CN111258299B CN202010074925.6A CN202010074925A CN111258299B CN 111258299 B CN111258299 B CN 111258299B CN 202010074925 A CN202010074925 A CN 202010074925A CN 111258299 B CN111258299 B CN 111258299B
Authority
CN
China
Prior art keywords
test
test item
result
expected
actual
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202010074925.6A
Other languages
Chinese (zh)
Other versions
CN111258299A (en
Inventor
徐建华
张弛
宋青阳
张瑞
闫妍
郭海琦
张鼎
高文博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Casco Signal Beijing Ltd
Original Assignee
Casco Signal Beijing Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Casco Signal Beijing Ltd filed Critical Casco Signal Beijing Ltd
Priority to CN202010074925.6A priority Critical patent/CN111258299B/en
Publication of CN111258299A publication Critical patent/CN111258299A/en
Application granted granted Critical
Publication of CN111258299B publication Critical patent/CN111258299B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B23/00Testing or monitoring of control systems or parts thereof
    • G05B23/02Electric testing or monitoring
    • G05B23/0205Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
    • G05B23/0218Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterised by the fault detection method dealing with either existing or incipient faults
    • G05B23/0221Preprocessing measurements, e.g. data collection rate adjustment; Standardization of measurements; Time series or signal analysis, e.g. frequency analysis or wavelets; Trustworthiness of measurements; Indexes therefor; Measurements using easily measured parameters to estimate parameters difficult to measure; Virtual sensor creation; De-noising; Sensor fusion; Unconventional preprocessing inherently present in specific fault detection methods like PCA-based methods

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Train Traffic Observation, Control, And Security (AREA)

Abstract

The embodiment of the invention provides a method and a system for testing a section occupation logic check function of a train control center, relates to the technical field of railway signal system testing, and is used for ensuring the testing accuracy of the section occupation logic check function of the train control center, improving the testing efficiency and reducing the testing cost, and the method comprises the following steps: acquiring line data; according to the line data and the test item generation instruction, determining the test item and an expected test result of the test item; detecting whether the test items comprise restart or not, and if the test items comprise restart, restarting the train control center through remote control power supply equipment; processing the test item according to the corresponding execution operation instruction of the test item to obtain an actual test result of the test item; and judging whether the actual test result is consistent with the expected test result or not, and recording the judgment result. The embodiment of the invention is used for testing the interval occupation logic checking function of the train control center.

Description

Test method and system for interval occupation logic check function of train control center
Technical Field
The embodiment of the invention relates to the technical field of railway signal system testing, in particular to a method and a system for testing an interval occupation logic check function of a train control center.
Background
A Train Control Center (TCC) is an important component of a Chinese Train Control System (CTCS), and a section occupancy logic check function is one of important functions of the Train Control center. If the interval occupation logic check function of the train control center is incorrect, the safe operation of the train can be influenced, therefore, the interval occupation logic check function of the train control center needs to be tested according to line data and the like provided by design before the train control center is put into formal use, and the test of the interval occupation logic check function of the train control center is very important work. At present, the interval of the train control center occupies the test of the logic checking function, which is mainly carried out manually, so that mistakes and omissions are easy to occur, the manual test consumes much time, and the test cost required to be input is high.
Disclosure of Invention
In view of the foregoing problems, an object of the embodiments of the present invention is to provide a method and a system for testing a section occupation logic check function of a train control center, so as to ensure the test accuracy of the section occupation logic check function of the train control center, improve the test efficiency, and reduce the test cost.
In order to solve the above technical problems, embodiments of the present invention provide the following technical solutions:
in a first aspect, an embodiment of the present invention provides a method for testing an interval occupancy logic check function of a train control center, including:
acquiring line data;
determining a test item and an expected test result of the test item according to the line data and a test item generation instruction;
detecting whether the test item includes restart or not, and if the test item includes restart, restarting the train control center through remote control power supply equipment;
processing the test item according to the execution operation instruction corresponding to the test item to obtain an actual test result of the test item;
and judging whether the actual test result is consistent with the expected test result or not, and recording a judgment result.
As an optional implementation manner of the embodiment of the present invention, before processing the test item according to the corresponding execution operation instruction of the test item, the method further includes:
selecting a required test item from the test items according to a selection instruction;
correspondingly, the detecting whether the test item includes restart or not, and if the test item includes restart, restarting the column control center through a remote control power supply device includes:
detecting whether the needed test items comprise restart or not, and if the needed test items comprise restart, restarting the train control center through remote control power supply equipment;
correspondingly, the step of processing the test item according to the corresponding execution operation instruction of the test item to obtain an actual test result of the test item includes:
and processing the required test item according to the execution operation instruction corresponding to the required test item to obtain an actual test result of the required test item.
As an optional embodiment of the present invention, the processing the required test item according to the execution operation instruction corresponding to the required test item to obtain an actual test result of the required test item includes:
and acquiring interface data of the execution operation instruction corresponding to the required test item through interface simulation, wherein the interface data comprises an actual test result of the required test item.
As an optional implementation manner of the embodiment of the present invention, the line data includes a line name, line direction information, and section information;
the determining a test item and an expected test result of the test item according to the line data and the test item generation instruction comprises:
determining the expected test results of the test items and the test items according to the line names, the line direction information, the section information and test item generating instructions, wherein the expected test results comprise the expected direction of the train on the line and the expected section state, and the expected section state comprises normal occupation, fault occupation, missing shunting or idle state;
correspondingly, the processing the test item according to the corresponding execution operation instruction of the test item to obtain the actual test result of the test item includes:
and determining the actual section state according to the line name, the line direction information and the section information, wherein the actual section state comprises normal occupation, fault occupation, shunt loss or idle state.
As an optional implementation manner of the embodiment of the present invention, after determining whether the actual test result is consistent with the expected test result and recording the determination result, the method further includes:
judging whether the test item is the last test item, if so, generating a test result according to the judgment result; and if not, processing the next test item according to the execution operation instruction corresponding to the test item.
In a second aspect, an embodiment of the present invention provides a system for testing a section occupation logic check function of a column control center, including:
the data acquisition module is used for acquiring line data;
the test item generating module is used for determining a test item and an expected test result of the test item according to the line data and a test item generating instruction;
the remote control power supply equipment restarting module is used for detecting whether the test item comprises restarting or not, and if the test item comprises restarting, restarting the train control center through the remote control power supply equipment;
the execution module is used for processing the test item according to the execution operation instruction corresponding to the test item to obtain an actual test result of the test item;
and the judging module is used for judging whether the actual test result is consistent with the expected test result or not and recording the judgment result.
As an optional implementation manner of the embodiment of the present invention, the system further includes: the selection module is used for selecting the required test items from the test items according to the selection instruction; correspondingly, the remote control power supply equipment restarting module is that: the system is specifically used for detecting whether the needed test items include restart or not, and if the needed test items include restart, restarting the train control center through remote control power supply equipment; correspondingly, the execution module is: and the method is specifically configured to process the required test item according to the execution operation instruction corresponding to the required test item to obtain an actual test result of the required test item.
As an optional implementation manner of the embodiment of the present invention, the execution module is specifically configured to obtain, through interface simulation, interface data of an execution operation instruction corresponding to the required test item, where the interface data includes an actual test result of the required test item.
As an optional implementation manner of the embodiment of the present invention, the line data includes a line name, line direction information, and section information; the test item generating module is specifically configured to determine the test item and an expected test result of the test item according to the line name, the line direction information, the section information, and a test item generating instruction, where the expected test result includes an expected direction of the train on the line and an expected section state, and the expected section state includes normal occupancy, fault occupancy, missing shunt, or idle; correspondingly, the execution module is specifically configured to determine an actual segment state according to the line name, the line direction information, and the segment information, where the actual segment state includes normal occupation, fault occupation, missing shunt, or idle.
As an optional implementation manner of the embodiment of the present invention, the system further includes: the test item judging module is used for judging whether the test item is the last test item or not, and if so, generating a test result according to the judgment result; and if not, processing the next test item according to the execution operation instruction corresponding to the test item.
The method for testing the interval occupation logic check function of the train control center provided by the embodiment of the invention comprises the following steps of firstly, acquiring line data; according to the line data and the test item generation instruction, determining the test item and an expected test result of the test item; then, whether the test item includes restarting is detected, and if the test item includes restarting, the train control center is restarted through the remote control power supply equipment; processing the test item according to the corresponding execution operation instruction of the test item to obtain an actual test result of the test item; and finally, judging whether the actual test result is consistent with the expected test result or not, and recording the judgment result. That is, the method for testing the interval occupancy logic check function of the column control center according to the embodiment of the present invention can automatically process the test item according to the execution operation instruction corresponding to the test item, automatically obtain the actual test result of the test item, automatically determine whether the actual test result is consistent with the expected test result, and automatically record the determination result of the test.
Drawings
Various other advantages and benefits will become apparent to those of ordinary skill in the art upon reading the following detailed description of the preferred embodiments. The drawings are only for purposes of illustrating the preferred embodiments and are not to be construed as limiting the invention. Also, like reference numerals are used to refer to like parts throughout the drawings. In the drawings:
fig. 1 is a schematic flowchart of a method for testing an interval occupancy logic check function of a train control center according to an embodiment of the present invention;
FIG. 2 is a schematic structural diagram of a test system for checking an interval occupancy logic of a column control center according to an embodiment of the present invention;
Detailed Description
Exemplary embodiments of the present invention will be described in more detail below with reference to the accompanying drawings. While exemplary embodiments of the invention are shown in the drawings, it should be understood that the invention can be embodied in various forms and should not be limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete, and will fully convey the scope of the invention to those skilled in the art.
The method in the examples of the present invention will be described in detail below.
The method for testing the interval occupation logic check function of the train control center in the embodiment of the invention can comprise the following steps:
1001. and acquiring line data.
Specifically, the line data includes a plurality of data, and the line data can be acquired by using python and C + + languages, the line data is provided by a design institute and related to a column control center, and the acquired line data is in an excel format, that is, the acquired line data is editable.
1002. And determining the test items and expected test results of the test items according to the line data and the test item generation instruction.
Specifically, a test item corresponding to the line data and an expected test result of the test item can be generated according to the line data and a generation instruction corresponding to the line data and formed by python and C + + languages; the test item corresponds to the expected test result of the test item.
Specifically, different test items and expected test results corresponding to the test items can be generated through different line data.
1003. And detecting whether the test items comprise restart or not, and if the test items comprise restart, restarting the train control center through the remote control power supply equipment.
Specifically, the remote control power supply device may control a power supply of the train control center, that is, the remote control power supply device may control a restart operation of the train control center; the test system with the interval occupying logic checking function of the train control center is communicated with the remote control power supply equipment in a client/server mode so as to realize the remote automatic control of the power supply switch of the train control center; the remote control power supply equipment consists of a Programmable Logic Controller (PLC), a miniature relay and control software of the PLC.
Specifically, part of the test items need to restart the train control center, and part of the test items do not need to restart the train control center; and detecting whether the test item comprises a restarting operation or not through the test item determined in the step 1002, and restarting the train control center through the remote control power supply equipment if the test item comprises the restarting operation.
Specifically, one test item may include a plurality of restarts, or include one restart; and if one test item comprises a plurality of restarts, restarting the column control center for a plurality of times through the remote control power supply equipment, and if one test item comprises a restart, restarting the column control center for one time through the remote control power supply equipment.
1004. And processing the test item according to the corresponding execution operation instruction of the test item to obtain an actual test result of the test item.
Specifically, the test items are executed according to the execution operation instructions composed of python and C + + languages corresponding to the test items, respectively, so as to obtain actual test results corresponding to the test items, respectively.
Specifically, the test items correspond to the actual test results of the test items one by one, the number of the test items and the actual test results of the test items can be multiple, and the number of the test items is consistent with the number of the actual test results of the test items.
1005. And judging whether the actual test result is consistent with the expected test result or not, and recording the judgment result.
Specifically, whether the actual test result is consistent with the expected test result or not is judged, and if so, the judgment result is recorded; and if not, recording and marking the judgment result.
Specifically, whether the actual test result is consistent with the expected test result or not is judged, the judgment result is recorded, and the judgment result can be recorded in an excel file. The manner of marking the determination result may be displayed in red, displayed with a label, or the like, and the manner of marking may be set according to actual conditions, and the manner of marking is not limited herein.
As can be seen from the above, in the method for testing the interval occupation logic check function of the train control center provided in the embodiment of the present invention, first, line data is obtained; according to the line data and the test item generation instruction, determining the test item and an expected test result of the test item; then, whether the test item includes restarting is detected, and if the test item includes restarting, the train control center is restarted through the remote control power supply equipment; processing the test item according to the corresponding execution operation instruction of the test item to obtain an actual test result of the test item; and finally, judging whether the actual test result is consistent with the expected test result or not, and recording the judgment result. That is, the method for testing the interval occupancy logic check function of the column control center according to the embodiment of the present invention can automatically process the test item according to the execution operation instruction corresponding to the test item, automatically obtain the actual test result of the test item, automatically determine whether the actual test result is consistent with the expected test result, and automatically record the determination result of the test.
Further, as the refinement and expansion of the method of the above-mentioned step 1001-1005, the embodiment of the present invention further provides a method for testing the interval occupation logic check function of the train control center.
Fig. 1 is a schematic flow chart of a method for testing a function of checking an interval occupancy logic of a column control center in an embodiment of the present invention, and referring to fig. 1, the method for testing a function of checking an interval occupancy logic of a column control center in an embodiment of the present invention may include:
s101, obtaining line data;
specifically, the line data includes a line name, line direction information, section information, and the like; the line direction information can be understood as the direction information of train running; the line data includes, in addition to the line name, the line direction information, and the section information: the line data includes a transponder position table, a line data table, a route information table, interface tables of The column Control center, and The like, and each interface table of The column Control center includes a Computer Based Interlocking (CBI) interface table, a CTC interface table, a ZPW interface table, and The like.
S102, determining the test items and the expected test results of the test items according to the line names, the line direction information, the section information and the test item generating instructions.
Specifically, the expected test result comprises an expected direction of the train on the line and an expected section state, wherein the expected section state comprises normal occupation, fault occupation, shunt loss or idle.
Specifically, according to the route data such as the route name and the route direction information and the corresponding generation instruction composed of python and C + + languages, the generated test item is the expected direction of the train on the route and the generated expected test result is the specific direction of the train on the expected direction of the route. And generating a test item according to the line name, the line direction information and a corresponding generation instruction composed of python and C + + languages. The generated segment status of the expected test result is one of normal occupied, fault occupied, lost shunt, and idle.
Further, the test items and the expected test results of the test items may also be determined according to other line data in the line data, except for the line name, the line direction information, and the section information, and the test item generation instruction. Specifically, the test items related to the position of the transponder and the expected test results of the test items related to the position of the transponder can be generated according to the transponder position table and the test item generation instruction; the transponder position-related test items and the expected test results may be line grade, track section, line speed information, temporary speed limit information, and the like. Or generating a test item related to the route information according to the route information table and the test item generating instruction, and generating an expected test result of the test item related to the route information; the test items related to the route information and the expected test result can be a vehicle receiving route, a vehicle sending route, a passing route and an enemy route. Or generating a test item related to each interface of the column control center according to each interface table and the test item generating instruction of the column control center, and generating an expected test result of the test item related to each interface of the column control center; the test items and expected test results related to each interface table of the column control center can be a section clear state, adjacent station vehicle receiving, adjacent station boundary section code sending, total section unlocking, no vehicle occupation command and the like. The determination of the test items and the expected test results of the test items may be set according to actual conditions, and is not limited herein.
S103, selecting the required test items from the test items according to the selection instruction.
In practical application, all test items may be used, or only part of the test items may be used; specifically, the test items to be used can be selected from the determined test items according to the selection instruction according to the actual requirements.
For example, if in practical application, a test of a part of the test items is required, the part of the test items may be selected by a selection instruction including section information, line direction information, and the like.
And S104, detecting whether the needed test items comprise restart, and restarting the train control center through the remote control power supply equipment if the needed test items comprise restart.
Step S104 is the same as step 1003, and therefore, will not be described herein again.
For example, if the selected test item does not detect whether a restart is involved, the test steps and conditions of the test procedure will be set incorrectly. Therefore, in order to overcome the problems in the above solutions, the embodiment of the present invention detects whether the required test item includes a restart according to the required test item selected in step S103, and if the required test item includes a restart, the train control center is restarted by remotely controlling the power supply device, so that it can be ensured that the test steps and conditions of the test process are correctly set.
And S105, acquiring interface data of the execution operation instruction corresponding to the required test item through interface simulation, wherein the interface data comprises an actual test result of the required test item.
Further, if the required test item is a line name, line direction information and zone information, the actual test result of the required test item may include an actual zone state, and the actual zone state includes normal occupation, fault occupation, missing shunt or idle.
Specifically, the interface data includes an actual test result of the required test item, the actual test result of the required test item is an actual segment state, and the actual test result of the required test item is one of a normal occupation state, a fault occupation state, a lost shunt state, and an idle state of the actual segment state.
Specifically, the interval occupancy logic check test function of the train control center communicates with each interface of the interface simulator through a User Datagram Protocol (UDP). The interface data for obtaining the execution operation instruction corresponding to the required test item is the interface data of interaction between the train control center and the peripheral simulation, and the peripheral simulation comprises a simulation CTC, a simulation CBI, a simulation adjacent TCC, a simulation Temporary Speed Limit Server (TSRS), a simulation ZPW, a simulation relay and the like.
Further, interface data of the execution operation instruction corresponding to other required test items except the required test items of the line name, the line direction information and the section information can be obtained through interface simulation, and the interface data comprises an actual test result of the required test items. Specifically, interface data of the transponder corresponding to the execution operation instruction may be obtained through interface simulation, where the interface data includes an actual test result of the required test item, and the actual test result of the required test item may be a line slope, a track section, line speed information, temporary speed limit information, and the like. Interface data of the simulation relay and the simulation ZPW corresponding to the execution operation instruction can be obtained through interface simulation, the interface data comprise actual test results of required test items, and the actual test results of the required test items can be the section clearing state. Interface data of the execution operation instruction corresponding to the simulated CBI can also be obtained through interface simulation, the interface data comprise actual test results of required test items, and the actual test results of the required test items can be access information, directional relay information and the like. Interface data simulating corresponding execution operation instructions of adjacent TCC can be obtained through interface simulation, the interface data comprise actual test results of required test items, and the actual test results of the required test items can be sent for adjacent station vehicle receiving and adjacent station boundary sections. Interface data of the execution operation instruction corresponding to the simulated CTC can be acquired through interface simulation, the interface data comprise actual test results of required test items, and the actual test results of the required test items can be total interval unlocking commands, vehicle occupation free commands and the like. The acquisition of the actual test result of the required test item may be set according to the actual situation, and is not limited herein.
Interface data of an execution operation instruction corresponding to the required test item is acquired through interface simulation, the interface data comprise an actual test result of the required test item, and the actual test result of the required test item can be directly acquired through interface equipment, so that the actual test result is more accurate.
And S106, judging whether the actual test result is consistent with the expected test result, and recording the judgment result.
Step S106 is the same as step 1005, and therefore will not be described herein again.
S107, judging whether the test item is the last test item, if so, generating all test results according to the judgment result; and if not, processing the next test item according to the corresponding execution operation instruction of the test item.
Specifically, judging whether the test item is the last test item, if so, generating a test result according to the judgment result, and storing the test result in an excel file; if not, processing the next test item according to the corresponding execution operation instruction of the test item, namely returning to the step S104 to execute the corresponding operations from the step S104 to the step S107 on the next test item until all the test items are tested.
The method for processing the next test item according to the corresponding execution operation instruction of the test item comprises the following steps:
and sequentially selecting the next test item from the unprocessed test items, and processing the sequentially selected next test item according to the corresponding execution operation instruction of the test item. Therefore, the next test item can be sequentially processed according to the sequence, and the next test item can be rapidly selected, so that the speed of processing the next test item according to the corresponding execution operation instruction of the test item is improved.
As can be seen from the above, in the method for testing the interval occupation logic check function of the train control center provided in the embodiment of the present invention, first, line data is obtained; determining the test items and the expected test results of the test items according to the line names, the line direction information, the section information and the like and the test item generation instructions; then, according to the selection instruction, selecting the required test item from the test items; detecting whether the needed test items comprise restart or not, and if the needed test items comprise restart, restarting the train control center through remote control power supply equipment; acquiring interface data after executing an operation instruction corresponding to the required test item through interface simulation, wherein the interface data comprises an actual test result of the required test item; judging whether the actual test result is consistent with the expected test result or not, and recording the judgment result; finally, judging whether the test item is the last test item, if so, generating a test result according to the judgment result; and if not, processing the next test item according to the corresponding execution operation instruction of the test item. Namely, the test method for the interval occupation logic check function of the train control center provided by the embodiment of the invention; interface data after the corresponding execution operation instruction of the required test item can be automatically acquired through interface simulation, the actual test result of the required test item can be obtained, and the actual test result of the required test item can be directly acquired through the interface equipment, so that the actual test result is more accurate.
Based on the same inventive concept, as an implementation of the method, the embodiment of the invention also provides a test system for the interval occupation logic check function of the train control center. Fig. 2 is a schematic structural diagram of a system in an embodiment of the present invention, and referring to fig. 2, the system 20 may include: a data acquisition module 201, configured to acquire line data; the test item generation 202 is used for determining the test items and expected test results of the test items according to the line data and the test item generation instructions; the remote control power supply equipment restarting module 203 is used for detecting whether the test items comprise restarting or not, and if the test items comprise restarting, restarting the train control center through the remote control power supply equipment; the execution module 204 is configured to process the test item according to the corresponding execution operation instruction of the test item, so as to obtain an actual test result of the test item; the determining module 205 is configured to determine whether the actual test result is consistent with the expected test result, and record the determination result.
As an optional implementation manner of the embodiment of the present invention, the system further includes: the selection module is used for selecting the required test items from the test items according to the selection instruction; correspondingly, the remote control power device restart module 203 is: the system comprises a remote control power supply device, a train control center, a test module and a power supply device, wherein the remote control power supply device is used for remotely controlling the power supply device; accordingly, the execution module 204 is: the method is specifically used for processing the required test items according to the corresponding execution operation instructions of the required test items to obtain the actual test results of the required test items.
As an optional implementation manner of the embodiment of the present invention, the execution module 204 is specifically configured to obtain interface data of an execution operation instruction corresponding to the required test item through interface simulation, where the interface data includes an actual test result of the required test item.
As an optional implementation manner of the embodiment of the present invention, the line data includes a line name, line direction information, section information, and the like; the test item generating module 202 is specifically configured to determine the test item and an expected test result of the test item according to the line name, the line direction information, the section information, and a test item generating instruction, where the expected test result includes an expected direction of the train on the line and an expected section state, and the expected section state includes normal occupancy, fault occupancy, missing shunt, or idle; correspondingly, the executing module 204 is specifically configured to determine an actual segment state according to the line name, the line direction information, and the segment information, where the actual segment state includes normal occupation, fault occupation, missing shunt, or idle.
As an optional implementation manner of the embodiment of the present invention, the system further includes: the test item judging module is used for judging whether the test item is the last test item or not, and if so, generating a test result according to the judgment result; and if not, processing the next test item according to the execution operation instruction corresponding to the test item.
Here, it should be noted that: the above description of the apparatus embodiments, similar to the above description of the method embodiments, has similar beneficial effects as the method embodiments. For technical details not disclosed in the embodiments of the apparatus according to the invention, reference is made to the description of the embodiments of the method according to the invention for understanding.
The above are merely examples of the present application and are not intended to limit the present application. Various modifications and changes may occur to those skilled in the art. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included in the scope of the claims of the present application.

Claims (8)

1. A test method for a section occupation logic check function of a train control center is characterized by comprising the following steps:
acquiring line data;
determining a test item and an expected test result of the test item according to the line data and a test item generation instruction;
detecting whether the test item includes restart or not, and if the test item includes restart, restarting the train control center through remote control power supply equipment;
processing the test item according to the execution operation instruction corresponding to the test item to obtain an actual test result of the test item;
judging whether the actual test result is consistent with the expected test result or not, and recording a judgment result;
the detecting whether the test item includes a restart condition further comprises:
selecting a required test item from the test items according to a selection instruction;
correspondingly, the detecting whether the test item includes restart or not, and if the test item includes restart, restarting the column control center through a remote control power supply device includes:
detecting whether the needed test items comprise restart or not, and if the needed test items comprise restart, restarting the train control center through remote control power supply equipment;
correspondingly, the step of processing the test item according to the corresponding execution operation instruction of the test item to obtain an actual test result of the test item includes:
and processing the required test item according to the execution operation instruction corresponding to the required test item to obtain an actual test result of the required test item.
2. The method according to claim 1, wherein the step of processing the required test item according to the corresponding execution operation instruction of the required test item to obtain an actual test result of the required test item comprises:
and acquiring interface data of the execution operation instruction corresponding to the required test item through interface simulation, wherein the interface data comprises an actual test result of the required test item.
3. The method of claim 1, wherein the line data includes a line name, line direction information, and section information;
the determining a test item and an expected test result of the test item according to the line data and the test item generation instruction comprises:
determining the expected test results of the test items and the test items according to the line names, the line direction information, the section information and test item generating instructions, wherein the expected test results comprise the expected direction of the train on the line and the expected section state, and the expected section state comprises normal occupation, fault occupation, missing shunting or idle state;
correspondingly, the processing the test item according to the corresponding execution operation instruction of the test item to obtain the actual test result of the test item includes:
and determining the actual section state according to the line name, the line direction information and the section information, wherein the actual section state comprises normal occupation, fault occupation, shunt loss or idle state.
4. The method of claim 1, wherein said determining whether the actual test result is consistent with the expected test result and recording the determination result further comprises:
judging whether the test item is the last test item, if so, generating a test result according to the judgment result; and if not, processing the next test item according to the execution operation instruction corresponding to the test item.
5. A test system for a section occupation logic check function of a train control center is characterized by comprising:
the data acquisition module is used for acquiring line data;
the test item generating module is used for determining a test item and an expected test result of the test item according to the line data and a test item generating instruction;
the remote control power supply equipment restarting module is used for detecting whether the test item comprises restarting or not, and if the test item comprises restarting, restarting the train control center through the remote control power supply equipment;
the execution module is used for processing the test item according to the execution operation instruction corresponding to the test item to obtain an actual test result of the test item;
the judging module is used for judging whether the actual test result is consistent with the expected test result or not and recording the judgment result;
the system further comprises:
the selection module is used for selecting the required test items from the test items according to the selection instruction;
correspondingly, the remote control power supply equipment restarting module is that:
the system is specifically used for detecting whether the needed test items include restart or not, and if the needed test items include restart, restarting the train control center through remote control power supply equipment;
correspondingly, the execution module is:
and the method is specifically configured to process the required test item according to the execution operation instruction corresponding to the required test item to obtain an actual test result of the required test item.
6. The system of claim 5,
the execution module is specifically configured to obtain interface data of an execution operation instruction corresponding to a required test item through interface simulation, where the interface data includes an actual test result of the required test item.
7. The system of claim 5, wherein the route data includes a route name, route direction information, and section information;
the test item generating module is specifically configured to determine the test item and an expected test result of the test item according to the line name, the line direction information, the section information, and a test item generating instruction, where the expected test result includes an expected direction of the train on the line and an expected section state, and the expected section state includes normal occupancy, fault occupancy, missing shunt, or idle;
correspondingly, the execution module is specifically configured to determine an actual segment state according to the line name, the line direction information, and the segment information, where the actual segment state includes normal occupation, fault occupation, missing shunt, or idle.
8. The system of claim 5, further comprising:
the test item judging module is used for judging whether the test item is the last test item or not, and if so, generating a test result according to the judgment result; and if not, processing the next test item according to the execution operation instruction corresponding to the test item.
CN202010074925.6A 2020-01-22 2020-01-22 Test method and system for interval occupation logic check function of train control center Active CN111258299B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010074925.6A CN111258299B (en) 2020-01-22 2020-01-22 Test method and system for interval occupation logic check function of train control center

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010074925.6A CN111258299B (en) 2020-01-22 2020-01-22 Test method and system for interval occupation logic check function of train control center

Publications (2)

Publication Number Publication Date
CN111258299A CN111258299A (en) 2020-06-09
CN111258299B true CN111258299B (en) 2021-05-28

Family

ID=70949179

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010074925.6A Active CN111258299B (en) 2020-01-22 2020-01-22 Test method and system for interval occupation logic check function of train control center

Country Status (1)

Country Link
CN (1) CN111258299B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111708708A (en) * 2020-06-22 2020-09-25 卡斯柯信号(北京)有限公司 Automatic test method and device for interval occupation logic check function
CN111703473B (en) * 2020-07-21 2024-07-12 北京西南交大盛阳科技股份有限公司 Manual unlocking device for section occupation logic inspection and control method thereof
CN112099478A (en) * 2020-11-10 2020-12-18 卡斯柯信号(北京)有限公司 Automatic test method and device for temporary speed limit message of train control center
CN113419970B (en) * 2021-08-24 2021-12-24 卡斯柯信号(北京)有限公司 Interface fault testing method and device
CN113552439B (en) * 2021-09-22 2022-01-07 卡斯柯信号(北京)有限公司 Track circuit tuning area testing method and device
CN114137940B (en) * 2021-11-29 2024-03-12 卡斯柯信号有限公司 Method for automatically switching section occupation logic inspection according to section running direction
CN115118627B (en) * 2022-08-29 2022-12-09 卡斯柯信号(北京)有限公司 Temporary speed limiting server testing method and device
CN115328103A (en) * 2022-10-13 2022-11-11 卡斯柯信号(北京)有限公司 Method and device for testing interval occupation logic check function
CN116661427B (en) * 2023-07-25 2023-10-31 卡斯柯信号(北京)有限公司 Parallel test method and device for checking logic occupation of column control center interval

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102267477A (en) * 2011-05-16 2011-12-07 北京全路通信信号研究设计院有限公司 Temporary speed-restricting command sending method and device of C3 system
CN102991535A (en) * 2012-12-07 2013-03-27 北京交控科技有限公司 Automatic test method for unlocking logic of entering section in interlocking system
CN104008050A (en) * 2014-05-16 2014-08-27 北京交通大学 System and method for automatically generating interface type test testing sequence
CN109298648A (en) * 2018-11-28 2019-02-01 卡斯柯信号有限公司 A kind of train control center emulation Auto-Test System
CN110442040A (en) * 2019-07-26 2019-11-12 卡斯柯信号有限公司 The interactive simulation test method of section occupied audit function between TCC and TSRS

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102267477A (en) * 2011-05-16 2011-12-07 北京全路通信信号研究设计院有限公司 Temporary speed-restricting command sending method and device of C3 system
CN102991535A (en) * 2012-12-07 2013-03-27 北京交控科技有限公司 Automatic test method for unlocking logic of entering section in interlocking system
CN104008050A (en) * 2014-05-16 2014-08-27 北京交通大学 System and method for automatically generating interface type test testing sequence
CN109298648A (en) * 2018-11-28 2019-02-01 卡斯柯信号有限公司 A kind of train control center emulation Auto-Test System
CN110442040A (en) * 2019-07-26 2019-11-12 卡斯柯信号有限公司 The interactive simulation test method of section occupied audit function between TCC and TSRS

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
自动闭塞区间列车占用逻辑检查的试验;鲁恩斌;《铁道通信信号》;20150430;全文 *

Also Published As

Publication number Publication date
CN111258299A (en) 2020-06-09

Similar Documents

Publication Publication Date Title
CN111258299B (en) Test method and system for interval occupation logic check function of train control center
CN109298648B (en) Simulation automatic test system for train control center
CN112099478A (en) Automatic test method and device for temporary speed limit message of train control center
CN103744781B (en) A kind of method of testing of interlocking software and test macro
CN110990297A (en) Testing method and device of interlocking system and electronic equipment
CN110704323B (en) Automatic data testing method and device based on rail transit line data
CN102402628A (en) Method and system for generating systems-on-a-chip (SoC) verification platform
CN108983077B (en) Circuit board test system and test method based on JTAG link
CN107766209B (en) Central control automation test method, device, equipment and computer readable storage medium
CN112527683B (en) Automatic interface test system for computer interlocking system and application
CN105490881A (en) Configurable data interface test method and system
CN111994138A (en) Test method and device for train control center track circuit coding
CN104101504A (en) Motor car automatic testing method and device
CN109344085A (en) A kind of method and system for analyzing satellite test data
CN114706747A (en) Automatic test system for TACS (train operation control System)
CN113133041A (en) Method and device for testing vehicle-to-vehicle communication function in dynamic interval train control vehicle
JP6440563B2 (en) Test apparatus and test method
CN113703417B (en) Method and device for determining test cases of full-automatic scene of train operation
CN110667654B (en) Indoor test method and device for information consistency of CBTC system transponder
CN108508879A (en) A kind of high ferro control cabinet detecting system
CN114113851B (en) Fault testing method and system for alternating current electric switch machine
CN103500112A (en) Software version control method
CN114942623B (en) Method and device for testing controller, vehicle and computer readable storage medium
CN109491845B (en) Test method and system for storage product controller
CN109945892B (en) Online testing method for complex algorithm requirements of inertial navigation system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant