CN111445213A CN202010244870.9A CN202010244870A CN111445213A CN 111445213 A CN111445213 A CN 111445213A CN 202010244870 A CN202010244870 A CN 202010244870A CN 111445213 A CN111445213 A CN 111445213A
Authority
CN
China
Prior art keywords
unit
processing time
residual processing
module
data requests
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010244870.9A
Other languages
Chinese (zh)
Inventor
曹建山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Urumqi Zhongweihuilian Information Technology Co ltd
Original Assignee
Urumqi Zhongweihuilian Information Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Urumqi Zhongweihuilian Information Technology Co ltd filed Critical Urumqi Zhongweihuilian Information Technology Co ltd
Priority to CN202010244870.9A priority Critical patent/CN111445213A/en
Publication of CN111445213A publication Critical patent/CN111445213A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Engineering & Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • Economics (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Quality & Reliability (AREA)
  • Data Mining & Analysis (AREA)
  • Operations Research (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to the technical field of enterprise incubation management, in particular to a network management system for park enterprise incubation service, which comprises: the application module is used for receiving and sending a data request; the management module is used for receiving and detecting the size of the file and sequencing the data requests from low to high according to the size of the file; the coordination module is used for acquiring the residual processing time of the data request and judging the residual processing time and the time threshold value; the processing module is used for sending a data request with the residual processing time less than the time threshold value and then sending a data request with the residual processing time more than or equal to the time threshold value; and the approval module is used for receiving the data requests in sequence and approving the transactions in the data requests. The invention reduces the requirement of bandwidth and solves the technical problems of high network pressure in a park and poor office experience of enterprise employees.

Description

Network management system for incubation service of park enterprise
Technical Field
The invention relates to the technical field of enterprise incubation management, in particular to a network management system for park enterprise incubation service.
Background
The enterprise incubator is also called a high and new technology entrepreneurship service center, and provides a series of service support by providing physical space and infrastructure for newly entrepreneurship small and medium-sized scientific and technological enterprises, thereby reducing entrepreneurship risk and entrepreneurship cost of entrepreneurship, improving entrepreneurship success rate, promoting scientific and technological achievement conversion and culturing successful enterprises and entrepreneurs.
The existing enterprise hatching service platform generally has the problems of short creation time, incomplete service function, incomplete construction of the integrity of an industrial chain, poor enterprise relevance and the like. Therefore, enterprises in the parks are easy to be malposed, so that the enterprises are frequently replaced, and the information sharing among the parks is not facilitated. In this regard, document CN110084485A discloses a park-associated enterprise hatching management system; the system comprises an application module, an approval module and a management module, wherein the application module is used for providing a platform for an enterprise needing to be applied for enrollment, supplying enterprise data counted by the management module to the application module for screening and distribution, the approval module is used for approving transactions in a garden, the approval module is used for approving the transactions distributed by the application module during the operation of the enterprise, and the management module comprises a counting unit, an industrial chain unit and a time scheduling unit; according to the method, the management module is arranged, an industrial chain unit in the management module analyzes an industrial chain in a park, a missing link on the industrial chain is determined, then the missing link is issued to the application module, an accessible enterprise is determined, and the construction of the whole industrial chain is completed; the inside of the industrial chain can form an attaching relation with each other, and the normal hatching of enterprises is ensured.
The entrepreneur selects an entrepreneur service park in order to save time and reduce walking in the entrepreneur process, create entrepreneur gathering effect and improve entrepreneur success rate. Particularly, after relevant laws and regulations and policies for encouraging entrepreneurship are released, a large number of entrepreneurs submit applications to the entrepreneurship service park. For example, an entrepreneur in a campus submits an online application at an APP of a mobile terminal, and data requests of the online application are transmitted to a router through an intranet and then transmitted to a server through the intranet or extranet router; and finally, the server sends the data request to the terminal, and the staff performs auditing. Thus, the storage space of the router is relatively small, and the data request of the creator is generally relatively large, so that the router faces a huge bandwidth pressure when sending the data request to the server. In addition, the bandwidth requirement of working in the park is caused to conflict with the bandwidth requirement of data request approval, so that great pressure is caused to a network system of the park, the cost of the park is increased, and the office experience of enterprise staff is reduced.
Disclosure of Invention
The invention provides a network management system for park enterprise incubation service, which solves the technical problems of high network system pressure, high cost and poor office experience of enterprise employees in a entrepreneurship service park.
The network management system for the incubation service of the park enterprise based on the basic scheme provided by the invention comprises the following components: the application module is used for receiving a data request submitted by an enterprise applying for residence and sending the data request, wherein the data request comprises the remaining processing time; the management module is used for receiving the data requests, detecting the sizes of the files, sequencing the data requests according to the sizes of the files from low to high, and sending the data requests according to the sequenced sequence; the coordination module is used for receiving the data requests of the arranged sequence, acquiring the residual processing time of the data requests one by one, and judging the residual processing time and the preset time threshold value; the processing module is used for sending a data request with the residual processing time less than the time threshold value and then sending a data request with the residual processing time more than or equal to the time threshold value; when a data request with the residual processing time smaller than a time threshold is sent, the residual processing time is before short, and the residual processing time is after long; when the data request with the residual processing time larger than or equal to the time threshold is sent, sending the data request according to the arranged sequence; and the approval module is used for receiving the data requests in sequence and approving the transactions in the data requests.
The working principle of the invention is as follows: the peak-off interaction comprises two logics, wherein one logic is used for detecting the size of the files and sequencing according to the size of the files; and secondly, acquiring the residual processing time of the data request, and judging the residual processing time and the time threshold. The peak staggering is realized by: in general, data requests with smaller files are processed preferentially; in a special case, that is, when the remaining processing time is less than the time threshold, it means that the data request is relatively urgent, and the data request with a short remaining processing time is preferentially processed. That is, a priority is given to a small file in general, and a priority is given to a short remaining processing time in a special case (remaining processing time is less than a time threshold). The invention has the advantages that: in normal times, the data request with small file is preferentially processed, so that the bandwidth pressure of a network system of the entrepreneurship service park can be reduced, and the office experience of enterprise staff is improved; and only in special cases, urgent data requests are processed preferentially, so that the influence on the bandwidth pressure is reduced to the maximum extent.
The invention realizes the peak-to-peak interaction through two judgment logics of the file size and the residual processing time, effectively reduces the requirement on the bandwidth, and well solves the technical problems of high network system pressure, high cost and poor office experience of enterprise employees in the entrepreneurship service park.
Furthermore, the application module also comprises an examination unit which is used for carrying out qualification examination on the applied enterprises and filtering out the data requests of the enterprises which do not meet the qualification examination. Has the advantages that: through qualification examination, the basic conditions of the enterprises can be quickly known, so that the enterprises which do not meet the qualification are excluded in advance, and the processing efficiency is improved.
Furthermore, the application module further comprises an accounting unit for accounting the cost occupied by the applied enterprises and filtering out the data requests of the enterprises whose occupied cost exceeds the preset threshold. Has the advantages that: cost accounting is carried out on the applied enterprises, so that the enterprises occupying higher cost can be conveniently removed in advance, and the processing efficiency is improved.
Furthermore, the management module also comprises a statistic unit for counting the resource use condition in the park. Has the advantages that: the method is convenient for knowing the occupation situation of the resources in the park in real time, thereby providing reference for the processing of the data request.
Further, the management module further comprises an industry unit used for analyzing the industry chain in the garden and screening out enterprises with missing industry chains. Has the advantages that: the high-quality enterprises with industrial chain loss can be found conveniently in time.
Further, the management module further comprises a time unit for scheduling and dispatching the working time. Has the advantages that: enterprises with the same working time or working time staggered can be selected conveniently according to needs, and accordingly convenience in approval is provided pertinently.
Furthermore, the examination and approval module also comprises a daily unit and an emergency unit; the daily unit is used for examining and approving daily affairs, and the emergency unit is used for examining and approving emergency affairs. Has the advantages that: and daily and urgent affairs are respectively processed, so that the efficiency is improved.
Furthermore, the examination and approval module also comprises a cooperation unit which is used for examining and approving the affairs needing to be examined and approved together. Has the advantages that: transactions requiring coordinated processing can be processed at the fastest speed.
Further, the coordination module comprises a receiving unit and a judging unit; the receiving unit is used for receiving the data requests of the arranged sequence and obtaining the residual processing time of the data requests; the judging unit is used for judging the residual processing time and the size of the time threshold. Has the advantages that: the system is convenient for each job and reduces the error probability.
Further, the processing module comprises a first unit and a second unit; the first unit sends data before the second unit; the first unit is used for sending a data request with the residual processing time smaller than a time threshold, wherein the residual processing time is short before and long after; the second unit is used for sending the data requests with the residual processing time larger than or equal to the time threshold value according to the arranged sequence. Has the advantages that: and the requirement on the bandwidth is reduced by a peak shifting interaction mode.
Drawings
Fig. 1 is a system configuration block diagram of an embodiment 1 of a network management system for a campus enterprise incubation service according to the present invention.
Detailed Description
The following is further detailed by the specific embodiments:
example 1
An embodiment 1 of the network management system for a campus enterprise incubation service according to the present invention is substantially as shown in fig. 1, and includes: the application module is used for receiving a data request submitted by an enterprise applying for residence and sending the data request; the management module is used for receiving the data requests, detecting the sizes of the files, sequencing the data requests according to the sizes of the files from low to high, and sending the data requests according to the sequenced sequence; the coordination module is used for receiving the data requests of the arranged sequence, acquiring the residual processing time of the data requests and judging the residual processing time and the time threshold value; the processing module is used for sending a data request with the residual processing time less than the time threshold value and then sending a data request with the residual processing time more than or equal to the time threshold value; when a data request with the residual processing time smaller than a time threshold is sent, the residual processing time is before short, and the residual processing time is after long; when the data request with the residual processing time larger than or equal to the time threshold is sent, sending the data request according to the arranged sequence; and the approval module is used for receiving the data requests in sequence and approving the transactions in the data requests.
The application module comprises an examination unit and an accounting unit. And when the application module receives a data request for applying for parking submitted by an enterprise, the examination unit examines the qualification of the enterprise applying for parking in the park. If the enterprise is not qualified according to the law, the enterprise is filtered out and is not processed next, so that the enterprise with relevant qualification is left. For example, the national law has certain limitation on export of semiconductors, and relates to the high and new technology industry of semiconductors, and if the enterprise includes export services of semiconductors and related technologies thereof, the enterprise needs to have certain qualification. Through qualification examination, the basic conditions of the enterprises can be quickly known, the enterprises which do not meet the qualification are excluded in advance, and the processing efficiency is improved. Then, the accounting unit carries out cost accounting on the enterprises meeting the qualification one by one, and estimates and receives various costs spent by the enterprises and the park. If the cost of some enterprises exceeds a preset threshold, they are filtered out. For example, for the enterprises involving polymer materials, the demand for electricity and site is high, and a large amount of capital is spent for disposing of pollution discharge matters. It can be seen that the cost of receiving such enterprises is relatively high. At this point, the highest cost that the campus can accept is established, i.e., a preset cost threshold, say 500 ten thousand dollars/year. When the annual cost of an enterprise which checks out a certain high polymer material is higher than 500 ten thousand yuan per year, for example, 600 ten thousand yuan per year, the enterprise is filtered out and is not considered. Therefore, enterprises with higher cost are removed in advance, the cost of the park can be reduced, and the processing efficiency can be improved. After two rounds of filtering, enterprises which meet qualification conditions and are relatively low in cost are left, and the application module sends data requests for application and enrollment of the enterprises to the management module.
After receiving the data request, the management module detects the sizes of the files one by one; then, the data requests are sorted according to the file size from low to high, and the data requests are sent according to the sorted sequence. For example, the enterprises applying for enrollment include company a, company B, company C, company D, company E, and company F, for a total of 6 enterprises. The document material provided by company A is 2MB, and the examination is required to be completed within 3 days; the document material provided by company B is 1MB, and the examination is required to be completed within 5 days; the document material provided by company C is 5Mb, and the examination is required to be completed within 15 days; the document material provided by company D is 8MB, and the examination is required to be completed within 1 day; the document material provided by company E is 0.5MB, and requires that the examination be completed within 7 days; company F provides 10MB of document material and requests that the review be completed within 2 days.
Thus, the file sizes of the applied materials of these 6 enterprises, i.e., company A-2 MB, company B-1 MB, company C-5 Mb, company D-8 MB, company E-0.5 MB, and company F-10 MB, were checked one by one. The file sizes of the 6 enterprise application materials should be E, B, A, C, D, F in descending order, that is, the management module sends the data requests of the 6 enterprises to the coordination module in E, B, A, C, D, F order.
The coordination module comprises a receiving unit and a judging unit, wherein the receiving unit receives the data requests of the arranged sequence, namely E, B, A, C, D, F; then, the remaining processing time of the 6 enterprise data requests is acquired one by one, namely: company A-3 days, company B-5 days, company C-15 days, company D-1 days, company E-7 days, and company F-2 days. Next, the determination unit determines the sizes of the remaining processing time and the time threshold value for 6 enterprises one by one, and the time threshold value may be set manually, and is set here to 3 days. Thus, the remaining processing time for company D and company F is less than the time threshold, and the remaining processing time for company a, company B, company C, and company E is either equal to or greater than the time threshold.
The processing module comprises a first unit and a second unit, and the first unit sends data before the second unit. The first unit sends a data request with the residual processing time less than a time threshold, wherein the residual processing time is short before and long after; the second unit transmits data requests having a remaining processing time greater than or equal to the time threshold value in the sorted sequence. That is, the first unit transmits data requests of company D and company F, with the data request of company D preceding the data request of company F; the second unit sends the data requests of company A, company B, company C and company E in the order of file size from low to high, that is, sends the data requests of company E, company B, company A and company C in turn.
And the approval module receives the data requests in sequence and approves the transactions in the data requests. That is, the approval module receives data requests of company D, company F, company E, company B, company A and company C in sequence, and then performs approval according to the sequence of the receiving.
Example 2
The only difference from example 1 is that: the management module further comprises a statistic unit, an industry unit and a time unit. After the management module receives the data request for applying for parking, firstly, the statistical unit performs statistics on the resource use condition in the park to know the resource occupation condition in the park. For example, the remaining amount of land and factory building, the available condition of electric power facilities, and the supporting services of environment, security, etc. Therefore, the actual situation of the garden can be fully considered, and the enterprise is suitable to be introduced. For example, when the land margin is small, it is not suitable for introducing into the related enterprises of the manufacturing industry, because of the need to build a large factory building for the manufacturing industry. And then, the industrial unit analyzes the industrial chain in the park, screens out the enterprise with the industrial chain missing, and finds out the high-quality enterprise with the industrial chain missing. A complete industrial chain is beneficial to reducing the cost of enterprises. For example, polycarbonate is needed in the manufacturing process of bullet-proof glass, and if there is no polycarbonate producer in the campus, the bullet-proof glass producer needs to search for a polycarbonate supplier outside the campus. If, at this point, a company that manufactures polycarbonate applies for a park, a loop in the supply and demand chain is just completed. Thus, the bullet-proof glass manufacturer does not need to search out of the campus for suppliers of polycarbonate. Thereby reducing the cost of the enterprise. Then, the time unit schedules and schedules the working time, and enterprises with the same working time or with working time staggered are selected according to needs, so that convenience in examination and approval is provided in a targeted manner. For example, the manufacturing process of some precision parts is automatically controlled by a numerical control machine, and the labor participation is hardly needed, so that the enterprises can completely produce the precision parts at night. Therefore, the influence of noise on other enterprises during production in the daytime is avoided, and the working time of most of enterprises can be staggered by introducing the enterprises.
The approval module further comprises a daily unit, an emergency unit and a cooperation unit. The daily unit approves daily matters, such as changing legal representatives. The emergency unit approves emergency transactions, such as large scale excess electricity usage. The cooperation unit examines and approves the affairs needing to be examined and approved together, for example, the affairs which relate to a plurality of departments and need to be coordinated. The transaction is classified in this way, which is beneficial to improving efficiency.
The foregoing is merely an example of the present invention, and common general knowledge in the field of known specific structures and characteristics is not described herein in any greater extent than that known in the art at the filing date or prior to the priority date of the application, so that those skilled in the art can now appreciate that all of the above-described techniques in this field and have the ability to apply routine experimentation before this date can be combined with one or more of the present teachings to complete and implement the present invention, and that certain typical known structures or known methods do not pose any impediments to the implementation of the present invention by those skilled in the art. It should be noted that, for those skilled in the art, without departing from the structure of the present invention, several changes and modifications can be made, which should also be regarded as the protection scope of the present invention, and these will not affect the effect of the implementation of the present invention and the practicability of the patent. The scope of the claims of the present application shall be determined by the contents of the claims, and the description of the embodiments and the like in the specification shall be used to explain the contents of the claims.

Claims (10)

1. Park enterprise hatching service's network management system, its characterized in that: the method comprises the following steps: the application module is used for receiving a data request submitted by an enterprise applying for residence and sending the data request, wherein the data request comprises the remaining processing time; the management module is used for receiving the data requests, detecting the sizes of the files, sequencing the data requests according to the sizes of the files from low to high, and sending the data requests according to the sequenced sequence; the coordination module is used for receiving the data requests of the arranged sequence, acquiring the residual processing time of the data requests one by one, and judging the residual processing time and the preset time threshold value; the processing module is used for sending a data request with the residual processing time less than the time threshold value and then sending a data request with the residual processing time more than or equal to the time threshold value; when a data request with the residual processing time smaller than a time threshold is sent, the residual processing time is before short, and the residual processing time is after long; when the data request with the residual processing time larger than or equal to the time threshold is sent, sending the data request according to the arranged sequence; and the approval module is used for receiving the data requests in sequence and approving the transactions in the data requests.
2. The network management system for a campus enterprise incubation service of claim 1, wherein: the application module also comprises a review unit which is used for performing qualification review on the applied enterprises and filtering out data requests of the enterprises which do not meet the qualification.
3. The network management system of a campus enterprise incubation service of claim 2, wherein: the application module further comprises an accounting unit, which is used for accounting the cost occupied by the applied enterprises and filtering out the data requests of the enterprises whose occupied cost exceeds the preset threshold.
4. The network management system of campus enterprise incubation services of claim 3, wherein: the management module also comprises a statistic unit used for counting the resource use condition in the park.
5. The network management system of campus enterprise incubation service of claim 4, wherein: the management module further comprises an industry unit used for analyzing the industry chain in the garden and screening out enterprises with missing industry chains.
6. The network management system of campus enterprise incubation services of claim 5, wherein: the management module also includes a time unit for scheduling and scheduling the work time.
7. The network management system of campus enterprise incubation services of claim 6, wherein: the approval module also comprises a daily unit and an emergency unit; the daily unit is used for examining and approving daily affairs, and the emergency unit is used for examining and approving emergency affairs.
8. The network management system for a campus enterprise incubation service of claim 7, wherein: the examination and approval module further comprises a cooperation unit which is used for examining and approving the affairs needing to be examined and approved together.
9. The network management system of campus enterprise incubation services of claim 8, wherein: the coordination module comprises a receiving unit and a judging unit; the receiving unit is used for receiving the data requests of the arranged sequence and obtaining the residual processing time of the data requests; the judging unit is used for judging the residual processing time and the size of the time threshold.
10. The network management system for a campus enterprise incubation service of claim 9, wherein: the processing module comprises a first unit and a second unit; the first unit sends data before the second unit; the first unit is used for sending a data request with the residual processing time smaller than a time threshold, wherein the residual processing time is short before and long after; the second unit is used for sending the data requests with the residual processing time larger than or equal to the time threshold value according to the arranged sequence.
CN202010244870.9A 2020-03-31 2020-03-31 Network management system for incubation service of park enterprise Pending CN111445213A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010244870.9A CN111445213A (en) 2020-03-31 2020-03-31 Network management system for incubation service of park enterprise

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010244870.9A CN111445213A (en) 2020-03-31 2020-03-31 Network management system for incubation service of park enterprise

Publications (1)

Publication Number Publication Date
CN111445213A true CN111445213A (en) 2020-07-24

Family

ID=71655837

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010244870.9A Pending CN111445213A (en) 2020-03-31 2020-03-31 Network management system for incubation service of park enterprise

Country Status (1)

Country Link
CN (1) CN111445213A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113240299A (en) * 2021-05-20 2021-08-10 同方股份有限公司 Background monitoring and management system of incubation cloud platform
CN114186960A (en) * 2021-11-29 2022-03-15 海南航众科技有限公司 Garden-oriented extremely-simple examination and approval service system

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101145112A (en) * 2007-11-01 2008-03-19 北京工业大学 Real-time system task scheduling method
CN101968750A (en) * 2010-10-15 2011-02-09 珠海举天软件科技有限公司 Computer system and working method thereof
CN102158906A (en) * 2011-05-19 2011-08-17 北京工业大学 Service quality sensory system and task scheduling method thereof
CN103164284A (en) * 2011-08-08 2013-06-19 Arm有限公司 Mapping quality of service parameters in a transaction to priority levels to allocate resources to service transaction requests
CN104202261A (en) * 2014-08-27 2014-12-10 华为技术有限公司 Service request processing method and device
CN104580338A (en) * 2013-10-29 2015-04-29 华为技术有限公司 Service processing method, system and equipment
CN106095582A (en) * 2016-06-17 2016-11-09 四川新环佳科技发展有限公司 The task executing method of cloud platform
CN106530059A (en) * 2016-12-01 2017-03-22 上海携程商务有限公司 Order processing method and system
CN106776036A (en) * 2016-12-30 2017-05-31 广东欧珀移动通信有限公司 A kind of resource allocation methods and device
CN109144707A (en) * 2017-06-16 2019-01-04 田文洪 A kind of unbalanced method of processing big data platform Spark data distribution
CN109992403A (en) * 2017-12-30 2019-07-09 中国移动通信集团福建有限公司 Optimization method, device, terminal device and the storage medium of multi-tenant scheduling of resource
CN110032439A (en) * 2018-01-10 2019-07-19 广东欧珀移动通信有限公司 Method for managing resource, device, mobile terminal and computer readable storage medium
CN110084485A (en) * 2019-03-30 2019-08-02 邵美琪 A kind of garden affiliated enterprise hatching management system
CN110333937A (en) * 2019-05-30 2019-10-15 平安科技(深圳)有限公司 Task distribution method, device, computer equipment and storage medium

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101145112A (en) * 2007-11-01 2008-03-19 北京工业大学 Real-time system task scheduling method
CN101968750A (en) * 2010-10-15 2011-02-09 珠海举天软件科技有限公司 Computer system and working method thereof
CN102158906A (en) * 2011-05-19 2011-08-17 北京工业大学 Service quality sensory system and task scheduling method thereof
CN103164284A (en) * 2011-08-08 2013-06-19 Arm有限公司 Mapping quality of service parameters in a transaction to priority levels to allocate resources to service transaction requests
CN104580338A (en) * 2013-10-29 2015-04-29 华为技术有限公司 Service processing method, system and equipment
CN104202261A (en) * 2014-08-27 2014-12-10 华为技术有限公司 Service request processing method and device
CN106095582A (en) * 2016-06-17 2016-11-09 四川新环佳科技发展有限公司 The task executing method of cloud platform
CN106530059A (en) * 2016-12-01 2017-03-22 上海携程商务有限公司 Order processing method and system
CN106776036A (en) * 2016-12-30 2017-05-31 广东欧珀移动通信有限公司 A kind of resource allocation methods and device
CN109144707A (en) * 2017-06-16 2019-01-04 田文洪 A kind of unbalanced method of processing big data platform Spark data distribution
CN109992403A (en) * 2017-12-30 2019-07-09 中国移动通信集团福建有限公司 Optimization method, device, terminal device and the storage medium of multi-tenant scheduling of resource
CN110032439A (en) * 2018-01-10 2019-07-19 广东欧珀移动通信有限公司 Method for managing resource, device, mobile terminal and computer readable storage medium
CN110084485A (en) * 2019-03-30 2019-08-02 邵美琪 A kind of garden affiliated enterprise hatching management system
CN110333937A (en) * 2019-05-30 2019-10-15 平安科技(深圳)有限公司 Task distribution method, device, computer equipment and storage medium

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113240299A (en) * 2021-05-20 2021-08-10 同方股份有限公司 Background monitoring and management system of incubation cloud platform
CN114186960A (en) * 2021-11-29 2022-03-15 海南航众科技有限公司 Garden-oriented extremely-simple examination and approval service system

Similar Documents

Publication Publication Date Title
CN111445213A (en) Network management system for incubation service of park enterprise
CN101676932A (en) Electronic monitoring method and system of government-invested construction project
CN115392771A (en) Enterprise efficiency management system and method in park
CN106296038A (en) Test assignment triggering method
CN1641673A (en) Public traffic integrated circuit card system information platform designing method
CN109462403A (en) A kind of method and system for realizing consignment address code
CN113850541A (en) Inventory-driven optical cable order distribution method based on SQL database
CN113377696A (en) Bus data processing method based on computer equipment
CN112288180A (en) Comprehensive order dispatching method and system for distribution network maintenance work order
CN102508720B (en) Method for improving efficiency of preprocessing module and efficiency of post-processing module and system
CN111369216A (en) Highway engineering cost information processing system and method
CN115600856A (en) Method, device, equipment and medium for automatically auditing and distributing events
Lin et al. An iterative improvement approach for high-speed train maintenance scheduling
CN114511286A (en) Environmental assessment industry project management system and method
CN112288394B (en) Controller scheduling test verification system
CN114429299A (en) Engineering quality safety management method
CN113971526A (en) Automatic order dispatching method based on RPA robot
CN117094496B (en) Scheduling operation system based on expert rules under mechanism and machine learning prediction
CN112541117A (en) Power grid supply chain purchase digital examination method based on full life cycle
CN113408940B (en) Electronic handover management and control system for industrial expansion engineering
CN117833296B (en) Energy storage device performance optimization system and method based on electric power spot transaction data
Radelyuk et al. Implementation of Circular Economy in the Water Sector in the Industrial Region of Kazakhstan
Liao et al. Mission reliability driven Risk-based maintenance approach of multi-state intelligent manufacturing system
Li et al. Greedy algorithm solution of flexible flow shop scheduling problem
CN114140019A (en) Special class auxiliary system of air quality management and control

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20200724