CN111428304B - Displacement deformation prediction method for shield tunnel with anti-floating anchor rod under excavation of foundation pit - Google Patents

Displacement deformation prediction method for shield tunnel with anti-floating anchor rod under excavation of foundation pit Download PDF

Info

Publication number
CN111428304B
CN111428304B CN202010243292.7A CN202010243292A CN111428304B CN 111428304 B CN111428304 B CN 111428304B CN 202010243292 A CN202010243292 A CN 202010243292A CN 111428304 B CN111428304 B CN 111428304B
Authority
CN
China
Prior art keywords
foundation pit
tunnel
floating anchor
shield tunnel
excavation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202010243292.7A
Other languages
Chinese (zh)
Other versions
CN111428304A (en
Inventor
魏纲
赵毅
孙樵
齐永洁
何骏飞
张书鸣
赵得乾麟
朱彦华
章亦然
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University City College ZUCC
Original Assignee
Zhejiang University City College ZUCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University City College ZUCC filed Critical Zhejiang University City College ZUCC
Priority to CN202010243292.7A priority Critical patent/CN111428304B/en
Publication of CN111428304A publication Critical patent/CN111428304A/en
Application granted granted Critical
Publication of CN111428304B publication Critical patent/CN111428304B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a displacement deformation prediction method for a shield tunnel with an anti-floating anchor rod under excavation of a foundation pit, and belongs to the technical field of underground engineering. The prediction method specifically comprises the following steps: establishing the position relation between the shield tunnel with the anti-floating anchor rods and the ground foundation pit, calculating the additional load of the shield tunnel with the anti-floating anchor rods caused by foundation pit excavation, considering the rotation and staggered segment ring cooperative deformation model, and calculating the total deformation potential energy E of the shield tunnel under the action of the anti-floating anchor rods pm Obtaining a longitudinal displacement function w (l) and a slab staggering quantity delta between adjacent shield segments through Fourier expansion and a variational control equation m2 And the shearing force Qm between the adjacent shield segments. The prediction method has the characteristics of considering the number of the anti-floating anchor rod acting pipe pieces, approaching the deformation condition of the shield tunnel to the real condition and having high accuracy.

Description

Displacement deformation prediction method for shield tunnel with anti-floating anchor rod under excavation of foundation pit
Technical Field
The invention belongs to the technical field of underground engineering, and particularly relates to a displacement deformation prediction method for a shield tunnel with an anti-floating anchor rod under foundation pit excavation, which is suitable for predicting displacement and deformation values of the shield tunnel with the anti-floating anchor rod under the influence of upper foundation pit excavation.
Background
In recent years, with the development of underground engineering construction, urban shallow stratum spaces become more and more crowded, and the situation that construction engineering is adjacent to an existing shield tunnel occurs more and more frequently. The adjacent existing tunnel is subjected to foundation pit excavation engineering, so that an unloading effect is generated on soil above the existing tunnel, floating deformation of the existing tunnel is caused, deformation and damage of a shield tunnel structure can be caused, and the safety of the tunnel is seriously threatened.
At present, measures for controlling the floating of the tunnel include carrying out pile loading back pressure in the tunnel, arranging an isolation pile at the side of the tunnel, arranging an anti-floating anchor rod and the like. The anti-floating anchor rod utilizes an anchoring body consisting of the anchor rod and mortar and shearing force of a rock-soil layer to resist buoyancy borne by an underground structure, is mainly applied to structures such as basements, shallow tunnels, pools and the like at present, is less in application of shield tunnels, and has yet to be continuously researched for controlling the floating effect of the shield tunnels. The existing research method is mainly finite element simulation, the result of the finite element simulation has a large relation with the reduction degree of the modeling on the real working condition, the accuracy of the result cannot be ensured, and the existing research of displacement deformation of the downward lying tunnel with the anti-floating anchor rod caused by excavation of the foundation pit is not solved by a useful theory at present.
In summary, most researches on displacement deformation of shield tunnels with anti-floating anchor rods under foundation pit excavation are focused on finite element numerical simulation, accuracy is difficult to ensure, and a derivation method without theoretical solution is urgent to carry out relevant researches.
Disclosure of Invention
The invention aims to overcome the defects and provides a displacement deformation prediction method for a shield tunnel with an anti-floating anchor rod under foundation pit excavation.
The purpose of the invention is realized by the following technical scheme: a displacement deformation prediction method for a shield tunnel with an anti-floating anchor rod under foundation pit excavation comprises the following steps:
(1) Establishing a coordinate system by taking the center of the ground foundation pit as a coordinate origin, measuring the excavation size L of the foundation pit parallel to the axial direction of the tunnel, the excavation size B of the foundation pit vertical to the axial direction of the tunnel, the excavation depth d of the foundation pit, and the insertion depth d of the enclosure structure below the bottom of the foundation pit 0 The outer diameter D of the shield tunnel, the distance s from the top of the shield tunnel to the bottom of the foundation pit and the horizontal distance a between the axis of the tunnel and the center of the foundation pit are calculated, the total height H = D + D0 of the enclosure structure of the foundation pit is calculated, the buried depth H = s + D/2+ D of the axis of the tunnel is calculated, and the number of calculation rings of the tunnel lining influenced by excavation of the foundation pit is obtained and is 2N; obtaining the number of calculation rings 2N of the tunnel lining influenced by the anti-floating anchor rod according to the working condition 1 To establishThe shield tunnel with the anti-floating anchor rods is in position relation with the ground foundation pit.
(2) Calculating the additional load of the shield tunnel with the anti-floating anchor rod caused by excavation of the foundation pit, and specifically comprising the following steps:
deducing that the position of a certain point (xi, eta, d) at the bottom of the foundation pit is p = - (1-alpha) according to a Mindlin solution 0 ) And gamma d, under the unloading action, causing a vertical additional load p (l) of a certain point (a, l, h) on the axis of the shield tunnel:
Figure BDA0002433266240000021
wherein gamma is the soil gravity, alpha 0 Is the residual stress factor.
(3) Predicting the displacement deformation of the shield tunnel with the anti-floating anchor rod under excavation of the foundation pit, and specifically comprising the following substeps:
(3.1) calculating the total deformation potential energy E of the shield tunnel under the action of the anti-floating anchor rods by considering the rotating and staggered segment ring collaborative deformation model pm
E pm =W L +W Rm +W S +W T (2)
Wherein, W L Acting on additional load of shield tunnel, W Rm For overcoming the resistance of the formation to work under the action of the anti-floating anchor rod, W S To overcome the shearing force between rings, W T Work is done to overcome the tension between the rings.
Figure BDA0002433266240000022
Figure BDA0002433266240000023
w (l) is a shield tunnel longitudinal displacement deformation function, k m Is the resistance coefficient of the anti-floating anchor rod soil body, k is the foundation bed coefficient of the soil, D t The width of each shield tunnel is the ring width of each shield tunnel.
(3.2) the shield tunnel longitudinal displacement deformation function is symmetrical about the excavation midpoint of the foundation pit and is obtained by Fourier series expansion:
Figure BDA0002433266240000024
wherein:
Figure BDA0002433266240000031
A=(a 1 a 2 a 3 L a n ) T
n is the expansion series of Fourier;
(3.3) solving a longitudinal displacement function w (l) and a slab staggering amount delta between adjacent shield segments through a variational control equation m2 And the shearing force Q between adjacent shield segments m
Based on the principle of minimum potential energy, the total potential energy E of the step (3.1) is calculated pm And (3) taking an extreme value for each undetermined coefficient, namely:
Figure BDA0002433266240000032
in the formula: a is i The ith element in the matrix A, namely the coefficient of the polynomial of the longitudinal displacement deformation function of the tunnel;
expressed in matrix form:
([K r ]+[K sm ])AT=[P] T (7)
in the formula: [ K ] r ]A T For the interaction effect between the tunnel rings:
Figure BDA0002433266240000033
[K sm ]A T the soil resistance effect under the action of the anti-floating anchor rod is as follows:
Figure BDA0002433266240000034
wherein: [ P ]] T Represents the effect of the additional load on the tunnel lining:
Figure BDA0002433266240000035
[ P ] obtained by the above procedure] T 、[K r ]And [ K ] sm ]Calculating to obtain an undetermined coefficient matrix AT:
A T =([K r ]+[K sm ]) -1 [P] T (11)
obtaining a longitudinal displacement deformation function w (l) of the tunnel:
w(l)=T n (l)A T (12)
slab staggering quantity delta between adjacent shield segments m2 Then it is:
δ m2 =(1-j){w[(m+1)D t ]-w(mD t )} (13)
shearing force Q between adjacent shield segments m Comprises the following steps:
Q m =(1-j){w[(m+1)D t ]-w(mD t )}×k t (14)
further, the process of acquiring the number 2N of the calculation loops of the tunnel lining affected by the excavation of the foundation pit in the step 1 specifically comprises the following steps: and when the 2N is different, the corresponding maximum bump value forms a change curve, the change curve finally tends to be stable, and the 2N is the minimum value which enables the change curve to tend to be stable.
Further, 2N is 50 rings or more.
Further, step 3 is described as [ K ] t ]And [ K ] sm ]Is a 10 th order matrix.
Compared with the prior art, the invention has the beneficial effects that:
1. a segment ring collaborative deformation model considering rotation and slab staggering is introduced, shearing deformation and slab staggering deformation between tunnel rings are comprehensively considered, the situation of stress deformation of a real tunnel structure is more met, and the accuracy of the prediction method is improved.
2. The downward elastic force of the upper soil body and the anti-floating force generated by the anti-floating anchor rod on the shield tunnel are combined and simplified into a larger vertical downward elastic force, so that the calculation model is simpler and more understandable.
3. Introducing a new soil resistance coefficient k of the anti-floating anchor rod m And using 2N in combination 1 And the number of the shield tunnel segments influenced by the anti-floating anchor rods is shown. Can be calculated by changing k during programming m And N 1 The numerical value of the k is used for reflecting the deformation of the shield tunnel with the anti-floating anchor rod under various working conditions, and when the k is m And N 1 And when one item is 0, the calculation method is the shield tunnel deformation caused by the excavation of the foundation pit without the anti-floating anchor rod. After example calculation and comparison, the empirical values of the resistance coefficient km of the anti-floating anchor rod soil body under different working conditions can be obtained so as to guide the design of an actual engineering scheme. By changing the value of N1 in prediction, the application scheme of the anti-floating anchor rod in the shield tunnel can be optimized.
4. The invention provides a method for predicting displacement deformation of a shield tunnel with an anti-floating anchor rod under foundation pit excavation, which can be used for predicting actual foundation pit excavation engineering and can also be used as a reference for selecting the anti-floating anchor rod as a shield tunnel anti-floating measure.
Drawings
FIG. 1 is a model diagram of a circular shield tunnel with anti-floating anchor rods;
FIG. 2 is a mechanical model diagram of a circular shield tunnel with anti-floating anchor rods;
FIG. 3 is a schematic diagram illustrating the influence of excavation of a foundation pit on a lower horizontal shield tunnel with anti-floating anchors;
FIG. 4 is a diagram showing a relationship between the positions of a foundation pit and a shield tunnel;
FIG. 5 is a graph of a tunnel lining calculation loop number;
FIG. 6 is a reliability verification diagram of the prediction method of the present invention.
Detailed Description
The invention is further described below with reference to the following examples and the accompanying drawings. The following examples are presented to aid in understanding the present invention and to verify the reliability of the prediction method proposed by the present invention. It should be noted that, for those skilled in the art, it is possible to make various improvements and modifications to the present invention without departing from the principle of the present invention, and those improvements and modifications also fall within the scope of the claims of the present invention.
Examples
The method is characterized in that a study on the protection technology of the existing shield tunnel lying in an ultra-short distance in the excavation construction of a foundation pit [ J ]. Tunnel construction (Chinese and English), 2017,37 (increase 2): 35-46 ] is carried out by taking the numerical calculation result of finite difference software FLAC3D as a case, and prediction analysis is carried out, and the specific steps are as follows:
step 1: establishing shield tunnel model with anti-floating anchor rod
As shown in fig. 1, the anti-floating anchor rod is reserved on a segment at the lower part of the shield tunnel to serve as an early support in tunnel sections with weak surrounding rocks, severe breakage and poor self-stability, and soft rocks in V-level surrounding rocks, VI-level surrounding rocks and IV-level surrounding rocks; the combined support is combined with an anchor rod, a reinforcing mesh and sprayed concrete to form a combined support, and the vacancy is connected with the shield tunnel. When the surrounding environment of the shield tunnel with the anti-floating anchor rods is not changed, the anti-floating anchor rods do not work; when a foundation pit is excavated above the shield tunnel with the anti-floating anchor rods, the unloading action of the excavation surface can be transmitted to the shield tunnel below through the soil body, additional load is caused on the tunnel structure, the stress balance of the segment structure is damaged, and therefore deformation is generated, and the anti-floating anchor rods give downward anti-floating force to the shield tunnel through the friction action with the soil body. As shown in fig. 2, each segment ring of the shield tunnel is simplified into an elastic foundation short beam, and at the moment, the shield tunnel can be regarded as being subjected to downward elastic force of an upper soil body and anti-floating force generated by an anti-floating anchor rod, and can be combined and simplified into a larger vertical downward elastic force.
Referring to fig. 3-5, a coordinate system is established by using the center of the ground foundation pit as the origin of coordinates, and the excavation size L of the foundation pit parallel to the axial direction of the tunnel, the excavation size B of the foundation pit perpendicular to the axial direction of the tunnel, the excavation depth d of the foundation pit, and the insertion depth d of the enclosure structure below the bottom of the foundation pit are measured 0 Outer diameter D of shield tunnel, distance s from top of shield tunnel to bottom of foundation pit, tunnel axis and foundation pitThe horizontal distance a of the center is calculated, the total height H = D + D0 of the foundation pit support structure is calculated, the buried depth H = s + D/2+ D of the tunnel axis is calculated, and the number of calculation rings of the tunnel lining influenced by the excavation of the foundation pit is obtained and is 2N; obtaining the number of the calculation rings 2N of the tunnel lining influenced by the anti-floating anchor rod according to the working condition 1 And establishing the position relation between the shield tunnel with the anti-floating anchor rods and the ground foundation pit.
The process of acquiring the number 2N of the calculated rings of the tunnel lining affected by the excavation of the foundation pit specifically comprises the following steps: and when the 2N is different, the corresponding maximum bump value forms a change curve, the change curve finally tends to be stable, and the 2N is the minimum value which enables the change curve to tend to be stable. 2N is more than 50 rings.
And 2, step: calculating additional load of shield tunnel with anti-floating anchor rod caused by foundation pit excavation
Deducing that the position of a certain point (xi, eta, d) at the bottom of the foundation pit is p = - (1-alpha) according to a Mindlin solution 0 ) And gamma d, under the unloading action, causing a vertical additional load p (l) of a certain point (a, l, h) on the axis of the shield tunnel:
Figure BDA0002433266240000061
wherein gamma is the gravity of soil and alpha 0 Is the residual stress coefficient.
And step 3: calculating displacement deformation of shield tunnel with anti-floating anchor rod under excavation of foundation pit
In order to enable the result of calculating the settlement and deformation of the tunnel to be closer to the real result, the invention uses a segment ring cooperative deformation model considering rotation and slab staggering. The displacement deformation calculation method of the shield tunnel with the anti-floating anchor rods under the excavation of the foundation pit is obtained by changing a formula for overcoming the stratum resistance to obtain acting for overcoming the stratum resistance under the action of the anti-floating anchor rods, so that the total deformation potential energy of the shield tunnel under the action of the anti-floating anchor rods is calculated, and then the displacement deformation calculation method of the shield tunnel with the anti-floating anchor rods under the excavation of the foundation pit is obtained through Fourier expansion of a longitudinal displacement function of the shield tunnel and solution of a variational control equation. The method specifically comprises the following substeps:
(3.1) calculating the total deformation potential energy E of the shield tunnel under the action of the anti-floating anchor rods by considering the rotating and staggered segment ring collaborative deformation model pm
Let the relative vertical displacement of adjacent lining rings numbered m and m +1 be δ m Obtaining:
δ m =w[(m+1)D t ]-w(mD t ) (15)
in the formula: the serial numbers of two adjacent ring pipe sheet rings of m and m + 1; d t The ring width of the pipe sheet ring is shown, and the unit symbol is m;
when the lining rings rotate by an angle theta m When the time is smaller:
Figure BDA0002433266240000062
shear force F between rings sm Comprises the following steps:
F sm =(1-j)k s δ m (17)
maximum tension F between rings tm Comprises the following steps:
F tm =k t θ m D (18)
formation resistance F k Comprises the following steps:
F k =kDw(l) (19)
wherein: k is a radical of s For the inter-annular shear stiffness, k, of the tunnel t Is the tensile rigidity between rings of the tunnel, j is the proportional coefficient of the rigid rotation effect of the segment ring, k is the foundation bed coefficient of the soil, the Vesic formula is adopted for calculation,
Figure BDA0002433266240000071
mu is the Poisson's ratio of the soil, E 0 Is the deformation modulus of the foundation soil,
Figure BDA0002433266240000072
E s is the compressive modulus of soil, E t I t Is the equivalent flexural rigidity of the tunnel, and b is the width of the foundation beam.
The total potential energy of the shield tunnel deformation can be divided into four parts, and a new anti-floating anchor rod soil resistance coefficient k is introduced into the stratum resistance acting part in the method of the invention m Can be used as an anti-floating anchorThe method is characterized in that the method uses the lower overcoming stratum resistance to do work, so that the total deformation potential energy of the shield tunnel under the action of the anti-floating anchor rod is obtained, and the method specifically comprises the following steps:
and (3) applying work by using additional load caused by excavation of the foundation pit:
Figure BDA0002433266240000073
overcoming the resistance of the stratum to do work under the action of the anti-floating anchor rod:
because the soil resistance effect can be changed under the action of the anti-floating anchor rod, the invention introduces the soil resistance coefficient k of the anti-floating anchor rod m And obtaining a calculation method for the soil resistance effect when the anti-floating anchor rod acts:
Figure BDA0002433266240000074
in the formula: k is a radical of m Is the resistance coefficient of the soil body of the anti-floating anchor rod.
Overcoming the inter-ring shearing force to do work:
Figure BDA0002433266240000075
overcoming tension between rings to do work:
Figure BDA0002433266240000076
total potential energy E of horizontal shield tunnel deformation under action of anti-floating anchor rod pm
E pm =W L +W Rm +W S +W T (2)
(3.2) the shield tunnel longitudinal displacement deformation function is symmetrical about the excavation midpoint of the foundation pit and is obtained by expanding according to Fourier series:
Figure BDA0002433266240000077
wherein:
Figure BDA0002433266240000078
A=(a 1 a 2 a 3 L a n ) T
n is the expansion series of Fourier;
(3.3) solving a longitudinal displacement function w (l) and a slab staggering amount delta between adjacent shield segments through a variational control equation m2 And the shearing force Q between adjacent shield segments m
Based on the principle of minimum potential energy, the total potential energy E of the step (3.1) is calculated pm And (3) taking an extreme value for each undetermined coefficient, namely:
Figure BDA0002433266240000081
in the formula: a is i The coefficient of the ith element in the matrix A, namely the polynomial of the longitudinal displacement deformation function of the tunnel;
expressed in matrix form:
([K r ]+[K sm ])A T =[P] T (7)
in the formula: [ K ] r ]A T For the interaction effect between the tunnel rings:
Figure BDA0002433266240000082
[K sm ]A T the soil resistance effect under the action of the anti-floating anchor rod is as follows:
Figure BDA0002433266240000083
wherein: [ P ]] T Represents the effect of the additional load on the tunnel lining:
Figure BDA0002433266240000084
[ P ] obtained by the above procedure] T 、[K r ]And [ K ] sm ]Calculating to obtain a matrix A of undetermined coefficients T
A T =([K r ]+[K sm ]) -1 [P] T (11)
Obtaining a longitudinal displacement deformation function w (l) of the tunnel:
w(l)=T n (l)A T (12)
slab staggering quantity delta between adjacent shield segments m2 Then it is:
δ m2 =(1-j){w[(m+1)D t ]-w(mD t )} (13)
shearing force Q between adjacent shield segments m Comprises the following steps:
Q m =(1-j){w[(m+1)D t ]-w(mD t )}×k t (14)
the prediction method can be programmed and calculated by Matlab software, wherein the matrix [ K [ ] t ]And [ K ] sm ]A calculation matrix of order 10 is used to ensure accuracy.
In the embodiment, the specific parameters in the Matlab software take the following values:
when no anti-floating anchor rod acts:
L=90m,B=70m,H=18.9m,d=11.2m,d 0 =7.7m,α 0 =0,μ=0.35,γ=19kN/m 3 ,c=30kPa,Es=8×10 3 kPa,D t =1.2m,D=6m,N=61,ks=1.94×10 6 kN/m,k t =7.45×10 5 kN/m,E t I t =1.1×10 8 kN·m 2 ,b=0.22m,j=0.3,a=7.5m,h=15.9m,N 1 =0,k m =0。
when the anti-floating anchor rod acts:
L=90m,B=70m,H=18.9m,d=11.2m,d 0 =7.7m,α 0 =0,μ=0.35,γ=19kN/m 3 ,c=30kPa,Es=8×10 3 kPa,D t =1.2m,D=6m,N=61,ks=1.94×10 6 kN/m,k t =7.45×10 5 kN/m,E t I t =1.1×10 8 kN·m 2 ,b=0.22m,j=0.3,a=7.5m,h=15.9m,N 1 =40,k m =1.4。
in the above parameters, the values of the foundation pit sizes L and B are properly adjusted on the basis of the original text because the finite element model is not a standard foundation pit excavation condition.
The calculated value and the simulated value of the displacement deformation of the lower horizontal existing tunnel with the anti-floating anchor rod caused by the excavation of the foundation pit are shown in fig. 6. As can be seen from FIG. 6, the vertical displacement value predicted by the method of the invention is matched with the analog value, wherein the maximum value of the calculated vertical displacement value when no anchor rod exists in the tunnel is 23.4mm, the analog value in the original text is 23mm, the maximum value of the calculated vertical displacement value when an anchor rod exists in the tunnel is 18.6mm, the analog value in the original text is 18.9mm, and the calculated result meets the accuracy requirement. The prediction method provided by the invention can better reflect the displacement deformation of the existing tunnel with the anti-floating anchor rod in the horizontal direction caused by the excavation of the foundation pit.

Claims (3)

1. A displacement deformation prediction method for a shield tunnel with an anti-floating anchor rod under foundation pit excavation is characterized by comprising the following steps:
(1) Establishing a coordinate system by taking the center of the ground foundation pit as a coordinate origin, measuring the excavation size L of the foundation pit parallel to the axial direction of the tunnel, the excavation size B of the foundation pit vertical to the axial direction of the tunnel, the excavation depth d of the foundation pit, and the insertion depth d of the enclosure structure below the bottom of the foundation pit 0 The outer diameter D of the shield tunnel, the distance s from the top of the shield tunnel to the bottom of the foundation pit and the horizontal distance a between the axis of the tunnel and the center of the foundation pit are calculated, the total height H = D + D0 of the enclosure structure of the foundation pit is calculated, the buried depth H = s + D/2+ D of the axis of the tunnel is calculated, and the number of calculation rings of the tunnel lining influenced by excavation of the foundation pit is obtained and is 2N; obtaining the number of the calculation rings 2N of the tunnel lining influenced by the anti-floating anchor rod according to the working condition 1 Establishing the position relation between the shield tunnel with the anti-floating anchor rods and the ground foundation pit;
the process of acquiring the number 2N of the calculated rings of the tunnel lining affected by the excavation of the foundation pit in the step (1) specifically comprises the following steps: when the 2N is different, the corresponding maximum bump value forms a change curve, the change curve finally tends to be stable, and the 2N is the minimum value which enables the change curve to tend to be stable;
(2) Calculating the additional load of the shield tunnel with the anti-floating anchor rod caused by excavation of the foundation pit, and specifically comprising the following steps:
deducing that the position of a certain point (xi, eta, d) at the bottom of the foundation pit is p = - (1-alpha) according to a Mindlin solution 0 ) And gamma d, under the unloading action, causing a vertical additional load p (l) of a certain point (a, l, h) on the axis of the shield tunnel:
Figure FDA0003940981090000011
wherein gamma is the gravity of soil and alpha 0 Is the residual stress coefficient;
(3) Predicting the displacement deformation of the shield tunnel with the anti-floating anchor rod under excavation of the foundation pit, and specifically comprising the following substeps:
(3.1) calculating the total deformation potential energy E of the shield tunnel under the action of the anti-floating anchor rods by considering the rotating and staggered segment ring collaborative deformation model pm
E pm =W L +W Rm +W S +W T (2)
Wherein, W L Acting on additional load of shield tunnel, W Rm For overcoming the resistance of the formation to work under the action of the anti-floating anchor rod, W S To overcome the inter-ring shear force, W T Acting to overcome tension between rings;
Figure FDA0003940981090000021
Figure FDA0003940981090000022
w (l) is a shield tunnel longitudinal displacement deformation function, k m Is the resistance coefficient of the soil body of the anti-floating anchor rod, k is the foundation bed coefficient of the soil, D t The width of each shield tunnel is the ring width;
(3.2) the shield tunnel longitudinal displacement deformation function is symmetrical about the excavation midpoint of the foundation pit and is obtained by expanding according to Fourier series:
Figure FDA0003940981090000023
wherein:
Figure FDA0003940981090000024
A=(a 1 a 2 a 3 L a n ) T
n is the expansion series of Fourier;
(3.3) solving a longitudinal displacement function w (l) and a slab staggering amount delta between adjacent shield segments through a variational control equation m2 And the shearing force Q between adjacent shield segments m
Based on the principle of minimum potential energy, the total potential energy E of the step (3.1) is calculated pm And (3) taking an extreme value for each undetermined coefficient, namely:
Figure FDA0003940981090000025
in the formula: a is i The ith element in the matrix A, namely the coefficient of the polynomial of the longitudinal displacement deformation function of the tunnel;
expressed in matrix form:
([K r ]+[K sm ])A T =[P] T (7)
in the formula: [ K ] r ]A T For the interaction effect between the tunnel rings:
Figure FDA0003940981090000031
[K sm ]A T the soil resistance effect under the action of the anti-floating anchor rod is as follows:
Figure FDA0003940981090000032
wherein: [ P ]] T Represents the effect of the additional load on the tunnel lining:
Figure FDA0003940981090000033
[ P ] obtained by the above procedure] T 、[K r ]And [ K ] sm ]Calculating to obtain a matrix A of undetermined coefficients T
A T =([K r ]+[K sm ]) -1 [P] T (11)
Obtaining a longitudinal displacement deformation function w (l) of the tunnel:
w(l)=T n (l)A T (12)
slab staggering quantity delta between adjacent shield segments m2 Then it is:
δ m2 =(1-j){w[(m+1)D t ]-w(mD t )} (13)
shearing force Q between adjacent shield segments m Comprises the following steps:
Q m =(1-j){w[(m+1)D t ]-w(mD t )}×k t (14)
2. the prediction method according to claim 1, wherein 2N is 50 rings or more.
3. The prediction method of claim 1, wherein [ K ] is defined in step 3 r ]And [ K ] sm ]Is a 10 th order matrix.
CN202010243292.7A 2020-03-31 2020-03-31 Displacement deformation prediction method for shield tunnel with anti-floating anchor rod under excavation of foundation pit Active CN111428304B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010243292.7A CN111428304B (en) 2020-03-31 2020-03-31 Displacement deformation prediction method for shield tunnel with anti-floating anchor rod under excavation of foundation pit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010243292.7A CN111428304B (en) 2020-03-31 2020-03-31 Displacement deformation prediction method for shield tunnel with anti-floating anchor rod under excavation of foundation pit

Publications (2)

Publication Number Publication Date
CN111428304A CN111428304A (en) 2020-07-17
CN111428304B true CN111428304B (en) 2023-01-03

Family

ID=71550151

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010243292.7A Active CN111428304B (en) 2020-03-31 2020-03-31 Displacement deformation prediction method for shield tunnel with anti-floating anchor rod under excavation of foundation pit

Country Status (1)

Country Link
CN (1) CN111428304B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112131748B (en) * 2020-09-25 2023-08-18 北京交通大学 Deformation prediction method and system for composite layering stratum in urban tunnel construction
CN112597674B (en) * 2020-12-05 2022-07-08 福建工程学院 Method for determining lateral pipeline transverse additional internal force caused by foundation pit excavation
CN115146420B (en) * 2022-09-05 2022-11-25 中南大学 Method for establishing railway tunnel anchor rod refined model

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004197386A (en) * 2002-12-18 2004-07-15 Railway Technical Res Inst Estimating method for ground displacement in shield machine passage in tunnel
CN103244134B (en) * 2013-04-26 2015-04-29 上海交通大学 Anti-floating ballasting method for shield tunnel under negative earthing condition
JP6309888B2 (en) * 2014-12-25 2018-04-11 戸田建設株式会社 Method for predicting final displacement of tunnel
CN106951706B (en) * 2017-03-20 2019-07-02 浙江大学城市学院 A kind of ground preloading causes existing shield tunnel to be displaced calculation method
CN207003499U (en) * 2017-07-25 2018-02-13 广州大学 A kind of anti-floating lifting device of underground tunnel upper excavation of foundation pit
CN108241783B (en) * 2018-01-05 2019-08-02 浙江大学城市学院 The shield tunnel Method for Calculating Deformation of section of jurisdiction faulting of slab ends and rotation is considered under a kind of ground preloading simultaneously
CN208793021U (en) * 2018-09-30 2019-04-26 西南石油大学 A kind of shield tunnel anti-floating control structure
CN110836121A (en) * 2019-11-27 2020-02-25 杭州合跃科技有限责任公司 Anti-floating reinforcing structure of operated subway tunnel and construction method

Also Published As

Publication number Publication date
CN111428304A (en) 2020-07-17

Similar Documents

Publication Publication Date Title
Xu et al. Shaking table tests on seismic measures of a model mountain tunnel
CN111428304B (en) Displacement deformation prediction method for shield tunnel with anti-floating anchor rod under excavation of foundation pit
Ng et al. Three-dimensional centrifuge modelling of basement excavation effects on an existing tunnel in dry sand
Yu et al. Field investigations of high stress soft surrounding rocks and deformation control
Elbaz et al. Investigation into performance of deep excavation in sand covered karst: a case report
Shi et al. Interaction between a large-scale triangular excavation and adjacent structures in Shanghai soft clay
Liu et al. Numerical analysis on the mechanical performance of supporting structures and ground settlement characteristics in construction process of subway station built by Pile-Beam-Arch method
Zhou et al. The failure mechanism and construction practice of large underground caverns in steeply dipping layered rock masses
Zidan et al. Three dimensional numerical analysis of the effects of tunnelling near piled structures
Xu et al. Shanghai center project excavation induced ground surface movements and deformations
Qi et al. Structural deformation of existing horseshoe-shaped tunnels by shield overcrossing
Zhang et al. Effect of permafrost on seismic performance of railway bridge pile foundation with elevated cap
Fall et al. Three-dimensional response of double anchored sheet pile walls subjected to excavation and construction sequence
Sabagh et al. Centrifuge experiments for shallow tunnels at active reverse fault intersection
Zhang et al. Construction techniques and mechanical behavior of newly-built large-span tunnel ultra-short distance up-crossing the existing shield tunnel with oblique angle
Chen et al. Characteristics and treatment measures of tunnel collapse in fault fracture zone during rainfall: A case study
Gao et al. Influence of Benoto bored pile construction on nearby existing tunnel: A case study
Liu et al. Observed performance of a deep excavation of Qingdao Metro Line 4 in China
Zhang et al. Observed deformation characteristics of a deep excavation for the spring area in Jinan, China
Zhou et al. Deformation analysis of shield undercrossing and vertical paralleling excavation with existing tunnel in composite stratum
Cui et al. A study on the mechanisms of interaction between deep foundation pits and the pile foundations of adjacent skewed arches as well as methods for deformation control
Rashiddel et al. Seismic analysis of segmental shallow tunnels adjacent to building foundations under soil liquefaction and its mitigation
Quan et al. Damage mechanisms of soft rock tunnels in the western China: a case study on the dujiashan tunnel
CN115809498A (en) Longitudinal deformation calculation method for existing line penetrating through deep-buried shield tunnel
CN115344935A (en) Shield tunnel construction period floating analysis and calculation method considering slurry solidification characteristics

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant