CN111368437A - 基于bim技术的铁路路基工程设计方法 - Google Patents

基于bim技术的铁路路基工程设计方法 Download PDF

Info

Publication number
CN111368437A
CN111368437A CN202010151117.5A CN202010151117A CN111368437A CN 111368437 A CN111368437 A CN 111368437A CN 202010151117 A CN202010151117 A CN 202010151117A CN 111368437 A CN111368437 A CN 111368437A
Authority
CN
China
Prior art keywords
engineering
model
roadbed
line
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010151117.5A
Other languages
English (en)
Other versions
CN111368437B (zh
Inventor
谢毅
董凤翔
刘厚强
翟连吉
刘呈斌
谢先当
解治敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN202010151117.5A priority Critical patent/CN111368437B/zh
Publication of CN111368437A publication Critical patent/CN111368437A/zh
Application granted granted Critical
Publication of CN111368437B publication Critical patent/CN111368437B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

本发明涉及三维建模设计领域,其公开了一种基于BIM技术的铁路路基工程设计方法,满足铁路路基支挡工程的三维快速建模及工程出图的需求,实现铁路路基工程的快速三维展示,方便修改和传达施工要点。该方法包括以下步骤:a.读取路线信息要素,导入三维建模软件并生成铁路路线模型;b.将路线设计参数与铁路路线模型进行关联;c.将铁路桥梁、涵洞、隧道、站场设计数据与路线进行关联;d.向三维建模软件导入路基横断面数据;e.根据铁路路线模型和路基横断面数据生成路基模型;f.选择创建工程命令,并输入相应工程设计参数,在路基模型的基础上创建相应的工程模型。

Description

基于BIM技术的铁路路基工程设计方法
技术领域
本发明涉及三维建模设计领域,具体涉及一种基于BIM技术的铁路路基工程设计方法。
背景技术
因BIM技术的目标是信息的共享和互用,故如何建立和运用信息模型,是BIM技术应用成功与否的关键。运用信息模型前,必须要建立信息模型,能否满足应用需要,是建立信息模型的依据。
当前市场上已有的主流建模软件,都在二维软件上绘图,不能满足铁路路基的三维设计建模需要。而对于不同的信息模型,建立模型的方法千差万别,专业属性各不相同,绘图效率低,三维展示差,不能清晰展示设计成果及设计意图。
发明内容
本发明所要解决的技术问题是:提出一种基于BIM技术的铁路路基工程设计方法,满足铁路路基支挡工程的三维快速建模及工程出图的需求,实现铁路路基工程的快速三维展示,方便修改和传达施工要点。
本发明解决上述技术问题采用的技术方案是:
基于BIM技术的铁路路基工程设计方法,包括以下步骤:
a.读取路线信息要素,导入三维建模软件并生成铁路路线模型;
b.将路线设计参数与铁路路线模型进行关联;
c.将铁路桥梁、涵洞、隧道、站场设计数据与路线进行关联;
d.向三维建模软件导入路基横断面数据;
e.根据铁路路线模型和路基横断面数据生成路基模型;
f.选择创建工程命令,并输入相应工程设计参数,在路基模型的基础上创建相应的工程模型。
作为进一步优化,步骤a中,所述三维建模软件为OpenRailDesigner软件。
作为进一步优化,步骤a中,所述读取路线信息要素,导入三维建模软件并生成铁路路线模型,具体包括:
从线路数据库MDB中读取线路的平面数据、纵断面数据和断链数据;
将平面数据和纵断面数据转换为对应的几何要素;
基于转换获得的几何要素,调用OpenRailDesigner软件接口生成线路几何;
通过里程与线路长度进行换算,将从MDB数据库中读出的断链信息,附加到对应线路从而创建线路信息模型。
作为进一步优化,步骤b中,所述路线设计参数包括:路线宽度、设计速度、线路个数、主线和线间距。
作为进一步优化,步骤d中,导入的所述路基横断面数据包括:横断面里程桩号、中桩高程、地层信息、地层线点集和坡面注释信息。
作为进一步优化,步骤d中所述向三维建模软件导入路基横断面数据,具体包括:
遍历地质数据中的所有里程桩号信息和中桩高程信息,生成端点列表;
从所述端点列表中的第一个端点开始遍历所有端点,生成地面点集列表;
从所述地面点集列表中的第一条线的点集开始,沿地质线的逻辑顺序,读取该地质断面中所有地层的属性,并将读取的属性和对应的属性值按照OpenRailDesigner软件可识别的数据格式存储为中间文件;
OpenRailDesigner软件读取所述中间文件,并按照中间文件中存储的属性及对应的属性值生成与地质数据对应的地层线列表,每一个地层线下包含该地质断面对应的所有点集及地层属性,OpenRailDesigner软件根据地质断面列表生成三维数据模型。
作为进一步优化,步骤f中,所述相应工程包括:支挡工程及其附属边坡防护工程、排水工程。
作为进一步优化,步骤f中,在选择创建工程命令后,通过调用预先建立的铁路路基工程数据库获取对应的工程构件数据,输入相应工程设计参数后快速创建相应的工程模型。
作为进一步优化,步骤f还包括:可根据工程设计需要修改相关参数,实现工程模型快速修改。
本发明的有益效果是:
在三维建模软件中融合路基三维建模必须的线路、桥梁、隧道、站场、地质等专业的接接口,通过自动读取线路数据,自动读取当前路基设计软件的前期数据,并利用预先建立的路基工程数据库实现构件的快速调用,从而快速生成路基支挡工程模型,并提供对路基工程模型的修改的相关功能,从而满足铁路路基支挡工程的三维快速建模及工程出图的需求;
此外,由于本发明是在三维空间上的设计方案,对细节和控制点的表现相对于二维设计更为直观、清晰,从而提供更为真实的设计体验,并且工程量计算也更为准确;
再者,由于采用参数化建模的方式,并且对参数进行了合理的设计,如需修改模型,则只需要改变一个或多个参数即可完成修改,提升设计效率。
附图说明
图1为本发明的基于BIM技术的铁路路基工程设计方法流程图。
具体实施方式
本发明旨在提出一种基于BIM技术的铁路路基工程设计方法,满足铁路路基支挡工程的三维快速建模及工程出图的需求,实现铁路路基工程的快速三维展示,方便修改和传达施工要点。
如图1所示,本发明中的基于BIM技术的铁路路基工程设计方法包括以下步骤:
S1、导入路线信息要素,生成铁路路线模型:
本步骤中,从线路数据库MDB中读取线路的平面数据、纵断面数据和断链数据等路线信息要素,经过处理并导入OpenRailDesigner软件中,生成铁路路线模型;该铁路路线模型包含路线三维几何信息、断链信息、里程桩号信息。
具体实现包括:从线路数据库MDB中读取线路的平面数据、纵断面数据和断链数据;
将平面数据和纵断面数据转换为对应的几何要素;
基于转换获得的几何要素,调用OpenRailDesigner软件接口生成线路几何;
通过里程与线路长度进行换算,将从MDB数据库中读出的断链信息,附加到对应线路从而创建线路信息模型。
上述平面数据包括交点信息,曲线半径,缓和曲线长度、切线长度,曲线长度,夹直线长度,里程冠号等信息。遍历所有这些信息逐一转化为OpenRailDesigner平面点集。
上述纵断面信息即为路线坡度信息,包括变坡点(坡度改变点)的里程、设计高程、坡度、竖曲线半径、竖曲线长度等信息。遍历所有纵断面信息,将其转化为三维点集信息。
上述断链信息包括等号左右里程及断链长度信息。
上述平面数据和纵断面数据转换为对应的几何要素,其中平面几何信息为线路平面模型需要的直线段、缓和曲线、圆曲线等几何要素,纵面几何信息为直线段、圆曲线段等几何要素。
S2、关联路线设计数据:
本步骤中,将设计人员设计的路线宽度、设计速度、线路个数、主线、线间距等设计参数与路线模型绑定,可依据路线自动生成符合设计原则的路基模型,为设计人员确定路基设计方案提供便利。
S3:关联铁路桥、涵、隧、站数据:
本步骤中,将铁路桥梁、涵洞、隧道、站场设计数据与路线关联,从而生成包含各类几何与非几何信息的路线模型。将桥梁、隧道、涵洞、站场等数据与路线关联,预留路基与其他各专业间接口,实现了各专业接口工程的自动变更,减少了各专业接口设计的冲突。
上述关联,主要是根据路线得到桥梁、涵洞、隧道、车站的里程数据,并将该里程数据存入路线信息中。
S4:导入路基横断面数据:
本步骤中,将测绘专业的路基标准横断面数据导入软件,导入测绘数据包括该横断面里程桩号、中桩高程、地层信息、地层线点集、坡面注释等信息。
具体实现包括:
遍历地质数据中的所有里程桩号信息和中桩高程信息,生成端点列表;
从所述端点列表中的第一个端点开始遍历所有端点,生成地面点集列表;
从所述地面点集列表中的第一条线的点集开始,沿地质线的逻辑顺序,读取该地质断面中所有地层的属性,并将读取的属性和对应的属性值按照OpenRailDesigner软件可识别的数据格式存储为中间文件;
OpenRailDesigner软件读取所述中间文件,并按照中间文件中存储的属性及对应的属性值生成与地质数据对应的地层线列表,每一个地层线下包含该地质断面对应的所有点集及地层属性,OpenRailDesigner软件根据地质断面列表生成三维数据模型。
S5:创建铁路路基模型:
本步骤中,根据线路模型和路基横断面数据生成路基模型,通过横断面生成地膜,与路线比对后,得到路基填挖信息,生成各级填挖方边坡及排水沟、侧沟模型,并得到路基两侧路肩边线。同时在横断面视图上生成边坡线,得到填挖方土石方算量信息;同时使得路肩边线关联路线信息,路线关联边坡模型信息。
S6:创建铁路路基工程:
本步骤中,选择创建工程命令,选择相应数据模型,从数据库中得到工程模型详细数据,从而生成相应的支挡工程模型。生成工程模型时,只选择相应路肩边线,路肩边线会自动关联路线,路线会自动关联边坡,实现自动修改边坡及排水工程模型,并同时生成工点图及横断面图,更新挖方土石方算量信息。
在选择创建工程命令后,通过调用预先建立的铁路路基工程数据库获取对应的工程构件,输入相应工程设计参数后快速创建相应的工程模型。同时,满足设计人员根据实际工程情况调整设计参数,快速修改模型的要求。

Claims (9)

1.基于BIM技术的铁路路基工程设计方法,其特征在于,包括以下步骤:
a.读取路线信息要素,导入三维建模软件并生成铁路路线模型;
b.将路线设计参数与铁路路线模型进行关联;
c.将铁路桥梁、涵洞、隧道、站场设计数据与路线进行关联;
d.向三维建模软件导入路基横断面数据;
e.根据铁路路线模型和路基横断面数据生成路基模型;
f.选择创建工程命令,并输入相应工程设计参数,在路基模型的基础上创建相应的工程模型。
2.如权利要求1所述的基于BIM技术的铁路路基工程设计方法,其特征在于,
步骤a中,所述三维建模软件为OpenRailDesigner软件。
3.如权利要求2所述的基于BIM技术的铁路路基工程设计方法,其特征在于,
步骤a中,所述读取路线信息要素,导入三维建模软件并生成铁路路线模型,具体包括:
从线路数据库MDB中读取线路的平面数据、纵断面数据和断链数据;
将平面数据和纵断面数据转换为对应的几何要素;
基于转换获得的几何要素,调用OpenRailDesigner软件接口生成线路几何;
通过里程与线路长度进行换算,将从MDB数据库中读出的断链信息,附加到对应线路从而创建线路信息模型。
4.如权利要求2所述的基于BIM技术的铁路路基工程设计方法,其特征在于,
步骤b中,所述路线设计参数包括:路线宽度、设计速度、线路个数、主线和线间距。
5.如权利要求2所述的基于BIM技术的铁路路基工程设计方法,其特征在于,
步骤d中,导入的所述路基横断面数据包括:横断面里程桩号、中桩高程、地层信息、地层线点集和坡面注释信息。
6.如权利要求5所述的基于BIM技术的铁路路基工程设计方法,其特征在于,
步骤d中所述向三维建模软件导入路基横断面数据,具体包括:
遍历地质数据中的所有里程桩号信息和中桩高程信息,生成端点列表;
从所述端点列表中的第一个端点开始遍历所有端点,生成地面点集列表;
从所述地面点集列表中的第一条线的点集开始,沿地质线的逻辑顺序,读取该地质断面中所有地层的属性,并将读取的属性和对应的属性值按照OpenRailDesigner软件可识别的数据格式存储为中间文件;
OpenRailDesigner软件读取所述中间文件,并按照中间文件中存储的属性及对应的属性值生成与地质数据对应的地层线列表,每一个地层线下包含该地质断面对应的所有点集及地层属性,OpenRailDesigner软件根据地质断面列表生成三维数据模型。
7.如权利要求2所述的基于BIM技术的铁路路基工程设计方法,其特征在于,
步骤f中,所述相应工程包括:支挡工程及其附属边坡防护工程、排水工程。
8.如权利要求7所述的基于BIM技术的铁路路基工程设计方法,其特征在于,
步骤f中,在选择创建工程命令后,通过调用预先建立的铁路路基工程数据库获取对应的工程构件数据,输入相应工程设计参数后快速创建相应的工程模型。
9.如权利要求8所述的基于BIM技术的铁路路基工程设计方法,其特征在于,
步骤f还包括:可根据工程设计需要修改相关参数,实现工程模型快速修改。
CN202010151117.5A 2020-03-05 2020-03-05 基于bim技术的铁路路基工程设计方法 Active CN111368437B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010151117.5A CN111368437B (zh) 2020-03-05 2020-03-05 基于bim技术的铁路路基工程设计方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010151117.5A CN111368437B (zh) 2020-03-05 2020-03-05 基于bim技术的铁路路基工程设计方法

Publications (2)

Publication Number Publication Date
CN111368437A true CN111368437A (zh) 2020-07-03
CN111368437B CN111368437B (zh) 2022-11-04

Family

ID=71210365

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010151117.5A Active CN111368437B (zh) 2020-03-05 2020-03-05 基于bim技术的铁路路基工程设计方法

Country Status (1)

Country Link
CN (1) CN111368437B (zh)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111967071A (zh) * 2020-07-30 2020-11-20 中交第二公路勘察设计研究院有限公司 路基横断面数据处理系统及其方法
CN112184883A (zh) * 2020-09-21 2021-01-05 中铁第四勘察设计院集团有限公司 铁路轨道的三维模型构建方法、电子设备及存储介质
CN112347213A (zh) * 2020-11-06 2021-02-09 中铁第一勘察设计院集团有限公司 基于bim+gis的铁路工程数字化成果三维展示方法
CN112580134A (zh) * 2020-12-10 2021-03-30 中铁第四勘察设计院集团有限公司 一种路基工程的设计方法、装置、设备和存储介质
CN112734922A (zh) * 2021-01-12 2021-04-30 中铁工程设计咨询集团有限公司 一种铁路路基的三维设计方法
CN112906096A (zh) * 2020-12-25 2021-06-04 四川省交通勘察设计研究院有限公司 一种公路工程设计数据重构解析的方法及系统
CN112948920A (zh) * 2021-02-03 2021-06-11 浙江交工集团股份有限公司 一种基于Revit平台的路基路面BIM模型快速建模方法及系统
CN113094802A (zh) * 2021-04-30 2021-07-09 中国电建集团中南勘测设计研究院有限公司 一种公路路基建模方法及系统
CN113190897A (zh) * 2021-04-09 2021-07-30 北京都市霍普建筑设计有限公司 一种工程建设总体结构设计辅助系统
CN114925506A (zh) * 2022-04-29 2022-08-19 中国铁路设计集团有限公司 一种站场路基面bim模型正向设计方法
CN115114716A (zh) * 2022-08-30 2022-09-27 中国铁路设计集团有限公司 一种基于bim的地铁盾构区间联络通道预拼装方法

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102385657A (zh) * 2011-11-18 2012-03-21 铁道第三勘察设计院集团有限公司 虚拟现实环境下高速铁路路基三维参数化建模方法
CN102651045A (zh) * 2012-04-06 2012-08-29 铁道第三勘察设计院集团有限公司 铁路多线线路三维可视化方法
CN104631826A (zh) * 2015-01-21 2015-05-20 中国十七冶集团有限公司 一种基于bim模型的施工总平面布置方法
CN105279792A (zh) * 2015-10-13 2016-01-27 铁道第三勘察设计院集团有限公司 基于地形曲面的铁路路基排水bim设计方法
US20160125100A1 (en) * 2014-10-30 2016-05-05 IronCAD, LLC Auto-conversion mechanism for multiple three-dimensional object representations to facilitate collaboration
CN107729673A (zh) * 2017-10-30 2018-02-23 中建三局第建设工程有限责任公司 基于bim的道路桥梁实景模型分析方法、装置及其施工方法
CN107945264A (zh) * 2017-11-17 2018-04-20 中国铁路设计集团有限公司 路基三维建模方法
CN107974945A (zh) * 2017-12-07 2018-05-01 中国十九冶集团有限公司 基于变截面刚构桥连续梁悬臂浇筑施工的bim建模方法
CN108108566A (zh) * 2018-01-02 2018-06-01 河南省交通规划设计研究院股份有限公司 基于bim的公路隧道设计方法
CN108550086A (zh) * 2018-04-13 2018-09-18 北京市轨道交通设计研究院有限公司 一种暗挖车站施工进度的识别方法及系统
CN110210120A (zh) * 2019-05-30 2019-09-06 北京工业大学 基于参数化的铁路工程自动化建模方法
CN110362887A (zh) * 2019-06-27 2019-10-22 中铁四局集团有限公司 一种基于Revit的快速建模方法

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102385657A (zh) * 2011-11-18 2012-03-21 铁道第三勘察设计院集团有限公司 虚拟现实环境下高速铁路路基三维参数化建模方法
CN102651045A (zh) * 2012-04-06 2012-08-29 铁道第三勘察设计院集团有限公司 铁路多线线路三维可视化方法
US20160125100A1 (en) * 2014-10-30 2016-05-05 IronCAD, LLC Auto-conversion mechanism for multiple three-dimensional object representations to facilitate collaboration
CN104631826A (zh) * 2015-01-21 2015-05-20 中国十七冶集团有限公司 一种基于bim模型的施工总平面布置方法
CN105279792A (zh) * 2015-10-13 2016-01-27 铁道第三勘察设计院集团有限公司 基于地形曲面的铁路路基排水bim设计方法
CN107729673A (zh) * 2017-10-30 2018-02-23 中建三局第建设工程有限责任公司 基于bim的道路桥梁实景模型分析方法、装置及其施工方法
CN107945264A (zh) * 2017-11-17 2018-04-20 中国铁路设计集团有限公司 路基三维建模方法
CN107974945A (zh) * 2017-12-07 2018-05-01 中国十九冶集团有限公司 基于变截面刚构桥连续梁悬臂浇筑施工的bim建模方法
CN108108566A (zh) * 2018-01-02 2018-06-01 河南省交通规划设计研究院股份有限公司 基于bim的公路隧道设计方法
CN108550086A (zh) * 2018-04-13 2018-09-18 北京市轨道交通设计研究院有限公司 一种暗挖车站施工进度的识别方法及系统
CN110210120A (zh) * 2019-05-30 2019-09-06 北京工业大学 基于参数化的铁路工程自动化建模方法
CN110362887A (zh) * 2019-06-27 2019-10-22 中铁四局集团有限公司 一种基于Revit的快速建模方法

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
刘厚强等: "基于 BIM 的三维铁路路基建模应用研究", 《铁道标准设计》 *
徐博: "基于BIM技术的铁路工程正向设计方法研究", 《铁道标准设计》 *
杨文成: "基于BIM设计的道岔设备建模方法研究", 《铁道勘察》 *
薛宇腾等: "基于BIM的铁路路基三维建模方法研究", 《铁道勘察》 *

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111967071A (zh) * 2020-07-30 2020-11-20 中交第二公路勘察设计研究院有限公司 路基横断面数据处理系统及其方法
CN111967071B (zh) * 2020-07-30 2024-02-02 中交第二公路勘察设计研究院有限公司 路基横断面数据处理系统及其方法
CN112184883A (zh) * 2020-09-21 2021-01-05 中铁第四勘察设计院集团有限公司 铁路轨道的三维模型构建方法、电子设备及存储介质
CN112347213A (zh) * 2020-11-06 2021-02-09 中铁第一勘察设计院集团有限公司 基于bim+gis的铁路工程数字化成果三维展示方法
CN112580134A (zh) * 2020-12-10 2021-03-30 中铁第四勘察设计院集团有限公司 一种路基工程的设计方法、装置、设备和存储介质
CN112580134B (zh) * 2020-12-10 2022-05-13 中铁第四勘察设计院集团有限公司 一种路基工程的设计方法、装置、设备和存储介质
CN112906096B (zh) * 2020-12-25 2021-09-07 四川省交通勘察设计研究院有限公司 一种公路工程设计数据重构解析的方法及系统
CN112906096A (zh) * 2020-12-25 2021-06-04 四川省交通勘察设计研究院有限公司 一种公路工程设计数据重构解析的方法及系统
CN112734922A (zh) * 2021-01-12 2021-04-30 中铁工程设计咨询集团有限公司 一种铁路路基的三维设计方法
CN112948920A (zh) * 2021-02-03 2021-06-11 浙江交工集团股份有限公司 一种基于Revit平台的路基路面BIM模型快速建模方法及系统
CN113190897A (zh) * 2021-04-09 2021-07-30 北京都市霍普建筑设计有限公司 一种工程建设总体结构设计辅助系统
CN113094802A (zh) * 2021-04-30 2021-07-09 中国电建集团中南勘测设计研究院有限公司 一种公路路基建模方法及系统
CN114925506A (zh) * 2022-04-29 2022-08-19 中国铁路设计集团有限公司 一种站场路基面bim模型正向设计方法
CN114925506B (zh) * 2022-04-29 2024-03-22 中国铁路设计集团有限公司 一种站场路基面bim模型正向设计方法
CN115114716A (zh) * 2022-08-30 2022-09-27 中国铁路设计集团有限公司 一种基于bim的地铁盾构区间联络通道预拼装方法

Also Published As

Publication number Publication date
CN111368437B (zh) 2022-11-04

Similar Documents

Publication Publication Date Title
CN111368437B (zh) 基于bim技术的铁路路基工程设计方法
CN109538237B (zh) 一种基于obm的公路隧道设计方法
CN103699731B (zh) 一种铁道工程真实场景模型协同设计平台的构建方法
KR102062057B1 (ko) 철도 인프라 3d 모델링 장치 및 방법
CN105279792B (zh) 基于地形曲面的铁路路基排水bim设计方法
CN101872376B (zh) 真三维道路智能设计方法及系统
CN112948920B (zh) 一种基于Revit平台的路基路面BIM模型快速建模方法及系统
CN111428306A (zh) 一种道路精细化设计方法
CN109711052A (zh) 基于Revit+Dynamo的隧道模型创建方法
US9529944B2 (en) Corridor modeling system, apparatus, and method
CN105138788A (zh) 一种道路三维模型全参数化建立方法
CN106649912A (zh) 一种地铁隧道盾构下穿既有铁路设施的沉降预测方法
CN112906096B (zh) 一种公路工程设计数据重构解析的方法及系统
CN102385657A (zh) 虚拟现实环境下高速铁路路基三维参数化建模方法
CN112231799A (zh) 基于bim的铁路智能选线走向方案快速建模方法
CN112733247A (zh) 一种大型项目上场策划的方法
CN104314015B (zh) 铁路路基排水平纵横协同设计方法
CN112069571B (zh) 一种基于三维实景的绿色矿山立体规划方法
CN105825003A (zh) 一种GeoDesign支持下的农地整理规划智能化设计方法
Berdigylyjov et al. The implementation and role of geotechnical data in BIM process
CN109447437B (zh) 一种包含土石方调配的公(铁)路纵断面自动构建方法
CN113177251B (zh) 一种基于bim+gis平台的公路设计数据协同管理方法及管理系统
CN107563076B (zh) 铁路线路安全保护区自动设计方法
CN108170921B (zh) 隧道辅助坑道线位选择的bim设计方法
KR100777373B1 (ko) 3차원 객체와 일정을 연계한 토목공사 시설물의 4차원 건설공사 공정관리시스템의 구현방법

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant