CN111335640A - Construction method for preventing guide wall from sputtering floating slurry - Google Patents
Construction method for preventing guide wall from sputtering floating slurry Download PDFInfo
- Publication number
- CN111335640A CN111335640A CN202010195446.XA CN202010195446A CN111335640A CN 111335640 A CN111335640 A CN 111335640A CN 202010195446 A CN202010195446 A CN 202010195446A CN 111335640 A CN111335640 A CN 111335640A
- Authority
- CN
- China
- Prior art keywords
- guide wall
- thin paper
- plastic thin
- concrete
- adhesive tape
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/02—Conveying or working-up concrete or similar masses able to be heaped or cast
Abstract
The invention discloses a construction method for preventing a guide wall from sputtering laitance, and belongs to the technical field of building construction. The method comprises the following steps: the method comprises the following steps: after a concrete construction joint is formed, a double-faced adhesive tape is pasted along the edge of the construction joint before formwork erection; step two: sticking a layer of plastic thin paper on the double-faced adhesive tape to enable the screw on the lower guide wall to penetrate through the plastic thin paper; step three: when a formwork is erected, the formwork deviates 250-300 mm towards the lower guide wall and is continuously reinforced by using a screw of the lower guide wall; step four: and after the concrete pouring is finished, taking down the plastic thin paper. According to the invention, the double faced adhesive tape is pasted on the edge of the concrete construction joint, and the plastic thin paper layer is pasted on the double faced adhesive tape, so that the plastic thin paper can be vertically downward to support the formwork, and the laitance can be splashed onto the plastic thin paper when the concrete is poured.
Description
Technical Field
The invention relates to the technical field of building construction, in particular to a construction method for preventing a guide wall from sputtering laitance.
Background
The floating slurry is a layer of slurry floating on the surface of concrete after the concrete is cast and molded, generally, particles deposited on the surface along with water secretion in the concrete with large water cement and poor working performance consist of hydrated and condensed cement and fine particles in sand, contain a large amount of water, and a porous loose layer is left after the water is evaporated. The surface of the concrete is easy to cause sand and crack, the strength and the impermeability of the concrete are affected, when the concrete needs to be continuously poured or jointed, the concrete needs to be removed to strengthen the adhesion between the newly poured concrete and the previously poured concrete, and the lower guide wall needs to avoid slurry leakage and slurry sputtering so as not to affect the engineering quality.
Disclosure of Invention
1. Technical problem to be solved by the invention
The construction method can effectively avoid the laitance generated by pouring the concrete while not influencing the attaching degree of the template and reduce the labor cost generated by later cleaning.
2. Technical scheme
In order to achieve the purpose, the technical scheme provided by the invention is as follows:
the invention relates to a construction method for preventing a guide wall from sputtering floating slurry, which comprises the following steps:
the method comprises the following steps: after a concrete construction joint is formed, a double-faced adhesive tape is pasted along the edge of the construction joint before formwork erection;
step two: sticking a layer of plastic thin paper on the double-faced adhesive tape to enable the screw on the lower guide wall to penetrate through the plastic thin paper;
step three: when a formwork is erected, the formwork deviates 250-300 mm towards the lower guide wall and is continuously reinforced by using a screw of the lower guide wall;
step four: and after the concrete pouring is finished, taking down the plastic thin paper.
3. Advantageous effects
Compared with the prior art, the technical scheme provided by the invention has the following beneficial effects:
according to the invention, the double faced adhesive tape is pasted on the edge of the concrete construction joint, and the plastic thin paper layer is pasted on the double faced adhesive tape, so that the plastic thin paper can be vertically downward to support the formwork, and the laitance can be splashed onto the plastic thin paper when the concrete is poured.
Drawings
FIG. 1 is a plan view of a double-sided adhesive tape application location of the present invention;
FIG. 2 is a perspective view of a double-sided adhesive tape applying position of the present invention;
FIG. 3 is a plan view of a plastic tissue application location of the present invention;
FIG. 4 is a perspective view of a plastic tissue application site of the present invention;
FIG. 5 is a plan view of the screw mounting position of the present invention;
FIG. 6 is a perspective view of the screw mounting location of the present invention;
fig. 7 is a partial sectional view of the screw installation of the present invention.
Detailed Description
The invention is further described with reference to the following figures and examples:
example 1
As can be seen from fig. 1-2, the construction method for preventing the guide wall from sputtering floating slurry of the embodiment includes the steps of:
the method comprises the following steps: as can be seen from fig. 1-2, the position a in the figure is the installation position of the double faced adhesive tape, after the concrete construction joint is formed, the double faced adhesive tape is pasted along the edge of the construction joint before the formwork is erected;
step two: 3-4, the position B is the plastic tissue installation position, and a layer of plastic tissue is adhered to the double-faced adhesive tape, so that the screw on the lower guide wall passes through the plastic tissue;
step three: as can be seen from fig. 5-7, the position C in the figure is the screw installation position, and when the formwork is supported, the formwork deviates 250 mm-300 mm from the lower guide wall and is continuously reinforced by using the screws of the lower guide wall;
step four: and after the concrete pouring is finished, taking down the plastic thin paper.
The concrete construction joints are kept at positions where the structure is less stressed and convenient to construct, and when the horizontal construction joints are arranged in layers, the positions and the interval time of the horizontal construction joints are determined according to the temperature crack control requirement in the concrete pouring process, the concrete supply capacity, the construction of the steel bar engineering, the installation of embedded pipes and other factors except that the horizontal construction joints meet the design requirement.
According to the invention, the double faced adhesive tape is pasted on the edge of the concrete construction joint, and the plastic thin paper layer is pasted on the double faced adhesive tape, so that the plastic thin paper can be vertically downward to support the formwork, and the laitance can be splashed onto the plastic thin paper when the concrete is poured.
The present invention and its embodiments have been described above schematically, without limitation, and what is shown in the drawings is only one of the embodiments of the present invention, and the actual structure is not limited thereto. Therefore, if the person skilled in the art receives the teaching, without departing from the spirit of the invention, the person skilled in the art shall not inventively design the similar structural modes and embodiments to the technical solution, but shall fall within the scope of the invention.
Claims (1)
1. A construction method for avoiding guide wall sputtering laitance is characterized in that: the method comprises the following steps:
the method comprises the following steps: after a concrete construction joint is formed, a double-faced adhesive tape is pasted along the edge of the construction joint before formwork erection;
step two: sticking a layer of plastic thin paper on the double-faced adhesive tape to enable the screw on the lower guide wall to penetrate through the plastic thin paper;
step three: when a formwork is erected, the formwork deviates 250-300 mm towards the lower guide wall and is continuously reinforced by using a screw of the lower guide wall;
step four: and after the concrete pouring is finished, taking down the plastic thin paper.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010195446.XA CN111335640A (en) | 2020-03-19 | 2020-03-19 | Construction method for preventing guide wall from sputtering floating slurry |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010195446.XA CN111335640A (en) | 2020-03-19 | 2020-03-19 | Construction method for preventing guide wall from sputtering floating slurry |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111335640A true CN111335640A (en) | 2020-06-26 |
Family
ID=71182515
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010195446.XA Pending CN111335640A (en) | 2020-03-19 | 2020-03-19 | Construction method for preventing guide wall from sputtering floating slurry |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111335640A (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107859260A (en) * | 2017-10-31 | 2018-03-30 | 浙江品宏涂装有限公司 | A kind of wall surface spraying technique |
CN108532631A (en) * | 2018-05-28 | 2018-09-14 | 中国十七冶集团有限公司 | Formwork reinforcement structure and construction method at a kind of underground pipe gallery horizontal construction joint |
CN109137885A (en) * | 2018-10-16 | 2019-01-04 | 中铁二十二局集团轨道工程有限公司 | A kind of construction method of underground continuous wall |
CN110512656A (en) * | 2019-07-12 | 2019-11-29 | 中冶天工集团有限公司 | A kind of waterproofing node method at outer wall of underground structure formwork erection and construction joint |
-
2020
- 2020-03-19 CN CN202010195446.XA patent/CN111335640A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107859260A (en) * | 2017-10-31 | 2018-03-30 | 浙江品宏涂装有限公司 | A kind of wall surface spraying technique |
CN108532631A (en) * | 2018-05-28 | 2018-09-14 | 中国十七冶集团有限公司 | Formwork reinforcement structure and construction method at a kind of underground pipe gallery horizontal construction joint |
CN109137885A (en) * | 2018-10-16 | 2019-01-04 | 中铁二十二局集团轨道工程有限公司 | A kind of construction method of underground continuous wall |
CN110512656A (en) * | 2019-07-12 | 2019-11-29 | 中冶天工集团有限公司 | A kind of waterproofing node method at outer wall of underground structure formwork erection and construction joint |
Non-Patent Citations (1)
Title |
---|
杜福祥等: "成都来福士广场浅色饰面清水混凝土结构成品保护技术", 《施工技术》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110607809B (en) | Waterproof construction method for basement of building engineering | |
CN207499403U (en) | A kind of FS composite thermal-insulating exterior formworks system | |
CN106436893A (en) | Fully-prefabricated structure and construction method thereof | |
CN101831985A (en) | Precast concrete wallboard and preparation method thereof | |
CN104032771B (en) | Attractive joint anti-crack construction method set up by a kind of underground structure | |
CN101818541A (en) | Precast composite wallboard with door/window holes and manufacturing method thereof | |
CN206220238U (en) | Fully-prefabricated assembled structure | |
CN112252462A (en) | Construction method of concrete roof layer waterproof structure | |
CN110056097A (en) | A kind of fiberglass gridding ultra-high performance concrete heat preservation decoration integrative assembling type outer wall plate | |
CN209397803U (en) | A kind of removable steel bar girder laminated floor slab of UHPC ultra-high performance concrete | |
CN207685961U (en) | Spliced gutter based on bellows | |
CN113529982A (en) | Deformation joint waterproof construction method | |
CN111335640A (en) | Construction method for preventing guide wall from sputtering floating slurry | |
CN204326522U (en) | Insulation protection integrated non-dismantling formwork | |
CN112112295A (en) | Reinforcing construction method for post-cast strip of post-sealed outer wall | |
CN103572786A (en) | Pile head joint waterproof processing device and construction method thereof | |
CN110629801A (en) | Construction method using vertical mold as base surface of pre-paved anti-sticking self-adhesive waterproof roll | |
CN109518769A (en) | A kind of method and structure using PVC waterstop joint installation sewer pipe | |
CN211229512U (en) | Formwork and formwork base body for pouring clear water concrete column | |
CN218990501U (en) | Bathroom water stop ridge structure | |
CN219808506U (en) | Waterproof structure of prefabricated side fascia horizontal joint of assembled building | |
CN219952281U (en) | Water stop ridge with anti-leakage reinforced structure | |
CN220504284U (en) | Prevent support template roof exempts from of fracture | |
CN215889364U (en) | Accurate positioning device for beam and plate reserved vertical hole of construction building | |
CN109441060A (en) | Tolerant noise-insulating warm-keeping composite pad |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20200626 |