CN111287406A - Building rubbish clearing device in high-rise building construction - Google Patents

Building rubbish clearing device in high-rise building construction Download PDF

Info

Publication number
CN111287406A
CN111287406A CN202010093917.6A CN202010093917A CN111287406A CN 111287406 A CN111287406 A CN 111287406A CN 202010093917 A CN202010093917 A CN 202010093917A CN 111287406 A CN111287406 A CN 111287406A
Authority
CN
China
Prior art keywords
cleaning
clearing
trolley
bottom plate
box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010093917.6A
Other languages
Chinese (zh)
Other versions
CN111287406B (en
Inventor
韩守勤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Xiangyu Qianqiu Construction Group Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202010093917.6A priority Critical patent/CN111287406B/en
Publication of CN111287406A publication Critical patent/CN111287406A/en
Application granted granted Critical
Publication of CN111287406B publication Critical patent/CN111287406B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F17/00Vertical ducts; Channels, e.g. for drainage
    • E04F17/10Arrangements in buildings for the disposal of refuse
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/12Slings comprising chains, wires, ropes, or bands; Nets
    • B66C1/16Slings with load-engaging platforms or frameworks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/04Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
    • B66C13/06Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for minimising or preventing longitudinal or transverse swinging of loads
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D1/00Rope, cable, or chain winding mechanisms; Capstans
    • B66D1/02Driving gear
    • B66D1/12Driving gear incorporating electric motors
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Types And Forms Of Lifts (AREA)

Abstract

The invention relates to the field of building garbage clearing devices, in particular to a building garbage clearing device in high-rise building construction, which comprises a clearing trolley, wherein the clearing trolley is placed in an inner cavity of a clearing floor, a clearing box is arranged in the inner cavity of the clearing trolley, and supporting inserted rods are inserted into the front side and the rear side of the upper end of the clearing trolley in a sliding manner, and the building garbage clearing device has the advantages that: the cleaning trolley slides on the bottom plate by adding the matching of the bottom plate and the lifting groove, and the mounting operation is carried out on the bottom plate, so that the risk of suspended mounting is avoided, and the safety of operation is greatly improved; the bidirectional adjusting buckle is matched with the limiting rope, so that the left-right shaking amplitude of the cleaning box is limited, and the collision between the cleaning box and a wall body caused by inertia is avoided; through the cooperation that sets up second ear seat and spacing stay cord, and then realize steadily fixing to the box of transporting clearly and draw and rise, avoid the box of transporting clearly to empty, utilize spacing fixed pulley to inject the position of spacing stay cord simultaneously, prevent the stay cord skew.

Description

Building rubbish clearing device in high-rise building construction
Technical Field
The invention relates to the field of building garbage clearing devices, in particular to a building garbage clearing device in high-rise building construction.
Background
In the building work progress, can produce more concrete or grit rubbish, along with building floor's the increase, the clearance of rubbish is more and more difficult, and long adoption elevating gear goes up and down to clear and transport the rubbish of higher floor among the prior art.
However, during the cleaning process, there are major drawbacks:
1. because the volume of the building garbage is large and the weight is heavy, the garbage is easy to shake left and right in the descending process and easily collide with the outer wall of a floor under the action of inertia;
2. in the process of connecting the cleaning trolley with the lifting device, as the cleaning box is heavy and the floor is high, a large safety risk exists during suspension installation, and the installation operation is not facilitated;
3. because the internal gravity of the cleaning and transporting box is unevenly distributed, the gravity center of the cleaning and transporting box deviates when the cleaning and transporting box descends, the cleaning and transporting box is easy to dump, and the garbage is easy to dump.
Therefore, the building garbage cleaning device in high-rise building construction is provided, and the problems of collision, safety and stability during lifting and cleaning of garbage are solved.
Disclosure of Invention
The invention aims to provide a building rubbish clearing device in high-rise building construction, which aims to solve the problems in the background technology.
In order to achieve the purpose, the invention provides the following technical scheme:
a building rubbish clearing device in high-rise building construction comprises a clearing trolley, wherein the clearing trolley is placed in an inner cavity of a clearing floor, a clearing box is arranged in the inner cavity of the clearing trolley, supporting insertion rods are inserted into the front side and the rear side of the upper end of the clearing trolley in a sliding mode, a bottom plate is arranged at the lower end of the clearing trolley, a baffle plate is perpendicularly welded on the right side of the bottom plate, a lifting groove is formed in the middle of the bottom plate, the left end face of the baffle plate is tightly attached to the right end face of the clearing trolley, second lug seats are fixedly welded on four side faces of the clearing box, first lug seats are fixedly welded at the lower ends of the second lug seats on the left side and the right side of the clearing box, and a limiting fixed pulley is fixedly installed at a position, corresponding to the second lug seats, of the;
the upper end of the cleaning floor is provided with a top floor, a winch is installed on the top floor, a guide fixed pulley is vertically installed on the right side of the top floor, a pair of limiting ropes which are bilaterally symmetrical are arranged on the lower end face of the top floor, a lifting guide rope is wound on the winch and driven by a motor and vertically extends downwards along the guide fixed pulley to the upper end of the cleaning box, the lower end of the lifting guide rope is fixed on the upper end of a connecting block, limiting pull ropes are fixedly distributed on the four end faces of the lower end of the connecting block, the middle section of each limiting pull rope sequentially extends to the limiting fixed pulley to downwards penetrate through a second lug seat, the lower end of each limiting pull rope is connected with a limiting block, a bidirectional adjusting buckle is arranged between each limiting rope and the first lug seat, an adjusting inner cavity is arranged in each bidirectional adjusting buckle, and the upper end and the, the equal fixed welding of tip of first regulation pole and second regulation pole has first clamp, the other end of first clamp passes through locking bolt symmetric connection second clamp, the tip joint of first regulation pole is on first ear seat, the tip slip of second regulation pole cup joints the outer wall at spacing rope.
Preferably, the front side and the rear side of the upper end of the cleaning and transporting box are symmetrically and transversely penetrated and provided with jacks, and the middle section of the supporting inserted bar is slidably inserted into the inner cavity of the jack.
Preferably, the lower end of the inner cavity of the cleaning trolley penetrates through and coincides with the lifting groove, and the inner diameter of the lifting groove is larger than the outer contour of the cleaning box.
Preferably, the upper end of the left side of the cleaning trolley is provided with a handle, the lower end of the cleaning trolley is provided with a pair of universal wheels which are symmetrical front and back, sliding grooves are formed in the front and back sides of the upper end face of the bottom plate, and the universal wheels slide rightwards along the sliding grooves.
Preferably, the left side of bottom plate is provided with the slope, and the upper end intercommunication spout of slope, the lower extreme of slope and the ground of clearance floor are leveled.
Preferably, the right-angle connecting plate is vertically welded on the left side of the lower end of the bottom plate, and the right side of the vertical plate of the right-angle connecting plate is fixed on the wall surface outside the cleaning floor through linearly distributed locking screws.
Preferably, the upper end of the limiting rope is fixed at the lower end of the top floor, the lower end of the limiting rope is vertically and downwards fixed on the ground, and the limiting rope is in a tightening state.
Preferably, the upper ends of the first ear seat and the second ear seat are both penetrated through to form a through hole, and the inner diameter of the through hole is smaller than the outer diameter of the limiting block.
Preferably, threaded holes are formed in the upper end and the lower end of the bidirectional adjusting buckle, external threads are arranged on the outer walls of the first adjusting rod and the second adjusting rod, and the first adjusting rod and the second adjusting rod are rotatably installed in the threaded holes through the external threads.
Compared with the prior art, the invention has the beneficial effects that:
1. the cleaning trolley slides on the bottom plate by adding the matching of the bottom plate and the lifting groove, and the mounting operation is carried out on the bottom plate, so that the risk of suspended mounting is avoided, and the safety of operation is greatly improved;
2. according to the invention, the bidirectional adjusting buckle is matched with the limiting rope, so that the left-right shaking amplitude of the cleaning box is limited, and the collision between the cleaning box and a wall body caused by inertia is avoided;
3. according to the invention, the second lug seat is matched with the limiting pull rope, so that the cleaning box is stably fixed and pulled up, the cleaning box is prevented from toppling, and meanwhile, the position of the limiting pull rope is limited by the limiting fixed pulley, so that the pull rope is prevented from deviating.
Drawings
FIG. 1 is a schematic view of the mounting structure of the present invention;
FIG. 2 is a schematic view of the connection structure of the descending process of the cleaning box of the present invention;
FIG. 3 is a cross-sectional view of a bi-directional adjustment buckle arrangement of the present invention;
FIG. 4 is a schematic perspective view of the two-way adjusting buckle of the present invention;
FIG. 5 is a schematic perspective view of a base plate according to the present invention;
fig. 6 is a schematic perspective view of the cleaning box of the present invention.
In the figure: 1. clearing and transporting the trolley; 2. clearing the floor; 3. a top floor; 4. a handle; 5. clearing and transporting the boxes; 6. supporting the inserted rod; 7. a winch; 8. a guide fixed pulley; 9. a lifting guide rail rope; 10. connecting blocks; 11. A limiting pull rope; 12. a limiting fixed pulley; 13. a base plate; 14. a right-angle connecting plate; 15. locking the screw; 16. a lifting groove; 17. a limiting rope; 18. a universal wheel; 19. a chute; 20. a baffle plate; 21. a first ear mount; 22. a second ear mount; 23. a bidirectional adjusting buckle; 24. a first adjusting lever; 25. a second adjusting lever; 26. a limiting block; 27. adjusting the inner cavity; 28. an external thread; 29. a threaded hole; 30. a first clamp; 31. a second clamp; 32. locking the bolt; 33. a jack; 34. a through hole; 35. a ramp.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1 to 6, the present invention provides a technical solution:
the utility model provides a building rubbish clearance device in high-rise building construction, including clearance dolly 1, clearance dolly 1 is placed in the inner chamber of clearance floor 2, the inner chamber of clearance dolly 1 is provided with clearance case 5, both sides slip grafting has the support inserted bar 6 around the upper end of clearance dolly 1, bilateral symmetry transversely runs through around the upper end of clearance case 5 and has seted up jack 33, the interlude of supporting inserted bar 6 slides and pegs graft in the inner chamber of jack 33, utilize the cooperation of supporting inserted bar 6 and jack 33, realize clearance case 5 at the fixed mounting of clearance dolly 1 inner chamber.
The lower end of the cleaning trolley 1 is provided with a bottom plate 13, the left side of the lower end of the bottom plate 13 is vertically welded with a right-angle connecting plate 14, and the right side of a vertical plate of the right-angle connecting plate 14 is fixed on the wall surface outside the cleaning floor 2 through locking screws 15 which are linearly distributed.
The lower end of the cleaning trolley 1 is provided with a pair of universal wheels 18 which are symmetrical front and back, the front and back sides of the upper end face of the bottom plate 13 are provided with sliding grooves 19, the universal wheels 18 slide rightwards along the sliding grooves 19, the left side of the bottom plate 13 is provided with a slope 35, the upper end of the slope 35 is communicated with the sliding grooves 19, the lower end of the slope 35 is flush with the ground of the cleaning floor 2, and the universal wheels 18 are utilized to enable the cleaning trolley 1 to slide to the upper end of the bottom plate 13 along the slope 35 and the sliding grooves.
The middle of the bottom plate 13 is provided with a lifting groove 16, the lower end of the inner cavity of the cleaning trolley 1 penetrates through and coincides with the lifting groove 16, the inner diameter of the lifting groove 16 is larger than the outer contour of the cleaning box 5, the mounting operation is carried out on the bottom plate 13, the risk of suspended mounting is avoided, and the operation safety is greatly improved.
The upper end of the left side of the cleaning trolley 1 is provided with a handle 4, the right side of the bottom plate 13 is vertically welded with a baffle plate 20, the left end face of the baffle plate 20 is tightly attached to the right end face of the cleaning trolley 1, the baffle plate 20 is used for limiting the sliding position of the cleaning trolley 1, and then the cleaning box 5 is located right above the lifting groove 16.
The upper end of the cleaning floor 2 is provided with a top floor 3, a winch 7 is installed on the top floor 3, a guide fixed pulley 8 is vertically installed on the right side of the top floor 3, a lifting guide rail rope 9 is driven by the winding of the motor on the winch 7, and lifting power is provided by the winch 7.
The lifting guide rail rope 9 vertically extends downwards to the upper end of the cleaning and transporting box 5 along the guide fixed pulley 8, and the lower end of the lifting guide rail rope 9 is fixed at the upper end of the connecting block 10.
All fixed welding has second ear seat 22 in four sides of clear case 5, four terminal surface distribution fixed mounting of lower extreme of connecting block 10 have spacing stay cord 11, the up end of clear case 5 and the corresponding fixed position mounting of second ear seat 22 have spacing fixed pulley 12, the interlude of spacing stay cord 11 extends spacing fixed pulley 12 in proper order and runs through second ear seat 22 downwards, utilize the cooperation of second ear seat 22 with spacing stay cord 11, realize being connected between clear case 5 and the connecting block 10, utilize spacing fixed pulley 12 to realize the injectment to spacing stay cord 11 position, prevent that spacing stay cord 11 from taking place the skew, make clear case 5 steadily fixed draw and rise, avoid clear case 5 to empty.
The lower extreme of spacing stay cord 11 is connected with stopper 26, and first ear seat 21 and second ear seat 22's upper end has all run through and has seted up through-hole 34, and the internal diameter of through-hole 34 is less than stopper 26's external diameter, and it is fixed to utilize stopper 26 to realize the lower extreme of spacing stay cord 11.
The lower terminal surface of the top floor 3 is provided with a pair of spacing ropes 17 of bilateral symmetry, and the lower extreme at the top floor 3 is fixed to the upper end of spacing rope 17, and the lower extreme of spacing rope 17 is vertical fixed subaerial downwards, and spacing rope 17 is in the state of tightening.
The lower end of the second ear seats 22 on the left side and the right side of the cleaning box 5 is fixedly welded with a first ear seat 21, a bidirectional adjusting buckle 23 is arranged between the limiting rope 17 and the first ear seat 21, an adjusting inner cavity 27 is arranged in the bidirectional adjusting buckle 23, and the cleaning box 5 is connected with the limiting rope 17 by the bidirectional adjusting buckle 23.
Two-way regulation is detained 23 the upper and lower both ends and is rotated respectively and is connected with first regulation pole 24 and second regulation pole 25, two-way regulation is detained 23 the upper and lower both ends and is all seted up threaded hole 29, the outer wall of first regulation pole 24 and second regulation pole 25 all is provided with external screw thread 28, first regulation pole 24 and second regulation pole 25 all rotate through external screw thread 28 and install in threaded hole 29, utilize threaded hole 29 and external screw thread 28's cooperation, realize the rotation installation of first regulation pole 24 and second regulation pole 25, simultaneously according to the distance between the outer wall body of clear case 5 and clear 2 of transporting floors, adjust the length that first regulation pole 24 and second regulation pole 25 extend, thereby reach the purpose of injecing the range of rocking.
The equal fixed welding of tip of first regulation pole 24 and second regulation pole 25 has first clamp 30, and the other end of first clamp 30 passes through locking bolt 32 symmetric connection second clamp 31, and the tip joint of first regulation pole 24 is on first ear seat 21, and the tip slip of second regulation pole 25 cup joints the outer wall at spacing rope 17, utilizes the cooperation of first clamp 30 and second clamp 31, realizes the slip cup joint between transport case 5 and the spacing rope 17.
The working principle is as follows: firstly, the cooperation of the supporting inserted bar 6 and the jack 33 is utilized, the fixed installation of the cleaning box 5 in the inner cavity of the cleaning trolley 1 is realized, then the cleaning trolley 1 is pushed to the garbage position in the cleaning floor 2 for loading, then the cleaning trolley 1 slides to the upper end of the bottom plate 13 along the slope 35 and the chute 19 by utilizing the universal wheels 18, in the sliding process, the sliding position of the cleaning trolley 1 is limited by utilizing the baffle plate 20, further the cleaning box 5 is positioned right above the lifting groove 16, the installation operation is carried out on the bottom plate 13, the risk of suspended installation is avoided, and the operation safety is greatly improved.
Utilize hoist engine 7 to provide lift power, make lift guide rope 9 extend to the upper end of clearing case 5 along the perpendicular downwardly extending of direction fixed pulley 8, the lower extreme of lift guide rope 9 is fixed in connecting block 10 upper end, utilize the cooperation of second ear seat 22 and spacing stay cord 11, realize being connected between clearing case 5 and the connecting block 10, utilize spacing fixed pulley 12 to realize the injecing to spacing stay cord 11 position, prevent that spacing stay cord 11 from taking place the skew, make clearing case 5 steadily fixed draw and rise, avoid clearing case 5 to empty.
Draw out support inserted bar 6 this moment, utilize 7 pulling of hoist engine to clear transport case 5 and rise, make first ear seat 21 naked, utilize two-way regulation to detain 23 and realize being connected between clear transport case 5 and the spacing rope 17, utilize the cooperation of first clamp 30 and second clamp 31, realize the slip cup joint between clear transport case 5 and the spacing rope 17, utilize screw hole 29 and external screw thread 28's cooperation, realize the rotation installation of first regulation pole 24 and second regulation pole 25, simultaneously according to clear transport case 5 and the distance between the outer wall of clear transport floor 2, adjust the length that first regulation pole 24 and second regulation pole 25 extend, thereby reach the purpose of injecing the range of rocking of injecing.
The hoist 7 is a common technical means in the existing lifting device, and is not described in detail.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (9)

1. The utility model provides a building rubbish is clear to be transported device in high-rise building construction, includes clearance dolly (1), its characterized in that: the cleaning trolley (1) is placed in an inner cavity of the cleaning floor (2), a cleaning box (5) is arranged in the inner cavity of the cleaning trolley (1), supporting inserted rods (6) are inserted in the front and rear sides of the upper end of the cleaning trolley (1) in a sliding manner, a bottom plate (13) is arranged at the lower end of the cleaning trolley (1), a baffle plate (20) is vertically welded on the right side of the bottom plate (13), a lifting groove (16) is arranged in the middle of the bottom plate (13), the left end surface of the baffle (20) is tightly attached to the right end surface of the cleaning trolley (1), the upper end of the left side of the cleaning and transporting box (5) is provided with a handle (4), the four side surfaces of the cleaning and transporting box (5) are fixedly welded with second lug seats (22), the lower ends of the second lug seats (22) on the left side and the right side of the cleaning and transporting box (5) are fixedly welded with first lug seats (21), and the position, corresponding to the second lug seats (22), of the upper end surface of the cleaning and transporting box (5) is fixedly provided with a limiting fixed pulley (12);
the upper end of the clearing floor (2) is provided with a top floor (3), a winch (7) is installed on the top floor (3), a guide fixed pulley (8) is vertically installed on the right side of the top floor (3), a pair of limiting ropes (17) which are bilaterally symmetrical are arranged on the lower end face of the top floor (3), a lifting guide rail rope (9) is driven by the winch (7) in a winding mode, the lifting guide rail rope (9) vertically extends downwards along the guide fixed pulley (8) to the upper end of the clearing box (5), the lower end of the lifting guide rail rope (9) is fixed to the upper end of a connecting block (10), limiting pull ropes (11) are fixedly installed on four end faces of the lower end of the connecting block (10) in a distributed mode, the middle section of each limiting pull rope (11) sequentially extends to each limiting fixed pulley (12) and downwards to penetrate through a second lug seat (22), and the lower end of each, be provided with between spacing rope (17) and first ear seat (21) two-way regulation and detain (23), be provided with in two-way regulation detains (23) and adjust inner chamber (27), the upper and lower both ends of two-way regulation detain (23) rotate respectively and are connected with first regulation pole (24) and second regulation pole (25), the equal fixed welding of tip of first regulation pole (24) and second regulation pole (25) has first clamp (30), the other end of first clamp (30) passes through locking bolt (32) symmetric connection second clamp (31), the tip joint of first regulation pole (24) is on first ear seat (21), the tip slip of second regulation pole (25) cup joints the outer wall at spacing rope (17).
2. The construction waste cleaning device in the high-rise building construction according to claim 1, characterized in that: the front side and the rear side of the upper end of the cleaning and transporting box (5) are symmetrically and transversely penetrated and provided with jacks (33), and the middle section of the supporting inserted bar (6) is slidably inserted into the inner cavity of the jack (33).
3. The construction waste cleaning device in the high-rise building construction according to claim 1, characterized in that: the lower end of the inner cavity of the cleaning trolley (1) penetrates through and is overlapped with the lifting groove (16), and the inner diameter of the lifting groove (16) is larger than the outer contour of the cleaning box (5).
4. The construction waste cleaning device in the high-rise building construction according to claim 1, characterized in that: the cleaning trolley is characterized in that a handle (4) is arranged at the upper end of the left side of the cleaning trolley (1), a pair of universal wheels (18) which are symmetrical front and back are arranged at the lower end of the cleaning trolley (1), sliding grooves (19) are formed in the front and back sides of the upper end face of the bottom plate (13), and the universal wheels (18) slide rightwards along the sliding grooves (19).
5. The construction waste cleaning device in the high-rise building construction according to claim 1, characterized in that: the left side of bottom plate (13) is provided with slope (35), and the upper end intercommunication spout (19) of slope (35), the lower extreme of slope (35) and the ground of clearance floor (2) flush.
6. The construction waste cleaning device in the high-rise building construction according to claim 1, characterized in that: the lower end left side of bottom plate (13) is connected with right angle connecting plate (14) perpendicularly by welding, the vertical board right side of right angle connecting plate (14) is fixed on the wall in the clearance floor (2) outside through linear distribution's locking screw (15).
7. The construction waste cleaning device in the high-rise building construction according to claim 1, characterized in that: the upper end of the limiting rope (17) is fixed at the lower end of the top floor (3), the lower end of the limiting rope (17) is vertically and downwards fixed on the ground, and the limiting rope (17) is in a tightening state.
8. The construction waste cleaning device in the high-rise building construction according to claim 1, characterized in that: the upper ends of the first ear seat (21) and the second ear seat (22) are all penetrated and provided with a through hole (34), and the inner diameter of the through hole (34) is smaller than the outer diameter of the limiting block (26).
9. The construction waste cleaning device in the high-rise building construction according to claim 1, characterized in that: threaded holes (29) are formed in the upper end and the lower end of the two-way adjusting buckle (23), external threads (28) are arranged on the outer walls of the first adjusting rod (24) and the second adjusting rod (25), and the first adjusting rod (24) and the second adjusting rod (25) are rotatably installed in the threaded holes (29) through the external threads (28).
CN202010093917.6A 2020-02-14 2020-02-14 Building rubbish clearing device in high-rise building construction Expired - Fee Related CN111287406B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010093917.6A CN111287406B (en) 2020-02-14 2020-02-14 Building rubbish clearing device in high-rise building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010093917.6A CN111287406B (en) 2020-02-14 2020-02-14 Building rubbish clearing device in high-rise building construction

Publications (2)

Publication Number Publication Date
CN111287406A true CN111287406A (en) 2020-06-16
CN111287406B CN111287406B (en) 2021-04-13

Family

ID=71017679

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010093917.6A Expired - Fee Related CN111287406B (en) 2020-02-14 2020-02-14 Building rubbish clearing device in high-rise building construction

Country Status (1)

Country Link
CN (1) CN111287406B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112665078A (en) * 2020-12-28 2021-04-16 重庆伏特猫科技有限公司 Intelligent factory ventilation and temperature control system and method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3213085U (en) * 2017-08-04 2017-10-19 山九株式会社 Hanging balance with automatic shackle pin attachment / detachment device
CN207943070U (en) * 2018-02-02 2018-10-09 安徽三江建设工程有限公司 A kind of construction site hopper trolley
CN109723203A (en) * 2018-12-29 2019-05-07 深圳钜联锚杆技术有限公司 Rubbish well, classified collection device and the collection method collected for building refuse
CN209242477U (en) * 2018-09-02 2019-08-13 恒城建设科技有限公司 Device is cleared in a kind of automation of skyscraper
CN209351440U (en) * 2018-10-11 2019-09-06 广田建设工程有限公司 Building waste transport pushing cart in a kind of high-building construction floor
CN209411657U (en) * 2019-01-09 2019-09-20 天津市兴和顺塑料包装有限公司 A kind of turnover box lifting device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3213085U (en) * 2017-08-04 2017-10-19 山九株式会社 Hanging balance with automatic shackle pin attachment / detachment device
CN207943070U (en) * 2018-02-02 2018-10-09 安徽三江建设工程有限公司 A kind of construction site hopper trolley
CN209242477U (en) * 2018-09-02 2019-08-13 恒城建设科技有限公司 Device is cleared in a kind of automation of skyscraper
CN209351440U (en) * 2018-10-11 2019-09-06 广田建设工程有限公司 Building waste transport pushing cart in a kind of high-building construction floor
CN109723203A (en) * 2018-12-29 2019-05-07 深圳钜联锚杆技术有限公司 Rubbish well, classified collection device and the collection method collected for building refuse
CN209411657U (en) * 2019-01-09 2019-09-20 天津市兴和顺塑料包装有限公司 A kind of turnover box lifting device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112665078A (en) * 2020-12-28 2021-04-16 重庆伏特猫科技有限公司 Intelligent factory ventilation and temperature control system and method
CN112665078B (en) * 2020-12-28 2021-10-08 重庆伏特猫科技有限公司 Intelligent factory ventilation and temperature control system and method

Also Published As

Publication number Publication date
CN111287406B (en) 2021-04-13

Similar Documents

Publication Publication Date Title
CN111287406B (en) Building rubbish clearing device in high-rise building construction
CN212556365U (en) Multi-functional transport trolley of utility tunnel
CN106044632B (en) A kind of power equipment stair carrying auxiliary device
CN105692350A (en) Multifunctional power field transmitting facility
CN211688077U (en) Concrete lifting and transporting device for construction site
CN209079928U (en) A kind of grey trolley of building transport
CN114194269A (en) A fortune hopper car for building construction material transportation
CN210338014U (en) Water pump auxiliary transfer device
CN112031430A (en) Post-cast constructional column concrete lifting device
CN209468024U (en) A kind of multi-functional formula equipment hoisting platform
CN212376290U (en) Post-cast constructional column concrete lifting device
CN211110698U (en) Prevent rocking hoist device
CN210710496U (en) Lightweight material hoisting frame
CN216512286U (en) Elevator mounting structure convenient to construction
CN215854802U (en) Guide rail of electric winch
CN213679454U (en) Crane lifting hook for building construction
CN111942783B (en) Pulley dragging device for garbage transport vehicle
CN218320372U (en) Auxiliary hanger frame for road and bridge construction
CN219823389U (en) Clamp
CN213976033U (en) Auxiliary carrying manipulator for filling finished product boxes
CN214399480U (en) A conveniently unload and transfer device for reinforcing bar coil stock
CN219116985U (en) Simple elevator
CN217458724U (en) Embrace pole and promote drive arrangement and fall to ground rocking arm and embrace pole hoisting frame
CN208856832U (en) The device for discharging of material cableway
CN110436357B (en) Omnidirectional tower crane device for large-scale bridge engineering construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20210330

Address after: 239300 podium, building a, Qianqiu building, west of Erfeng South Road, Tianchang City, Chuzhou City, Anhui Province

Applicant after: Anhui Xiangyu Qianqiu Construction Group Co.,Ltd.

Address before: Shandong Agricultural University, 61 Daizong street, Taishan District, Taian City, Shandong Province, 271018

Applicant before: Han Shouqin

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210413

Termination date: 20220214