CN212478530U - Construction hydraulic pressure template climbing device - Google Patents

Construction hydraulic pressure template climbing device Download PDF

Info

Publication number
CN212478530U
CN212478530U CN201922465661.2U CN201922465661U CN212478530U CN 212478530 U CN212478530 U CN 212478530U CN 201922465661 U CN201922465661 U CN 201922465661U CN 212478530 U CN212478530 U CN 212478530U
Authority
CN
China
Prior art keywords
hydraulic
climbing device
template
fixed plate
fixing plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922465661.2U
Other languages
Chinese (zh)
Inventor
许晓明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Tianyi Hydraulic Technology Co ltd
Original Assignee
Suzhou Tianyi Hydraulic Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Tianyi Hydraulic Technology Co ltd filed Critical Suzhou Tianyi Hydraulic Technology Co ltd
Priority to CN201922465661.2U priority Critical patent/CN212478530U/en
Application granted granted Critical
Publication of CN212478530U publication Critical patent/CN212478530U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a construction climbing device technical field specifically is a construction hydraulic template climbing device, including the wall body, its characterized in that, one side fixed mounting of wall body has climbing device, climbing device's top fixed mounting has hydraulic template subassembly, the hydraulic template subassembly includes the outer fixed plate of fixed mounting on climbing device, one side fixedly connected with dead lever of outer fixed plate, the one end fixedly connected with inner fixed plate of outer fixed plate is kept away from to the dead lever, equal fixed mounting has the pneumatic cylinder on the inner wall of outer fixed plate and inner fixed plate, the output of pneumatic cylinder is provided with the hydraulic stem. This building construction hydraulic template climbing device is through setting up outer fixed plate, dead lever and inner fixed plate to install pneumatic cylinder, hydraulic stem and inside and outside template inside it, can effectively the structural stability of pneumatic cylinder, hydraulic stem and inside and outside template, and then effectively improve the device's result of use.

Description

Construction hydraulic pressure template climbing device
Technical Field
The utility model relates to a construction climbing device technical field specifically is a construction hydraulic template climbing device.
Background
The climbing formwork is an effective formwork system of a reinforced concrete structure of a shear wall system and a barrel system in engineering construction, is often applied to high-rise buildings and high-volume structure construction, and is widely popularized and applied in all countries and China in the world; climbing formwork (i.e. climbing formwork) is a formwork technology suitable for cast-in-place reinforced concrete vertical or inclined structure construction, such as walls, bridges, towers and the like. The method can be divided into two types of 'scaffold creeping formwork' (namely formwork creeping scaffold and scaffold creeping formwork ') and' frameless creeping formwork '(namely formwork creeping formwork'), wherein the 'scaffold creeping formwork' in China starts in the later period of the 20 th century in the 70 th era and is developed and applied in Shanghai; the 'frameless climbing formwork' is firstly used for the construction of cast-in-place reinforced concrete engineering of a main building of a new and universal hotel in Beijing in the 80 th century, and three processes of 'mutual climbing of a template and a climbing frame', 'mutual climbing of the climbing frame and the climbing frame' and 'mutual climbing of the template and the template' are gradually developed and formed, wherein the first process is the most common process; the climbing formwork is one formwork combining large formwork and sliding formwork, has the common advantages of both large formwork and sliding formwork, and is especially suitable for use in super high-rise building construction.
Although the first hydraulic cylinder and the second hydraulic cylinder can be controlled by the controller to adjust the telescopic lengths of the first hydraulic rod and the second hydraulic rod, the distance between the outer formwork and the inner formwork can be conveniently adjusted, the thickness of wall pouring is adjusted, and the convenience in wall pouring is improved; the times of dismounting the template and the die carrier for multiple times are avoided, and the construction efficiency is improved; simple structure, installation and use are very convenient, however, this building construction hydraulic template climbing device when the solution problem, only connects through hydraulic means between interior template and the exterior sheathing, lacks fixing device, leads to stability not enough between interior template and the exterior sheathing.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a construction hydraulic template climbing device has solved the problem that proposes in the above-mentioned background art.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the building construction hydraulic formwork climbing device comprises a wall body, and is characterized in that the climbing device is fixedly installed on one side of the wall body, and a hydraulic formwork assembly is fixedly installed at the top of the climbing device;
the hydraulic template assembly comprises an outer fixing plate fixedly mounted on the climbing device, a fixing rod is fixedly connected to one side of the outer fixing plate, an inner fixing plate is fixedly connected to one end, far away from the outer fixing plate, of the fixing rod, hydraulic cylinders are fixedly mounted on the inner walls of the outer fixing plate and the inner fixing plate, hydraulic rods are arranged at output ends of the hydraulic cylinders, and one ends, far away from the hydraulic cylinders, of the hydraulic rods are fixedly connected with the inner template and the outer template respectively.
Optionally, the climbing device includes a slide rail, an electric slider, a connecting rod, and a mounting plate.
Optionally, the slide rail is fixedly mounted on the wall.
Optionally, one side of the slide rail is provided with an electric slider, and the number of the electric sliders is several.
Optionally, one side of the electric sliding block is provided with connecting rods, and the number of the connecting rods is equal to that of the electric sliding blocks.
Optionally, one end of the connecting rod, which is far away from the electric slider, is fixedly connected with the mounting plate.
Optionally, the outer fixing plate is fixedly connected with the mounting plate.
Optionally, the number of the fixing rods is several.
(III) advantageous effects
The utility model provides a construction hydraulic template climbing device possesses following beneficial effect:
1. this building construction hydraulic template climbing device is through setting up outer fixed plate, dead lever and inner fixed plate to install pneumatic cylinder, hydraulic stem and inside and outside template inside it, can effectively the structural stability of pneumatic cylinder, hydraulic stem and inside and outside template, and then effectively improve the device's result of use.
2. This construction hydraulic template climbing device through the setting that sets up pneumatic cylinder, hydraulic stem and interior outer formword, thickness when can pour the concrete wall body between interior inner formword and the outer formword is adjusted according to actual pouring thickness, and then effectively improves the device's result of use, strengthens the device's practicality.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic view of the installation structure of the present invention;
fig. 3 is a schematic view of the installation sectional structure of the present invention.
In the figure: 1-wall body, 2-climbing device, 201-slide rail, 202-electric slide block, 203-connecting rod, 204-mounting plate, 3-hydraulic template component, 301-external fixing plate, 302-fixing rod, 303-internal fixing plate, 304-hydraulic cylinder, 305-hydraulic rod, 306-internal template, 307-external template.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1 to 3, the present invention provides a technical solution: a hydraulic formwork climbing device for building construction comprises a wall body 1 and is characterized in that a climbing device 2 is fixedly installed on one side of the wall body 1, and a hydraulic formwork component 3 is fixedly installed at the top of the climbing device 2;
the hydraulic formwork assembly 3 comprises an outer fixing plate 301 fixedly installed on the climbing device 2, one side of the outer fixing plate 301 is fixedly connected with a fixing rod 302, one end of the fixing rod 302 far away from the outer fixing plate 301 is fixedly connected with an inner fixing plate 303, hydraulic cylinders 304 are fixedly installed on the inner walls of the outer fixing plate 301 and the inner fixing plate 303, the output ends of the hydraulic cylinders 304 are provided with hydraulic rods 305, one ends of the hydraulic rods 305 far away from the hydraulic cylinders 304 are respectively fixedly connected with an inner formwork 306 and an outer formwork 307, through the arrangement of the outer fixing plate 301, the fixing rod 302 and the inner fixing plate 303, the hydraulic cylinders 304, the hydraulic rods 305 and the inner and outer formworks are installed inside the hydraulic rods 304, the hydraulic cylinders 304 can be used effectively, the structural stability of the hydraulic rods 305 and the inner and outer formworks can be adjusted according to the actual casting thickness when the concrete wall body 1 between the inner formwork 306 and the outer formwork 307 Festival, and then effectively improve the result of use of the device, strengthen the device's practicality, climbing device 2 includes slide rail 201, electronic slider 202, connecting rod 203 and mounting panel 204, slide rail 201 fixed mounting is on wall body 1, one side of slide rail 201 is provided with electronic slider 202, the quantity of electronic slider 202 has a plurality of, one side of electronic slider 202 is provided with connecting rod 203, the quantity of connecting rod 203 is equivalent with the quantity of electronic slider 202, the one end fixed connection mounting panel 204 of electronic slider 202 is kept away from to connecting rod 203, outer fixed plate 301 and mounting panel 204 fixed connection, the quantity of dead lever 302 has a plurality of.
The working principle of the utility model is as follows: through setting up outer fixed plate 301, dead lever 302 and interior fixed plate 303 to install pneumatic cylinder 304, hydraulic stem 305 and inside and outside template inside it, can be effectively the structural stability of pneumatic cylinder 304, hydraulic stem 305 and inside and outside template, and the setting of pneumatic cylinder 304, hydraulic stem 305 and inside and outside template can be adjusted according to actual thickness of pouring when pouring to concrete wall 1 between inside form 306 and outside form 307.
To sum up, the utility model discloses during the use, through setting up outer fixed plate 301, dead lever 302 and inner fixed plate 303, and install pneumatic cylinder 304, hydraulic stem 305 and inside and outside template inside it, can effective pneumatic cylinder 304, the structural stability of hydraulic stem 305 and inside and outside template, and then effectively improve the device's result of use, through setting up pneumatic cylinder 304, the setting of hydraulic stem 305 and inside and outside template, thickness is adjusted according to actually pouring thickness when can pour concrete wall 1 between inner formword 306 and the outer formword 307, and then effectively improve the device's result of use, strengthen the device's practicality.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (8)

1. A climbing device for a hydraulic formwork in building construction comprises a wall body (1), and is characterized in that a climbing device (2) is fixedly installed on one side of the wall body (1), and a hydraulic formwork assembly (3) is fixedly installed at the top of the climbing device (2);
the hydraulic template assembly (3) comprises an outer fixing plate (301) fixedly mounted on the climbing device (2), a fixing rod (302) is fixedly connected to one side of the outer fixing plate (301), one end, far away from the outer fixing plate (301), of the fixing rod (302) is fixedly connected with an inner fixing plate (303), hydraulic cylinders (304) are fixedly mounted on the inner walls of the outer fixing plate (301) and the inner fixing plate (303), hydraulic rods (305) are arranged at the output ends of the hydraulic cylinders (304), and one ends, far away from the hydraulic cylinders (304), of the hydraulic rods (305) are fixedly connected with an inner template (306) and an outer template (307) respectively.
2. The building construction hydraulic template climbing device according to claim 1, characterized in that: the climbing device (2) comprises a sliding rail (201), an electric sliding block (202), a connecting rod (203) and a mounting plate (204).
3. The building construction hydraulic template climbing device according to claim 2, characterized in that: the sliding rail (201) is fixedly installed on the wall body (1).
4. The building construction hydraulic template climbing device according to claim 2, characterized in that: one side of the sliding rail (201) is provided with an electric sliding block (202), and the number of the electric sliding blocks (202) is several.
5. The building construction hydraulic template climbing device according to claim 2, characterized in that: one side of the electric sliding block (202) is provided with connecting rods (203), and the number of the connecting rods (203) is equal to that of the electric sliding blocks (202).
6. The building construction hydraulic template climbing device according to claim 2, characterized in that: and one end of the connecting rod (203), which is far away from the electric sliding block (202), is fixedly connected with the mounting plate (204).
7. The building construction hydraulic template climbing device according to claim 1, characterized in that: the outer fixing plate (301) is fixedly connected with the mounting plate (204).
8. The building construction hydraulic template climbing device according to claim 1, characterized in that: the number of the fixing rods (302) is several.
CN201922465661.2U 2019-12-31 2019-12-31 Construction hydraulic pressure template climbing device Expired - Fee Related CN212478530U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922465661.2U CN212478530U (en) 2019-12-31 2019-12-31 Construction hydraulic pressure template climbing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922465661.2U CN212478530U (en) 2019-12-31 2019-12-31 Construction hydraulic pressure template climbing device

Publications (1)

Publication Number Publication Date
CN212478530U true CN212478530U (en) 2021-02-05

Family

ID=74415300

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922465661.2U Expired - Fee Related CN212478530U (en) 2019-12-31 2019-12-31 Construction hydraulic pressure template climbing device

Country Status (1)

Country Link
CN (1) CN212478530U (en)

Similar Documents

Publication Publication Date Title
CN111395787A (en) Auxiliary device for installing prefabricated building wallboard
CN208343121U (en) Prefabricated assembled steel structure concrete wallboard mould
CN110344535A (en) A kind of prefabricated assembled combined wall board and construction method realized concealed beam and exempt from formwork
CN205476451U (en) Construction liquid die plate climbing device
CN212478530U (en) Construction hydraulic pressure template climbing device
CN204800838U (en) A built -up plate for parapet production
CN106013200A (en) Prefabricated assembly type strip foundation and construction technology
CN110847598A (en) Thin-wall hollow pier diaphragm plate bottom formwork and construction method
CN204510688U (en) A kind of temporary fixing structure of precast wall panel
CN211006352U (en) Pier stud template reinforced structure
CN206607867U (en) The cast in situs of small-size concrete component is with simple tempering glass molds plate
CN211250567U (en) Pouring die for balcony
CN211572085U (en) A wallboard connection major structure for assembly type structure
CN101265704B (en) Underground cast-in-place concrete structure outer wall neck construction method
CN211250563U (en) Pouring die for bearing wall board
CN210194906U (en) Concrete formwork for fabricated building
CN105317191A (en) Temporary fixing method of prefabricated external wall panel and temporary fixing structure of prefabricated external wall panel
CN209179173U (en) Tooling without mould concrete
CN207003720U (en) A kind of assembled integral concrete shear force wall attachment structure
CN205712613U (en) Connector for prefabricated overall assembling insulation exterior sheathing outer mould bases with exterior-wall heat insulation
CN206503365U (en) A kind of shear wall and filling wall junction aluminum alloy pattern plate erecting device
CN111236624A (en) Construction method of PCF structure cast-in-place node template reinforcing system
CN111677286A (en) Concrete pouring and vibrating device assembly for closed space and vibrating method
CN217812369U (en) Building engineering construction pouring template
CN213829512U (en) Precast beam formwork

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210205

Termination date: 20211231