CN111259520A - 基于决策图的多状态发电系统运行可靠性分析方法 - Google Patents
基于决策图的多状态发电系统运行可靠性分析方法 Download PDFInfo
- Publication number
- CN111259520A CN111259520A CN202010021499.XA CN202010021499A CN111259520A CN 111259520 A CN111259520 A CN 111259520A CN 202010021499 A CN202010021499 A CN 202010021499A CN 111259520 A CN111259520 A CN 111259520A
- Authority
- CN
- China
- Prior art keywords
- state
- power generation
- generation system
- state transition
- decision diagram
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010248 power generation Methods 0.000 title claims abstract description 96
- 238000010586 diagram Methods 0.000 title claims abstract description 56
- 238000004458 analytical method Methods 0.000 title claims abstract description 9
- 230000007704 transition Effects 0.000 claims abstract description 96
- 238000009826 distribution Methods 0.000 claims abstract description 25
- 238000000034 method Methods 0.000 claims description 23
- 230000001186 cumulative effect Effects 0.000 claims description 3
- 230000007547 defect Effects 0.000 description 2
- 238000005265 energy consumption Methods 0.000 description 2
- 238000009987 spinning Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 238000012502 risk assessment Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Business, Economics & Management (AREA)
- Health & Medical Sciences (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Human Resources & Organizations (AREA)
- Marketing (AREA)
- Primary Health Care (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
Claims (5)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010021499.XA CN111259520B (zh) | 2020-01-09 | 2020-01-09 | 基于决策图的多状态发电系统运行可靠性分析方法 |
AU2020100796A AU2020100796A4 (en) | 2020-01-09 | 2020-05-20 | Method for analyzing operation reliability of multi-state power generation system based on decision diagram |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010021499.XA CN111259520B (zh) | 2020-01-09 | 2020-01-09 | 基于决策图的多状态发电系统运行可靠性分析方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111259520A true CN111259520A (zh) | 2020-06-09 |
CN111259520B CN111259520B (zh) | 2022-03-25 |
Family
ID=70954079
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010021499.XA Active CN111259520B (zh) | 2020-01-09 | 2020-01-09 | 基于决策图的多状态发电系统运行可靠性分析方法 |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN111259520B (zh) |
AU (1) | AU2020100796A4 (zh) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106056305A (zh) * | 2016-06-14 | 2016-10-26 | 中国电力工程顾问集团中南电力设计院有限公司 | 一种基于状态聚类的发电系统可靠性快速评估方法 |
CN106202717A (zh) * | 2016-07-06 | 2016-12-07 | 浙江大学 | 一种基于多状态树的退化系统风险概率计算方法 |
CN107292019A (zh) * | 2017-06-16 | 2017-10-24 | 浙江大学 | 一种基于多态决策图的含备用系统可靠性分析计算方法 |
-
2020
- 2020-01-09 CN CN202010021499.XA patent/CN111259520B/zh active Active
- 2020-05-20 AU AU2020100796A patent/AU2020100796A4/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106056305A (zh) * | 2016-06-14 | 2016-10-26 | 中国电力工程顾问集团中南电力设计院有限公司 | 一种基于状态聚类的发电系统可靠性快速评估方法 |
CN106202717A (zh) * | 2016-07-06 | 2016-12-07 | 浙江大学 | 一种基于多状态树的退化系统风险概率计算方法 |
CN107292019A (zh) * | 2017-06-16 | 2017-10-24 | 浙江大学 | 一种基于多态决策图的含备用系统可靠性分析计算方法 |
US20190385067A1 (en) * | 2017-06-16 | 2019-12-19 | Zhejiang University | Automatic reliability analysis method for warm standby system based on multi-state decision diagram |
Also Published As
Publication number | Publication date |
---|---|
CN111259520B (zh) | 2022-03-25 |
AU2020100796A4 (en) | 2020-06-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2019184286A1 (zh) | 一种机组恢复在线动态决策方法及系统 | |
CN112467807A (zh) | 一种多能源电力系统日前优化调度方法及系统 | |
CN109861297B (zh) | 一种基于灰狼优化算法的电力系统黑启动方法 | |
CN111259520B (zh) | 基于决策图的多状态发电系统运行可靠性分析方法 | |
CN117875161B (zh) | 考虑多故障不确定性的源网荷协同弹性提升方法及系统 | |
CN111817581B (zh) | 一种多电平换流器的运行控制方法及控制系统 | |
Wen et al. | Intelligent control for rapidity and security of all-electric ships gas turbine under complex mutation load using optimized neural network | |
CN113537627A (zh) | 一种面向运维的海上风电机组故障间隔时间预测方法 | |
Ilić et al. | MLP ANN Condition Assessment Model of the Turbogenerator Shaft A6 HPP Đerdap 2 | |
CN112800625B (zh) | 一种区域电网全清洁供电运行边界确定方法和系统 | |
CN114649826A (zh) | 一种考虑风电场的黑启动分区方法及系统 | |
CN110707712B (zh) | 一种考虑需求响应的微电网供电可靠性分析方法 | |
CN114552774A (zh) | 一种计及安全性与充裕性的电网实时运行状态监视方法 | |
Li et al. | Two-stage robust unit commitment with wind farms and pumped hydro energy storage systems under typhoons | |
Tang et al. | A Bayesian-optimized Hybrid Neural Network Based on CNN and BiLSTM for Predictive Maintenance of Diesel Generator | |
CN118246351B (zh) | 一种考虑机组置信度的深度学习机组组合问题求解方法 | |
Prodan et al. | Predictive control for reliable microgrid energy management under uncertainties | |
Shi et al. | Design of stochastic model predictive control for wind energy conversion system | |
CN113052717B (zh) | 一种火力发电系统中能效管理方法和系统 | |
CN112861295B (zh) | 一种基于电气耦合系统安全预警的紧急控制方法及系统 | |
CN114336630A (zh) | 一种电网机组运行控制及裕度评估方法 | |
CN117540581B (zh) | 卡诺电池储能系统可靠性评估方法、系统、设备及介质 | |
Cao et al. | Research on Predictive Maintenance Strategy of Wind Turbine Based on Generalized Stochastic Differential Equation Model | |
Ge et al. | Unit commitment considering the characteristics of nuclear and wind power | |
CN118425764A (zh) | 一种机组变负荷试验的方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Jia Heping Inventor after: Liu Dunnan Inventor after: Li Yanbin Inventor after: Liu Mingguang Inventor after: Li Genzhu Inventor after: Xu Xiaofeng Inventor after: Qin Guangyu Inventor before: Liu Dunnan Inventor before: Jia Heping Inventor before: Li Yanbin Inventor before: Liu Mingguang Inventor before: Li Genzhu Inventor before: Xu Xiaofeng Inventor before: Qin Guangyu |
|
CB03 | Change of inventor or designer information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |