CN1113529A - 水下钢模就位下沉现浇构件的施工工艺 - Google Patents

水下钢模就位下沉现浇构件的施工工艺 Download PDF

Info

Publication number
CN1113529A
CN1113529A CN 95102330 CN95102330A CN1113529A CN 1113529 A CN1113529 A CN 1113529A CN 95102330 CN95102330 CN 95102330 CN 95102330 A CN95102330 A CN 95102330A CN 1113529 A CN1113529 A CN 1113529A
Authority
CN
China
Prior art keywords
underwater
construction
situ
punching block
cast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 95102330
Other languages
English (en)
Other versions
CN1107148C (zh
Inventor
冯毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 95102330 priority Critical patent/CN1107148C/zh
Publication of CN1113529A publication Critical patent/CN1113529A/zh
Application granted granted Critical
Publication of CN1107148C publication Critical patent/CN1107148C/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

本发明提供了一种水下结构物的施工工艺,采取 钢筋混凝土构件在设计现场逐步浇注、逐步就位下沉 直至设计基面,就位后的水下构件钢模可水下灌注, 也可干法现浇钢筋混凝土构件。可免去在水中的筑 岛工程,免除预制场专用运输道路及大型浮吊、大型 方驳等制约条件,使工程量大大减少施工工期缩短, 并可回收大部分水下钢模,工程造价降低,施工难度 不大,具有一般水工施工能力的施工企业均可独立施 工。

Description

本发明涉及一种水下结构物的施工工艺,尤其是一种水下钢模就位下沉现浇大型水下钢筋混凝土构件的施工工艺。
目前,对水下结构物的施工方法往往有两种:
1、通过河流或其他水域桥梁的桥墩,往往采用大型钢筋混凝土沉井作墩基。沉井墩基的制作与施工工艺,一般是先在计划桥墩位置的河中水域处筑岛,筑岛方法一般有石笼围堰填心、麻袋围堰填心和钢板围堰填心而成。桥墩墩基沉井在筑岛上立架支模后,分层浇制钢筋混凝土井筒,待钢筋混凝土井筒养护至设计强度后,即在井筒内抽水干挖或带水吸排开挖下沉,直至设计标高。该沉井制作与施工工艺较复杂,需要筑岛工程,有时因筑岛体积过大而引起流速加大,缩窄航宽而影响航行安全,在筑岛上浇筑钢筋混凝土沉井时,需搭设高架支模,施工难度大,竣工后要清除筑岛临时建筑物,工程造价高。
2、目前内河、沿海修建大型深水码头泊位,由于其相对造价较低而采用大型空心钢筋混凝土圆筒或空心方块作档土重力结构,这种以大圆筒或空心方块作靠船泊位和档土墙码头构件的制作与施工工艺流程是:①首先修建较大面积大构件予制场和从予制场至可靠船码头(或临时可靠船的海岸边缘)的专用运输道路→②在予制场分批浇筑制作大圆筒(每个约200吨),并养护至设计吊装强度→③用水垫器或大型门式吊机经专用运输道路将大圆筒分批运至可靠船的码头→④用大型浮吊将大圆筒从岸上分批吊上大驳船→⑤最后由驳船分批运至新建泊位现场用大型浮吊将大圆筒吊起就位下沉安装至经挖槽、抛石、夯实和整平的基床上。上述大型空心大圆筒构件,由于其体积与重量大,除了需要修建或具备构件予制场及专用运输道路,其临时设施投资大以外,构件浇制时需搭设高架支模,而且要具备大型陆上搬运和大型浮吊、大型方驳等设备,施工环节多,工期长,技术要求高,施工难度大,目前只有少数大型水工施工企业单位才能独立承担施工任务。要进一步缩短码头建设周期和降低工程造价,受到制约的条件难以解决。
本发明的目的是提供一种可免去在水中筑岛工程,免除予制场、专用运输道路,及大型浮吊、大型驳船的条件,采用设计现场逐步浇注、逐步就位下沉,构件钢模可在水下拆除回收,施工工期短,工程造价低的水下钢模就位下沉现浇构件的施工工艺。
本发明的工艺方法及原理为:
根据钢筋混凝土沉井、空心大圆筒、空心大方块的设计尺寸与几何形状,用数个小方驳拼装成水上施工与安装平台(可载重30~90吨即可)。在施工时,首先在水上施工平台的周边焊接制作上述构件下部钢模,并通过滑轮组、吊具、钢丝绳等令构件钢模与水上施工平台周边数台小型卷扬机(1.5~3吨)连系,然后将钢模整体吊入水下,由于钢模为水密结构,在水下有相当大的浮力,而且整个构件水密钢模由水上施工平台的卷扬机悬吊状态,届时即可通过浮力+吊力与重力平衡计算,逐步分节拼装加高钢模,分节现浇构件,分节下沉直至将钢模下沉至设计基面及全部完成钢筋混凝土构件现浇,最后在水下拆除回收大部分钢模。其施工工艺流程示意如下:
①水上方驳施工安装平台连结制作→②构件下部水密钢模制作安装→③水上施工平台周边的卷扬机悬吊构件钢模,并将钢模吊入水上施工平台外侧水中→④继续在水上平台拼装加高构件钢模→⑤在水面就位现浇一节钢筋混凝土构件,并将钢模通过平台卷扬机下沉一节钢模→重量④与⑤流程,直到构件现浇至设计要求→⑥水下拆除回收大部分钢模(详见附图所示)。即采用钢筋混凝土构件在设计现场逐步浇筑,逐步就位下沉直至设计基面,构件钢模可在水下拆除回收,就位后的水下构件钢模可水下灌注,也可干法现浇钢筋混凝土构件。
图1为本发明的沉井水上现浇制作结构示意图。
图2为本发明的沉井水上现浇制作结构俯视图。
图3为本发明的大圆筒水上现浇制作结构示意图。
图4为本发明的大圆筒水上现浇制作结构俯视图。
图中:1为水上现浇混凝土漏斗,2为水上施工平台,3为卷扬机,4为水面,5为钢筋混凝土,6为水下钢模,7为基床面,8为滑轮组。
当本发明应用于桥墩或在水域中供水泵房的沉井施工时,具有如下优点:
1、可免去在河中或其他水域处筑岛工程,而且由于沉井直接插至河床,可免除由筑岛面至河底的下沉开挖工程量,预计工程造价可降低20~30%。
2、可回收的大部分水下钢模,可提前在现场或在工厂制作,预计可缩短工期50%。
3、减少施工对通航的干扰。
当本发明应用于内河或沿海码头大型空心圆筒或空心方块的制作和安装施工时,具有如下优点:
1、在可免除空心大圆筒或空心大方块制作的予制场专用运输道路和大型浮吊,大型驳船的条件,也可现场制作安装大型水下钢筋混凝土构件,予计可降低工程造价30%以上。
2、构件水下钢模可回收80%以上,可提前于现场或工厂制作后运至现场安装,予计可缩短工期30%以上。
3、具有一般水工施工能力的施工企业(无需大型企业),均可参与冲毁和独立承包施工,有利于降低工程造价与缩短码头建筑周期。

Claims (1)

1、一种水下钢模就位下沉现浇构件的施工工艺,采用构件钢模逐层浇注的方法,其特征在于:钢筋混凝土构件在设计现场逐步浇筑,逐步就位下沉直至设计基面,构件钢模可在水下拆除回收,就位后的水下构件钢模可水下灌注,也可干法现浇钢筋混凝土构件。
CN 95102330 1995-04-04 1995-04-04 水下钢模就位下沉现浇构件的施工工艺 Expired - Fee Related CN1107148C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 95102330 CN1107148C (zh) 1995-04-04 1995-04-04 水下钢模就位下沉现浇构件的施工工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 95102330 CN1107148C (zh) 1995-04-04 1995-04-04 水下钢模就位下沉现浇构件的施工工艺

Publications (2)

Publication Number Publication Date
CN1113529A true CN1113529A (zh) 1995-12-20
CN1107148C CN1107148C (zh) 2003-04-30

Family

ID=5074272

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 95102330 Expired - Fee Related CN1107148C (zh) 1995-04-04 1995-04-04 水下钢模就位下沉现浇构件的施工工艺

Country Status (1)

Country Link
CN (1) CN1107148C (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1318703C (zh) * 2003-10-31 2007-05-30 上海建工(集团)总公司 蜂窝半蜂窝状自浮套箱
CN103088844A (zh) * 2013-03-04 2013-05-08 济南城建集团有限公司 钢筋混凝土检查井整体预制吊装施工方法
CN103924595A (zh) * 2014-04-25 2014-07-16 安徽省高速公路控股集团有限公司 一种空心管柱水下浇筑自浮式内模系统及其应用
CN106948356A (zh) * 2017-04-19 2017-07-14 中铁大桥局集团第六工程有限公司 一种陆域钢筋混凝土沉井底节接高方法
CN111691447A (zh) * 2020-05-27 2020-09-22 武汉建策工程咨询有限公司 用于沉管隧道管顶减载的缓沉式沉箱施工方法

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1318703C (zh) * 2003-10-31 2007-05-30 上海建工(集团)总公司 蜂窝半蜂窝状自浮套箱
CN103088844A (zh) * 2013-03-04 2013-05-08 济南城建集团有限公司 钢筋混凝土检查井整体预制吊装施工方法
CN103088844B (zh) * 2013-03-04 2015-04-08 济南城建集团有限公司 钢筋混凝土检查井整体预制吊装施工方法
CN103924595A (zh) * 2014-04-25 2014-07-16 安徽省高速公路控股集团有限公司 一种空心管柱水下浇筑自浮式内模系统及其应用
CN103924595B (zh) * 2014-04-25 2016-01-20 安徽省交通控股集团有限公司 一种空心管柱水下浇筑自浮式内模系统
CN106948356A (zh) * 2017-04-19 2017-07-14 中铁大桥局集团第六工程有限公司 一种陆域钢筋混凝土沉井底节接高方法
CN111691447A (zh) * 2020-05-27 2020-09-22 武汉建策工程咨询有限公司 用于沉管隧道管顶减载的缓沉式沉箱施工方法

Also Published As

Publication number Publication date
CN1107148C (zh) 2003-04-30

Similar Documents

Publication Publication Date Title
CN101245603B (zh) 浮式拱围堰及其施工方法
CN102720140B (zh) 大跨度预应力砼连续梁深水桥墩施工工艺
CN101476326B (zh) 一种承台预制及施工方法
US20220002961A1 (en) Suction Anchors and Their Methods of Manufacture
CN101538833B (zh) 竖向分条双壁钢围堰止水施工工法
KR101211811B1 (ko) 조립케이슨을 이용한 현장타설말뚝
CN102561371A (zh) 岛遂结合部钢沉箱围护结构
CN104878779B (zh) 沉管隧道碎石基床覆盖式防淤盖板、防淤系统及施工方法
CN104294749A (zh) 一种圆筒基础栈桥结构的安装方法
CN1107148C (zh) 水下钢模就位下沉现浇构件的施工工艺
CN214401781U (zh) 适用于大吨位水中钢管桩清除装置的握裹机构
CN201649036U (zh) 建码头用的管桩平台
CN206512730U (zh) 一种可以实现吊箱壁体周转使用的吊箱
KR101031571B1 (ko) 분리형 우물통 시공방법
CN203583509U (zh) 深水用吸力式重力基础及其深水安装装置
CN1020203C (zh) 河港工程结构件的制造方法和装备
CN110984003B (zh) 一种跨河桥梁下部桥墩及承台的拆除方法
CN87103253A (zh) 沉井和沉箱工程的现场悬吊施工方法
CN104047276B (zh) 一种格型钢板桩大圆筒主格板桩1/4圆筒现场拼接方法
CN109403325B (zh) 大直径钢混组合圆筒分散式多沉井基础及其施工方法
JP4602840B2 (ja) 作業用静穏水域の形成方法
CN110130232A (zh) 一种桥墩整体刚度增强以及桩基加固的方法
JP3308958B2 (ja) 埋立用構造物の構築工法および型枠台船
CN216839516U (zh) 一种适用于水下复杂地质情况的无底钢套箱围堰
JP2001003332A (ja) ケーソン沈設方法とケーソン沈設用フロータ

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee