CN111244820A - Iron tower tool hanging rack - Google Patents
Iron tower tool hanging rack Download PDFInfo
- Publication number
- CN111244820A CN111244820A CN202010174456.5A CN202010174456A CN111244820A CN 111244820 A CN111244820 A CN 111244820A CN 202010174456 A CN202010174456 A CN 202010174456A CN 111244820 A CN111244820 A CN 111244820A
- Authority
- CN
- China
- Prior art keywords
- sleeve
- iron tower
- hanging plate
- adjusting
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 title claims abstract description 61
- 229910052742 iron Inorganic materials 0.000 title claims abstract description 31
- 229910000746 Structural steel Inorganic materials 0.000 claims abstract description 13
- 239000011810 insulating material Substances 0.000 claims description 4
- 210000000078 claw Anatomy 0.000 claims description 2
- 229910000831 Steel Inorganic materials 0.000 description 4
- 239000010959 steel Substances 0.000 description 4
- 241000883966 Astrophytum capricorne Species 0.000 description 3
- 235000014364 Trapa natans Nutrition 0.000 description 3
- 230000005484 gravity Effects 0.000 description 2
- 230000002146 bilateral effect Effects 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 150000002505 iron Chemical class 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/02—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
Landscapes
- Electric Cable Installation (AREA)
Abstract
The application discloses iron tower instrument stores pylon includes: a support bar; the supporting rod is provided with a hanging plate for hanging tools; the hanging plate is rotationally connected with the supporting rod; the support rod is also provided with a fixing component for fixing the support rod on the angle iron of the iron tower; the support rod is fixed on the angle iron tower through the fixing component. The invention effectively solves the problem that the operating rod cannot be safely stored during the operation intermittence, so that the operating personnel can safely and orderly select the insulating operating rod without the risk of falling objects, thereby ensuring the operation safety.
Description
Technical Field
The application relates to the technical field of electric power tools, in particular to an iron tower tool hanging frame.
Background
In 35kV live working, towers are divided into cement poles and iron towers, and operators need various tools for operating poles to assist in the indirect live working, and the condition that the same operating pole is used for multiple times in the process of one-time indirect live working is not excluded. However, at present, no tool for storing the operating rod on the iron tower in 35kV live-line work exists, an operator only transmits the operating rod through the insulating pulley, needs a plurality of operators to assist in work, and has high requirement on the coordination rate, so that the tool is inconvenient to take and use.
Disclosure of Invention
The embodiment of the application provides an iron tower tool hanging rack, so that the problem that an operating rod cannot be safely stored during operation intermittence is effectively solved, an operator can select an insulating operating rod in a safe and orderly manner, and the iron tower tool hanging rack is free of high-altitude falling danger and ensures operation safety.
In view of this, the present application provides an iron tower tool hanger, including: a support bar;
the supporting rod is provided with a hanging plate for hanging tools;
the hanging plate is rotatably connected with the supporting rod;
the support rod is also provided with a fixing component for fixing the support rod on the angle iron of the iron tower;
the support rod is fixed on the angle iron tower through the fixing component.
Optionally, a shaft sleeve for mounting the hanging plate is arranged on the supporting rod;
the shaft sleeve is detachably connected with the supporting rod.
Optionally, the shaft sleeve comprises an inner shaft sleeve and an outer shaft sleeve;
the inner shaft sleeve and the outer shaft sleeve are fixed on the support rod through claw nuts;
a through hole is formed in the center of the hanging plate;
the hanging plate is sleeved on the outer shaft sleeve and is rotationally connected with the outer shaft sleeve.
Optionally, a circle of bulges are arranged on the outer side of the outer shaft sleeve;
the upper end of the bulge is provided with a fixing ring;
the hanging plate is located between the bulge and the fixing ring.
Optionally, the fixing assembly comprises a fixing sleeve, an adjusting sleeve and a fixing lock catch;
the fixed sleeve is fixedly connected with the supporting rod;
the fixed lock catch is fixedly connected with the adjusting sleeve;
the adjusting sleeve is sleeved on the supporting rod;
the adjusting sleeve is positioned below the fixed sleeve and is abutted against the fixed sleeve;
the front side and the rear side of the adjusting sleeve are symmetrically provided with adjusting channels for adjusting the horizontal position of the hanging plate;
the supporting rod is correspondingly fixed with a clamping piece which is matched with the adjusting channel to realize fixation.
Optionally, the bottom of the fixing sleeve is provided with first saw teeth;
and a second sawtooth matched with the first sawtooth is arranged at the top of the adjusting sleeve.
Optionally, a plurality of notches are uniformly formed in the outer edge of the hanging plate;
the inner side of the notch is correspondingly provided with a fixing hole.
Optionally, two ends of the support rod are respectively provided with a pull ring.
Optionally, the hanging plate is a circular turntable.
Optionally, the support rod and the hanging plate are made of insulating materials.
According to the technical scheme, the embodiment of the application has the following advantages: including the bracing piece, be provided with the link plate that is used for articulating the instrument on the bracing piece, the link plate rotates with the bracing piece to be connected, still be provided with on the bracing piece and be used for fixing the fixed subassembly on the angle iron tower angle, the bracing piece is fixed in on the angle iron tower angle through fixed subassembly, can make things convenient for the operation personnel to carry out the interim access of insulating bar through the link plate, alleviate operation personnel's intensity of labour, and safe and reliable, the restriction that the action bars can't be deposited safely during operation intermittent type has effectively been solved, make operation personnel can safe and orderly select insulating bar, there is not high altitude weight thing danger, in.
Drawings
Fig. 1 is a schematic structural view of an iron tower tool hanger according to an embodiment of the present application;
fig. 2 is a perspective view of an iron tower tool hanger according to an embodiment of the present application;
fig. 3 is an exploded view of an iron tower tool hanger according to an embodiment of the present application;
FIG. 4 is a cross-sectional view of an embodiment of the present application;
FIG. 5 is a partial enlarged view of portion A of FIG. 4;
FIG. 6 is a partial enlarged view of portion B of FIG. 4;
wherein the reference numerals are:
1-supporting rod, 2-hanging plate, 3-fixing component, 4-shaft sleeve, 5-pull ring, 6-claw nut, 7-fixing ring, 11-clamping component, 21-notch, 22-fixing hole, 23-through hole, 31-fixing sleeve, 32-adjusting sleeve, 33-fixing lock catch, 41-inner shaft sleeve, 42-outer shaft sleeve, 311-first sawtooth, 321-adjusting channel, 322-second sawtooth and 421-bulge.
Detailed Description
In order to make the technical solutions of the present application better understood, the technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application, and it is obvious that the described embodiments are only a part of the embodiments of the present application, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present application.
In the description of the present application, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present application. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
Unless expressly stated or limited otherwise, the terms "mounted," "connected," and "connected" are intended to be inclusive and mean, for example, that they may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present application can be understood in a specific case by those of ordinary skill in the art.
The present application provides an embodiment of an iron tower tool hanger, please refer to fig. 1 specifically.
Iron tower tool pylon in this embodiment includes: bracing piece 1 is provided with the link plate 2 that is used for articulating the instrument on the bracing piece 1, and link plate 2 rotates with bracing piece 1 to be connected, still is provided with on the bracing piece 1 to be used for fixing the fixed subassembly 3 on the angle iron tower angle steel, and bracing piece 1 is fixed in on the angle iron tower angle steel through fixed subassembly 3.
It should be noted that: can make things convenient for the operation personnel to carry out the temporary access of insulating bar through link plate 2, alleviate operation personnel's intensity of labour, and safe and reliable, effectively solved the restriction that the action bars can't be deposited safely during operation intermittent type, make operation personnel can safe and orderly select insulating bar, there is not the high altitude and weighs down the thing danger to ensure operation safety.
The above is a first embodiment of an iron tower tool hanger provided in the embodiments of the present application, and the following is a second embodiment of an iron tower tool hanger provided in the embodiments of the present application, specifically referring to fig. 1 to 6.
Iron tower tool pylon in this embodiment includes: bracing piece 1 is provided with the link plate 2 that is used for articulating the instrument on the bracing piece 1, and link plate 2 rotates with bracing piece 1 to be connected, still is provided with on the bracing piece 1 to be used for fixing the fixed subassembly 3 on the angle iron tower angle steel, and bracing piece 1 is fixed in on the angle iron tower angle steel through fixed subassembly 3.
The supporting rod 1 is provided with a shaft sleeve 4 for mounting the hanging plate 2, the shaft sleeve 4 is detachably connected with the supporting rod 1, and the mounting position of the shaft sleeve 4 can be adjusted to realize the adjustment of the height of the hanging plate 2.
Specifically, axle sleeve 4 includes interior axle sleeve 41 and outer axle sleeve 42, and interior axle sleeve 41 passes through goat's horn nut 6 with outer axle sleeve 42 and fixes on bracing piece 1, and it can be understood that, when the link plate 2 height is adjusted to needs, only need unscrew goat's horn nut 6, then upwards or the axle sleeve 4 that slides downwards, it can to screw up goat's horn nut 6 again after the adjustment, and it is convenient to adjust.
Through-hole 23 has been seted up at link plate 2 center, and link plate 2 cover is established on outer axle sleeve 42 to rotate with outer axle sleeve 42 and be connected, the operation personnel can access the instrument through rotatory link plate 2, make things convenient for the operation personnel to select the instrument.
Specifically, the outer side of the outer shaft sleeve 42 is provided with a circle of protrusions 421, the upper end of each protrusion 421 is provided with a fixing ring 7, and the hanging plate 2 is located between the protrusions 421 and the fixing rings 7 and can rotate.
The fixing component 3 comprises a fixing sleeve 31, an adjusting sleeve 32 and a fixing lock catch 33, the fixing sleeve 31 is fixedly connected with the support rod 1, the fixing lock catch 33 is fixedly connected with the adjusting sleeve 32, and the fixing lock catch 33 and the adjusting sleeve 32 can be of an integrally formed structure; the adjusting sleeve 32 is sleeved on the supporting rod 1, the adjusting sleeve 32 can slide up and down along the supporting rod 1 for a distance, the adjusting sleeve 32 is located below the fixing sleeve 31, and the adjusting sleeve 32 abuts against the fixing sleeve 31, it can be understood that when the fixing lock catch 33 is fixed on the angle iron tower, the fixing sleeve 31 can abut against and be connected with the adjusting sleeve 32 under the action of gravity.
Adjusting channel 321 that is used for adjusting 2 horizontal positions of link plate is offered to adjusting sleeve 32 bilateral symmetry around, it cooperatees with adjusting channel 321 and realizes fixed joint spare 11 to correspond to be fixed with on the bracing piece 1, specifically, two the same adjusting channel 321 have been offered to adjusting sleeve 32 front and back both sides symmetry respectively, bracing piece 1 front and back both sides correspond respectively and are fixed with two joint spare 11, joint spare 11 and adjusting channel 321 one-to-one, it is fixed more stable, firm to make adjusting sleeve 32 and fixed cover 31 fixed.
It should be noted that: when 2 horizontal positions of link plate are adjusted to needs, only need upwards lift up bracing piece 1, fixed cover 31 can follow bracing piece 1 rebound, thereby separate with adjusting sleeve 32, and simultaneously, joint spare 11 also can break away from the fixed point in adjusting the channel 321, then translation bracing piece 1 left or right, joint spare 11 can be in adjusting channel 321 horizontal slip, after adjusting the position, put down bracing piece 1 again, fixed cover 31 can offset with adjusting sleeve 32 again under the effect of gravity this moment, the fixed point card that joint spare 11 falls into in adjusting the channel 321 dies simultaneously, prevent that it from taking place to control, accomplish the regulation of 2 horizontal positions of link plate.
Fixed cover 31 bottom is provided with first sawtooth 311, and adjusting sleeve 32 top is provided with the second sawtooth 322 with first sawtooth 311 assorted, and when adjusting sleeve 32 and fixed cover 31 offseted, first sawtooth 311 and second sawtooth 322 block were connected, made adjusting sleeve 32 and fixed cover 31 be connected more stably, can prevent that it from taking place relative rotation.
A plurality of notches 21 are uniformly formed in the outer edge of the hanging plate 2 and used for storing a plurality of tools; the fixed orifices 22 are correspondingly formed in the inner sides of the notches 21, stored tools can be fixed, the tools can be safely stored, the danger of falling objects can be avoided, and the operation safety is ensured.
The two ends of the support rod 1 are respectively provided with a pull ring 5, and the support rod can be connected with other parts through the pull rings 5, so that the use is convenient.
The hanging plate 2 can be a circular turntable; the support rod 1 and the hanging plate 2 are made of insulating materials.
This iron tower instrument stores pylon adopts stereoplasm insulating material to make, under the circumstances of guaranteeing the air insulation distance, settles on the iron tower, makes things convenient for the operation personnel to carry out the temporary access of insulated operation pole, alleviates operation personnel's intensity of labour, and safe and reliable.
The above embodiments are only used for illustrating the technical solutions of the present application, and not for limiting the same; although the present application has been described in detail with reference to the foregoing embodiments, it should be understood by those of ordinary skill in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; and such modifications or substitutions do not depart from the spirit and scope of the corresponding technical solutions in the embodiments of the present application.
Claims (10)
1. An iron tower tool hanger, comprising: a support bar;
the supporting rod is provided with a hanging plate for hanging tools;
the hanging plate is rotatably connected with the supporting rod;
the support rod is also provided with a fixing component for fixing the support rod on the angle iron of the iron tower;
the support rod is fixed on the angle iron tower through the fixing component.
2. The iron tower tool hanger of claim 1, wherein a bushing for mounting the hanging plate is disposed on the support rod;
the shaft sleeve is detachably connected with the supporting rod.
3. The iron tower tool hanger of claim 2, wherein the bushing comprises an inner bushing and an outer bushing;
the inner shaft sleeve and the outer shaft sleeve are fixed on the support rod through claw nuts;
a through hole is formed in the center of the hanging plate;
the hanging plate is sleeved on the outer shaft sleeve and is rotationally connected with the outer shaft sleeve.
4. The iron tower tool hanger of claim 3, wherein a circle of protrusions are arranged on the outer side of the outer shaft sleeve;
the upper end of the bulge is provided with a fixing ring;
the hanging plate is located between the bulge and the fixing ring.
5. The iron tower tool hanger defined in claim 1, wherein the securing assembly comprises a securing sleeve, an adjustment sleeve and a securing latch;
the fixed sleeve is fixedly connected with the supporting rod;
the fixed lock catch is fixedly connected with the adjusting sleeve;
the adjusting sleeve is sleeved on the supporting rod;
the adjusting sleeve is positioned below the fixed sleeve and is abutted against the fixed sleeve;
the front side and the rear side of the adjusting sleeve are symmetrically provided with adjusting channels for adjusting the horizontal position of the hanging plate;
the supporting rod is correspondingly fixed with a clamping piece which is matched with the adjusting channel to realize fixation.
6. The pylon tool hanger of claim 5 wherein the bottom of the retaining sleeve is provided with first serrations;
and a second sawtooth matched with the first sawtooth is arranged at the top of the adjusting sleeve.
7. The iron tower tool hanging frame according to claim 1, wherein a plurality of notches are uniformly formed in the outer edge of the hanging plate;
the inner side of the notch is correspondingly provided with a fixing hole.
8. The iron tower tool hanger of claim 1, wherein pull rings are respectively disposed at both ends of the support rod.
9. The iron tower tool hanger defined in claim 1, wherein the hanging plate is a circular turntable.
10. The iron tower tool hanger of claim 1, wherein the support rods and the hanging plates are made of insulating materials.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010174456.5A CN111244820A (en) | 2020-03-13 | 2020-03-13 | Iron tower tool hanging rack |
PCT/CN2020/122313 WO2021179610A1 (en) | 2020-03-13 | 2020-10-21 | Pylon-mounted tool holder |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010174456.5A CN111244820A (en) | 2020-03-13 | 2020-03-13 | Iron tower tool hanging rack |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111244820A true CN111244820A (en) | 2020-06-05 |
Family
ID=70864732
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010174456.5A Pending CN111244820A (en) | 2020-03-13 | 2020-03-13 | Iron tower tool hanging rack |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN111244820A (en) |
WO (1) | WO2021179610A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2021179610A1 (en) * | 2020-03-13 | 2021-09-16 | 广东电网有限责任公司清远供电局 | Pylon-mounted tool holder |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115192935B (en) * | 2022-07-18 | 2023-07-04 | 广东电网有限责任公司 | Standing device for iron tower overhead operation |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202856237U (en) * | 2012-04-29 | 2013-04-03 | 沧州供电公司 | Integrated electric power facility maintenance tool |
JP2013227736A (en) * | 2012-04-24 | 2013-11-07 | Ntt Infranet Co Ltd | Recovery tool and recovery method using the same |
JP2014143783A (en) * | 2013-01-22 | 2014-08-07 | Chugoku Electric Power Co Inc:The | Aerial workbench supporting tool |
CN207039058U (en) * | 2017-05-11 | 2018-02-23 | 国网浙江省电力公司湖州供电公司 | A kind of rotating disc type insulating bar hanging rack structure |
CN107769078A (en) * | 2017-11-20 | 2018-03-06 | 国网湖北省电力公司宜昌供电公司 | The multifunction insulating bar hanging rack of 10kV insulating bar working systems |
CN107910804A (en) * | 2017-05-11 | 2018-04-13 | 国网浙江省电力公司湖州供电公司 | A kind of rotating disc type insulating bar hanger |
CN209088408U (en) * | 2018-11-08 | 2019-07-09 | 国网浙江淳安县供电有限公司 | Adjustable-angle operating stick hanger on a kind of livewire work column |
CN110829279A (en) * | 2019-12-16 | 2020-02-21 | 国网辽宁省电力有限公司鞍山供电公司 | Insulating hanging rack and telescopic clamp for live connection and operation method |
CN211405279U (en) * | 2020-03-13 | 2020-09-01 | 广东电网有限责任公司 | Iron tower tool hanging rack |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111244820A (en) * | 2020-03-13 | 2020-06-05 | 广东电网有限责任公司 | Iron tower tool hanging rack |
-
2020
- 2020-03-13 CN CN202010174456.5A patent/CN111244820A/en active Pending
- 2020-10-21 WO PCT/CN2020/122313 patent/WO2021179610A1/en active Application Filing
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2013227736A (en) * | 2012-04-24 | 2013-11-07 | Ntt Infranet Co Ltd | Recovery tool and recovery method using the same |
CN202856237U (en) * | 2012-04-29 | 2013-04-03 | 沧州供电公司 | Integrated electric power facility maintenance tool |
JP2014143783A (en) * | 2013-01-22 | 2014-08-07 | Chugoku Electric Power Co Inc:The | Aerial workbench supporting tool |
CN207039058U (en) * | 2017-05-11 | 2018-02-23 | 国网浙江省电力公司湖州供电公司 | A kind of rotating disc type insulating bar hanging rack structure |
CN107910804A (en) * | 2017-05-11 | 2018-04-13 | 国网浙江省电力公司湖州供电公司 | A kind of rotating disc type insulating bar hanger |
CN107769078A (en) * | 2017-11-20 | 2018-03-06 | 国网湖北省电力公司宜昌供电公司 | The multifunction insulating bar hanging rack of 10kV insulating bar working systems |
CN209088408U (en) * | 2018-11-08 | 2019-07-09 | 国网浙江淳安县供电有限公司 | Adjustable-angle operating stick hanger on a kind of livewire work column |
CN110829279A (en) * | 2019-12-16 | 2020-02-21 | 国网辽宁省电力有限公司鞍山供电公司 | Insulating hanging rack and telescopic clamp for live connection and operation method |
CN211405279U (en) * | 2020-03-13 | 2020-09-01 | 广东电网有限责任公司 | Iron tower tool hanging rack |
Non-Patent Citations (1)
Title |
---|
陆丹;夏正青;唐夏明;陈宇;胡仁;闫仁宝;: "输电线路带电拆除异物方法改进和工具研制", 浙江电力, no. 11, 25 November 2015 (2015-11-25), pages 24 - 27 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2021179610A1 (en) * | 2020-03-13 | 2021-09-16 | 广东电网有限责任公司清远供电局 | Pylon-mounted tool holder |
Also Published As
Publication number | Publication date |
---|---|
WO2021179610A1 (en) | 2021-09-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111244820A (en) | Iron tower tool hanging rack | |
CN211405279U (en) | Iron tower tool hanging rack | |
CN111600236B (en) | Interphase insulation isolation device for distribution live-line work line and use method | |
CN116632756B (en) | Spacer for overhead cable | |
CN111451614B (en) | Welding equipment for light alloy motor shell | |
CN210036731U (en) | Be used for building survey and drawing to use portable sighting rod | |
US6804980B2 (en) | Metal stock bender twister adaptor | |
CN211890794U (en) | Adjustable angle iron bracket for iron tower tool hanging rack | |
CN211405278U (en) | Iron tower is carousel subassembly for instrument stores pylon | |
CN216215615U (en) | Cable strutting arrangement for building site | |
CN108581539A (en) | The cutter device of clamp spring production | |
CN216092138U (en) | Wire pole staple bolt hoisting device | |
CN214429211U (en) | Distribution network planning device based on distribution network frame | |
CN213425581U (en) | Low-voltage power distribution cabinet | |
CN211596349U (en) | Road bridge for construction | |
CN212252927U (en) | Outer machine mounting structure of central air conditioner | |
CN212652778U (en) | Adjustable aluminum profile machining equipment | |
CN210387031U (en) | Copper wire take-up with regulatory function | |
CN214912824U (en) | Safety belt protective support for outdoor framework operation | |
CN214898936U (en) | Earth connection action bars of universal wire end clamp | |
CN211776469U (en) | Separation net for municipal building construction | |
CN211697886U (en) | High-voltage cable head grounding clamp | |
CN215368588U (en) | High stability scaffold frame convenient to climbing | |
CN210280917U (en) | Cutting machine with protective device | |
CN219241814U (en) | Fixed tower ladder of meteorological wind tower |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |