CN111382538A - Spherical net rack suspension assembly integral lifting construction method - Google Patents

Spherical net rack suspension assembly integral lifting construction method Download PDF

Info

Publication number
CN111382538A
CN111382538A CN202010217527.5A CN202010217527A CN111382538A CN 111382538 A CN111382538 A CN 111382538A CN 202010217527 A CN202010217527 A CN 202010217527A CN 111382538 A CN111382538 A CN 111382538A
Authority
CN
China
Prior art keywords
lifting
spherical
net rack
grid structure
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010217527.5A
Other languages
Chinese (zh)
Other versions
CN111382538B (en
Inventor
杨叶松
蔡东毅
李洪利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN202010217527.5A priority Critical patent/CN111382538B/en
Publication of CN111382538A publication Critical patent/CN111382538A/en
Application granted granted Critical
Publication of CN111382538B publication Critical patent/CN111382538B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Abstract

The invention discloses a spherical net rack hanging, assembling and integral lifting construction method, and belongs to the technical field of net rack structure construction. The method comprises the following steps: step 1: establishing a grid structure finite element analysis model by applying Midas/Gen finite element analysis software according to the composition form of the spherical grid structure; step 2: dividing the splicing and lifting stages or lifting heights of the spherical grid structure according to the analysis and verification result in the step 1 and the actual space size of the structure; step 3, setting a lifting platform and a lifting hoisting point, and installing a hydraulic synchronous lifting system; step 4, after lifting one height, repeatedly carrying out the assembly of the next lifting unit in the step 2 and the lifting process of the next lifting unit in the step 3; step 5, continuously lifting the whole ball structure assembled in the step 4 to a position which is 100-200mm away from the designed elevation; and 6, unloading the hydraulic lifting system step by step. The invention adopts the spherical structure to be assembled in sections and integrally lifted, and has high construction speed, safety and reliability.

Description

Spherical net rack suspension assembly integral lifting construction method
Technical Field
The invention relates to the technical field of grid structure construction, in particular to a suspension, assembly and integral lifting construction method for a spherical grid.
Background
Along with the improvement of the scientific and technical level of the present generation, the diversified spatial grid structure of molding is more and more applied to in the real life, as a grid structure, and the spherical grid structure in space is because of its height is straggly, and the pattern is novel etc. and is applied to modern building gradually a bit more, but because spherical grid structure whole span is big, the dead weight is heavy, and the installation technology is complicated, and the work progress requires the precision high, and dangerous reason such as big is restraining spherical grid structure's development always. Therefore, how to adopt a construction method which is always efficient and safe to construct aiming at the complex structure is a problem which needs to be solved urgently at the present stage.
Disclosure of Invention
1. Problems to be solved
Aiming at the defects and shortcomings in the prior art, the invention provides a spherical net rack suspension, assembly and integral lifting construction method, which adopts a spherical structure to assemble and integrally lift in a segmented manner, and has high construction speed, safety and reliability.
2. Technical scheme
In order to achieve the purpose, the technical scheme provided by the invention is as follows:
a spherical net rack suspension assembly integral lifting construction method comprises the following steps:
step 1: according to the composition form of the spherical grid structure, Midas/Gen finite element analysis software is applied to establish a grid structure finite element analysis model, the stress ratio of the rod members formed by the spherical grid structure, the distribution of internal force of lifting points and the deformation result under the load effect are obtained, then, ANSYS is used for establishing a finite element analysis model in the whole structure lifting process, the stress ratio and the deformation result of the whole spherical grid structure under the different load combination effects are obtained, the two combined finite element models are subjected to comparative analysis, and the correctness of simulation analysis is verified;
step 2: dividing splicing and lifting stages or lifting heights of the spherical grid structure according to the analysis and verification result in the step 1 and the actual space size of the structure, sequentially splicing spheres from outside to inside according to the divided stages or heights, and sequentially splicing the sphere-forming structural truss on the ground right below the projection plane of the structural truss into a plurality of lifting units;
step 3, setting a lifting platform and lifting hoisting points, installing a hydraulic synchronous lifting system, setting a temporary reinforcing structure, and sequentially lifting the lifting units according to the lifting heights divided in the step 2;
step 4, after lifting one height, repeating the assembling of the next lifting unit in the step 2 and the lifting process of the next lifting unit in the step 3 until the structure is assembled into a complete spherical structure;
step 5, continuously lifting the whole ball structure assembled in the step 4 to a position which is 200mm away from the designed elevation, stopping lifting, measuring the self height and the relative height utilization of each lifting point, carrying out vertical direction fine adjustment on each lifting point by a hydraulic synchronous lifting system to enable each lifting point to reach the designed position, and then carrying out post-installation rod piece installation;
and 6, unloading the hydraulic lifting system step by step, and removing the lifting system and temporary processing measures after transferring the load to the supporting upright columns on the two sides.
Furthermore, each lifting unit in step 2 has a height 1/4 corresponding to the full height of the sphere.
Furthermore, the lifting platform in the step 3 is arranged on the fixed supporting columns at two sides of the spherical structure; the lifting points are symmetrically arranged on the lifting platform, and the lifting points are 4 groups; the hydraulic synchronous lifting system comprises a hydraulic lifter, a steel strand, a special ground anchor and a computer synchronous system.
Furthermore, before the assembling and lifting process of the next lifting unit in the step 4, the data of the lifting height of the previous lifting unit, the stress of each lifting point and the stability of the lifting platform are monitored and corrected.
3. Advantageous effects
Compared with the prior art, the invention has the beneficial effects that:
according to the spherical net rack hanging, assembling and integral lifting construction method, the spherical steel net rack structure is constructed in sections, and hydraulic lifting equipment is utilized to lift a part of the whole spherical steel structure when each part is lifted, so that the whole spherical steel structure is always in a suspended state with balanced stress during construction, the influence of stress and stress deformation on structural members caused by the fact that the spherical steel structure is hoisted after ground assembling due to dead weight is effectively solved, meanwhile, the problem that the size of the structural members is difficult to position when the spherical steel structure is assembled in high altitude is effectively solved, the mounting precision of the spherical net rack structure is improved, and the safety of the mounting process is effectively guaranteed.
Drawings
FIG. 1 is a construction flow chart of the present invention.
Detailed Description
The invention will be further described with reference to specific embodiments and the accompanying drawings in which:
example 1
The spherical net rack hanging, assembling and integral lifting construction method comprises the following steps:
step 1: according to the composition form of the spherical grid structure, Midas/Gen finite element analysis software is applied to establish a grid structure finite element analysis model, the stress ratio of the rod members formed by the spherical grid structure, the distribution of internal force of lifting points and the deformation result under the load effect are obtained, then, ANSYS is used for establishing a finite element analysis model in the whole structure lifting process, the stress ratio and the deformation result of the whole spherical grid structure under the different load combination effects are obtained, the two combined finite element models are subjected to comparative analysis, and the correctness of simulation analysis is verified;
step 2: dividing splicing and lifting stages or lifting heights of the spherical grid structure according to the analysis and verification result in the step 1 and the actual space size of the structure, sequentially splicing spheres from outside to inside according to the divided stages or heights, and sequentially splicing the sphere-forming structural truss on the ground right below the projection plane of the structural truss into a plurality of lifting units;
step 3, setting a lifting platform and lifting hoisting points, installing a hydraulic synchronous lifting system, setting a temporary reinforcing structure, and sequentially lifting the lifting units according to the lifting heights divided in the step 2;
step 4, after lifting one height, repeating the assembling of the next lifting unit in the step 2 and the lifting process of the next lifting unit in the step 3 until the structure is assembled into a complete spherical structure;
step 5, continuously lifting the whole ball structure assembled in the step 4 to a position which is 200mm away from the designed elevation, stopping lifting, measuring the self height and the relative height utilization of each lifting point, carrying out vertical direction fine adjustment on each lifting point by a hydraulic synchronous lifting system to enable each lifting point to reach the designed position, and then carrying out post-installation rod piece installation;
and 6, unloading the hydraulic lifting system step by step, and removing the lifting system and temporary processing measures after transferring the load to the supporting upright columns on the two sides.
Each lifting unit in step 2 is 1/4 with the full height of the sphere.
The lifting platform in the step 3 is arranged on the fixed supporting columns at two sides of the spherical structure; the lifting points are symmetrically arranged on the lifting platform, and the lifting points are 4 groups; the hydraulic synchronous lifting system comprises a hydraulic lifter, a steel strand, a special ground anchor and a computer synchronous system.
And 4, before the assembling and lifting process of the next lifting unit in the step 4, monitoring and correcting the lifting height of the previous lifting unit, the stress of each lifting point and the stability of the lifting platform.
The invention adopts the sectional construction of the spherical steel net rack structure, utilizes hydraulic lifting equipment to lift one part every time, so that the whole spherical steel structure is always in a suspended state with balanced stress during construction, effectively solves the influence of stress and stress deformation generated when the spherical steel structure is hoisted after being assembled on the ground due to self weight on structural members, also effectively solves the problem of difficult size positioning of the structural members during high-altitude assembly of the spherical steel structure, improves the installation precision of the spherical net rack structure, and effectively ensures the safety of the installation process.
The present invention and its embodiments have been described above schematically, without limitation, and what is shown in the drawings is only one of the embodiments of the present invention, to which the actual method is not limited. Therefore, if the person skilled in the art receives the teaching, without departing from the spirit of the invention, the person skilled in the art shall not inventively design the similar structural modes and embodiments to the technical solution, but shall fall within the scope of the invention.

Claims (4)

1. A spherical net rack suspension assembly integral lifting construction method is characterized in that: the method comprises the following steps:
step 1: according to the composition form of the spherical grid structure, Midas/Gen finite element analysis software is applied to establish a grid structure finite element analysis model, the stress ratio of the rod members formed by the spherical grid structure, the distribution of internal force of lifting points and the deformation result under the load effect are obtained, then, ANSYS is used for establishing a finite element analysis model in the whole structure lifting process, the stress ratio and the deformation result of the whole spherical grid structure under the different load combination effects are obtained, the two combined finite element models are subjected to comparative analysis, and the correctness of simulation analysis is verified;
step 2: dividing splicing and lifting stages or lifting heights of the spherical grid structure according to the analysis and verification result in the step 1 and the actual space size of the structure, sequentially splicing spheres from outside to inside according to the divided stages or heights, and sequentially splicing the sphere-forming structural truss on the ground right below the projection plane of the structural truss into a plurality of lifting units;
step 3, setting a lifting platform and lifting hoisting points, installing a hydraulic synchronous lifting system, setting a temporary reinforcing structure, and sequentially lifting the lifting units according to the lifting heights divided in the step 2;
step 4, after lifting one height, repeating the assembling of the next lifting unit in the step 2 and the lifting process of the next lifting unit in the step 3 until the structure is assembled into a complete spherical structure;
step 5, continuously lifting the whole ball structure assembled in the step 4 to a position which is 200mm away from the designed elevation, stopping lifting, measuring the self height and the relative height utilization of each lifting point, carrying out vertical direction fine adjustment on each lifting point by a hydraulic synchronous lifting system to enable each lifting point to reach the designed position, and then carrying out post-installation rod piece installation;
and 6, unloading the hydraulic lifting system step by step, and removing the lifting system and temporary processing measures after transferring the load to the supporting upright columns on the two sides.
2. The spherical net rack suspension, assembly and integral lifting construction method according to claim 1, characterized in that: each lifting unit in step 2 is 1/4 with the full height of the sphere.
3. The spherical net rack suspension, assembly and integral lifting construction method according to claim 1, characterized in that: the lifting platform in the step 3 is arranged on the fixed supporting columns at two sides of the spherical structure; the lifting points are symmetrically arranged on the lifting platform, and the lifting points are 4 groups; the hydraulic synchronous lifting system comprises a hydraulic lifter, a steel strand, a special ground anchor and a computer synchronous system.
4. The spherical net rack suspension, assembly and integral lifting construction method according to claim 1, characterized in that: and 4, before the assembling and lifting process of the next lifting unit in the step 4, monitoring and correcting the lifting height of the previous lifting unit, the stress of each lifting point and the stability of the lifting platform.
CN202010217527.5A 2020-03-25 2020-03-25 Spherical net rack suspension assembly integral lifting construction method Active CN111382538B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010217527.5A CN111382538B (en) 2020-03-25 2020-03-25 Spherical net rack suspension assembly integral lifting construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010217527.5A CN111382538B (en) 2020-03-25 2020-03-25 Spherical net rack suspension assembly integral lifting construction method

Publications (2)

Publication Number Publication Date
CN111382538A true CN111382538A (en) 2020-07-07
CN111382538B CN111382538B (en) 2023-01-24

Family

ID=71219963

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010217527.5A Active CN111382538B (en) 2020-03-25 2020-03-25 Spherical net rack suspension assembly integral lifting construction method

Country Status (1)

Country Link
CN (1) CN111382538B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112035936A (en) * 2020-09-07 2020-12-04 中国十七冶集团有限公司 Steel truss lifting construction method based on BIM
CN112554345A (en) * 2020-11-27 2021-03-26 中国二冶集团有限公司 Ground splicing and integral lifting construction method for large-span welding ball net rack
CN113323406A (en) * 2021-06-11 2021-08-31 上海宝冶集团有限公司 Large-weight ship-shaped steel structure integral hoisting structure based on ANSYS and construction method thereof

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108532767A (en) * 2018-05-09 2018-09-14 中建七局安装工程有限公司 Lifting construction method after space Reticulated dome is first pushed up by ring expansion
CN108678180A (en) * 2018-05-09 2018-10-19 中建七局安装工程有限公司 Space Reticulated dome ladder lifting construction method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108532767A (en) * 2018-05-09 2018-09-14 中建七局安装工程有限公司 Lifting construction method after space Reticulated dome is first pushed up by ring expansion
CN108678180A (en) * 2018-05-09 2018-10-19 中建七局安装工程有限公司 Space Reticulated dome ladder lifting construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112035936A (en) * 2020-09-07 2020-12-04 中国十七冶集团有限公司 Steel truss lifting construction method based on BIM
CN112554345A (en) * 2020-11-27 2021-03-26 中国二冶集团有限公司 Ground splicing and integral lifting construction method for large-span welding ball net rack
CN113323406A (en) * 2021-06-11 2021-08-31 上海宝冶集团有限公司 Large-weight ship-shaped steel structure integral hoisting structure based on ANSYS and construction method thereof

Also Published As

Publication number Publication date
CN111382538B (en) 2023-01-24

Similar Documents

Publication Publication Date Title
CN111382538B (en) Spherical net rack suspension assembly integral lifting construction method
CN111444650B (en) Integral lifting construction method for large-span net rack roof structure
CN109208915B (en) Construction method for integrally lifting cooling tower system and steel gallery
CN106284663B (en) A kind of construction method of ellipse suspended-dome structure
CN108360686B (en) Integral installation device of net rack and construction method thereof
CN106337501A (en) Inverted lifting installation method of arched reticulated shell
CN104695715A (en) Construction method of beam string structure of roof
CN111691681A (en) Method for mounting outer frame cylinder structure of diagonal steel pipe grid column
CN106812328A (en) The overall two step lifting construction methods of a string prestressed steel structure rack with hanging layer
CN110374200A (en) Large span rigidity unevenly mixes rack high altitude bulk method
CN106760559B (en) The installation method of hemispherical spherical crown reticulated shell
CN111809888A (en) Construction method of large-span irregular truss
WO2021120335A1 (en) Cumulative lifting method for large-span unequal-height bidirectional curved surface grid
CN114182647B (en) Construction method for lifting and turning weak arch
CN109518614B (en) Suspension construction mechanism and construction method for steel bridge
CN105484503A (en) Method for hoisting inclining shuttle-shaped space truss
CN102877412B (en) Method of pre-assembly in integral erecting way of steel tower
KR20120118723A (en) Simulation method of climbing hydraulic robot and construction factory
CN205369948U (en) Lifting device for daylighting top is used for installing
CN108547458B (en) Construction method of high-altitude special-shaped steel structure
CN113235950A (en) High-altitude installation method for single-layer latticed shell
CN114164945A (en) Stadium net rack construction method
CN108385844A (en) FRAME ON THE ROOF OF HIGH-RISE BUILDING steel construction mast exempts from tower crane construction
CN106320524B (en) A kind of method for improving of the upside-down mounting accumulation of the vertical rack of superelevation height
CN111705931A (en) Construction method of large-span grid structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant