CN111290323A - Equipment monitoring system and method - Google Patents
Equipment monitoring system and method Download PDFInfo
- Publication number
- CN111290323A CN111290323A CN202010087925.XA CN202010087925A CN111290323A CN 111290323 A CN111290323 A CN 111290323A CN 202010087925 A CN202010087925 A CN 202010087925A CN 111290323 A CN111290323 A CN 111290323A
- Authority
- CN
- China
- Prior art keywords
- equipment
- information
- abnormal
- processing terminal
- electricity utilization
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/04—Programme control other than numerical control, i.e. in sequence controllers or logic controllers
- G05B19/048—Monitoring; Safety
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Automation & Control Theory (AREA)
- Alarm Systems (AREA)
Abstract
The invention discloses an equipment monitoring system and a method, wherein the equipment monitoring system comprises a monitoring device and a processing end, the monitoring device is used for acquiring power utilization information of electric equipment in an area and transmitting the power utilization information of all the electric equipment to the processing end, and the power utilization information comprises address information and equipment information of the electric equipment; the processing terminal is used for analyzing all the electricity utilization information to obtain the electricity utilization equipment with abnormal electricity utilization, and generating an abnormal report according to the address information and the equipment information of the electricity utilization equipment with abnormal electricity utilization, wherein the abnormal report comprises the address information, the equipment information and abnormal data of the electricity utilization equipment with abnormal electricity utilization. The equipment monitoring system and the equipment monitoring method can improve the intellectualization of the park, enable the equipment of the park to be better monitored and maintained, reduce the labor cost and improve the management and control capability of the park.
Description
Technical Field
The invention relates to a device monitoring system and a device monitoring method.
Background
A park refers to a standard building or group of buildings that is generally planned and constructed by governments (private enterprises and government cooperation), has complete water supply, power supply, gas supply, communication, roads, storage and other supporting facilities, is reasonable in layout and can meet the requirements of production and scientific experiments in a certain specific industry, and comprises: industrial parks, logistics parks, metropolitan industrial parks, scientific and technological parks, creative parks, and the like.
In the prior art, various electric equipment needs to be equipped in a park, and the management and the maintenance of the electric equipment are difficult.
Disclosure of Invention
The technical problem to be solved by the invention is to overcome the defect that the management and maintenance of electric equipment in a park are difficult in the prior art, and provide an equipment monitoring system and method which can improve the intellectualization of the park, enable the equipment in the park to be better monitored and maintained, reduce the labor cost and improve the management and control capability of the park.
The invention solves the technical problems through the following technical scheme:
the equipment monitoring system is characterized by comprising a monitoring device and a processing end,
the monitoring device is used for acquiring power utilization information of electric equipment in an area and transmitting the power utilization information of all the electric equipment to the processing end, and the power utilization information comprises address information and equipment information of the electric equipment;
the processing terminal is used for analyzing all the electricity utilization information to obtain the electricity utilization equipment with abnormal electricity utilization, and generating an abnormal report according to the address information and the equipment information of the electricity utilization equipment with abnormal electricity utilization, wherein the abnormal report comprises the address information, the equipment information and abnormal data of the electricity utilization equipment with abnormal electricity utilization.
Preferably, the first and second liquid crystal films are made of a polymer,
the processing end is also used for matching a contact according to the abnormal report;
and the processing terminal is used for sending the abnormal report to the communication terminal corresponding to the contact person.
Preferably, the first and second liquid crystal films are made of a polymer,
the processing terminal is used for acquiring a contact list corresponding to an address information recording address according to the address information of the abnormal report;
and the processing terminal is used for matching the corresponding contact in the contact list according to the equipment information of the abnormal report and the current time.
Preferably, the first and second liquid crystal films are made of a polymer,
the communication terminal is used for sending positioning information to the processing terminal;
the processing terminal is used for receiving the positioning information and recording the receiving time;
the processing terminal is also used for adding the communication terminal for sending the positioning information into the contact list according to the position recorded in the positioning information;
the processing terminal is further configured to determine whether the abnormal report generation time is within a preset time period, if so, search a contact corresponding to a communication terminal whose abnormal report generation time is located at a position recorded in the positioning information in a contact list according to the receiving time, and if not, acquire a contact corresponding to a communication terminal located at a position recorded in the positioning information first from the abnormal report generation time.
Preferably, the electric equipment comprises an equipment group, the equipment group comprises a plurality of sub-equipment, the models of the sub-equipment are the same and the sub-equipment are connected in parallel,
the monitoring device is used for acquiring the power of the equipment group;
the processing end is used for calculating whether the power of the equipment group is smaller than the rated power, and if so, the equipment group is judged to be abnormal power utilization equipment.
The invention also provides an equipment monitoring method, which is characterized in that the equipment monitoring system comprises a monitoring device and a processing end, and the equipment monitoring method comprises the following steps:
the monitoring device collects power utilization information of electric equipment in an area and transmits the power utilization information of all the electric equipment to the processing end, wherein the power utilization information comprises address information and equipment information of the electric equipment;
the processing terminal analyzes all the electricity utilization information to obtain the electricity utilization equipment with abnormal electricity utilization, and generates an abnormal report according to the address information and the equipment information of the electricity utilization equipment with abnormal electricity utilization, wherein the abnormal report comprises the address information, the equipment information and abnormal data of the electricity utilization equipment with abnormal electricity utilization.
Preferably, the device monitoring method includes:
the processing terminal matches a contact person according to the abnormal report;
and the processing terminal sends the abnormal report to a communication terminal corresponding to the contact person.
Preferably, the device monitoring method includes:
the processing terminal acquires a contact list corresponding to an address information recording address according to the address information of the abnormal report;
and the processing terminal matches the corresponding contact in the contact list according to the equipment information of the abnormal report and the current time.
Preferably, the device monitoring method includes:
the communication terminal sends positioning information to the processing terminal;
the processing terminal receives the positioning information and records the receiving time;
the processing terminal adds the communication terminal sending the positioning information to the contact list according to the position recorded in the positioning information;
and the processing terminal judges whether the abnormal report generation time is in a preset time period, if so, searches a contact corresponding to the communication terminal of which the abnormal report generation time is positioned at the position recorded in the positioning information in a contact list according to the receiving time, and if not, acquires the contact corresponding to the communication terminal of which the abnormal report generation time is positioned at the position recorded in the positioning information.
Preferably, the electric equipment comprises an equipment group, the equipment group comprises a plurality of sub-equipments, the models of the sub-equipments are the same and the sub-equipments are all connected in parallel, and the equipment monitoring method comprises the following steps:
the monitoring device collects the power of the equipment group;
and the processing end calculates whether the power of the equipment group is smaller than the rated power, and if so, the equipment group is judged to be abnormal power utilization equipment.
On the basis of the common knowledge in the field, the above preferred conditions can be combined randomly to obtain the preferred embodiments of the invention.
The positive progress effects of the invention are as follows:
the equipment monitoring system and the equipment monitoring method can improve the intellectualization of the park, enable the equipment of the park to be better monitored and maintained, reduce the labor cost and improve the management and control capability of the park.
Drawings
Fig. 1 is a flowchart of an apparatus monitoring method according to embodiment 1 of the present invention.
Fig. 2 is another flowchart of the device monitoring method according to embodiment 2 of the present invention.
Detailed Description
The invention is further illustrated by the following examples, which are not intended to limit the scope of the invention.
Example 1
The embodiment provides an equipment monitoring system, which comprises a monitoring device and a processing terminal. The processing side may be a desktop. The detection device can be an electric energy meter with a communication function or a small-sized electric energy detection device.
The monitoring device is used for collecting power utilization information of power utilization equipment in an area and transmitting the power utilization information of all the power utilization equipment to the processing end, and the power utilization information comprises address information and equipment information of the power utilization equipment.
The electricity information may include current, voltage, and amount of electricity in the present embodiment. The address information is used to locate the electric device, and may be an IP address or a real location.
The processing terminal is used for analyzing all the electricity utilization information to obtain the electricity utilization equipment with abnormal electricity utilization, and generating an abnormal report according to the address information and the equipment information of the electricity utilization equipment with abnormal electricity utilization; the abnormality report may describe power consumption device information indicating a power consumption abnormality.
The abnormal report comprises address information, equipment information and abnormal data of the electric equipment with abnormal electricity.
For the abnormal report, a manager can manually distribute the abnormal report to maintenance personnel, but the manual distribution is difficult for the unified management of a plurality of parks, and the application provides the equipment monitoring system for automatically distributing the work order.
The processing end is also used for matching a contact according to the abnormal report;
and the processing terminal is used for sending the abnormal report to the communication terminal corresponding to the contact person.
Further, the air conditioner is provided with a fan,
the processing terminal is used for acquiring a contact list corresponding to an address information recording address according to the address information of the abnormal report;
and the processing terminal is used for matching the corresponding contact in the contact list according to the equipment information of the abnormal report and the current time.
The communication terminal is used for sending positioning information to the processing terminal;
the processing terminal is used for receiving the positioning information and recording the receiving time;
the processing terminal is also used for adding the communication terminal for sending the positioning information into the contact list according to the position recorded in the positioning information;
the processing terminal is further configured to determine whether the abnormal report generation time is within a preset time period, if so, search a contact corresponding to a communication terminal whose abnormal report generation time is located at a position recorded in the positioning information in a contact list according to the receiving time, and if not, acquire a contact corresponding to a communication terminal located at a position recorded in the positioning information first from the abnormal report generation time.
The communication terminal of this application still has the attendance function, carries out the attendance to maintenance personal through uploading positional information and the image of shooting office position, and positional information can be used for carrying out classification management to the contact list, detects the shooting time that communication terminal uploaded the image and obtains communication terminal's attendance information after communication terminal reachs appointed garden. The communication terminal can be determined whether the communication terminal is located at the designated position of the park or not by identifying the shot object (such as shooting of the two-dimensional code) by using image identification, so that management of a manager is facilitated.
In addition, the electric equipment comprises an equipment group, the equipment group comprises a plurality of sub-equipment, the models of the sub-equipment are the same and the sub-equipment are connected in parallel,
the monitoring device is used for acquiring the power of the equipment group;
the processing end is used for calculating whether the power of the equipment group is smaller than the rated power, and if so, the equipment group is judged to be abnormal power utilization equipment.
Referring to fig. 1, with the above device monitoring system, the present embodiment further provides a device monitoring method, including:
and 102, the processing terminal sends the abnormal report to a communication terminal corresponding to the contact person, wherein the abnormal report comprises address information, equipment information and abnormal data of the abnormal power utilization equipment.
103, the processing end matches a contact person according to the abnormal report;
and 104, the processing terminal sends the abnormal report to the communication terminal corresponding to the contact person.
Step 103 specifically comprises:
the processing terminal acquires a contact list corresponding to an address information recording address according to the address information of the abnormal report;
and the processing terminal matches the corresponding contact in the contact list according to the equipment information of the abnormal report and the current time.
Further, the device monitoring method further includes:
the communication terminal sends positioning information to the processing terminal;
the processing terminal receives the positioning information and records the receiving time;
the processing terminal adds the communication terminal sending the positioning information to the contact list according to the position recorded in the positioning information;
the above steps may be performed in parallel with the device monitoring method.
Referring to fig. 2, step 103 specifically includes:
The preset time period is an on-duty time period in this embodiment.
While specific embodiments of the invention have been described above, it will be appreciated by those skilled in the art that these are by way of example only, and that the scope of the invention is defined by the appended claims. Various changes and modifications to these embodiments may be made by those skilled in the art without departing from the spirit and scope of the invention, and these changes and modifications are within the scope of the invention.
Claims (10)
1. An equipment monitoring system is characterized in that the equipment monitoring system comprises a monitoring device and a processing end,
the monitoring device is used for acquiring power utilization information of electric equipment in an area and transmitting the power utilization information of all the electric equipment to the processing end, and the power utilization information comprises address information and equipment information of the electric equipment;
the processing terminal is used for analyzing all the electricity utilization information to obtain the electricity utilization equipment with abnormal electricity utilization, and generating an abnormal report according to the address information and the equipment information of the electricity utilization equipment with abnormal electricity utilization, wherein the abnormal report comprises the address information, the equipment information and abnormal data of the electricity utilization equipment with abnormal electricity utilization.
2. The device monitoring system of claim 1,
the processing end is also used for matching a contact according to the abnormal report;
and the processing terminal is used for sending the abnormal report to the communication terminal corresponding to the contact person.
3. The device monitoring system of claim 2,
the processing terminal is used for acquiring a contact list corresponding to an address information recording address according to the address information of the abnormal report;
and the processing terminal is used for matching the corresponding contact in the contact list according to the equipment information of the abnormal report and the current time.
4. The device monitoring system of claim 3,
the communication terminal is used for sending positioning information to the processing terminal;
the processing terminal is used for receiving the positioning information and recording the receiving time;
the processing terminal is also used for adding the communication terminal for sending the positioning information into the contact list according to the position recorded in the positioning information;
the processing terminal is further configured to determine whether the abnormal report generation time is within a preset time period, if so, search a contact corresponding to a communication terminal whose abnormal report generation time is located at a position recorded in the positioning information in a contact list according to the receiving time, and if not, acquire a contact corresponding to a communication terminal located at a position recorded in the positioning information first from the abnormal report generation time.
5. The equipment monitoring system of claim 1, wherein the powered equipment comprises an equipment group, the equipment group comprises a plurality of sub-equipment, the sub-equipment are of the same type and are all connected in parallel,
the monitoring device is used for acquiring the power of the equipment group;
the processing end is used for calculating whether the power of the equipment group is smaller than the rated power, and if so, the equipment group is judged to be abnormal power utilization equipment.
6. An equipment monitoring method is characterized in that an equipment monitoring system comprises a monitoring device and a processing end, and the equipment monitoring method comprises the following steps:
the monitoring device collects power utilization information of electric equipment in an area and transmits the power utilization information of all the electric equipment to the processing end, wherein the power utilization information comprises address information and equipment information of the electric equipment;
the processing terminal analyzes all the electricity utilization information to obtain the electricity utilization equipment with abnormal electricity utilization, and generates an abnormal report according to the address information and the equipment information of the electricity utilization equipment with abnormal electricity utilization, wherein the abnormal report comprises the address information, the equipment information and abnormal data of the electricity utilization equipment with abnormal electricity utilization.
7. The equipment monitoring system of claim 6, wherein the equipment monitoring method comprises:
the processing terminal matches a contact person according to the abnormal report;
and the processing terminal sends the abnormal report to a communication terminal corresponding to the contact person.
8. The equipment monitoring system of claim 7, wherein the equipment monitoring method comprises:
the processing terminal acquires a contact list corresponding to an address information recording address according to the address information of the abnormal report;
and the processing terminal matches the corresponding contact in the contact list according to the equipment information of the abnormal report and the current time.
9. The equipment monitoring system of claim 8, wherein the equipment monitoring method comprises:
the communication terminal sends positioning information to the processing terminal;
the processing terminal receives the positioning information and records the receiving time;
the processing terminal adds the communication terminal sending the positioning information to the contact list according to the position recorded in the positioning information;
and the processing terminal judges whether the abnormal report generation time is in a preset time period, if so, searches a contact corresponding to the communication terminal of which the abnormal report generation time is positioned at the position recorded in the positioning information in a contact list according to the receiving time, and if not, acquires the contact corresponding to the communication terminal of which the abnormal report generation time is positioned at the position recorded in the positioning information.
10. The equipment monitoring system of claim 6, wherein the electric equipment comprises an equipment group, the equipment group comprises a plurality of sub-equipments, the sub-equipments have the same model and are all connected in parallel, and the equipment monitoring method comprises:
the monitoring device collects the power of the equipment group;
and the processing end calculates whether the power of the equipment group is smaller than the rated power, and if so, the equipment group is judged to be abnormal power utilization equipment.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010087925.XA CN111290323A (en) | 2020-02-12 | 2020-02-12 | Equipment monitoring system and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010087925.XA CN111290323A (en) | 2020-02-12 | 2020-02-12 | Equipment monitoring system and method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111290323A true CN111290323A (en) | 2020-06-16 |
Family
ID=71022432
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010087925.XA Pending CN111290323A (en) | 2020-02-12 | 2020-02-12 | Equipment monitoring system and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111290323A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112734175A (en) * | 2020-12-28 | 2021-04-30 | 江苏晟能科技有限公司 | Comprehensive energy management and control system for industrial enterprise |
CN114549229A (en) * | 2021-12-29 | 2022-05-27 | 广东飞企互联科技股份有限公司 | Intelligent safety monitoring management system and method for park |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106569466A (en) * | 2016-10-20 | 2017-04-19 | 国网山东省电力公司菏泽供电公司 | Building electric equipment operation state monitoring method, device and system |
CN207301710U (en) * | 2017-09-05 | 2018-05-01 | 山东比特智能科技股份有限公司 | A kind of equipment state remote monitoring system |
CN110032093A (en) * | 2019-03-12 | 2019-07-19 | 江苏楷正建设有限公司 | A kind of engineering Electrical Safety management method of view-based access control model Internet of Things |
-
2020
- 2020-02-12 CN CN202010087925.XA patent/CN111290323A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106569466A (en) * | 2016-10-20 | 2017-04-19 | 国网山东省电力公司菏泽供电公司 | Building electric equipment operation state monitoring method, device and system |
CN207301710U (en) * | 2017-09-05 | 2018-05-01 | 山东比特智能科技股份有限公司 | A kind of equipment state remote monitoring system |
CN110032093A (en) * | 2019-03-12 | 2019-07-19 | 江苏楷正建设有限公司 | A kind of engineering Electrical Safety management method of view-based access control model Internet of Things |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112734175A (en) * | 2020-12-28 | 2021-04-30 | 江苏晟能科技有限公司 | Comprehensive energy management and control system for industrial enterprise |
CN112734175B (en) * | 2020-12-28 | 2023-09-26 | 江苏晟能科技有限公司 | Comprehensive energy management and control system for industrial enterprises |
CN114549229A (en) * | 2021-12-29 | 2022-05-27 | 广东飞企互联科技股份有限公司 | Intelligent safety monitoring management system and method for park |
CN114549229B (en) * | 2021-12-29 | 2023-07-28 | 广东飞企互联科技股份有限公司 | Safety intelligent monitoring management system and method for park |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109978052A (en) | A kind of user side energy device wisdom repair method | |
CN111463902A (en) | Overhead line monitoring method, system, device and server | |
CN208905033U (en) | A kind of intelligent well cover controlling and management | |
CN106355357B (en) | Power distribution network fault processing method and information processing system | |
CN111290323A (en) | Equipment monitoring system and method | |
CN103259679A (en) | Method for identifying equipment and automatically reporting broken-down equipment for repair based on mobile terminal | |
CN104581030A (en) | Portable intelligent monitoring system | |
CN105376534A (en) | Integrated electric power information communication monitoring platform based on wireless transmission technology | |
CN105356680A (en) | Intelligent operation and maintenance system of power generator | |
US9224122B2 (en) | Outdoor device management system | |
CN112528742A (en) | State checking method and device for transformer substation pressure plate | |
CN104376495A (en) | Wireless monitoring system and method for coal mine electromechanical device overhauling | |
CN114021754A (en) | Dispatching distribution network emergency repair system | |
CN115460259A (en) | Intelligent park management system and management method thereof | |
CN116485606A (en) | Intelligent water management platform for drainage households, pipe networks, pump stations, sewage plants and river channels | |
CN112966552B (en) | Routine inspection method and system based on intelligent identification | |
CN116882662B (en) | Smart park management method, device, management system and storage medium | |
CN113835346A (en) | Intelligent building energy consumption control system and method based on Internet of things | |
CN110994420A (en) | Method and device for patrolling power distribution facilities in residential area | |
CN110260915A (en) | Environmental protection equipment on-line monitoring platform and monitoring method | |
CN202771248U (en) | Equipment operation state monitoring and prompting system with GPS positioning function | |
CN115864199A (en) | Electric power inspection system based on enhanced reality type AR glasses | |
CN211653437U (en) | Intelligent oil engine Internet of things operation monitoring system | |
CN204258435U (en) | Intelligent electrical network patrolling and checking management system | |
CN108520306B (en) | Energy management method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |