CN111255275A - Transformer field overhaul frame combined house - Google Patents

Transformer field overhaul frame combined house Download PDF

Info

Publication number
CN111255275A
CN111255275A CN202010068051.3A CN202010068051A CN111255275A CN 111255275 A CN111255275 A CN 111255275A CN 202010068051 A CN202010068051 A CN 202010068051A CN 111255275 A CN111255275 A CN 111255275A
Authority
CN
China
Prior art keywords
overhaul
transformer
frame
lifting
connecting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010068051.3A
Other languages
Chinese (zh)
Other versions
CN111255275B (en
Inventor
饶建明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengde Power Technology Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202010068051.3A priority Critical patent/CN111255275B/en
Publication of CN111255275A publication Critical patent/CN111255275A/en
Application granted granted Critical
Publication of CN111255275B publication Critical patent/CN111255275B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H5/00Buildings or groups of buildings for industrial or agricultural purposes
    • E04H5/02Buildings or groups of buildings for industrial purposes, e.g. for power-plants or factories
    • E04H5/06Pits or building structures for inspection or services
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C11/00Trolleys or crabs, e.g. operating above runways
    • B66C11/14Trolleys or crabs, e.g. operating above runways adapted to operate on crane or bridge structure of particular configuration, e.g. on reinforced concrete girders of rectangular cross-section
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C19/00Cranes comprising trolleys or crabs running on fixed or movable bridges or gantries

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Housings And Mounting Of Transformers (AREA)

Abstract

The utility model provides a transformer field overhaul frame combination room, including iron core overhaul workshop and quick-witted case overhaul workshop, and have by balanced ground beam and room body frame, dampproofing wallboard inter combination assembly constitutes, be equipped with at iron core overhaul workshop top and hang the core window, the bottom is equipped with the multiport hydraulic press, it decides smooth crane to be equipped with to install many at hanging core window top, it lifts up transformer core and quick-witted case with the horizontal mode to decide smooth crane, install quick-witted case carrier in iron core overhaul workshop and quick-witted case overhaul workshop, quick-witted case carrier is including lifting the case automobile body on a left side, the case automobile body is lifted on the right side, preceding automobile body connecting rod and back automobile body connecting rod, can carry quick-witted case again can transversely overturn quick-. According to the transformer overhaul method, the overhaul rooms which accord with the transformer overhaul conditions are erected around the transformer, and the iron core pulling and hanging overhaul mechanism and the machine case turning over overhaul mechanism are installed, so that workers can complete the transformer disassembly and inspection and maintenance work on the installation site, the time length of the transformer overhaul work is shortened, and the overhaul cost is reduced.

Description

一种变压器现场大修框架组合房A frame combination room for transformer on-site overhaul

技术领域technical field

本发明属于一种框架组合房,尤其涉及一种将变压器现场解体大修的变压器现场大修框架组合房。The invention belongs to a frame combination house, in particular to a frame combination house for on-site overhaul of a transformer by dismantling and overhauling the transformer on site.

背景技术Background technique

浸油式变压器投入运行一定年限或者发生意外事故后必须进行大修。由于变压器大修对现场环境要求较高,所以常采用将变压器整体搬运至电气检修厂房内进行大修。变压器属于精密电器设备且其自身较重,必须长时间频繁使用大型起重机、平板搬运车等起重搬运设备,并且要做好防潮、防尘、防火等保护工作,才能安全地完成整个搬运工作,因此,变压器大修工作不仅费用高,还要消耗较长的时间。Oil-immersed transformers must be overhauled after being put into operation for a certain number of years or after an accident occurs. Due to the high requirements of the on-site environment for transformer overhaul, it is often adopted to transport the transformer as a whole to the electrical maintenance workshop for overhaul. Transformers are precision electrical equipment and are heavy themselves. Large cranes, flatbed trucks and other lifting and handling equipment must be frequently used for a long time, and moisture-proof, dust-proof, fire-proof and other protection work must be done to complete the entire handling work safely. Therefore, transformer overhaul work is not only expensive, but also consumes a long time.

发明内容SUMMARY OF THE INVENTION

为了解决现有变压器大修方式费用高、耗时长的问题,本发明旨在提供一种变压器现场大修框架组合房,该框架组合房由平衡地梁、房体框架与防潮墙板组合构成,将变压器周围搭设成符合大修工作条件的工房,并安装有铁芯抽吊检修机构和机箱翻身检修机构,不需要将变压器搬运到电气检修厂房,就能完成变压器大修工作。In order to solve the problems of high cost and time-consuming existing transformer overhaul methods, the present invention aims to provide a frame combination house for on-site overhaul of transformers. A workshop that meets the working conditions of overhaul is built around it, and an iron core pulling and lifting maintenance mechanism and a chassis turning over maintenance mechanism are installed. The transformer overhaul can be completed without moving the transformer to the electrical maintenance workshop.

为了达到上述目的,本发明采用如下技术方案:一种变压器现场大修框架组合房,包括铁芯检修工间和机箱检修工间,其特征是:所述铁芯检修工间和机箱检修工间由平衡地梁与房体框架、防潮墙板相互组合装配构成,在铁芯检修工间顶部设有吊芯窗口,底部设有多端口液压机,在吊芯窗口顶部设有平吊基架板,所述多端口液压机设有多副液力伸缩柱并带动平吊基架板升降运动,所述平吊基架板设有同步起重梁和伸缩窗口罩,所述同步起重梁安装有多台定滑吊车,所述定滑吊车设有起重吊绳并以水平方式起吊变压器铁芯和机箱,在铁芯检修工间和机箱检修工间的两侧都设有槽型轨道,在槽型轨道上安装有机箱搬运车,所述机箱搬运车包括左抬箱车体、右抬箱车体、前车体连杆和后车体连杆,既能搬运机箱又能将机箱横向翻倒,所述左抬箱车体与右抬箱车体左右相对安装在槽型轨道上,在左抬箱车体和右抬箱车体的顶部、中部、底部依次设有抬箱悬臂、横臂定位夹和卡轨滚轮,所述抬箱悬臂具有轴向移动及旋转功能且其端部设有横架臂杆,在横架臂杆两端设有连杆对接口,所述横臂定位夹与横架臂杆卡夹配合,所述卡轨滚轮与槽型轨道滚动配合,所述前车体连杆和后车体连杆的杆体具有伸缩功能,且杆体两端设有与连杆对接口配合的插口横档,所述前车体连杆、后车体连杆与横架臂杆连接成方形框架,在方形框架上设有多副箍抱圆盘。In order to achieve the above purpose, the present invention adopts the following technical scheme: a transformer on-site overhaul frame combination room, comprising an iron core overhaul workshop and a chassis overhaul workshop, and is characterized in that: the iron core overhaul workshop and the chassis overhaul workshop are composed of The balanced ground beam, the house frame and the moisture-proof wall panel are assembled together. There is a hanging core window at the top of the iron core maintenance workshop, a multi-port hydraulic press at the bottom, and a flat hanging base plate on the top of the hanging core window. The multi-port hydraulic press is provided with multiple pairs of hydraulic telescopic columns and drives the horizontal crane base plate to move up and down. The horizontal crane base plate is provided with a synchronous lifting beam and a telescopic window cover. There are many synchronous lifting beams installed. The fixed-slide crane is equipped with a lifting rope and lifts the transformer core and the chassis in a horizontal manner. There are grooved rails on both sides of the iron core maintenance workshop and the chassis maintenance workshop. A chassis truck is installed on the track, and the chassis truck includes a left box lift car body, a right box lift car body, a front car body connecting rod and a rear car body connecting rod, which can not only carry the chassis but also turn the chassis horizontally. The left and right lift car bodies are installed on the trough track opposite to left and right, and the top, middle and bottom of the left and right lift car bodies are sequentially provided with a lift cantilever and a cross arm for positioning. Clamps and rail rollers, the lift box cantilever has the functions of axial movement and rotation, and its end is provided with a cross-frame arm rod, and the two ends of the cross-frame arm rod are provided with connecting rod butt joints, and the cross-arm positioning clip is connected to The cross frame arm rod is clamped and matched, the rail rollers are rollingly matched with the grooved track, the rod bodies of the front body link and the rear body link have a telescopic function, and both ends of the rod body are provided with connecting rods butt joints For the matching socket crosspiece, the front vehicle body connecting rod, the rear vehicle body connecting rod and the cross frame arm rod are connected to form a square frame, and a plurality of pairs of hoop discs are arranged on the square frame.

本优选实施例还具有下列技术特征:This preferred embodiment also has the following technical features:

所述平衡地梁由多根方形钢梁组合构成并在地面组合成房屋地面基架,所述房体框架由多副门形梁架组合构成并与平衡地梁组合成房屋主体框架,所述防潮墙板安装在房体框架上并相互组合成房屋墙体,所述平衡地梁设有多副升降撑地盘。The balanced ground beam is composed of a plurality of square steel beams and assembled on the ground to form a house ground base frame. The moisture-proof wall panels are installed on the frame of the house body and combined with each other to form a house wall body, and the balance ground beam is provided with a plurality of pairs of lifting support bases.

在平吊基架板左右两端设有与液力伸缩柱连接的顶杆基座,所述同步起重梁设置在平吊基架板底部的前后两侧,所述伸缩窗口罩设置在平吊基架板四周外缘且其底部与吊芯窗口边框连接。At the left and right ends of the flat hanging base frame plate, there are jack bases connected with hydraulic telescopic columns, the synchronous lifting beams are arranged on the front and rear sides of the bottom of the flat hanging base frame plate, and the telescopic window covers are arranged on the flat hanging base frame. The outer edge of the hanging base frame plate is connected with the frame of the hanging core window at the bottom and the periphery.

所述同步起重梁呈方型梁体结构且其内腔顶部设有起吊定位槽,底部设有滚轮滑道槽,在起吊定位槽和滚轮滑道槽中部设有往下穿通梁体的吊车槽口。The synchronous lifting beam has a square beam body structure and a lifting positioning slot is arranged at the top of its inner cavity, a roller chute slot is arranged at the bottom, and a crane slot that penetrates the beam body downward is arranged in the middle of the lifting positioning slot and the roller chute slot. .

所述定滑吊车车体呈柱形结构且其顶部设有卡槽起吊板,底部设有吊绳卡环,在车体中部设有轮轴升降口,在轮轴升降口中设有吊车轮轴和顶车弹簧,在吊车轮轴两端都设有卡槽滚轮,所述起重吊绳与吊绳卡环连接。The fixed-slide crane body has a columnar structure and is provided with a slot lifting plate at the top, a suspending rope clamping ring at the bottom, and an axle lift port in the middle of the car body. The spring, the two ends of the hoisting wheel axle are provided with grooved rollers, and the hoisting rope is connected with the suspending rope snap ring.

所述左抬箱车体和右抬箱车体呈底部大顶部小的三角板结构,且三角板顶部设有悬臂轴套,中部设有左右相通的方形管套,所述抬箱悬臂呈轴杆结构并套装在悬臂轴套内,所述横臂定位夹套装在方形管套内且其端部设有悬臂卡口,外壁设有进退齿口,在方形管套尾端设有与进退齿口相配套的控制转钮,所述卡轨滚轮设置在三角板底部的两端。The left box lifter body and the right box lifter body have a triangular plate structure with a large bottom and a small top, and the top of the triangular plate is provided with a cantilever bushing, and the middle is provided with a left and right connected square tube sleeve, and the box lifting cantilever has a shaft structure. And sleeved in the cantilever shaft sleeve, the cross-arm positioning clip is sleeved in the square tube sleeve and its end is provided with a cantilever bayonet, the outer wall is provided with an advance and retreat tooth gap, and the end of the square tube sleeve is provided with an advance and retreat tooth gap. The matching control knob, the rail rollers are arranged at both ends of the bottom of the triangular plate.

所述前车体连杆和后车体连杆杆体中部断开并设置成螺管结构,在两副螺管口之间设有双向螺杆,所述插口横档横向设置在前车体连杆和后车体连杆端部,在插口横档中部设有插销卡口,在连杆对接口中部设有与插销卡口配套的定位插销。The front body connecting rod and the rear body connecting rod are disconnected in the middle and set into a coil structure, a bidirectional screw rod is arranged between the two pairs of the coil openings, and the socket crosspiece is laterally arranged on the front body connecting rod. and the end of the connecting rod of the rear car body, a latch bayonet is arranged in the middle part of the crosspiece of the socket, and a positioning latch matched with the latch bayonet is arranged in the middle part of the connecting rod butt joint.

所述箍抱圆盘端面设有防滑软垫,背部设有顶盘螺杆,所述顶盘螺杆套装在方形框架上的螺管内,且螺杆端部设置成非圆柱体。The end face of the hoop disk is provided with a non-slip pad, and the back is provided with a top disk screw, the top disk screw is sleeved in the spiral tube on the square frame, and the end of the screw is set to be non-cylindrical.

所述变压器现场大修框架组合房安装有真空抽油机和空气交换机,所述真空抽油机设有双向过滤器和油温控制器,所述空气交换机设有除尘滤芯和湿度控制器。The transformer on-site overhaul frame combination room is equipped with a vacuum pumping unit and an air switch, the vacuum pumping unit is provided with a bidirectional filter and an oil temperature controller, and the air switch is provided with a dust removal filter element and a humidity controller.

本实施例利用平衡地梁、房体框架和防潮墙板在变压器周围搭设符合变压器大修条件的检修房,并安装铁芯抽吊检修机构和机箱翻身检修机构,使工人们在装机现场就能完成变压器解体及检查维修工作,不仅缩短了变压器大修工作的时间长度,还降低了大修费用。因此,该变压器现场大修框架组合房结构合理、使用方便,具有推广意义。In this embodiment, an overhaul room that meets the transformer overhaul conditions is built around the transformer by using balanced ground beams, house frame and moisture-proof wall panels, and an iron core pulling and lifting overhaul mechanism and a chassis turning over overhaul mechanism are installed, so that workers can complete the work at the installation site. Transformer dismantling and inspection and maintenance work not only shortens the time length of transformer overhaul work, but also reduces overhaul costs. Therefore, the frame combination room for on-site overhaul of the transformer has a reasonable structure, is convenient to use, and has promotion significance.

附图说明Description of drawings

下面结合附图和实施例对本发明进一步说明。The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

图1为本发明一个实施例的装配结构示意图。FIG. 1 is a schematic diagram of an assembly structure of an embodiment of the present invention.

图2为图1中平吊基架板13与液力伸缩柱120装配的结构示意图。FIG. 2 is a schematic structural diagram of the assembly of the horizontal suspension base plate 13 and the hydraulic telescopic column 120 in FIG. 1 .

图3为图1中左抬箱车体31与右抬箱车体32装配的结构示意图。FIG. 3 is a schematic structural diagram of the assembly of the left box lifter body 31 and the right box lifter body 32 in FIG. 1 .

图4为图1中前车体连杆33与后车体连杆34装配的结构示意图。FIG. 4 is a schematic structural diagram of the assembly of the front vehicle body connecting rod 33 and the rear vehicle body connecting rod 34 in FIG. 1 .

图5为图1中升降撑地盘04与平衡地梁01装配的结构示意图。FIG. 5 is a schematic structural diagram of the assembly of the lifting support base 04 and the balance ground beam 01 in FIG. 1 .

图6为图1中同步起重梁14横向剖开后的结构示意图。FIG. 6 is a schematic structural diagram of the synchronous lifting beam 14 in FIG. 1 after being transversely cut.

图中序号分别表示:01.平衡地梁,02.房体框架,03.防潮墙板,04.升降撑地盘,041.调节螺杆,042.非圆形卡口,043.球型旋转接头,05.真空抽油机,06.空气交换机,10.铁芯检修工间,11.吊芯窗口,12.多端口液压机,120.液力伸缩柱,13.平吊基架板,14.同步起重梁,140.起吊定位槽,141.滚轮滑道槽,142.吊车槽口,15.伸缩窗口罩,16.定滑吊车,160.起重吊绳,161.卡槽起吊板,162.吊绳卡环,163.吊车轮轴,164.顶车弹簧,165.卡槽滚轮,20.机箱检修工间,21.槽型轨道,30.机箱搬运车,31.左抬箱车体,310.抬箱悬臂,311.横臂定位夹,312.卡轨滚轮,313.横架臂杆,32.右抬箱车体,320.悬臂轴套,321.方形管套,322.控制转钮,33.前车体连杆,330.插口横档,34.后车体连杆,340.双向螺杆,341.插销卡口,342.定位插销,35.箍抱圆盘,350.顶盘螺杆。The serial numbers in the figure represent: 01. Balanced ground beam, 02. House frame, 03. Moisture-proof wall panel, 04. Lifting support floor, 041. Adjusting screw, 042. Non-circular bayonet, 043. Ball type rotary joint, 05. Vacuum pumping unit, 06. Air switch, 10. Iron core maintenance workshop, 11. Hanging core window, 12. Multi-port hydraulic press, 120. Hydraulic telescopic column, 13. Flat hanging base plate, 14. Synchronization Lifting beam, 140. Lifting positioning slot, 141. Roller chute, 142. Crane slot, 15. Telescopic window cover, 16. Fixed-slide crane, 160. Lifting rope, 161. Card slot lifting plate, 162 . sling snap ring, 163. crane axle, 164. jack spring, 165. slot roller, 20. chassis maintenance workshop, 21. slot track, 30. chassis truck, 31. left lift box body, 310. Lifting box cantilever, 311. Cross arm positioning clip, 312. Track roller, 313. Cross frame arm, 32. Right lift box body, 320. Cantilever bushing, 321. Square tube bushing, 322. Control rotation button, 33. Front body link, 330. Socket crosspiece, 34. Rear body link, 340. Two-way screw, 341. Latch bayonet, 342. Positioning pin, 35. Hoop disc, 350. Top Disc screw.

具体实施方式Detailed ways

参见图1并结合图2、3、4、5、6,本实施例的变压器现场大修框架组合房包括铁芯检修工间10和机箱检修工间20,所述铁芯检修工间10和机箱检修工间20由平衡地梁01与房体框架02、防潮墙板03相互组合装配构成,在铁芯检修工间10顶部设有吊芯窗口11,底部设有多端口液压机12,在吊芯窗口11顶部设有平吊基架板13,所述多端口液压机12设有多副液力伸缩柱120并带动平吊基架板13升降运动,所述平吊基架板13设有同步起重梁14和伸缩窗口罩15,所述同步起重梁14安装有多台定滑吊车16,所述定滑吊车16设有起重吊绳160并以水平方式起吊变压器铁芯和机箱,在铁芯检修工间10和机箱检修工间20的两侧都设有槽型轨道21,在槽型轨道21上安装有机箱搬运车30,所述机箱搬运车30包括左抬箱车体31、右抬箱车体32、前车体连杆33和后车体连杆34,既能搬运机箱又能将机箱横向翻倒,所述左抬箱车体31与右抬箱车体32左右相对安装在槽型轨道21上,在左抬箱车体31和右抬箱车体32的顶部、中部、底部依次设有抬箱悬臂310、横臂定位夹311和卡轨滚轮312,所述抬箱悬臂310具有轴向移动及旋转功能且其端部设有横架臂杆313,在横架臂杆313两端设有连杆对接口,所述横臂定位夹311与横架臂杆313卡夹配合,所述卡轨滚轮312与槽型轨道21滚动配合,所述前车体连杆33和后车体连杆34的杆体具有伸缩功能,且杆体两端设有与连杆对接口配合的插口横档330,所述前车体连杆33、后车体连杆34与横架臂杆313连接成方形框架,在方形框架上设有多副箍抱圆盘35。Referring to FIG. 1 and in conjunction with FIGS. 2 , 3 , 4 , 5 and 6 , the frame combination room for on-site overhaul of the transformer in this embodiment includes an iron core overhaul workshop 10 and a chassis overhaul workshop 20 , and the iron core overhaul workshop 10 and the chassis are The maintenance workshop 20 is composed of a balanced ground beam 01, a house frame 02, and a moisture-proof wall panel 03. There is a hanging core window 11 at the top of the iron core maintenance workshop 10, and a multi-port hydraulic press 12 at the bottom. The top of the window 11 is provided with a flat hanging base plate 13, the multi-port hydraulic press 12 is provided with a plurality of hydraulic telescopic columns 120 and drives the flat hanging base plate 13 to move up and down, and the flat hanging base plate 13 is provided with a synchronous lift. A heavy beam 14 and a telescopic window cover 15 are installed. The synchronous lifting beam 14 is installed with a plurality of fixed-sliding cranes 16. The fixed-sliding cranes 16 are provided with lifting ropes 160 and hoist the transformer core and the case in a horizontal manner. Both sides of the iron core overhaul workshop 10 and the chassis overhaul workshop 20 are provided with grooved rails 21 , and a chassis truck 30 is installed on the grooved rails 21 , and the chassis truck 30 includes a left lift box body 31 , The right lift car body 32, the front car body connecting rod 33 and the rear car body connecting rod 34 can both carry the chassis and turn the chassis laterally over. Installed on the trough track 21, the top, middle and bottom of the left lift car body 31 and the right lift car body 32 are sequentially provided with a lift box cantilever 310, a cross arm positioning clip 311 and a rail roller 312. The box cantilever 310 has the functions of axial movement and rotation, and its end is provided with a cross-frame arm rod 313, and the two ends of the cross-frame arm rod 313 are provided with connecting rod docking ports. The cross-arm positioning clip 311 and the cross-frame arm rod 313 Clamp fitting, the rail rollers 312 are in rolling fit with the grooved rails 21, the rod bodies of the front body link 33 and the rear body link 34 have a telescopic function, and both ends of the rod body are provided with connecting rod docking ports The matching socket rails 330, the front body link 33, the rear body link 34 and the cross frame arm 313 are connected to form a square frame, and multiple pairs of hoop discs 35 are arranged on the square frame.

本实施例利用平衡地梁01、房体框架02和防潮墙板03在变压器周围搭设符合变压器大修条件的检修房,在检修房内安装有铁芯抽吊检修机构和机箱翻身检修机构,使工人们在装机现场就能完成变压器解体及检查维修工作,不仅缩短了变压器大修工作的时间长度,还降低了大修费用。In this embodiment, a balanced ground beam 01, a house frame 02 and a moisture-proof wall panel 03 are used to set up an overhaul room around the transformer that meets the transformer overhaul conditions, and an iron core pulling and lifting overhaul mechanism and a chassis turning over overhaul mechanism are installed in the overhaul room, so that workers can We can complete the transformer disassembly, inspection and maintenance work at the installation site, which not only shortens the time length of the transformer overhaul work, but also reduces the overhaul cost.

所述平衡地梁01由多根方形钢梁组合构成并在地面组合成房屋地面基架,所述房体框架02由多副门形梁架组合构成并与平衡地梁01组合成房屋主体框架,所述防潮墙板03安装在房体框架02上并相互组合成房屋墙体,所述平衡地梁01设有多副升降撑地盘04。The balanced ground beam 01 is composed of a plurality of square steel beams and assembled on the ground to form a house ground base frame, and the house body frame 02 is composed of a combination of multiple door-shaped beams and is combined with the balanced ground beam 01 to form the main frame of the house. , the moisture-proof wall panels 03 are installed on the house frame 02 and combined with each other to form a house wall.

具体实施时,在平衡地梁01顶部设有房架卡口和轨道卡口,房体框架02通过房架卡口牢固的安装在平衡地梁01顶部并能方便的拆卸,槽型轨道21通过轨道卡口牢固的安装在房屋两侧并能方便的拆卸,在房体框架02上设有墙板卡扣,防潮墙板03通过墙板卡扣牢固的安装在房体框架02上并能方便的拆卸。In the specific implementation, the top of the balanced ground beam 01 is provided with a room frame bayonet and a rail bayonet, the house body frame 02 is firmly installed on the top of the balanced floor beam 01 through the bayonet bayonet and can be easily disassembled, and the grooved rail 21 passes through The track bayonet is firmly installed on both sides of the house and can be easily disassembled. There are wall panel clips on the house frame 02, and the moisture-proof wall panel 03 is firmly installed on the house frame 02 through the wall panel clips and can be easily removed. disassembly.

具体实施时,在平衡地梁01上设有多个顶底相通的螺孔,升降撑地盘04呈圆盘结构,且其顶部调节螺杆041,调节螺杆041套装在螺孔内且其中心设有非圆形卡口042,在调节螺杆041与升降撑地盘04之间设有球型旋转接头043。操作人员通过非圆形卡口042带动调节螺杆041旋转,就能带动升降撑地盘04升降运动,使平衡地梁01以水平方式稳定的架设在地面上。In the specific implementation, the balance ground beam 01 is provided with a plurality of screw holes that communicate with the top and the bottom, the lifting and supporting ground plate 04 has a disc structure, and the top of the adjusting screw 041 is sleeved in the screw holes and the center of the adjusting screw 041 is provided with The non-circular bayonet 042 is provided with a ball-type rotary joint 043 between the adjusting screw 041 and the lifting support base 04 . The operator can drive the adjusting screw 041 to rotate through the non-circular bayonet 042, and can drive the lifting and supporting platform 04 to move up and down, so that the balance ground beam 01 can be stably erected on the ground in a horizontal manner.

在平吊基架板13左右两端设有与液力伸缩柱120连接的顶杆基座,所述同步起重梁14设置在平吊基架板13底部的前后两侧,所述伸缩窗口罩15设置在平吊基架板13四周外缘且其底部与吊芯窗口11边框连接。At the left and right ends of the horizontal hanging base frame plate 13, there are jack bases connected to the hydraulic telescopic columns 120. The synchronous lifting beams 14 are arranged on the front and rear sides of the bottom of the horizontal hanging base frame plate 13. The telescopic window The cover 15 is arranged on the outer edge of the flat hanging base plate 13 and its bottom is connected with the frame of the hanging core window 11 .

具体实施时,平吊基架板13设置成与吊芯窗口11相配套的板块结构,两根同步起重梁14相互平行设置,顶杆基座设置在同步起重梁14端部,既能改善平吊基架板13的受力结构,又使同步起重梁14能以水平方式起吊变压器铁芯和机箱。In the specific implementation, the horizontal hanging base frame plate 13 is set as a plate structure matched with the hanging core window 11, the two synchronous lifting beams 14 are arranged in parallel with each other, and the top rod base is arranged at the end of the synchronous lifting beam 14, which can not only The force-bearing structure of the flat hanging base plate 13 is improved, and the synchronous lifting beam 14 can lift the transformer iron core and the chassis in a horizontal manner.

具体实施时,在铁芯检修工间10两侧各设有两副液力伸缩柱120,多端口液压机12与四副液力伸缩柱120同时连接并设有同步升降器,使四副液力伸缩柱120同步升降运动。吊芯窗口11设置成略大于变压器铁芯的方框结构,能方便的将铁芯向上起吊至铁芯检修工间10顶部。In the specific implementation, two pairs of hydraulic telescopic columns 120 are provided on both sides of the iron core maintenance workshop 10, and the multi-port hydraulic press 12 is connected with the four pairs of hydraulic telescopic columns 120 at the same time and is provided with a synchronous lifter, so that the four pairs of hydraulic The telescopic column 120 moves up and down synchronously. The hanging core window 11 is set to a frame structure slightly larger than the transformer core, so that the iron core can be easily lifted up to the top of the iron core maintenance workshop 10 .

具体实施时,伸缩窗口罩15设置成与吊芯窗口11相配套的罩型结构并具有伸缩弹性,随着平吊基架板13升降运动而伸长或缩短,防止灰尘、潮气等其它杂物粘到铁芯上。In specific implementation, the telescopic window cover 15 is set as a cover-shaped structure matched with the hanging core window 11 and has telescopic elasticity, and is extended or shortened with the lifting movement of the horizontal hanging base plate 13 to prevent dust, moisture and other sundries. glued to the iron core.

所述同步起重梁14呈方型梁体结构且其内腔顶部设有起吊定位槽140,底部设有滚轮滑道槽141,在起吊定位槽140和滚轮滑道槽141中部设有往下穿通梁体的吊车槽口142。The synchronous lifting beam 14 has a square beam structure and a lifting positioning groove 140 is provided at the top of its inner cavity, a roller slide groove 141 is provided at the bottom, and a downward positioning groove is provided in the middle of the lifting positioning groove 140 and the roller slide groove 141. Crane slot 142 through the beam body.

所述定滑吊车16车体呈柱形结构且其顶部设有卡槽起吊板161,底部设有吊绳卡环162,在车体中部设有轮轴升降口,在轮轴升降口中设有吊车轮轴163和顶车弹簧164,在吊车轮轴163两端都设有卡槽滚轮165,所述起重吊绳160与吊绳卡环162连接。The vehicle body of the fixed-slide crane 16 has a cylindrical structure and is provided with a slot lifting plate 161 on the top, a suspending rope snap ring 162 on the bottom, an axle lift port in the middle of the car body, and a crane wheel axle in the wheel axle lift port. 163 and the jacking spring 164, both ends of the hoist axle 163 are provided with groove rollers 165, and the hoisting rope 160 is connected with the suspending rope snap ring 162.

具体实施时,卡槽起吊板161套装在起吊定位槽140内,卡槽滚轮165套装在滚轮滑道槽141内,吊绳卡环162没有受到起重吊绳160的拉力时,顶车弹簧164的弹性力推动整个车体向上运行,并使卡槽起吊板161脱离起吊定位槽140底板处于悬空状态,整个车体就可以随着卡槽滚轮165顺着吊车槽口142运行,操作人员只要横向拉动起重吊绳160,就可以带动定滑吊车16滑动至预定位置;当吊绳卡环162受到起重吊绳160的拉力时,整个车体克服弹簧顶力向下运行,卡槽起吊板161就会卡压在起吊定位槽140底板上,限制定滑吊车16不能横向移动。In the specific implementation, the slot lifting plate 161 is fitted in the lifting positioning slot 140, the slot roller 165 is fitted in the roller chute slot 141, and when the sling snap ring 162 is not subjected to the pulling force of the hoisting sling 160, the jack spring 164 The elastic force pushes the whole car body to run upward, and makes the slot lifting plate 161 separate from the bottom plate of the lifting positioning slot 140 in a suspended state, and the whole car body can run along the crane slot 142 with the slot roller 165. Pulling the hoisting rope 160 can drive the fixed-slide crane 16 to slide to a predetermined position; when the suspending rope snap ring 162 is pulled by the hoisting rope 160, the entire car body runs downwards against the top force of the spring, and the card slot lifts the plate 161 will be pressed on the bottom plate of the lifting positioning groove 140, and the fixed-slide crane 16 cannot be moved laterally.

由于铁芯和机箱上都四个吊点,所以在同步起重梁14上安装有八台定滑吊车16,其中四台用于吊装铁芯并调整至与铁芯吊点上下垂直位置,另外四台用于吊装机箱并调整至与机箱吊点上下垂直位置。具体实施时,吊装铁芯的四根起重吊绳160较短,能将铁芯从机箱顶口吊出,吊装机箱的起重吊绳160较长,只要能将机箱吊起离地面一定高度即可。Since there are four lifting points on the iron core and the chassis, eight fixed-slip cranes 16 are installed on the synchronous lifting beam 14, four of which are used to hoist the iron core and adjust to the vertical position up and down with the iron core lifting points. Four sets are used to hoist the chassis and adjust it to the vertical position up and down with the chassis lifting point. In specific implementation, the four hoisting ropes 160 for hoisting the iron core are relatively short, so that the iron core can be lifted out from the top of the case, and the hoisting ropes 160 for hoisting the case are long, as long as the case can be hoisted to a certain height from the ground That's it.

具体实施时,槽型轨道21包括左侧轨道和右侧轨道并以左右相对方式安装在铁芯检修工间10和机箱检修工间20两侧,在左侧轨道和右侧轨道的内侧都设有搬运车轮槽,卡轨滚轮312卡套在搬运车轮槽内滚动运行,进而带动机箱搬运车30横向运行。In specific implementation, the trough rail 21 includes a left rail and a right rail and is installed on both sides of the iron core overhaul workshop 10 and the chassis overhaul workshop 20 in a left-right opposite manner. There are transport wheel grooves, and the rail rollers 312 are clamped to roll and run in the transport wheel groove, thereby driving the chassis transport vehicle 30 to run laterally.

所述左抬箱车体31和右抬箱车体32呈底部大顶部小的三角板结构,且三角板顶部设有悬臂轴套320,中部设有左右相通的方形管套321,所述抬箱悬臂310呈轴杆结构并套装在悬臂轴套320内,所述横臂定位夹311套装在方形管套321内且其端部设有悬臂卡口,外壁设有进退齿口,在方形管套321尾端设有与进退齿口相配套的控制转钮322,所述卡轨滚轮312设置在三角板底部的两端。The left box lifter body 31 and the right box lifter body 32 have a triangular plate structure with a large bottom and a small top, and the top of the triangular plate is provided with a cantilever bushing 320, and the middle part is provided with a square tube sleeve 321 connected to the left and right. 310 has a shaft structure and is sleeved in the cantilever sleeve 320. The transverse arm positioning clip 311 is sleeved in the square tube sleeve 321 and has a cantilever bayonet at its end. The tail end is provided with a control knob 322 matched with the advancing and retreating tooth openings, and the rail rollers 312 are arranged at both ends of the bottom of the triangular plate.

具体实施时,卡轨滚轮312套装在搬运车轮槽内,使左抬箱车体31和右抬箱车体32牢固的安装在槽型轨道21上,并能方便的顺着轨道运行,抬箱悬臂310既能顺着悬臂轴套320轴向运行,又能带动横架臂杆313旋转摇摆运动。在控制转钮322端部设有与进退齿口相配套的齿轮,旋转时带动横臂定位夹311伸出或缩进方形管套321。In specific implementation, the rail rollers 312 are fitted into the transport wheel grooves, so that the left box lifter body 31 and the right box lifter body 32 are firmly installed on the groove track 21, and can easily run along the track, lifting the box. The cantilever 310 can not only run along the axial direction of the cantilever bushing 320 , but also drive the transverse arm rod 313 to rotate and swing. The end of the control knob 322 is provided with a gear matched with the advancing and retracting tooth gaps, which drives the transverse arm positioning clip 311 to extend or retract the square tube sleeve 321 when rotated.

所述前车体连杆33和后车体连杆34杆体中部断开并设置成螺管结构,在两副螺管口之间设有双向螺杆340,所述插口横档330横向设置在前车体连杆33和后车体连杆34端部,在插口横档330中部设有插销卡口341,在连杆对接口中部设有与插销卡口341配套的定位插销342。The front body connecting rod 33 and the rear body connecting rod 34 are disconnected in the middle part of the rod body and set into a coil structure, a bidirectional screw 340 is arranged between the two pairs of coil ports, and the socket crosspiece 330 is laterally arranged at the front The ends of the vehicle body link 33 and the rear vehicle body link 34 are provided with a latch bayonet 341 in the middle of the socket crosspiece 330 , and a positioning latch 342 matched with the latch bayonet 341 in the middle of the connecting rod butt joint.

具体实施时,插口横档330与连杆对接口卡插配合,使前车体连杆33、后车体连杆34既能方便的与左抬箱车体31、右抬箱车体32牢固的连成一体,又能方便的拆卸分离。在双向螺杆340两端分别设置正转螺纹和反转螺纹,在两副螺管口内设置与之相对应的螺口,转动双向螺杆340就能带动前车体连杆33或后车体连杆34伸长或缩短运动。In specific implementation, the socket crosspiece 330 is snap-fitted with the connecting rod docking interface, so that the front vehicle body connecting rod 33 and the rear vehicle body connecting rod 34 can be easily and firmly connected to the left lift box body 31 and the right lift box body 32 It can be easily disassembled and separated. The two ends of the two-way screw 340 are respectively provided with a forward rotation thread and a reverse screw, and the corresponding screw ports are set in the two pairs of screw ports. Rotating the two-way screw 340 can drive the front vehicle body connecting rod 33 or the rear vehicle body connecting rod 34 Lengthening or shortening movements.

所述箍抱圆盘35端面设有防滑软垫,背部设有顶盘螺杆350,所述顶盘螺杆350套装在方形框架上的螺管内,且螺杆端部设置成非圆柱体。The end surface of the hooping disk 35 is provided with a non-slip pad, and the back is provided with a top disk screw 350. The top disk screw 350 is sleeved in a coil tube on the square frame, and the end of the screw is set to be non-cylindrical.

具体实施时,多副箍抱圆盘35均匀分布安装在方形框架上,使机箱搬运车30以四周箍抱方式牢固的抱紧变压器机箱。顶盘螺杆350设有螺杆摇把,螺杆摇把设有与非圆柱体相配套的卡口,能方便的带动顶盘螺杆350旋转,进而带动箍抱圆盘35顶紧或放松机箱。During the specific implementation, multiple pairs of hooping discs 35 are evenly distributed and installed on the square frame, so that the chassis truck 30 firmly hugs the transformer chassis in a surrounding hoop manner. The top plate screw 350 is provided with a screw handle, and the screw handle is provided with a bayonet matched with the non-cylindrical body, which can easily drive the top plate screw 350 to rotate, and then drive the hoop disk 35 to tighten or loosen the chassis.

具体实施时,先操控多端口液压机12和定滑吊车16将变压器铁芯向上吊起,当铁芯脱离机箱后暂停起吊工作,将机箱与起重吊绳160牢固连接后再同步起吊,当机箱脱离地面一定高度后停止起吊,然后将机箱搬运车30运行至铁芯检修工间10并使方形框架牢固的抱紧机箱,控制多端口液压机12向下运行,当与机箱连接的起重吊绳160完全松弛后停止,将机箱与起重吊绳160脱离并横向推动,就可以将机箱搬运至机箱检修工间20内,然后将机箱横向翻到,就能方便详细的检修机箱内部,机箱进入检修工间后再控制多端口液压机12向下运行,直至铁芯下降至方便检修的位置,就可以对铁芯进行详细全面的检查和修理,当机箱和铁芯都完成检修工作后,重新将铁芯吊起,然后将机箱往回搬运至铁芯检修工间10内并放置地面,再将铁芯往下放入机箱,就可以完成检修装配工作。In the specific implementation, first control the multi-port hydraulic press 12 and the fixed-slide crane 16 to hoist the transformer iron core upwards. When the iron core is separated from the chassis, the lifting work is suspended, and the chassis and the lifting rope 160 are firmly connected and then synchronously hoisted. After getting off the ground at a certain height, stop lifting, then run the chassis truck 30 to the iron core maintenance workshop 10 and make the square frame firmly hold the chassis, control the multi-port hydraulic press 12 to run downward, when the lifting rope connected to the chassis After the 160 is completely relaxed, stop, disengage the chassis from the hoisting rope 160 and push it horizontally, and then the chassis can be transported to the chassis maintenance workshop 20, and then the chassis can be turned laterally to facilitate detailed inspection of the inside of the chassis. After overhauling the workshop, control the multi-port hydraulic press 12 to run downward until the iron core is lowered to a position that is convenient for maintenance, and then the iron core can be inspected and repaired in detail and comprehensively. The iron core is lifted, and then the chassis is transported back to the iron core maintenance workshop 10 and placed on the ground, and then the iron core is lowered into the chassis to complete the maintenance and assembly work.

所述变压器现场大修框架组合房安装有真空抽油机05和空气交换机06,所述真空抽油机05设有双向过滤器和油温控制器,所述空气交换机06设有除尘滤芯和湿度控制器。The transformer on-site overhaul frame combination room is equipped with a vacuum pumping unit 05 and an air switch 06. The vacuum pumping unit 05 is provided with a bidirectional filter and an oil temperature controller, and the air switch 06 is provided with a dust filter element and a humidity control. device.

具体实施时,真空抽油机05安装在铁芯检修工间10内,并通过油管连接在变压器机箱与储油罐之间,将变压器油输入或输出机箱,并在输油过程中进行过滤净化和温度调节。空气交换机06安装在机箱检修工间20内,使铁芯检修工间10和机箱检修工间20内的空气保持洁净和干燥的状态。In the specific implementation, the vacuum pumping unit 05 is installed in the iron core maintenance workshop 10, and is connected between the transformer case and the oil storage tank through the oil pipe, and the transformer oil is input to or output from the case, and is filtered and purified during the oil delivery process. and temperature regulation. The air switch 06 is installed in the chassis maintenance workshop 20 to keep the air in the iron core maintenance workshop 10 and the chassis maintenance workshop 20 clean and dry.

综上所述,本实施例解决了现有变压器大修方式费用高、耗时长的问题,提供了一种将变压器周围搭设成符合大修工作条件的变压器现场大修框架组合房。To sum up, the present embodiment solves the problems of high cost and time-consuming of existing transformer overhaul methods, and provides a transformer on-site overhaul frame combination house that meets the overhaul working conditions around the transformer.

Claims (7)

1. The utility model provides a transformer field overhaul frame combination room, includes that the iron core overhauls the workshop and quick-witted case overhauls the workshop, characterized by: the iron core overhaul workshop (10) and the case overhaul workshop (20) are formed by mutually combining and assembling a balance ground beam (01), a house body frame (02) and a moisture-proof wall plate (03), a hoisting core window (11) is arranged at the top of the iron core overhaul workshop (10), a multi-port hydraulic machine (12) is arranged at the bottom of the iron core overhaul workshop, a horizontal hoisting base frame plate (13) is arranged at the top of the hoisting core window (11), a plurality of hydraulic telescopic columns (120) are arranged on the multi-port hydraulic machine (12) and drive the horizontal hoisting base frame plate (13) to move up and down, a synchronous hoisting beam (14) and a telescopic window mask (15) are arranged on the horizontal hoisting base frame plate (13), a plurality of fixed sliding cranes (16) are installed on the synchronous hoisting beam (14), hoisting ropes (160) are arranged on the fixed sliding cranes (16) and hoist the transformer core and the case in a horizontal mode, groove-shaped rails (21) are arranged on two sides of the iron core overhaul workshop (10), the chassis carrying vehicle (30) is installed on the groove-shaped track (21), the chassis carrying vehicle (30) comprises a left box lifting vehicle body (31), a right box lifting vehicle body (32), a front vehicle body connecting rod (33) and a rear vehicle body connecting rod (34), the chassis can be carried and can be overturned transversely, the left box lifting vehicle body (31) and the right box lifting vehicle body (32) are installed on the groove-shaped track (21) in a left-right opposite mode, box lifting cantilevers (310), cross arm positioning clamps (311) and clamping rail rollers (312) are sequentially arranged at the top, the middle and the bottom of the left box lifting vehicle body (31) and the right box lifting vehicle body (32), the box lifting cantilevers (310) have axial movement and rotation functions, cross frame arm rods (313) are arranged at the end parts of the box lifting cantilevers, connecting rod butt joints are arranged at the two ends of the cross frame arm rods (313), the cross arm positioning clamps (311) are in clamping fit with the cross frame arm rods (313), and the clamping rails (312) are in rolling, the body of rod of preceding automobile body connecting rod (33) and back automobile body connecting rod (34) has flexible function, and the body of rod both ends be equipped with connecting rod butt joint mouth complex socket crosspiece (330), preceding automobile body connecting rod (33), back automobile body connecting rod (34) connect into square frame with crossbearer armed lever (313), are equipped with many pairs on square frame and hoop and embrace disc (35).
2. The on-site overhaul frame combined house of the transformer as claimed in claim 1, wherein: balance ground roof beam (01) constitute and make up into house ground bed frame on ground by many square steel beam combinations, room body frame (02) constitute and make up into house main body frame with balance ground roof beam (01) by many pairs of door shape roof beam frame combinations, dampproofing wallboard (03) are installed on room body frame (02) and make up into house wall body each other, balance ground roof beam (01) are equipped with many pairs and go up and down to prop ground dish (04).
3. The on-site overhaul frame combined house of the transformer as claimed in claim 1, wherein: the synchronous hoisting beam (14) is of a square beam body structure, the top of an inner cavity of the synchronous hoisting beam is provided with a hoisting positioning groove (140), the bottom of the synchronous hoisting beam is provided with a roller slideway groove (141), and the middle parts of the hoisting positioning groove (140) and the roller slideway groove (141) are provided with crane notches (142) which penetrate through the beam body downwards.
4. The on-site overhaul frame combined house of the transformer as claimed in claim 1, wherein: the fixed-sliding crane (16) is of a cylindrical structure, a clamping groove lifting plate (161) is arranged at the top of the fixed-sliding crane, a lifting rope clamping ring (162) is arranged at the bottom of the fixed-sliding crane, a wheel shaft lifting port is formed in the middle of the crane, a crane wheel shaft (163) and a lifting spring (164) are arranged in the wheel shaft lifting port, clamping groove rolling wheels (165) are arranged at two ends of the crane wheel shaft (163), and the lifting rope (160) is connected with the lifting rope clamping ring (162).
5. The on-site overhaul frame combined house of the transformer as claimed in claim 1, wherein: the left lifting box car body (31) and the right lifting box car body (32) are of a triangular plate structure with a large bottom and a small top, a cantilever shaft sleeve (320) is arranged at the top of the triangular plate, a square pipe sleeve (321) communicated with the left and the right is arranged in the middle of the triangular plate, the lifting box cantilever (310) is of a shaft rod structure and is sleeved in the cantilever shaft sleeve (320), a transverse arm positioning clamp (311) is sleeved in the square pipe sleeve (321), a cantilever bayonet is arranged at the end part of the transverse arm positioning clamp, a driving and reversing tooth mouth is arranged on the outer wall of the transverse arm positioning clamp, a control knob (322) matched with the driving and reversing tooth mouth is arranged at the tail end of the square pipe sleeve (.
6. The on-site overhaul frame combined house of the transformer as claimed in claim 1, wherein: preceding automobile body connecting rod (33) and back automobile body connecting rod (34) body of rod middle part disconnection and set to the solenoid structure, are equipped with two-way screw rod (340) between two screw tube mouths, socket crosspiece (330) transversely set up in the front automobile body connecting rod (33) and back automobile body connecting rod (34) tip, are equipped with bolt bayonet socket (341) in socket crosspiece (330) middle part, are equipped with in the connecting rod and fix a position bolt (342) supporting with bolt bayonet socket (341) in the interface middle part.
7. The on-site overhaul frame combined house of the transformer as claimed in claim 1, wherein: hoop and embrace disc (35) terminal surface and be equipped with anti-skidding cushion, the back is equipped with a set screw rod (350), in set screw rod (350) suit was in the screw pipe on the square frame, and the screw rod tip set to the non-cylinder.
CN202010068051.3A 2020-01-21 2020-01-21 Transformer field overhaul frame combined house Active CN111255275B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010068051.3A CN111255275B (en) 2020-01-21 2020-01-21 Transformer field overhaul frame combined house

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010068051.3A CN111255275B (en) 2020-01-21 2020-01-21 Transformer field overhaul frame combined house

Publications (2)

Publication Number Publication Date
CN111255275A true CN111255275A (en) 2020-06-09
CN111255275B CN111255275B (en) 2021-03-19

Family

ID=70944173

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010068051.3A Active CN111255275B (en) 2020-01-21 2020-01-21 Transformer field overhaul frame combined house

Country Status (1)

Country Link
CN (1) CN111255275B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115557386A (en) * 2022-10-10 2023-01-03 意特利(滁州)智能数控科技有限公司 Hoisting equipment for moving horizontal polishing machine
CN120026598A (en) * 2025-03-28 2025-05-23 华能澜沧江水电股份有限公司 Hydropower station hammer side relay maintenance platform and equipment

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06165322A (en) * 1992-11-20 1994-06-10 Aichi Denki Seisakusho:Kk Transformer-containing cubicle and installing method of transformer in cubicle
CN105914626A (en) * 2016-06-20 2016-08-31 国网河南省电力公司检修公司 Movable maintenance square warehouse
CN206163968U (en) * 2016-11-25 2017-05-10 国网河南省电力公司平顶山供电公司 Transformer maintenance platform
CN107188069A (en) * 2017-05-22 2017-09-22 国网河南省电力公司平顶山供电公司 A transformer lifting device
CN107720561A (en) * 2017-10-23 2018-02-23 国网四川省电力公司成都供电公司 A kind of indoor transformer loaded switch core body hangs detecting method and device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06165322A (en) * 1992-11-20 1994-06-10 Aichi Denki Seisakusho:Kk Transformer-containing cubicle and installing method of transformer in cubicle
CN105914626A (en) * 2016-06-20 2016-08-31 国网河南省电力公司检修公司 Movable maintenance square warehouse
CN206163968U (en) * 2016-11-25 2017-05-10 国网河南省电力公司平顶山供电公司 Transformer maintenance platform
CN107188069A (en) * 2017-05-22 2017-09-22 国网河南省电力公司平顶山供电公司 A transformer lifting device
CN107720561A (en) * 2017-10-23 2018-02-23 国网四川省电力公司成都供电公司 A kind of indoor transformer loaded switch core body hangs detecting method and device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115557386A (en) * 2022-10-10 2023-01-03 意特利(滁州)智能数控科技有限公司 Hoisting equipment for moving horizontal polishing machine
CN120026598A (en) * 2025-03-28 2025-05-23 华能澜沧江水电股份有限公司 Hydropower station hammer side relay maintenance platform and equipment
CN120026598B (en) * 2025-03-28 2025-11-11 华能澜沧江水电股份有限公司 Hydropower station heavy hammer side servomotor maintenance platform and hydropower station heavy hammer side servomotor maintenance equipment

Also Published As

Publication number Publication date
CN111255275B (en) 2021-03-19

Similar Documents

Publication Publication Date Title
CN111906531B (en) Electric locomotive wheel drive unit assembly line
CN212740608U (en) Lifting vehicle for replacing lifting jacks
CN209740652U (en) self-propelled compensating beam tipping arrangement
CN117226498B (en) An assembly system for docking large aircraft engine components
CN117303197A (en) Movable hanging bracket
CN116119231A (en) Light duty stacker for storage
CN111255275A (en) Transformer field overhaul frame combined house
CN105645260A (en) Suspended walking combined gantry crane
CN111807014B (en) Steel arch transport device
CN204400479U (en) Mining hydraulic lifting appliance
CN106564818B (en) A kind of electric power hanging apparatus
CN116118674A (en) A mobile electric truck power station
CN105668450B (en) Breaker mechanism inspection trolley
CN114590704B (en) Semi-trailer compartment transfer equipment and transfer method
CN220684529U (en) Motor train unit lifting equipment
CN203269454U (en) Crane coiling block maintenance lifting device
CN218201887U (en) Lifting type folding arm crane for switch cabinet handling machine
CN207903766U (en) The test specimen for testing loading system becomes rail conveying device
CN214935462U (en) A segmented lift bridge crane
CN110315767A (en) A kind of winding fitting tooling of insulating layer cryogenic tank
CN2433137Y (en) Movable folding lifter for repairing vehicle
JPH05131901A (en) Temporary truck for carrying car body
CN115650041A (en) A detection and maintenance workbench for urban rail transit electric passenger car bogies
CN108190739A (en) The test specimen for testing loading system becomes rail conveying device and hanging method
CN115123964A (en) Dustproof gear reducer convenient to installation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240604

Address after: 325000 Shangyanhou Village, Liushi Town, Leqing City, Wenzhou City, Zhejiang Province

Patentee after: Li Haipei

Country or region after: China

Address before: Room 1-1402, building 16, Yangguang Shuian, Baiyun Street, Kecheng District, Quzhou City, Zhejiang Province

Patentee before: Rao Jianming

Country or region before: China

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20241129

Address after: Room 102 and 202, Building 4, Nanling Avenue (Science and Technology Industrial Park), Beihu District, Chenzhou City, Hunan Province, 423000

Patentee after: Zhengde Power Technology Co.,Ltd.

Country or region after: China

Address before: 325000 Shangyanhou Village, Liushi Town, Leqing City, Wenzhou City, Zhejiang Province

Patentee before: Li Haipei

Country or region before: China