CN111461496A - 一种中长期负荷数据的季节性调整方法 - Google Patents
一种中长期负荷数据的季节性调整方法 Download PDFInfo
- Publication number
- CN111461496A CN111461496A CN202010162730.7A CN202010162730A CN111461496A CN 111461496 A CN111461496 A CN 111461496A CN 202010162730 A CN202010162730 A CN 202010162730A CN 111461496 A CN111461496 A CN 111461496A
- Authority
- CN
- China
- Prior art keywords
- adjustment
- seasonal
- sequence
- arima
- link
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000001932 seasonal effect Effects 0.000 title claims abstract description 58
- 238000000034 method Methods 0.000 title claims abstract description 21
- 230000007774 longterm Effects 0.000 title claims abstract description 15
- 230000000694 effects Effects 0.000 claims abstract description 31
- YHXISWVBGDMDLQ-UHFFFAOYSA-N moclobemide Chemical compound C1=CC(Cl)=CC=C1C(=O)NCCN1CCOCC1 YHXISWVBGDMDLQ-UHFFFAOYSA-N 0.000 claims abstract description 12
- 230000009466 transformation Effects 0.000 claims abstract description 4
- 230000001788 irregular Effects 0.000 claims description 10
- 238000012360 testing method Methods 0.000 claims description 8
- 230000008859 change Effects 0.000 claims description 7
- 125000004122 cyclic group Chemical group 0.000 claims description 7
- 230000000737 periodic effect Effects 0.000 claims description 7
- 230000005611 electricity Effects 0.000 claims description 6
- 238000012937 correction Methods 0.000 claims description 5
- 238000003908 quality control method Methods 0.000 claims description 4
- 230000003595 spectral effect Effects 0.000 claims description 4
- 238000013519 translation Methods 0.000 claims description 4
- 238000013450 outlier detection Methods 0.000 claims description 2
- 238000011161 development Methods 0.000 description 3
- 238000003745 diagnosis Methods 0.000 description 3
- 230000006870 function Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 238000000354 decomposition reaction Methods 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000012417 linear regression Methods 0.000 description 1
- 238000012067 mathematical method Methods 0.000 description 1
- 238000007781 pre-processing Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000011160 research Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06312—Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/067—Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Health & Medical Sciences (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Water Supply & Treatment (AREA)
- Primary Health Care (AREA)
- Public Health (AREA)
- General Health & Medical Sciences (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010162730.7A CN111461496A (zh) | 2020-03-10 | 2020-03-10 | 一种中长期负荷数据的季节性调整方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010162730.7A CN111461496A (zh) | 2020-03-10 | 2020-03-10 | 一种中长期负荷数据的季节性调整方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111461496A true CN111461496A (zh) | 2020-07-28 |
Family
ID=71678400
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010162730.7A Pending CN111461496A (zh) | 2020-03-10 | 2020-03-10 | 一种中长期负荷数据的季节性调整方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111461496A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113962491A (zh) * | 2021-12-01 | 2022-01-21 | 国网河北省电力有限公司雄安新区供电公司 | 基于季节分解的短期冷热电负荷联合预测方法及装置 |
Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1372090A1 (en) * | 2002-06-12 | 2003-12-17 | Sap Ag | Position budgeting and control system |
US20110218838A1 (en) * | 2010-03-01 | 2011-09-08 | Chuck Byce | Econometrical investment strategy analysis apparatuses, methods and systems |
CN102819770A (zh) * | 2012-08-02 | 2012-12-12 | 积成电子股份有限公司 | 基于人体舒适度指数的配电网短期负荷预测方法 |
JP2013005465A (ja) * | 2011-06-10 | 2013-01-07 | Azbil Corp | 負荷量予測装置、負荷量予測方法および負荷量予測プログラム |
CN103617457A (zh) * | 2013-12-06 | 2014-03-05 | 国网山东省电力公司 | 电力系统中与温度有关的天气敏感负荷的预测方法 |
CN103745280A (zh) * | 2014-01-26 | 2014-04-23 | 北京中电普华信息技术有限公司 | 用电量预测方法、装置及处理器 |
US20140310059A1 (en) * | 2011-11-14 | 2014-10-16 | Energent Incorporation | System , method and computer program forecasting energy price |
CN104239982A (zh) * | 2014-10-12 | 2014-12-24 | 刘岩 | 一种基于时间序列和神经网络的建筑节假日能耗预测方法 |
CN105205570A (zh) * | 2015-10-16 | 2015-12-30 | 国网重庆铜梁区供电有限责任公司 | 一种基于季节时序分析的电网售电量预测方法 |
US20170016430A1 (en) * | 2015-07-17 | 2017-01-19 | General Electric Company | Systems and methods for improved wind power generation |
CN109376953A (zh) * | 2018-11-21 | 2019-02-22 | 国网冀北电力有限公司 | 一种中长期电量预测方法及系统 |
CN109978201A (zh) * | 2017-12-27 | 2019-07-05 | 深圳市景程信息科技有限公司 | 基于高斯过程分位数回归模型的概率负荷预测系统及方法 |
CN110264001A (zh) * | 2019-06-20 | 2019-09-20 | 国网上海市电力公司 | 基于多时序的用电负荷预测方法 |
-
2020
- 2020-03-10 CN CN202010162730.7A patent/CN111461496A/zh active Pending
Patent Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1372090A1 (en) * | 2002-06-12 | 2003-12-17 | Sap Ag | Position budgeting and control system |
US20110218838A1 (en) * | 2010-03-01 | 2011-09-08 | Chuck Byce | Econometrical investment strategy analysis apparatuses, methods and systems |
JP2013005465A (ja) * | 2011-06-10 | 2013-01-07 | Azbil Corp | 負荷量予測装置、負荷量予測方法および負荷量予測プログラム |
US20140310059A1 (en) * | 2011-11-14 | 2014-10-16 | Energent Incorporation | System , method and computer program forecasting energy price |
CN102819770A (zh) * | 2012-08-02 | 2012-12-12 | 积成电子股份有限公司 | 基于人体舒适度指数的配电网短期负荷预测方法 |
CN103617457A (zh) * | 2013-12-06 | 2014-03-05 | 国网山东省电力公司 | 电力系统中与温度有关的天气敏感负荷的预测方法 |
CN103745280A (zh) * | 2014-01-26 | 2014-04-23 | 北京中电普华信息技术有限公司 | 用电量预测方法、装置及处理器 |
CN104239982A (zh) * | 2014-10-12 | 2014-12-24 | 刘岩 | 一种基于时间序列和神经网络的建筑节假日能耗预测方法 |
US20170016430A1 (en) * | 2015-07-17 | 2017-01-19 | General Electric Company | Systems and methods for improved wind power generation |
CN105205570A (zh) * | 2015-10-16 | 2015-12-30 | 国网重庆铜梁区供电有限责任公司 | 一种基于季节时序分析的电网售电量预测方法 |
CN109978201A (zh) * | 2017-12-27 | 2019-07-05 | 深圳市景程信息科技有限公司 | 基于高斯过程分位数回归模型的概率负荷预测系统及方法 |
CN109376953A (zh) * | 2018-11-21 | 2019-02-22 | 国网冀北电力有限公司 | 一种中长期电量预测方法及系统 |
CN110264001A (zh) * | 2019-06-20 | 2019-09-20 | 国网上海市电力公司 | 基于多时序的用电负荷预测方法 |
Non-Patent Citations (1)
Title |
---|
蒋贲: "用电市场景气分析研究", 《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113962491A (zh) * | 2021-12-01 | 2022-01-21 | 国网河北省电力有限公司雄安新区供电公司 | 基于季节分解的短期冷热电负荷联合预测方法及装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110555561B (zh) | 一种中长期径流集合预报方法 | |
Aprillia et al. | Statistical load forecasting using optimal quantile regression random forest and risk assessment index | |
CN111210093B (zh) | 基于大数据的日用水量预测方法 | |
CN111191193A (zh) | 一种基于自回归滑动平均模型的长期土壤温湿度高精度预测方法 | |
Coughlin | Analysis of wind power and load data at multiple time scales | |
CN111080477A (zh) | 一种家庭电力负荷预测方法及系统 | |
CN109740760A (zh) | 文本质检自动化训练方法、电子装置及计算机设备 | |
CN114330934A (zh) | 一种模型参数自适应的gru新能源短期发电功率预测方法 | |
CN111461496A (zh) | 一种中长期负荷数据的季节性调整方法 | |
Heydari et al. | Mid-term load power forecasting considering environment emission using a hybrid intelligent approach | |
CN108154259B (zh) | 热泵的负荷预测方法及装置、存储介质、处理器 | |
CN117236800B (zh) | 一种多场景自适应的用电负荷预测方法及系统 | |
Khalyasmaa et al. | Averaged errors as a risk factor for intelligent forecasting systems operation in the power industry | |
CN105046372A (zh) | 一种逐日蔬菜价格的预测方法和装置 | |
CN112614010A (zh) | 负荷预测方法及装置、存储介质及电子装置 | |
CN110909916B (zh) | 一种基于熵权法的风力发电月度电量区间预测方法 | |
CN116646917A (zh) | 一种校园多步概率电力负荷预测方法及系统 | |
CN114648156A (zh) | 一种基于卷积神经网络的时间序列负荷预测方法 | |
CN111242805B (zh) | 一种用电量增长率计算方法和装置 | |
CN114819382A (zh) | 一种基于lstm的光伏功率预测方法 | |
Muschinski et al. | Predicting power ramps from joint distributions of future wind speeds | |
CN114117713A (zh) | 一种区域光伏出力预测方法及装置 | |
CN110544006A (zh) | 污染物排放清单时间分布确定方法及装置 | |
Li et al. | Abnormal Value Treatment and Seasonable Adjustment Method for Medium and Long-term Load Data | |
CN111445002B (zh) | 能源需求量预测方法/系统、存储介质及设备 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Wang Yao Inventor after: Wang Ai Inventor after: Wang Zhigang Inventor after: Wang Zheng Inventor after: Li Xuxia Inventor before: Wang Yao Inventor before: Wang Ai Inventor before: Wang Zhigang Inventor before: Wang Zheng Inventor before: Li Xuxia Inventor before: Tong Xing |
|
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20220112 Address after: 030000 15 / F, building 1, No.89, Fudong street, Xinghualing District, Taiyuan City, Shanxi Province Applicant after: ECONOMIC RESEARCH INSTITUTE OF STATE GRID SHANXI ELECTRIC POWER Co. Address before: 030000 15 / F, building 1, No.89, Fudong street, Xinghualing District, Taiyuan City, Shanxi Province Applicant before: ECONOMIC RESEARCH INSTITUTE OF STATE GRID SHANXI ELECTRIC POWER Co. Applicant before: Shenzhen orange Technology Co.,Ltd. |
|
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20200728 |