene data to the construction progress information acquisition module 11, and the set worker work attendance card punching module 17 can collect the work time of a worker in a work attendance card punching mode, the working position of a constructor can be positioned through the identity card GPS positioning module 18, so that the constructor can be managed conveniently, meanwhile, the temperature and humidity in the construction environment can be acquired through the temperature and humidity sensor 22 with the model of VMS-300C3-WS-GPRS, the acquired information can be transmitted to the temperature and humidity detection module 19, part of harmful gas in the air can be detected through the harmful gas detector 23 with the model of AS8900, the influence on the health of the constructor caused by the generation of the harmful gas is avoided, meanwhile, the acquired signal can be transmitted to the harmful gas detection module 20, the dust concentration in the construction environment can be detected through the dust tester 24 with the model of DT-96/DT96B, the influence on the environment around construction is avoided, and meanwhile, the detected information can be transmitted to the dust detection module 21, the temperature and humidity detection module 19, the harmful gas detection module 20 and the dust detection module 21 can transmit the acquired information to the central processing module 5 in the form of electric signals through the data transmission module 8, the central processing module 5 is a digital electronic device with a microprocessor, and is a digital logic controller for automatic control, and can load control instructions into a memory at any time for storage and execution, the programmable controller is formed by modularly combining an internal CPU, an instruction and data memory, an input and output unit, a power supply module, a digital analog unit and the like, the central processing module 5 can transmit the instructions to the command and control module 7 through the data transmission module 6, the command and control module 7 can transmit the instructions to the alarm module 13 and the command module 14 through wires, and the alarm module 13 can play a warning and reminding effect for workers through the alarm bell 15 with the type of MA-501, the command module 14 can broadcast the instruction to be expressed through the horn 16 with the model of DU-100, so that the practicability of the whole green building construction information acquisition system is well improved, and the using process of the whole green building construction information acquisition system is completed.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (9)

1. The utility model provides a green building construction information acquisition system, includes mobile terminal (1) and data transmission module (8), its characterized in that: the input end of the system login module (3) is electrically connected with a mobile terminal (1) and a PC terminal (2), the output end of the system login module (3) is electrically connected with a login information recording module (4) and a central processing module (5), the data transmission module (8) is electrically connected with the input end of the central processing module (5), the input end of the data transmission module (8) is electrically connected with a constructor information acquisition module (9), a construction environment information acquisition module (10) and a construction progress information acquisition module (11), the input end of the construction progress information acquisition module (11) is connected with an image information acquisition module (12), the input end of the image information acquisition module (12) is connected with a camera (25), the output end of the central processing module (5) is electrically connected with a data sending module (6), and the output end of the data sending module (6) is electrically connected with a command control module (7).
2. The green building construction information acquisition system according to claim 1, characterized in that: the output end of the command control module (7) is electrically connected with an alarm module (13) and a command module (14), and a parallel structure is formed between the alarm module (13) and the command module (14).
3. The green building construction information acquisition system according to claim 2, characterized in that: the output end of the alarm module (13) is electrically connected with an alarm bell (15), and the type of the alarm bell (15) is MA-501.
4. The green building construction information acquisition system according to claim 2, characterized in that: the output end of the command module (14) is electrically connected with a loudspeaker (16), and the model of the loudspeaker (16) is DU-100.
5. The green building construction information acquisition system according to claim 1, characterized in that: the input electric connection of constructor information acquisition module (9) has constructor punching card module (17) and identity tablet GPS orientation module (18) on duty, and constitutes parallel structure between constructor punching card module (17) on duty and identity tablet GPS orientation module (18).
6. The green building construction information acquisition system according to claim 1, characterized in that: the construction environment information collection system is characterized in that the input end of the construction environment information collection module (10) is electrically connected with a temperature and humidity detection module (19), a harmful gas detection module (20) and a dust detection module (21), and a parallel structure is formed among the temperature and humidity detection module (19), the harmful gas detection module (20) and the dust detection module (21).
7. The green building construction information acquisition system according to claim 6, characterized in that: the input end of the temperature and humidity detection module (19) is electrically connected with a temperature and humidity sensor (22), and the model of the temperature and humidity sensor (22) is VMS-300C 3-WS-GPRS.
8. The green building construction information acquisition system according to claim 6, characterized in that: the input end of the harmful gas detection module (20) is electrically connected with a harmful gas detector (23), and the model of the harmful gas detector (23) is AS 8900.
9. The green building construction information acquisition system according to claim 6, characterized in that: the input end of the dust detection module (21) is electrically connected with a dust tester (24), and the model of the dust tester (24) is DT-96/DT 96B.
CN202010295485.7A 2020-04-15 2020-04-15 Green building construction information acquisition system Pending CN111507614A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010295485.7A CN111507614A (en) 2020-04-15 2020-04-15 Green building construction information acquisition system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010295485.7A CN111507614A (en) 2020-04-15 2020-04-15 Green building construction information acquisition system

Publications (1)

Publication Number Publication Date
CN111507614A true CN111507614A (en) 2020-08-07

Family

ID=71864678

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010295485.7A Pending CN111507614A (en) 2020-04-15 2020-04-15 Green building construction information acquisition system

Country Status (1)

Country Link
CN (1) CN111507614A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106593534A (en) * 2016-12-18 2017-04-26 河北科技大学 Intelligent tunnel construction security monitoring system
CN107146168A (en) * 2017-07-11 2017-09-08 大连锐勃电子科技有限公司 Wisdom building site management system based on universe frequency conversion positioning Yu self-identifying technology
CN107888665A (en) * 2017-10-26 2018-04-06 中铁四局集团有限公司 A kind of job site personnel information and safety management system
CN108173942A (en) * 2017-12-28 2018-06-15 亳州景行网络科技有限公司 A kind of construction site monitors service platform
CN108876664A (en) * 2018-06-07 2018-11-23 安徽鼎龙网络传媒有限公司 A kind of cloud property back-stage management subscribes ordering system immediately

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106593534A (en) * 2016-12-18 2017-04-26 河北科技大学 Intelligent tunnel construction security monitoring system
CN107146168A (en) * 2017-07-11 2017-09-08 大连锐勃电子科技有限公司 Wisdom building site management system based on universe frequency conversion positioning Yu self-identifying technology
CN107888665A (en) * 2017-10-26 2018-04-06 中铁四局集团有限公司 A kind of job site personnel information and safety management system
CN108173942A (en) * 2017-12-28 2018-06-15 亳州景行网络科技有限公司 A kind of construction site monitors service platform
CN108876664A (en) * 2018-06-07 2018-11-23 安徽鼎龙网络传媒有限公司 A kind of cloud property back-stage management subscribes ordering system immediately

Similar Documents

Publication Publication Date Title
CN202092668U (en) Wireless grouting data monitoring system capable of freely networking
CN101709954B (en) Overhead wire icing on-line monitoring device based on machine vision
CN204465736U (en) A kind of power transmission line intelligent long distance control system based on Internet of Things
CN110888402A (en) Intelligent building site environment comprehensive monitoring system based on SAAS platform
CN113804598B (en) Construction environment monitoring system and monitoring method based on big data
CN208172562U (en) A kind of multifunctional intellectual building site monitoring collection system
CN104581087A (en) Intelligent remote monitoring system of power transmission line on basis of internet of things
CN111768123A (en) Visual management system for power distribution network construction site
CN108769180A (en) A kind of long-range environment monitoring system based on technology of Internet of things
CN107255970A (en) A kind of wearable electric power safety inspection working equipment
CN109829693A (en) One kind being used for Construction Schedule management system and management method
CN109683539A (en) Equipment dynamic control device and system is monitored online in pollutant
CN111770315A (en) Intelligent building site video online monitoring system
CN103414924A (en) Television set top box with indoor environment sensor
CN209842401U (en) Industrial sensing signal collector based on edge calculation
CN103048976A (en) Security management and control command system
CN204388922U (en) Micro-climate monitoring and early warning system
CN111507614A (en) Green building construction information acquisition system
CN205319800U (en) Power scheduling operation safety control system
CN202093569U (en) Safety tool monitoring and managing system
CN203941438U (en) The biochemical rescue outfit of a kind of core ensures information collecting device
CN205427969U (en) Wireless system of patrolling and examining
CN103607563A (en) Forest fire prevention hand-held terminal
CN204069181U (en) A kind of law enforcement recorded information coordinated control system
CN110220592A (en) A kind of remote supervision system constructing Noise map

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20200807

WD01 Invention patent application deemed withdrawn after publication