CN111456254B - Connecting device convenient for aluminum die reinforcement of heat insulation plate and construction method - Google Patents

Connecting device convenient for aluminum die reinforcement of heat insulation plate and construction method Download PDF

Info

Publication number
CN111456254B
CN111456254B CN202010317109.3A CN202010317109A CN111456254B CN 111456254 B CN111456254 B CN 111456254B CN 202010317109 A CN202010317109 A CN 202010317109A CN 111456254 B CN111456254 B CN 111456254B
Authority
CN
China
Prior art keywords
sleeve
positioning
connecting rod
insulation board
heat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202010317109.3A
Other languages
Chinese (zh)
Other versions
CN111456254A (en
Inventor
夏林峰
魏鹏飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN202010317109.3A priority Critical patent/CN111456254B/en
Publication of CN111456254A publication Critical patent/CN111456254A/en
Application granted granted Critical
Publication of CN111456254B publication Critical patent/CN111456254B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/74Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
    • E04B1/76Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
    • E04B1/78Heat insulating elements
    • E04B1/80Heat insulating elements slab-shaped
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/08Forms, which are completely dismantled after setting of the concrete and re-built for next pouring
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Electromagnetism (AREA)
  • Acoustics & Sound (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses a connecting device and a construction method for conveniently reinforcing an aluminum mould of a heat-insulation board, and belongs to the technical field of heat-insulation building template reinforcing devices. The heat-insulation board comprises a heat-insulation board, wherein embedded parts are arranged on two sides of the heat-insulation board, connecting structures and positioning blind holes are arranged on the two embedded parts, the two embedded parts are fixedly connected with corresponding reinforcing steel bar net racks through the connecting structures on the two embedded parts, connecting rods are connected in the two positioning blind holes in a matching mode, a sleeve is sleeved on each connecting rod, one end of each sleeve is attached to the inner side wall of the corresponding template, the other end of each sleeve is matched with the corresponding positioning blind hole, and one end, far away from the embedded parts, of each connecting rod penetrates through the corresponding template and is connected with an adjusting nut in. Avoid destroying its heated board overall structure, prevent that the later stage from appearing the percolating water phenomenon, guarantee its construction quality.

Description

Connecting device convenient for aluminum die reinforcement of heat insulation plate and construction method
Technical Field
The invention belongs to the technical field of heat-insulating building template reinforcing devices, and particularly relates to a connecting device and a construction method for effectively reinforcing an aluminum mould by avoiding damage to a heat-insulating plate.
Background
In the construction process of a composite heat-preservation steel bar welding net rack concrete wall (CCW building system), because a heat-preservation plate needs to be poured together with concrete, holes are punched or reserved on the heat-preservation plate according to a common construction method, the heat-preservation plate is made of special materials and is not beneficial to punching, otherwise, large-area damage is caused, and the due effect is locally lost; on the other hand, the tie bolts need to be cut off after the construction is finished, so that the resource waste is caused, and the construction cost is increased.
Disclosure of Invention
The invention aims to solve the defects in the prior art, and provides the connecting device and the construction method which are convenient for aluminum mould reinforcement of the heat-insulation plate, so that the problems that the heat-insulation plate needs to be damaged or is not easy to penetrate through the heat-insulation plate to cause large-area damage and the like in the traditional connecting device are solved, and the aluminum template is easier to reinforce.
In order to achieve the purpose, the invention adopts the following scheme:
the utility model provides a connecting device convenient to carry out aluminium mould reinforcement to heated board, includes the heated board, the both sides of heated board all are equipped with built-in fitting, two all be equipped with connection structure and location blind hole on the built-in fitting, two the built-in fitting is through self connection structure and the reinforcing bar rack fixed connection who corresponds, two equal accordant connection has a connecting rod, two in the location blind hole all the cover is equipped with a sleeve pipe on the connecting rod, the laminating of sheathed tube one end and the template inside wall that corresponds, other end location blind hole adaptation, two the one end that the built-in fitting was kept away from to the connecting rod runs through corresponding template respectively and accordant connection has adjusting nut.
Furthermore, the sleeve is a conical sleeve, and the diameter of one end, close to the embedded part, of the sleeve is smaller than that of one end, close to the template, of the sleeve.
Furthermore, a positioning block is arranged in each positioning blind hole, a stop block is fixed between the positioning block and the bottom of each positioning blind hole and is perpendicular to the positioning block, the side walls of the stop blocks, the positioning blocks and the positioning blind holes jointly form a positioning area, one end, far away from the corresponding template, of each connecting rod is fixedly connected with a hook portion, the width of each hook portion is between the outer diameter and the inner diameter of one end, close to the embedded part, of the sleeve, and each hook portion is clamped in the positioning area through rotation.
Furthermore, the connection structure includes spliced pole and locating plate, the spliced pole is equipped with four and is the rectangle structure and lays, every the equal fixed connection of one end of spliced pole is on the surface of built-in fitting, the other end all freely sets up, set up the mounting hole with the spliced pole adaptation on the locating plate, the spliced pole freely runs through its corresponding mounting hole and the accordant connection has set nut.
Further, the equal fixedly connected with bellying in one side four corners department of the relative heated board of locating plate, the bellying is used for restricting the reinforcing bar rack, the connecting hole has all been seted up on the bellying, the connecting hole in-connection has pricked the silk.
Also discloses a construction method of the connecting device for conveniently reinforcing the heat-insulation plate by using the aluminum die, which comprises the following steps:
s1, assembling the heat preservation plate: firstly, a cross connection point of a reinforcing steel bar net rack is installed between four connecting columns on the heat insulation board, then the cross connection point is sleeved on the connecting columns through a positioning plate by using an installation hole, then a positioning nut needs to be adjusted to a proper position, and the reinforcing steel bar net rack is fixed at the current position by using binding wires in the connecting hole;
s2, mounting a heat preservation plate: after the heat insulation plate and the reinforcing steel bar net rack are arranged at set positions, firstly, a sleeve with a conical structure is sleeved on the outer side of a connecting rod, one end, not provided with a hook part, of the connecting rod penetrates through a corresponding template and is connected with an adjusting nut in a matching mode, one end, provided with the hook part, of the connecting rod is inserted into a positioning blind hole, and the hook part is clamped in a positioning area by rotating the connecting rod;
s3, adjusting the installation position of the heat insulation plate: the two ends of the sleeve are respectively attached to the corresponding templates or matched with the corresponding positioning blind holes by adjusting the adjusting nuts;
s4, pouring concrete and removing the template: concrete is poured on the two sides of the heat insulation plate, after the concrete reaches a certain strength, the adjusting nut is loosened, then the connecting rod is rotated in the opposite direction to enable the hook portion of the connecting rod to be separated from the positioning area, the sleeve is driven out through the hook portion to achieve recycling, and finally formwork dismantling work is achieved.
Compared with the prior art, the invention can obtain the following technical effects:
according to the invention, the embedded part is arranged on the heat insulation plate, the connecting structure on the embedded part is fixedly connected with the reinforcing steel bar net rack, the positioning blind hole is used for quickly positioning the sleeve outside the connecting rod, and meanwhile, the connecting rod is connected with the embedded part in a matching manner, so that the overall structure of the heat insulation plate is prevented from being damaged, the water leakage phenomenon in the later stage is prevented, and the construction quality is ensured. Meanwhile, the connecting structure comprises a connecting column and a positioning plate, and the positioning plate is pushed to move to be proper by using a positioning nut on the outer side of the positioning plateIn the position, the binding wires in the convex parts, the connecting columns and the connecting holes fix the position of the reinforcing steel bar net rack, so that the adjusting capacity of the space between the reinforcing steel bar net rack and the heat insulation plate is improved; one end of the connecting rod is provided with a hook part, a positioning block and a stop block are arranged in the positioning blind hole, and the hook part is extended into the positioning blind holeTong (Chinese character of 'tong')Over-rotating the positioning block by a certain angle to enable the hook part to be clamped in a positioning area formed by the positioning block, the stop block and the positioning blind hole, so that the quick assembly and disassembly effect is realized.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is an enlarged view of a portion of the structure of FIG. 1 in a state where the hook portion is separated from the positioning area;
FIG. 3 is a partially enlarged view of the structure of FIG. 1, showing the hook engaged with the positioning area;
fig. 4 is a schematic view of the overall structure of the positioning plate of the present invention.
In the figure: 1. a thermal insulation board; 2. embedding parts; 3. positioning the blind hole; 4. a connecting rod; 5. a sleeve; 6. adjusting the nut; 7. positioning blocks; 8. a stopper; 9. a hook portion; 10. connecting columns; 11. positioning a plate; 12. positioning a nut; 13. a boss portion; 14. and (6) binding the wires.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is further described in detail with reference to the following embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
Example 1:
the utility model provides a connecting device convenient to carry out aluminium mould reinforcement to heated board, including heated board 1, a serial communication port, heated board 1's both sides all are equipped with built-in fitting 2, all be equipped with connection structure and location blind hole 3 on two built-in fittings 2, fixed connection is realized with the reinforcing bar rack that corresponds through the connection structure on self for two built-in fittings 2, equal accordant connection has connecting rod 4 in two location blind holes 3, all the cover is equipped with a sleeve pipe 5 on two connecting rod 4, the one end of sleeve pipe 5 and the laminating of the template inside wall that corresponds, 3 adaptations of other end location blind hole, the one end that embedded fitting 2 was kept away from respectively to two connecting rods 4 runs through corresponding template and threaded connection has adjusting. At first with the one end accordant connection of connecting rod 4 in location blind hole 3, another end suit sleeve pipe 5 and run through its aluminium template, through on connecting rod 4 in the aluminium template outside regulator adjusting nut 6 make effectively consolidate its aluminium template, the both ends of sleeve pipe 5 respectively with the laminating of aluminium template inside wall, location blind hole 3 looks adaptations simultaneously, still realize the minimizing injury to heated board 1 and guarantee its construction quality.
In this embodiment, the cross section of the sleeve 5 is a conical structure, the diameter of one end of the sleeve 5 close to the embedded part 2 is smaller than that of one end close to the template, and the conical structure is convenient to remove for recycling.
In this embodiment, be equipped with locating piece 7 of arc structure in every location blind hole 3, be fixed with dog 8 between the bottom of locating piece 7 and location blind hole 3, and dog 8 perpendicular to locating piece 7 sets up, dog 8, the locating area is constituteed jointly to the lateral wall of locating piece 7 and location blind hole 3, the equal fixedly connected with hook portion 9 of one end that corresponds the template is kept away from to every connecting rod 4, hook portion 9's width is between the external diameter and the internal diameter that the sleeve pipe is close to 2 one end of built-in fitting, every hook portion 9 is in the locating area through rotatory block, connecting rod 4 utilizes hook portion 9 can realize with the quick assembly disassembly work of heated board.
In this embodiment, connection structure includes spliced pole 10 and locating plate 11, spliced pole 10 is equipped with four and is the rectangle structure and lays, the equal fixed connection of one end of every spliced pole 10 is on the surface of built-in fitting 2, the other end is all freely set up, set up the mounting hole with spliced pole 10 adaptation on the locating plate 11, spliced pole 10 freely runs through its mounting hole that corresponds and the accordant connection has set nut 12, the equal fixedly connected with bellying 13 in one side four corners department of the relative heated board 1 of locating plate 11, bellying 13 is used for restricting the reinforcing bar rack, the connecting hole has all been seted up on the bellying 13, the connecting hole in-connection has prick. Utilize 11 suits of locating plate on spliced pole 10, make its locating plate 11 to move to suitable position through adjusting set nut 12 to fix the cross node of reinforcing bar rack through bellying 13 and spliced pole 10 and bundle silk 14, finally cause the interval between its reinforcing bar rack and the heated board 1 to have higher regulating power and satisfy the different environment of pouring.
Example 2:
a construction method of a connecting device convenient for aluminum mould reinforcement of a heat insulation plate comprises the following steps:
s1, assembling the heat preservation plate 1: firstly, a cross connection point of a reinforcing steel bar net rack is arranged between four connecting columns 10 on an insulation board 1, then the cross connection point is sleeved on the connecting columns 10 through a positioning plate 11 by using mounting holes, then a positioning nut 12 needs to be adjusted to a proper position, and the reinforcing steel bar net rack is fixed at the current position by using binding wires 14 in the connecting holes;
s2, mounting the heat preservation plate 1: after the heat insulation board 1 and the reinforcing steel bar net rack are installed at set positions, firstly, a sleeve 5 with a conical structure is sleeved on the outer side of a connecting rod 4, one end, not provided with a hook part 9, of the connecting rod 4 penetrates through a corresponding template and is connected with an adjusting nut 6 in a matching mode, one end, provided with the hook part 9, of the connecting rod 4 is inserted into a positioning blind hole 3, and the hook part 9 is clamped in a positioning area by rotating the connecting rod 4;
s3, adjusting the installation position of the heat preservation plate 1: the two ends of the sleeve 5 are respectively attached to corresponding templates or matched with the corresponding positioning blind holes 3 by adjusting the adjusting nuts 6;
s4, pouring concrete and removing the template: concrete is poured on two sides of the heat preservation plate 1, after the concrete reaches a certain strength, the adjusting nut 6 is loosened, then the connecting rod 4 is rotated in the opposite direction to separate the hook portion 9 of the connecting rod 4 from the positioning area, the sleeve 5 is driven through the hook portion 9 to realize recycling, and finally the formwork is dismantled.
It will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential attributes thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (4)

1. A connecting device convenient for aluminum die reinforcement of a heat insulation board comprises the heat insulation board (1) and is characterized in that embedded parts (2) are arranged on two sides of the heat insulation board (1), connecting structures and positioning blind holes (3) are arranged on the two embedded parts (2), the two embedded parts (2) are fixedly connected with corresponding steel bar net racks through the connecting structures on the embedded parts, connecting rods (4) are connected in the two positioning blind holes (3) in a matched mode, a sleeve (5) is sleeved on the two connecting rods (4), one end of the sleeve (5) is attached to the inner side wall of the corresponding template, the other end of the sleeve (3) is adapted to the positioning blind holes, and one ends, far away from the embedded parts (2), of the two connecting rods (4) penetrate through the corresponding template and are connected with adjusting nuts (6) in a matched mode;
the sleeve (5) is a conical sleeve (5), and the diameter of one end, close to the embedded part (2), of the sleeve (5) is smaller than that of one end, close to the template, of the sleeve (5);
every be equipped with locating piece (7) in location blind hole (3), be fixed with dog (8) between the bottom of locating piece (7) and location blind hole (3), dog (8) perpendicular to locating piece (7) set up, the location area is constituteed jointly to the lateral wall of dog (8), locating piece (7) and location blind hole (3), every one end fixedly connected with hook portion (9) of corresponding template are kept away from in connecting rod (4), the width of hook portion (9) is between the external diameter and the internal diameter that sleeve pipe (5) are close to built-in fitting (2) one end, every hook portion (9) are through rotatory block in the location area.
2. The connecting device convenient for aluminum die reinforcement of the heat insulation board according to claim 1, wherein the connecting structure comprises four connecting columns (10) and a positioning plate (11), the four connecting columns (10) are arranged in a rectangular structure, one end of each connecting column (10) is fixedly connected to the surface of the embedded part (2), the other end of each connecting column is freely arranged, a mounting hole matched with the connecting column (10) is formed in the positioning plate (11), and the connecting column (10) freely penetrates through the corresponding mounting hole and is connected with a positioning nut (12) in a matching manner.
3. The connecting device convenient to carry out aluminium mould to heated board and consolidate according to claim 2, characterized in that, the locating plate (11) is all fixedly connected with bellying (13) in the relative heated board (1) one side four corners department, bellying (13) are used for restricting the reinforcing bar rack, all seted up the connecting hole on bellying (13), the connecting hole in-connection has pricked silk (14).
4. The construction method of the connecting device for conveniently reinforcing the heat insulation plate by using the aluminum die as claimed in claim 3 is characterized by comprising the following steps:
s1, assembling the heat preservation plate (1): firstly, a cross connection point of a reinforcing steel bar net rack is arranged between four connecting columns (10) on an insulation board (1), then the cross connection point is sleeved on the connecting columns (10) through a positioning plate (11) by utilizing mounting holes, then a positioning nut (12) needs to be adjusted to a proper position, and the reinforcing steel bar net rack is fixed at the current position by utilizing binding wires (14) in the connecting holes;
s2, mounting the heat preservation plate (1): after the heat insulation board (1) and the reinforcing steel bar net rack are installed at set positions, firstly, a sleeve (5) with a conical structure is sleeved on the outer side of a connecting rod (4), one end, not provided with a hook part (9), of the connecting rod (4) penetrates through a corresponding template and is connected with an adjusting nut (6) in a matching mode, one end, provided with the hook part (9), of the connecting rod (4) is inserted into a positioning blind hole (3), and the hook part (9) is clamped in a positioning area by rotating the connecting rod (4);
s3, adjusting the installation position of the heat preservation plate (1): the two ends of the sleeve (5) are respectively attached to the corresponding templates or matched with the corresponding positioning blind holes (3) by adjusting the adjusting nuts (6);
s4, pouring concrete and removing the template: concrete is poured on two sides of the heat preservation plate (1), after the concrete reaches a certain strength, the adjusting nut (6) is loosened, and then the connecting rod (4) is rotated in the opposite direction to separate the hook part (9) of the connecting rod (4) from the positioning area, so that the formwork is dismantled.
CN202010317109.3A 2020-04-21 2020-04-21 Connecting device convenient for aluminum die reinforcement of heat insulation plate and construction method Active CN111456254B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010317109.3A CN111456254B (en) 2020-04-21 2020-04-21 Connecting device convenient for aluminum die reinforcement of heat insulation plate and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010317109.3A CN111456254B (en) 2020-04-21 2020-04-21 Connecting device convenient for aluminum die reinforcement of heat insulation plate and construction method

Publications (2)

Publication Number Publication Date
CN111456254A CN111456254A (en) 2020-07-28
CN111456254B true CN111456254B (en) 2021-07-09

Family

ID=71675551

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010317109.3A Active CN111456254B (en) 2020-04-21 2020-04-21 Connecting device convenient for aluminum die reinforcement of heat insulation plate and construction method

Country Status (1)

Country Link
CN (1) CN111456254B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114482309A (en) * 2020-11-13 2022-05-13 山东隆济时节能科技股份有限公司 Node formula integration heated board

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6668501B2 (en) * 2001-02-15 2003-12-30 Sacks Industrial Corp. Stucco fastening system
CN207063216U (en) * 2017-06-11 2018-03-02 王洪斌 A kind of cast-in-place concrete building heat preservation and structure-integrated wall structure
CN109208816A (en) * 2018-10-12 2019-01-15 中国建筑第七工程局有限公司 A kind of external wall is cast-in-place with prefabricated thermal insulation integral system
CN110593451A (en) * 2019-08-06 2019-12-20 中国十七冶集团有限公司 Composite heat-preservation concrete wall with welded steel bar net rack
CN209891485U (en) * 2019-04-23 2020-01-03 福建省龙祥建设集团有限公司 Cast-in-place concrete external wall insulation integration template bearing structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6668501B2 (en) * 2001-02-15 2003-12-30 Sacks Industrial Corp. Stucco fastening system
CN207063216U (en) * 2017-06-11 2018-03-02 王洪斌 A kind of cast-in-place concrete building heat preservation and structure-integrated wall structure
CN109208816A (en) * 2018-10-12 2019-01-15 中国建筑第七工程局有限公司 A kind of external wall is cast-in-place with prefabricated thermal insulation integral system
CN209891485U (en) * 2019-04-23 2020-01-03 福建省龙祥建设集团有限公司 Cast-in-place concrete external wall insulation integration template bearing structure
CN110593451A (en) * 2019-08-06 2019-12-20 中国十七冶集团有限公司 Composite heat-preservation concrete wall with welded steel bar net rack

Also Published As

Publication number Publication date
CN111456254A (en) 2020-07-28

Similar Documents

Publication Publication Date Title
CN111456254B (en) Connecting device convenient for aluminum die reinforcement of heat insulation plate and construction method
CN209874483U (en) Detachable fixing die for reserved air conditioner hole of shear wall
CN102493480B (en) Reusable die for equipment foundation reserved square hole
CN208748862U (en) A kind of assembled heat insulation wall body structure
CN111636709B (en) Reinforcing tool for aluminum alloy K plate matched CCW heat insulation system and construction method
CN211873406U (en) Precast concrete hollow wall structure
CN212224611U (en) Shear force wall pouring template reinforcing apparatus
CN103015548A (en) Fixing method for anchoring vacuum insulated panels on outside moldboard
CN210918299U (en) Positioner for fixing built-in insulation board of wall body
CN102493482B (en) Construction method of equipment foundation reserved square hole
CN111677286A (en) Concrete pouring and vibrating device assembly for closed space and vibrating method
CN206495372U (en) One kind is used for cast-in-situ wall assembled double-template interconnecting piece group
CN220336151U (en) Built-in cast-in-place concrete heat preservation system
CN215859070U (en) Frame post reinforcing apparatus for building
CN207568163U (en) Prefabricated Climbing frame for outer-wall hole mounting structure
CN210421534U (en) Concrete placement of structure integration exempts from to tear open heated board connecting piece
CN220521968U (en) Novel chamfering die for large-section square column of hospital building
CN214615528U (en) Auxiliary installation workpiece for prefabricated column
CN220080783U (en) Punching-free formwork supporting device for T-shaped masonry wall constructional column
CN220725750U (en) Beam-column node template reinforcing device
CN106639070A (en) Assembly-type double template inner connection set for cast-in-situ wall body
CN210115845U (en) Fixing tool for component to through pipe
CN211079926U (en) Template is pour to anticollision barrier plastic steel
CN212478530U (en) Construction hydraulic pressure template climbing device
CN218758715U (en) A novel regularization template for building subsiding crack department

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant