CN111257689B CN202010086097.8A CN202010086097A CN111257689B CN 111257689 B CN111257689 B CN 111257689B CN 202010086097 A CN202010086097 A CN 202010086097A CN 111257689 B CN111257689 B CN 111257689B
Authority
CN
China
Prior art keywords
section
contact
current
virtual impedance
line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202010086097.8A
Other languages
English (en)
Other versions
CN111257689A (zh
Inventor
易东
李群湛
解绍锋
郭锴
马庆安
张丽
王帅
王辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Jiaotong University
China State Railway Group Co Ltd
China Railway Qinghai Tibet Group Co Ltd
Original Assignee
Southwest Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Jiaotong University filed Critical Southwest Jiaotong University
Priority to CN202010086097.8A priority Critical patent/CN111257689B/zh
Publication of CN111257689A publication Critical patent/CN111257689A/zh
Application granted granted Critical
Publication of CN111257689B publication Critical patent/CN111257689B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/08Locating faults in cables, transmission lines, or networks
    • G01R31/081Locating faults in cables, transmission lines, or networks according to type of conductors
    • G01R31/086Locating faults in cables, transmission lines, or networks according to type of conductors in power transmission or distribution networks, i.e. with interconnected conductors
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R27/00Arrangements for measuring resistance, reactance, impedance, or electric characteristics derived therefrom
    • G01R27/02Measuring real or complex resistance, reactance, impedance, or other two-pole characteristics derived therefrom, e.g. time constant

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)

Abstract

本发明公开了一种AT供电接触网电气性能评估方法,属于电气化铁路供电技术领域。若AT段内无车时,AT段接触线T首端和末端电流幅值基本相等,且电流方向相同(以变电所为参考),当车进入AT段时,AT段首端电流会有较大增加,且将大于接触线T末端电流。当车在AT段末端时,AT段接触线T首端和末端电流幅值不相等,当车驶出AT段末端时,AT段接触线T首端和末端电流幅值相等,且电流方向相同。在列车每次驶入AT段和驶出AT段后计算接触线T的虚拟阻抗,负馈线F的虚拟阻抗。利用接触线T、负馈线F的虚拟阻抗与相应的虚拟阻抗理论值的差异识别接触线断线等情况,对AT接触网电气性能变化趋势进行记录和评判。

Description

一种AT供电接触网电气性能评估方法
技术领域
本发明涉及电气化铁路牵引供电技术领域。
背景技术
我国高速铁路无一例外地采用电力牵引。随着高速铁路里程的增加,牵引供电系统的安全、良好运行不能不受到高度重视。
AT(Auto Transformer,自耦变压器)供电方式具有更长的供电区段、更大的供电能力之优势,能够更好地满足高速铁路行车密度较大、运行速度高、供电容量大的要求,成为了我国高速铁路在现阶段的主流供电方式。
牵引网没有备用,且暴露于大自然中,加之弓网高速接触,容易导致故障的发生,引起断电,影响正常运行。牵引供电系统结构复杂、工作条件恶劣。沿铁路线路架设的接触网零件众多,地理分布广泛,工作于露天环境,需承受机车受电弓的高速冲击,且无备用,这些特点都导致了牵引供电系统的故障较易发生。
目前铁路供电系统普遍釆取故障后处理方式,故障恢复速度慢,容易造成巨大的经济损失和不良的社会影响。牵引供电系统目前的管理模式存在以下问题:
(1)故障发生后才进行处理。对牵引供电系统日常的运行状态认识不清,只有等故障发生后才进行处理,是一种消极被动的处理方式,故障后抢修模式给现场抢修人员带来巨大工作压力,容易导致人身伤害事故的发生,同时难以满足铁路对接触网状态高精确度的要求。
(2)故障之后的查找和恢复速度慢。现有的故障诊断方法精度不髙,故障后的查找和处理工作量大,列车停运时间长。
(3)缺乏有效的故障预防措施。对牵引供电系统未来可能发生的情况估计不足,缺乏有效的干预措施。
设备或系统故障的发生,是众多因素随时间累积的结果,其产生、发展必然经历一个时间过程,有时看似偶然的故障,也存在着内在的规律性,即使是突发性故障也存在孕育、发展的时期。若能对牵引供电系统的运行状态进行准确评估,掌握系统的实时工作状态,并从中总结系统状态演化发展的规律,根据规律就能提前识别出设备或系统的异常,提早对其进行检修或更换,将能减小牵引供电系统事故发生的概率,避免故障的发生。
发明内容
本发明的目的是提供一种AT供电接触网电气性能评估方法,它能有效地解决在线计算AT段的虚拟阻抗并与其理论计算值进行实时比较、评判的技术问题。
本发明解决其技术问题,所采用的技术方案为:
一种AT供电接触网电气性能评估方法,设电气化铁路AT牵引网额定电压为E,AT段的长度为D,接触线T的自阻抗为ZT,负馈线F的自阻抗为ZF,接触线T与负馈线F的互阻抗为ZTF;当列车在AT段首端时,同步测量AT段接触线TTF首端电压
Figure GDA0002719079720000011
和末端电压
Figure GDA0002719079720000012
接触线T的电流
Figure GDA0002719079720000013
负馈线F的电流
Figure GDA0002719079720000014
当列车在AT段末端时,同步测量AT段接触线TTF的首端电压
Figure GDA0002719079720000015
和末端电压
Figure GDA0002719079720000016
接触线T的电流
Figure GDA0002719079720000017
负馈线F的电流
Figure GDA0002719079720000018
(1)在列车每次驶入AT段和驶出AT段后,用公式(1)计算接触线T的虚拟阻抗ZT(xn),用公式(2)计算负馈线F的虚拟阻抗ZF(xn)
Figure GDA0002719079720000021
Figure GDA0002719079720000022
接触线T的虚拟阻抗ZT(xn)的理论值ZT(ll)由公式(3)得到,负馈线F的虚拟阻抗ZF(xn)的理论值ZF(ll)由公式(4)得到,
ZT(ll)=D(ZT-ZTF) (3)
ZF(ll)=D(ZF-ZTF) (4)
式中:长度D的单位为km,各种阻抗Z单位均为Ohm/km;牵引网额定电压E、接触线TTF首端电压
Figure GDA0002719079720000023
和末端电压
Figure GDA0002719079720000024
的单位均为V,电流
Figure GDA0002719079720000025
Figure GDA0002719079720000026
的单位均为A;
(2)负馈线F的虚拟阻抗ZF(xn)与其理论值ZF(ll)基本相等时,AT段的负馈线F电气性能无变化;负馈线F的虚拟阻抗ZF(xn)大于其理论值ZF(ll)时,判断负馈线F存在断股,断线的情况;
(3)接触线T的虚拟阻抗ZT(xn)与其理论值ZT(ll)基本相等时,AT段接触线T电气性能无变化;接触线T的虚拟阻抗ZT(xn)大于其理论值ZT(ll)时,判断接触线T存在断股,断线,磨耗加剧或承力索断线的情况;
(4)负馈线F的虚拟阻抗ZF(xn)小于其理论值ZF(ll)且接触线T的虚拟阻抗ZT(xn)也小于其理论值ZT(ll)时,则判断是负馈线F和接触线T线间距离变近;
记录接触线T的虚拟阻抗ZT(xn),负馈线F的虚拟阻抗ZF(xn),形成历史数据库,生成变化趋势,当其变化量超过设定值时,需要对该AT段进行检修或维修;
当同一电气化铁路或供电臂有多个AT区段时,每个AT段的接触线T的虚拟阻抗ZT(xn),负馈线F的虚拟阻抗ZF(xn)与理论值误差应基本接近,若差别较大时,则判断该AT段存在施工质量问题。
所述权利要求1中用到的数据条件是:以AT供电方式的同一变电所为参考,设列车在AT段首端或列车在AT段末端,(1)、若AT段内无车时,AT段接触线T首端和末端电流幅值基本相等,且电流方向相同;当列车进入AT段时,AT段首端电流会有较大增加,且大于接触线T末端的电流;(2)、当列车在AT段末端时,AT段接触线T首端和末端电流幅值不相等,当列车驶出AT段末端时,AT段接触线T首端和末端电流幅值相等,且电流方向相同。
本发明的工作原理是:一种AT供电接触网电气性能评估方法法,电气化铁路AT牵引网额定电压为E,AT段的长度为D,接触线T的自阻抗为ZT,负馈线F的自阻抗为ZF,接触线T与负馈线F的互阻抗为ZTF;当列车在AT段首端时,同步测量AT段接触线TTF首端电压
Figure GDA0002719079720000031
和末端电压
Figure GDA0002719079720000032
接触线T电流
Figure GDA0002719079720000033
负馈线F电流
Figure GDA0002719079720000034
当车在AT段末端时,同步测量AT段接触线TTF首端电压
Figure GDA0002719079720000035
和末端电压
Figure GDA0002719079720000036
接触线T电流
Figure GDA0002719079720000037
负馈线F电流
Figure GDA0002719079720000038
在列车每次驶入AT段和驶出AT段后用公式(1)计算接触线T的虚拟阻抗ZT(xn),用公式(2)计算负馈线F的虚拟阻抗ZF(xn)。接触线T的虚拟阻抗ZT(xn)的理论值ZT(ll)由公式(3)得到,负馈线F的虚拟阻抗ZF(xn)的理论值ZF(ll)由公式(4)得到。
利用接触线T、负馈线F的虚拟阻抗与相应的虚拟阻抗理论值的差异可以对AT接触网电气性能变化趋势进行记录和评判,当其变化量超过设定值时,对该AT段进行检修和维修,减少事故的发生。
与现有技术相比,本发明技术的有益效果是:
一、利用列车进入和离开AT段两端电压、电流进行接触网虚拟阻抗计算,对接触网断股、断线等进行识别。
二、利用接触线T、负馈线F的虚拟阻抗与相应的虚拟阻抗理论值的差异可以对AT接触网电气性能变化趋势进行记录和评判,当其变化量超过设定值时,对该AT段进行检修和维修,减少事故的发生。
三、通用性好,易于实施。
附图说明
图1是本发明流程图。
图2是本发明列车在AT段首端的示意图。
图3是本发明列车在AT段末端的示意图。
具体实施方式
如图1所示,本发明实施例提供了一种AT供电接触网电气性能评估方法,若AT段内无车时,AT段接触线T线首端和末端电流幅值基本相等,且电流方向相同(以变电所为参考),当列车进入AT段时,AT段首端电流会有较大增加,且将大于接触线T末端电流。当列车在AT段末端时,AT段T线首端和末端电流幅值不相等,当列车驶出AT段末端时,AT段接触线T首端和末端电流幅值相等,且电流方向相同(以变电所为参考)。在列车每次驶入AT段和驶出AT段后用公式计算接触线T的虚拟阻抗ZT(xn),负馈线F的虚拟阻抗ZF(xn)。负馈线F的虚拟阻抗ZF(xn)与其理论值ZF(ll)基本相等时,AT段负馈线F电气性能无变化;负馈线F的虚拟阻抗ZF(xn)大于其理论值ZF(ll)时,负馈线F可能存在断股,断线等情况。接触线T的虚拟阻抗ZT(xn)与其理论值ZT(ll)基本相等时,AT段接触线T电气性能无变化;接触线T的虚拟阻抗ZT(xn)大于其理论值ZT(ll)时,接触线可能存在断股,断线,磨耗加剧或承力索断线等情况。负馈线F的虚拟阻抗ZF(xn)小于其理论值ZF(ll)且接触线T的虚拟阻抗ZT(xn)也小于其理论值ZT(ll)时,则可能是负馈线F和接触线T线间距离变近。
如图2所示,电气化铁路AT牵引网额定电压为E,AT段的长度为D,接触线T自阻抗为ZT,负馈线F自阻抗为ZF,接触线T与负馈线F的互阻抗为ZTF;当列车在AT段首端时,同步测量AT段接触线TTF首端电压
Figure GDA0002719079720000041
和末端电压
Figure GDA0002719079720000042
接触线T电流
Figure GDA0002719079720000043
负馈线F电流
Figure GDA0002719079720000044
当列车在AT段末端时,同步测量AT段接触线TTF首端电压
Figure GDA0002719079720000045
和末端电压
Figure GDA0002719079720000046
接触线T的电流
Figure GDA0002719079720000047
负馈线F的电流
Figure GDA0002719079720000048
在列车每次驶入AT段和驶出AT段后用公式(1)计算接触线T的虚拟阻抗ZT(xn),用公式(2)计算负馈线F的虚拟阻抗ZF(xn)。接触线T的虚拟阻抗ZT(xn)的理论值ZT(ll)由公式(3)得到,负馈线F虚拟阻抗ZF(xn)的理论值ZF(ll)由公式(4)得到。利用接触线T与负馈线F的虚拟阻抗与相应的虚拟阻抗理论值的差异可以对AT接触网电气性能变化趋势进行记录和评判,当其变化量超过设定值时,对该AT段进行检修和维修,减少事故的发生。

Claims (2)

1.一种AT供电接触网电气性能评估方法,设电气化铁路AT牵引网额定电压为E,AT段的长度为D,接触线T的自阻抗为ZT,负馈线F的自阻抗为ZF,接触线T与负馈线F的互阻抗为ZTF;当列车在AT段首端时,同步测量AT段接触线TTF首端电压
Figure FDA0002719079710000011
和末端电压
Figure FDA0002719079710000012
接触线T的电流
Figure FDA0002719079710000013
负馈线F的电流
Figure FDA0002719079710000014
当列车在AT段末端时,同步测量AT段接触线TTF的首端电压
Figure FDA0002719079710000015
和末端电压
Figure FDA0002719079710000016
接触线T的电流
Figure FDA0002719079710000017
负馈线F的电流
Figure FDA0002719079710000018
其特征在于:
(1)在列车每次驶入AT段和驶出AT段后,用公式(1)计算接触线T的虚拟阻抗ZT(xn),用公式(2)计算负馈线F的虚拟阻抗ZF(xn)
Figure FDA0002719079710000019
Figure FDA00027190797100000110
接触线T的虚拟阻抗ZT(xn)的理论值ZT(ll)由公式(3)得到,负馈线F的虚拟阻抗ZF(xn)的理论值ZF(ll)由公式(4)得到,
ZT(ll)=D(ZT-ZTF) (3)
ZF(ll)=D(ZF-ZTF) (4)
式中:长度D的单位为km,各种阻抗Z单位均为Ohm/km;牵引网额定电压E、接触线TTF首端电压
Figure FDA00027190797100000111
和末端电压
Figure FDA00027190797100000112
的单位均为V,电流
Figure FDA00027190797100000113
Figure FDA00027190797100000114
的单位均为A;
(2)负馈线F的虚拟阻抗ZF(xn)与其理论值ZF(ll)基本相等时,AT段的负馈线F电气性能无变化;负馈线F的虚拟阻抗ZF(xn)大于其理论值ZF(ll)时,判断负馈线F存在断股,断线的情况;
(3)接触线T的虚拟阻抗ZT(xn)与其理论值ZT(ll)基本相等时,AT段接触线T电气性能无变化;接触线T的虚拟阻抗ZT(xn)大于其理论值ZT(ll)时,判断接触线T存在断股,断线,磨耗加剧或承力索断线的情况;
(4)负馈线F的虚拟阻抗ZF(xn)小于其理论值ZF(ll)且接触线T的虚拟阻抗ZT(xn)也小于其理论值ZT(ll)时,则判断是负馈线F和接触线T线间距离变近;
记录接触线T的虚拟阻抗ZT(xn),负馈线F的虚拟阻抗ZF(xn),形成历史数据库,生成变化趋势,当其变化量超过设定值时,需要对该AT段进行检修或维修;
当同一电气化铁路或供电臂有多个AT区段时,每个AT段的接触线T的虚拟阻抗ZT(xn),负馈线F的虚拟阻抗ZF(xn)与理论值误差应基本接近,若差别较大时,则判断该AT段存在施工质量问题。
2.根据权利要求1所述的一种AT供电接触网电气性能评估方法,其特征在于:所述权利要求1中用到的数据条件是:以AT供电方式的同一变电所为参考,设列车在AT段首端或列车在AT段末端,(1)、若AT段内无车时,AT段接触线T首端和末端电流幅值基本相等,且电流方向相同;当列车进入AT段时,AT段首端电流会有较大增加,且大于接触线T末端的电流;(2)、当列车在AT段末端时,AT段接触线T首端和末端电流幅值不相等,当列车驶出AT段末端时,AT段接触线T首端和末端电流幅值相等,且电流方向相同。
CN202010086097.8A 2020-02-11 2020-02-11 一种at供电接触网电气性能评估方法 Active CN111257689B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010086097.8A CN111257689B (zh) 2020-02-11 2020-02-11 一种at供电接触网电气性能评估方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010086097.8A CN111257689B (zh) 2020-02-11 2020-02-11 一种at供电接触网电气性能评估方法

Publications (2)

Publication Number Publication Date
CN111257689A CN111257689A (zh) 2020-06-09
CN111257689B true CN111257689B (zh) 2020-11-27

Family

ID=70948151

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010086097.8A Active CN111257689B (zh) 2020-02-11 2020-02-11 一种at供电接触网电气性能评估方法

Country Status (1)

Country Link
CN (1) CN111257689B (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113071538B (zh) * 2021-04-28 2021-12-10 西南交通大学 一种单线at牵引网列车运行方向辨识方法及系统

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0045113A1 (de) * 1980-07-30 1982-02-03 BBC Aktiengesellschaft Brown, Boveri & Cie. Verfahren und Anordnung zur Lokalisierung eines Erdschlusses
US4317151A (en) * 1979-01-03 1982-02-23 Bbc Brown, Boveri & Company Limited Apparatus for fault direction-comparison protection
JPS60180424A (ja) * 1984-02-28 1985-09-14 三菱電機株式会社 短絡距離継電器
US4751721A (en) * 1987-02-11 1988-06-14 Digital Equipment Corporation Apparatus and method for testing contact interruptions of circuit interconnection devices
JP2004301670A (ja) * 2003-03-31 2004-10-28 Denso Corp センサ装置用断線検出回路
CN101404409A (zh) * 2008-11-17 2009-04-08 国电南瑞科技股份有限公司 电气化铁路at供电接触网断线接地故障识别方法
CN101923138A (zh) * 2010-07-23 2010-12-22 南京国电南自轨道交通工程有限公司 内置了gps模块的at线路故障测距系统
CN102087316A (zh) * 2010-11-09 2011-06-08 西南交通大学 一种v/x接线牵引变压器短路电抗在线监测的方法
CN102436919A (zh) * 2011-12-28 2012-05-02 卧龙电气集团股份有限公司 用于at供电方式高速电气化铁路的单相牵引变压器
CN103715670A (zh) * 2013-12-30 2014-04-09 西南交通大学 一种基于阻抗特征的高速铁路供电臂联跳保护方法
CN103792433A (zh) * 2014-02-21 2014-05-14 国家电网公司 以火花系数修正杆塔接地装置的低幅值冲击电阻测量方法
CN105653818A (zh) * 2016-01-21 2016-06-08 中铁二院工程集团有限责任公司 一种电气化铁路牵引网阻抗计算方法
CN106055767A (zh) * 2016-05-25 2016-10-26 西南交通大学 电气化铁路at牵引供电系统的状态空间模型建立方法
CN106356876A (zh) * 2016-09-08 2017-01-25 国网吉林省电力有限公司延边供电公司 高铁at供电方式下注入电力系统的负序电流计算模型
CN109188209A (zh) * 2018-09-29 2019-01-11 江苏新绿能科技有限公司 At供电方式接触网接地故障识别方法

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4317151A (en) * 1979-01-03 1982-02-23 Bbc Brown, Boveri & Company Limited Apparatus for fault direction-comparison protection
EP0045113A1 (de) * 1980-07-30 1982-02-03 BBC Aktiengesellschaft Brown, Boveri & Cie. Verfahren und Anordnung zur Lokalisierung eines Erdschlusses
JPS60180424A (ja) * 1984-02-28 1985-09-14 三菱電機株式会社 短絡距離継電器
US4751721A (en) * 1987-02-11 1988-06-14 Digital Equipment Corporation Apparatus and method for testing contact interruptions of circuit interconnection devices
JP2004301670A (ja) * 2003-03-31 2004-10-28 Denso Corp センサ装置用断線検出回路
CN101404409A (zh) * 2008-11-17 2009-04-08 国电南瑞科技股份有限公司 电气化铁路at供电接触网断线接地故障识别方法
CN101923138A (zh) * 2010-07-23 2010-12-22 南京国电南自轨道交通工程有限公司 内置了gps模块的at线路故障测距系统
CN102087316A (zh) * 2010-11-09 2011-06-08 西南交通大学 一种v/x接线牵引变压器短路电抗在线监测的方法
CN102436919A (zh) * 2011-12-28 2012-05-02 卧龙电气集团股份有限公司 用于at供电方式高速电气化铁路的单相牵引变压器
CN103715670A (zh) * 2013-12-30 2014-04-09 西南交通大学 一种基于阻抗特征的高速铁路供电臂联跳保护方法
CN103792433A (zh) * 2014-02-21 2014-05-14 国家电网公司 以火花系数修正杆塔接地装置的低幅值冲击电阻测量方法
CN105653818A (zh) * 2016-01-21 2016-06-08 中铁二院工程集团有限责任公司 一种电气化铁路牵引网阻抗计算方法
CN106055767A (zh) * 2016-05-25 2016-10-26 西南交通大学 电气化铁路at牵引供电系统的状态空间模型建立方法
CN106356876A (zh) * 2016-09-08 2017-01-25 国网吉林省电力有限公司延边供电公司 高铁at供电方式下注入电力系统的负序电流计算模型
CN109188209A (zh) * 2018-09-29 2019-01-11 江苏新绿能科技有限公司 At供电方式接触网接地故障识别方法

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
Hierarchical nested predictive control for energy management of multi-microgrids system;Yuanyuan Zou 等;《2017 11th Asian Control Conference (ASCC)》;20171217;全文 *
可控测量频带的牵引供电系统频域阻抗测量方法;潘鹏宇 等;《中国电机工程学报》;20190930;全文 *
电气化铁道复线AT供电网络研究;李爱武 等;《铁道运营技术》;20100331;全文 *

Also Published As

Publication number Publication date
CN111257689A (zh) 2020-06-09

Similar Documents

Publication Publication Date Title
CN108845232B (zh) 一种直供牵引网上、下行接触网并联状态识别方法
CN102508092B (zh) 不依赖于gps对时的at接触网故障类型和方向的判别方法
CN111257688B (zh) 一种电气化铁路接触网电气性能评估方法
CN112904149B (zh) 一种单线at双边供电牵引网故障测距计算方法
CN111257689B (zh) 一种at供电接触网电气性能评估方法
WO2013045242A2 (de) Fahrleitungsanlage zur traktionsversorgung eines elektrischen triebfahrzeuges
CN113466597A (zh) 一种轨道交通供电系统设备状态智能检测方法
CN111274649B (zh) 一种单线直供电气化铁路接触网电气性能评估方法
CN109085456A (zh) 一种at段的用电列车位置及高阻故障位置的判别方法
CN102756672B (zh) 一种电气化铁路接触网融冰系统
Liu et al. Reliability evaluating for traction drive system of high-speed electrical multiple units
CN112406966A (zh) 区间内单辆机车运行位置定位方法
CN202471869U (zh) 接触网避雷器性能在线监测系统
CN112946419B (zh) 一种电气化铁道at故障测距修正系数计算方法
CN110687401A (zh) 铁路上接触网的故障检测系统和方法
CN113808300B (zh) 一种机车检修周期确定方法及系统
CN213292050U (zh) 一种宽-米套轨直线段中电力机车共用接触网结构
Yuan et al. Improved condition monitoring system to protect railway axle bearing safety from electric corrosion
CN212313568U (zh) 一种轨道电路信号质量检测系统
CN111384710A (zh) 一种适用于城市轨道交通的接地系统
CN112924815B (zh) 一种at供电电气化铁道故障测距计算方法
CN112485585A (zh) 电缆贯通线健康状态诊断系统及其方法
CN111274724B (zh) 一种能揭示元件灵敏度的接触网运行风险评估方法
CN118501595B (zh) 一种附加导线的状态实时监测系统
CN112946420B (zh) 一种电气化铁道at段故障位置识别方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Yi Dong

Inventor after: Wang Shuai

Inventor after: Wang Hui

Inventor after: Li Yan

Inventor after: Li Qunzhan

Inventor after: Zhang Shouhong

Inventor after: Xing Ting

Inventor after: Xie Shaofeng

Inventor after: Guo Jie

Inventor after: Ma Qingan

Inventor after: Zhang Li

Inventor before: Yi Dong

Inventor before: Li Qunzhan

Inventor before: Xie Shaofeng

Inventor before: Guo Jie

Inventor before: Ma Qingan

Inventor before: Zhang Li

Inventor before: Wang Shuai

Inventor before: Wang Hui

CB03 Change of inventor or designer information
TR01 Transfer of patent right

Effective date of registration: 20210913

Address after: 100844 Fuxing Road 10, Beijing, Haidian District

Patentee after: China National Railway Group Co.,Ltd.

Patentee after: CHINA RAILWAY QINGHAI-TIBET GROUP Co.,Ltd.

Patentee after: SOUTHWEST JIAOTONG University

Address before: 610031 No. two, section 111, ring road, Chengdu, Sichuan, China

Patentee before: SOUTHWEST JIAOTONG University

TR01 Transfer of patent right