CN111236539A - A steel connecting device - Google Patents

A steel connecting device Download PDF

Info

Publication number
CN111236539A
CN111236539A CN202010161810.0A CN202010161810A CN111236539A CN 111236539 A CN111236539 A CN 111236539A CN 202010161810 A CN202010161810 A CN 202010161810A CN 111236539 A CN111236539 A CN 111236539A
Authority
CN
China
Prior art keywords
steel bar
cavity
clamp
connection
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010161810.0A
Other languages
Chinese (zh)
Inventor
杨亚鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Wilsis Metal Products Co.,Ltd.
Original Assignee
Hebei Zhaofeng Keyuan Aerospace Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Zhaofeng Keyuan Aerospace Equipment Co Ltd filed Critical Hebei Zhaofeng Keyuan Aerospace Equipment Co Ltd
Priority to CN202010161810.0A priority Critical patent/CN111236539A/en
Publication of CN111236539A publication Critical patent/CN111236539A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/16Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
    • E04C5/162Connectors or means for connecting parts for reinforcements
    • E04C5/163Connectors or means for connecting parts for reinforcements the reinforcements running in one single direction
    • E04C5/165Coaxial connection by means of sleeves

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

本发明公开了一种钢筋连接装置,属于钢筋连接技术领域。包括钢筋连接套,钢筋连接套的左端口为钢筋插入孔,在钢筋插入孔的右侧由左至右依次连通钢筋固定连接腔,压簧容纳腔和内螺纹孔,钢筋固定连接腔为左端口小于右端口的锥型腔;在锥型腔内安装钢筋卡箍组件,在压簧容纳腔内设有钢筋卡箍组件压簧,在内螺纹孔内旋接螺纹连接件,钢筋卡箍组件包括一组卡箍连接片,各卡箍连接片环钢筋固定连接腔的内壁周向排列,各卡箍连接片的内侧壁为位于同一轴心线上的圆弧形面,且在其圆形弧面上设有钢筋咬合齿牙,卡箍连接片的外侧壁具有与钢筋固定连接腔的内壁锥度相适配的锥型面。它具有钢筋连接强度高,适应性强,操作便捷等特点。

Figure 202010161810

The invention discloses a steel bar connection device, which belongs to the technical field of steel bar connection. Including the steel bar connection sleeve, the left port of the steel bar connection sleeve is the steel bar insertion hole, and the right side of the steel bar insertion hole is connected to the steel bar fixing connection cavity, the compression spring accommodating cavity and the inner thread hole in turn from left to right, and the steel bar fixing connection cavity is the left port. The conical cavity is smaller than the right port; the rebar clamp assembly is installed in the conical cavity, the rebar clamp assembly compression spring is arranged in the compression spring accommodating cavity, and the threaded connector is screwed in the inner threaded hole, and the rebar clamp assembly includes A set of clamp connecting pieces, the inner wall of each clamp connecting piece ring steel fixed connection cavity is arranged circumferentially, and the inner side wall of each clamp connecting piece is a circular arc surface located on the same axis line, and is in the circular arc. There are steel bar occlusal teeth on the surface, and the outer side wall of the clamp connecting piece has a tapered surface that matches the inner wall taper of the steel bar fixing connection cavity. It has the characteristics of high steel connection strength, strong adaptability and convenient operation.

Figure 202010161810

Description

一种钢筋连接装置A steel connecting device

技术领域technical field

本发明涉及钢筋连接技术领域。The invention relates to the technical field of steel bar connection.

背景技术Background technique

钢筋的连接方式主要有绑扎搭接、机械连接、焊接三种。There are three main ways of connecting steel bars: lashing, mechanical connection, and welding.

绑扎搭接:钢筋接头处重叠部分通过绑扎进行固定的方法,该方法不但需要较长的重叠部分,导致浪费材料,对于不同的钢筋搭接位置不宜选取同一位置,所以绑扎方式主要缺点是使用钢材多,,传力性能差Binding and lap joint: the method of fixing the overlapping part of the steel bar joint by tying. This method not only requires a long overlapping part, which leads to waste of material. It is not suitable to select the same position for different lap joint positions of the steel bar. Therefore, the main disadvantage of the binding method is the use of steel Too much, poor force transmission performance

焊接连接:钢筋焊接连接有闪光对焊、电弧焊、电渣压力焊、气压焊和预埋件钢筋埋弧压力焊等几种方法。主要缺点是需要专门的施工设备和材料及电力,能源消耗最大,并且对人员要求严格,对施工环境有一定要求,不能随时随地采用:如电渣压力焊只能用于竖向钢筋连接,闪光对焊、气压焊只能在加工场施焊和连接有限长度钢筋,质量不能完全保证,易出不合格品,浪费较多。Welded connection: There are several methods for welded connection of steel bars, such as flash butt welding, arc welding, electroslag pressure welding, gas pressure welding and submerged arc pressure welding of embedded steel bars. The main disadvantage is that special construction equipment, materials and electricity are required, the energy consumption is the largest, and the requirements for personnel are strict, and there are certain requirements for the construction environment. Butt welding and air pressure welding can only weld and connect steel bars of limited length in the processing field, and the quality cannot be fully guaranteed, and it is easy to produce unqualified products and waste a lot.

机械连接:就是采用直螺纹,锥螺纹,套筒挤压等方式进行连接,又因套筒积压和锥螺纹连接质量不稳定和接头受力达不到等而现在很少采用,以最常用的直螺纹接头作为分析比较对象。直螺纹主要有敦粗切削直螺纹连接,需要将钢筋端部切圆,然后墩粗,再切螺纹,由于结构组织发生变化,且不经过回火处理,会产生应力集中,延性下降,对改善接头受力是不利的。还有就是挤压肋滚压直螺纹连接,连接比较稳定,但是由于钢筋的本身压制公差较大,丝头加工质量控制难度大,滚丝轮的受力条件恶劣,寿命低。Mechanical connection: It is connected by straight thread, tapered thread, sleeve extrusion, etc., and it is rarely used now because of the backlog of sleeve and the unstable quality of the tapered thread connection and the insufficient force of the joint. Straight threaded joints are used as the object of analysis and comparison. Straight thread mainly includes rough cutting straight thread connection. It is necessary to round the end of the steel bar, then thicken the pier, and then cut the thread. Due to the change in the structure and organization, and without tempering treatment, stress concentration will occur and ductility will decrease. Joint stress is unfavorable. There is also the extrusion rib rolling straight thread connection, which is relatively stable, but due to the large pressing tolerance of the steel bar itself, it is difficult to control the quality of the wire head processing, and the force conditions of the rolling wheel are poor and the service life is low.

发明内容SUMMARY OF THE INVENTION

本发明要解决的技术问题是提供一种钢筋连接装置,它具有钢筋连接强度高,适应性强,操作便捷等特点。The technical problem to be solved by the present invention is to provide a reinforcing bar connecting device, which has the characteristics of high reinforcing bar connecting strength, strong adaptability, convenient operation and the like.

为解决上述技术问题,本发明所采取的技术方案是:In order to solve the above-mentioned technical problems, the technical scheme adopted by the present invention is:

一种钢筋连接装置,包括钢筋连接套,钢筋连接套的左端口为钢筋插入孔,在钢筋插入孔的右侧由左至右依次连通钢筋固定连接腔,压簧容纳腔和内螺纹孔,钢筋固定连接腔为左端口小于右端口的锥型腔;在锥型腔内安装钢筋卡箍组件,在压簧容纳腔内设有钢筋卡箍组件压簧,在内螺纹孔内旋接螺纹连接件,以推动钢筋卡箍组件压簧压向钢筋卡箍组件;A reinforcing bar connecting device includes a reinforcing bar connecting sleeve, the left port of the reinforcing bar connecting sleeve is a reinforcing bar insertion hole, and the right side of the reinforcing bar inserting hole is connected to a reinforcing bar fixing connection cavity, a compression spring accommodating cavity and an inner thread hole in sequence from left to right, and the reinforcing bar The fixed connection cavity is a conical cavity whose left port is smaller than the right port; a steel bar clamp assembly is installed in the conical cavity, a steel bar clamp assembly compression spring is arranged in the compression spring accommodating cavity, and a threaded connector is screwed into the inner threaded hole , to push the compression spring of the rebar clamp assembly to press the rebar clamp assembly;

钢筋卡箍组件包括一组卡箍连接片,各卡箍连接片环钢筋固定连接腔的内壁周向排列,各卡箍连接片的内侧壁为位于同一轴心线上的圆弧形面,且在其圆形弧面上设有钢筋咬合齿牙,卡箍连接片的外侧壁具有与钢筋固定连接腔的内壁锥度相适配的锥型面,以使各卡箍连接片的外侧壁呈环形排列紧贴在钢筋固定连接腔的内壁上时,各卡箍连接片的内侧壁形成具有松紧间隙的圆柱形内环面,圆柱形内环面为钢筋抱紧固定套,圆柱形内环面所围成的圆柱形腔体为钢筋抱紧固定腔,当旋紧螺纹连接件使钢筋卡箍组件压簧对钢筋卡箍组件施加推力使其向左侧移动时,钢筋固定连接腔的锥型腔内壁将各卡箍连接片逐渐导向钢筋固定连接腔的轴心位置,从而使钢筋抱紧固定腔直径逐渐缩小,钢筋抱紧固定套将位于钢筋抱紧固定腔内的钢筋抱紧,各卡箍连接片的内侧壁上的钢筋咬合齿牙嵌入钢筋肋内,以将钢筋固定在钢筋固定连接腔内。The steel bar clamp assembly includes a set of clamp connection pieces, each clamp connection piece is circumferentially arranged around the inner wall of the steel fixed connection cavity, and the inner side wall of each clamp connection piece is an arc-shaped surface located on the same axis line, and The circular arc surface is provided with steel bar occlusal teeth, and the outer side wall of the clamp connection piece has a tapered surface that matches the inner wall taper of the steel bar fixing connection cavity, so that the outer side wall of each clamp connection piece is annular When the arrangement is close to the inner wall of the steel bar fixing connection cavity, the inner side wall of each clamp connecting piece forms a cylindrical inner ring surface with an elastic gap. The enclosed cylindrical cavity is the steel bar holding and fixing cavity. When the threaded connection is tightened, the steel bar clamp assembly compression spring exerts a thrust on the steel bar clamp assembly to move it to the left, and the steel bar is fixed to the conical cavity of the connection cavity. The inner wall gradually guides each clamp connecting piece to the axial position of the steel bar fixing connection cavity, so that the diameter of the steel bar tightening and fixing cavity is gradually reduced. The steel bar bite teeth on the inner side wall of the connecting piece are embedded in the steel bar rib, so as to fix the steel bar in the steel bar fixing connection cavity.

本发明进一步改进在于:The further improvement of the present invention is:

钢筋卡箍组件设有使各卡箍连接片周向环列且轴向定位的卡箍连接片定位结构。The reinforcing bar clamp assembly is provided with a clamp connection piece positioning structure for circumferentially arranging and axially positioning each clamp connection piece.

卡箍连接片定位结构为:在各卡箍连接片的内侧壁设有限位槽,各限位槽沿钢筋抱紧固定套周向设置,并设有与限位槽相适配的C型环,C型环嵌入各卡箍连接片的限位槽内,以对其在钢筋固定连接腔内定位,使各卡箍连接片环钢筋固定连接腔的内壁周向排列。The positioning structure of the clamp connection piece is as follows: a limit groove is arranged on the inner side wall of each clamp connection piece, and each limit groove is arranged along the circumferential direction of the steel bar-clinching fixing sleeve, and is provided with a C-shaped ring that matches the limit groove. The C-shaped ring is embedded in the limit groove of each clamp connecting piece to position it in the steel fixing connection cavity, so that the inner wall of each clamp connecting piece ring steel fixing connecting cavity is arranged circumferentially.

卡箍连接片定位结构为:包括两个直径与钢筋抱紧固定腔相适配的圆形金属片和一个直径不大于圆形金属片直径的圆片型磁铁,圆片型磁铁位于两个圆形金属片之间,各卡箍连接片环列并被圆片型磁铁吸附在两个圆形金属片9的圆边上,以对其在钢筋固定连接腔内定位,使各卡箍连接片环钢筋固定连接腔的内壁周向排列。The positioning structure of the clamp connection piece is: it includes two circular metal pieces whose diameters are adapted to the steel bar holding and fixing cavity and a circular piece magnet whose diameter is not larger than the diameter of the circular metal piece. The circular piece magnet is located in the two circles. Between the two circular metal sheets, each clamp connecting piece is arranged in a ring and is adsorbed on the round edges of the two circular metal sheets 9 by the disc magnets, so as to locate them in the fixed connection cavity of the steel bar, so that each clamp connecting piece is The inner wall of the ring reinforcement fixed connection cavity is arranged circumferentially.

螺纹连接件的右端设有外螺纹孔或内螺纹孔,用于连接其它钢筋连接装置。The right end of the threaded connector is provided with an external threaded hole or an internal threaded hole for connecting other steel bar connecting devices.

卡箍连接片为四个。There are four clamp connection pieces.

采用上述技术方案所产生的有益效果在于:The beneficial effects produced by the above technical solutions are:

本装置钢筋固定连接腔为左端口小于右端口的锥型腔,钢筋卡箍组件左右移动可使钢筋抱紧固定套扩大或缩小,从而对钢筋的不同厂商的公差差异要求低,适应性好;当钢筋受到向本装置相反方向的拉力时,钢筋带动钢筋卡箍组件沿钢筋固定连接腔的锥型腔内壁向开口小的方向移动,从而使钢筋抱紧固定套缩小,各卡箍连接片的内侧壁上的钢筋咬合齿牙嵌入钢筋肋深度增大,从而保障钢筋连接的强度;将钢筋由钢筋插入孔插入,旋紧螺纹连接件即可将本装置与钢筋固定,操作便捷,现场施工时间大大缩短,能够短时间连接钢筋,强度及质量都能很好地达到标准要求。The steel bar fixing connection cavity of the device is a conical cavity whose left port is smaller than the right port, and the left and right movement of the steel bar clamp assembly can expand or shrink the steel bar holding sleeve, so that the tolerance difference between different manufacturers of steel bars is low, and the adaptability is good; When the steel bar is pulled in the opposite direction of the device, the steel bar drives the steel bar clamp assembly to move along the inner wall of the tapered cavity of the steel bar fixing connection cavity to the direction of small opening, so that the steel bar tightening and fixing sleeve is reduced, and the The occlusal teeth of the steel bars on the inner side wall are embedded in the steel ribs to increase the depth, thus ensuring the strength of the steel bar connection; insert the steel bar through the steel bar insertion hole, and tighten the threaded connector to fix the device and the steel bar, which is convenient to operate and save time for on-site construction. It is greatly shortened, and the steel bars can be connected in a short time, and the strength and quality can well meet the standard requirements.

它具有钢筋连接强度高,适应性强,操作便捷等特点。It has the characteristics of high steel connection strength, strong adaptability and convenient operation.

附图说明Description of drawings

图1是本发明的结构示意图;Fig. 1 is the structural representation of the present invention;

图2是图1中钢筋连接套结构示意图;Fig. 2 is the structural representation of reinforcing bar connecting sleeve in Fig. 1;

图3是图1中钢筋卡箍组件的结构示意图;Fig. 3 is the structural representation of the reinforcing bar clamp assembly in Fig. 1;

图4是图1中卡箍连接片的结构示意图;Fig. 4 is the structural representation of the clamp connecting piece in Fig. 1;

图5是钢筋卡箍组件与卡箍连接片定位结构组合的结构示意图;5 is a schematic structural diagram of the combination of a reinforcing bar clamp assembly and a clamp connecting piece positioning structure;

图6是钢筋卡箍组件与卡箍连接片定位结构组合的结构示意图;6 is a schematic structural diagram of the combination of a reinforcing bar clamp assembly and a clamp connecting piece positioning structure;

图7是本发明使用状态结构示意图。FIG. 7 is a schematic diagram of the structure of the present invention in use state.

在附图中:1.钢筋连接套;2.钢筋插入孔;3.钢筋固定连接腔;4.压簧容纳腔;5.内螺纹孔;6.钢筋卡箍组件压簧;7.卡箍连接片;7-1.卡箍连接片的内侧壁;7-1-1.钢筋咬合齿牙;7-1-2.限位槽;7-2.卡箍连接片的外侧壁;8.C型环;9.圆形金属片;10.圆片型磁铁;11.螺纹连接件;12.钢筋。In the drawings: 1. Rebar connecting sleeve; 2. Reinforcing hole; 3. Reinforcing connection cavity; 4. Compression spring accommodating cavity; 5. Internal thread hole; 6. Rebar clamp assembly compression spring; 7. Clamp Connecting piece; 7-1. The inner side wall of the clamp connecting piece; 7-1-1. The steel bar bites the teeth; 7-1-2. The limit groove; 7-2. The outer side wall of the clamp connecting piece; 8. C-ring; 9. Circular metal sheet; 10. Disc magnet; 11. Threaded connector; 12. Steel bar.

具体实施方式Detailed ways

下面将结合附图和具体实施例对本发明进行进一步详细说明。The present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments.

本发明中使用到的标准零件均可以从市场上购买,异形件根据说明书的和附图的记载均可以进行订制,各个零件的具体连接方式均采用现有技术中成熟的螺栓、铆钉、焊接、粘贴等常规手段,在此不再详述。The standard parts used in the present invention can be purchased from the market, the special-shaped parts can be customized according to the description in the description and the drawings, and the specific connection methods of each part are all mature bolts, rivets, welding in the prior art. , pasting and other conventional means will not be described in detail here.

由图1~7所示的实施例可知,本实施例包括钢筋连接套1,钢筋连接套1的左端口为钢筋插入孔2,在钢筋插入孔2的右侧由左至右依次连通钢筋固定连接腔3,压簧容纳腔4和内螺纹孔5,钢筋固定连接腔3为左端口小于右端口的锥型腔;在锥型腔内安装钢筋卡箍组件,在压簧容纳腔4内设有钢筋卡箍组件压簧6,在内螺纹孔5内旋接螺纹连接件11,以推动钢筋卡箍组件压簧6压向钢筋卡箍组件;It can be seen from the embodiments shown in FIGS. 1 to 7 that this embodiment includes a steel bar connecting sleeve 1. The left port of the steel bar connecting sleeve 1 is a steel bar insertion hole 2, and the right side of the steel bar insertion hole 2 is connected to the steel bar from left to right. The connection cavity 3, the compression spring accommodating cavity 4 and the inner threaded hole 5, the steel bar fixing connection cavity 3 is a conical cavity whose left port is smaller than the right port; There is a compression spring 6 of the reinforcing bar clamp assembly, and the threaded connector 11 is screwed in the inner threaded hole 5 to push the reinforcing bar clamp assembly compression spring 6 to press the reinforcing bar clamp assembly;

钢筋卡箍组件包括一组卡箍连接片7,各卡箍连接片7环钢筋固定连接腔3的内壁周向排列,各卡箍连接片7的内侧壁7-1为位于同一轴心线上的圆弧形面,且在其圆形弧面上设有钢筋咬合齿牙7-1-1,齿牙向钢筋卡箍组件压簧的方向倾斜,在将钢筋向相反方向拽时,齿牙会嵌入钢筋肋内,越往外拽齿牙嵌入越深,固定钢筋越牢固;卡箍连接片7的外侧壁7-2具有与钢筋固定连接腔3的内壁锥度相适配的锥型面,以使各卡箍连接片7的外侧壁7-2呈环形排列紧贴在钢筋固定连接腔3的内壁上时,各卡箍连接片7的内侧壁7-1形成具有松紧间隙的圆柱形内环面,圆柱形内环面为钢筋抱紧固定套,圆柱形内环面所围成的圆柱形腔体为钢筋抱紧固定腔,当旋紧螺纹连接件11使钢筋卡箍组件压簧6对钢筋卡箍组件施加推力使其向左侧移动时,钢筋固定连接腔3的锥型腔内壁将各卡箍连接片7逐渐导向钢筋固定连接腔3的轴心位置,从而使钢筋抱紧固定腔直径逐渐缩小,钢筋抱紧固定套将位于钢筋抱紧固定腔内的钢筋抱紧,各卡箍连接片7的内侧壁7-1上的钢筋咬合齿牙7-1-1嵌入钢筋肋内,以将钢筋固定在钢筋固定连接腔3内。钢筋连接套右端的内螺纹孔可以连接其它钢筋连接装置。The steel bar clamp assembly includes a set of clamp connection pieces 7, each clamp connection piece 7 is circumferentially arranged around the inner wall of the steel reinforcement connection cavity 3, and the inner side wall 7-1 of each clamp connection piece 7 is located on the same axis line. The arc-shaped surface of the steel bar is provided with rebar occlusal teeth 7-1-1, and the teeth are inclined to the direction of the compression spring of the rebar clamp assembly. When the rebar is pulled in the opposite direction, the teeth It will be embedded in the steel ribs, and the deeper the teeth are embedded, the more firmly the fixed steel bars are; When the outer side walls 7-2 of each clamp connecting piece 7 are arranged in a ring shape and closely adhered to the inner wall of the steel fixing connection cavity 3, the inner side wall 7-1 of each clamp connecting piece 7 forms a cylindrical inner ring with an elastic gap. The cylindrical inner ring surface is the steel bar holding and fixing sleeve, and the cylindrical cavity enclosed by the cylindrical inner ring surface is the steel bar holding and fixing cavity. When the steel bar clamp assembly exerts a thrust to move it to the left, the inner wall of the conical cavity of the steel bar fixing connection cavity 3 will gradually guide each clamp connecting piece 7 to the axial center position of the steel bar fixing connection cavity 3, so that the steel bar will hold the fixing cavity tightly. The diameter is gradually reduced, and the steel bar gripping and fixing sleeves hold the steel bars in the steel bar gripping and fixing cavity tightly. In order to fix the steel bar in the steel bar fixing connection cavity 3. The inner threaded hole at the right end of the steel connecting sleeve can be connected to other steel connecting devices.

钢筋卡箍组件设有使各卡箍连接片周向环列且轴向定位的卡箍连接片定位结构。The reinforcing bar clamp assembly is provided with a clamp connection piece positioning structure for circumferentially arranging and axially positioning each clamp connection piece.

卡箍连接片定位结构为:在各卡箍连接片7的内侧壁7-1设有限位槽7-1-2,各限位槽7-1-2沿钢筋抱紧固定套周向设置,并设有与限位槽7-1-2相适配的C型环8,C型环8嵌入各卡箍连接片7的限位槽7-1-2内,以对其在钢筋固定连接腔3内定位,使各卡箍连接片7环钢筋固定连接腔3的内壁周向排列。The positioning structure of the clamp connecting piece is as follows: the inner side wall 7-1 of each clamp connecting piece 7 is provided with a limit groove 7-1-2, and each limit groove 7-1-2 is arranged along the circumferential direction of the steel bar tightening and fixing sleeve, And there is a C-shaped ring 8 adapted to the limit groove 7-1-2, and the C-shaped ring 8 is embedded in the limit groove 7-1-2 of each clamp connecting piece 7, so as to be fixedly connected to the steel bar. The inner wall of the cavity 3 is positioned so that the inner walls of each clamp connecting piece 7 are fixed and connected to the inner wall of the cavity 3 in the circumferential direction.

卡箍连接片定位结构为:包括两个直径与钢筋抱紧固定腔相适配的圆形金属片9和一个直径不大于圆形金属片9直径的圆片型磁铁10,圆片型磁铁10位于两个圆形金属片9之间,各卡箍连接片7环列并被圆片型磁铁10吸附在两个圆形金属片9的圆边上,以对其在钢筋固定连接腔3内定位,使各卡箍连接片7环钢筋固定连接腔3的内壁周向排列。The positioning structure of the clamp connection piece is as follows: it includes two circular metal pieces 9 whose diameters are adapted to the steel bar holding and fixing cavity, and a circular piece magnet 10 whose diameter is not larger than the diameter of the circular metal piece 9. The circular piece magnet 10 Located between the two circular metal sheets 9, each clamp connecting piece 7 is arranged in a ring and is adsorbed on the round edges of the two circular metal sheets 9 by the disc magnet 10, so that it is fixed in the steel bar fixing connection cavity 3. Positioning, so that the inner wall of each clamp connecting piece 7 ring steel fixed connection cavity 3 is arranged circumferentially.

螺纹连接件11的右端设有外螺纹孔或内螺纹孔,用于连接其它钢筋连接装置。The right end of the threaded connector 11 is provided with an external thread hole or an internal thread hole, which is used to connect other steel bar connection devices.

卡箍连接片7为四个。There are four clamp connecting pieces 7 .

使用方法:将钢筋由钢筋插入孔2插入,穿过钢筋抱紧固定腔延伸至钢筋卡箍组件压簧6内圈,旋紧螺纹连接件11,使钢筋卡箍组件压簧6对钢筋卡箍组件施加推力使其向左侧移动时,钢筋固定连接腔3的锥型腔内壁将各卡箍连接片7逐渐导向钢筋固定连接腔3的轴心位置,从而使钢筋抱紧固定腔直径逐渐缩小,钢筋抱紧固定套将位于钢筋抱紧固定腔内的钢筋抱紧,各卡箍连接片7的内侧壁7-1上的钢筋咬合齿牙7-1-1嵌入钢筋肋内,以将钢筋固定在钢筋固定连接腔3内。通过钢筋连接套右端的内螺纹孔连接其它钢筋连接装置,或通过螺纹连接件11的右端设有的外螺纹孔或内螺纹孔连接其它钢筋连接装置。How to use: Insert the rebar from the rebar insertion hole 2, extend through the rebar holding cavity to the inner ring of the rebar clamp assembly compression spring 6, and tighten the threaded connector 11, so that the rebar clamp assembly compression spring 6 is paired with the rebar clamp. When the component exerts a thrust to move it to the left, the inner wall of the conical cavity of the steel bar fixing connection cavity 3 will gradually guide each clamp connecting piece 7 to the axial position of the steel bar fixing connection cavity 3, so that the diameter of the steel bar fixing cavity is gradually reduced. , the steel bar gripping and fixing sleeves hold the steel bars in the steel bar gripping and fixing cavity tightly, and the steel bar occlusal teeth 7-1-1 on the inner side wall 7-1 of each clamp connecting piece 7 are embedded in the steel bar ribs, so that the steel bars are It is fixed in the fixed connection cavity 3 of the steel bar. Connect other reinforcing bar connecting devices through the inner threaded hole at the right end of the reinforcing bar connecting sleeve, or connect other reinforcing bar connecting devices through the externally threaded hole or the inner threaded hole provided on the right end of the threaded connector 11 .

Claims (6)

1.一种钢筋连接装置,其特征在于:包括钢筋连接套(1),所述钢筋连接套(1)的左端口为钢筋插入孔(2),在所述钢筋插入孔(2)的右侧由左至右依次连通钢筋固定连接腔(3),压簧容纳腔(4)和内螺纹孔(5),所述钢筋固定连接腔(3)为左端口小于右端口的锥型腔;在所述锥型腔内安装钢筋卡箍组件,在所述压簧容纳腔(4)内设有钢筋卡箍组件压簧(6),在所述内螺纹孔(5)内旋接螺纹连接件(11),以推动所述钢筋卡箍组件压簧(6)压向所述钢筋卡箍组件;1. A reinforcing bar connecting device, characterized in that: it comprises a reinforcing bar connecting sleeve (1), and the left port of the reinforcing bar connecting sleeve (1) is a reinforcing bar insertion hole (2), which is on the right side of the reinforcing bar inserting hole (2). The sides are sequentially connected to the steel bar fixing connection cavity (3), the compression spring accommodating cavity (4) and the inner threaded hole (5) from left to right, and the steel reinforcement fixing connection cavity (3) is a conical cavity whose left port is smaller than the right port; A steel bar clamp assembly is installed in the conical cavity, a steel bar clamp assembly compression spring (6) is arranged in the compression spring accommodating cavity (4), and a threaded connection is screwed in the inner threaded hole (5). a piece (11) to push the rebar clamp assembly compression spring (6) to press toward the rebar clamp assembly; 所述钢筋卡箍组件包括一组卡箍连接片(7),各所述卡箍连接片(7)环所述钢筋固定连接腔(3)的内壁周向排列,各所述卡箍连接片(7)的内侧壁(7-1)为位于同一轴心线上的圆弧形面,且在其圆形弧面上设有钢筋咬合齿牙(7-1-1),所述卡箍连接片(7)的外侧壁(7-2)具有与所述钢筋固定连接腔(3)的内壁锥度相适配的锥型面,以使各所述卡箍连接片(7)的外侧壁(7-2)呈环形排列紧贴在所述钢筋固定连接腔(3)的内壁上时,各所述卡箍连接片(7)的内侧壁(7-1)形成具有松紧间隙的圆柱形内环面,所述圆柱形内环面为钢筋抱紧固定套,所述圆柱形内环面所围成的圆柱形腔体为钢筋抱紧固定腔,当旋紧所述螺纹连接件(11)使钢筋卡箍组件压簧(6)对所述钢筋卡箍组件施加推力使其向左侧移动时,所述钢筋固定连接腔(3)的锥型腔内壁将各所述卡箍连接片(7)逐渐导向所述钢筋固定连接腔(3)的轴心位置,从而使所述钢筋抱紧固定腔直径逐渐缩小,所述钢筋抱紧固定套将位于所述钢筋抱紧固定腔内的钢筋抱紧,各所述卡箍连接片(7)的内侧壁(7-1)上的钢筋咬合齿牙(7-1-1)嵌入钢筋肋内,以将钢筋固定在所述钢筋固定连接腔(3)内。The steel bar clamp assembly includes a set of clamp connection pieces (7), each of the clamp connection pieces (7) is circumferentially arranged around the inner wall of the steel reinforcement fixing connection cavity (3), and each of the clamp connection pieces The inner side wall (7-1) of (7) is a circular arc surface located on the same axis, and the circular arc surface is provided with steel bar occlusal teeth (7-1-1). The outer side wall (7-2) of the connecting piece (7) has a tapered surface adapted to the taper of the inner wall of the steel bar fixing connection cavity (3), so that the outer side wall of each clamp connecting piece (7) is (7-2) When the inner wall (7-1) of each of the clamp connecting pieces (7) is tightly attached to the inner wall of the steel bar fixing connection cavity (3) in an annular arrangement, the inner side wall (7-1) of each of the clamp connection pieces (7) forms a cylindrical shape with an elastic gap. Inner ring surface, the cylindrical inner ring surface is a steel bar tightening and fixing sleeve, and the cylindrical cavity enclosed by the cylindrical inner ring surface is a steel bar tightening and fixing cavity. ) When the rebar clamp assembly compression spring (6) pushes the rebar clamp assembly to move it to the left, the inner wall of the tapered cavity of the rebar fixing connection cavity (3) pushes each clamp connection piece. (7) Gradually lead to the axial position of the steel bar fixing connection cavity (3), so that the diameter of the steel bar gripping and fixing cavity is gradually reduced, and the steel bar gripping and fixing sleeve will be located in the steel bar gripping and fixing cavity. The steel bars are held tightly, and the steel bar occlusion teeth (7-1-1) on the inner side walls (7-1) of each of the clamp connecting pieces (7) are embedded in the steel bar ribs, so as to fix the steel bars in the steel bar fixed connection inside the cavity (3). 2.根据权利要求1所述的一种钢筋连接装置,其特征在于:所述钢筋卡箍组件设有使各所述卡箍连接片周向环列且轴向定位的卡箍连接片定位结构。2 . The reinforcing bar connecting device according to claim 1 , wherein the reinforcing bar clamp assembly is provided with a clamp connecting piece positioning structure for circumferentially arranging and axially positioning each of the clamp connecting pieces. 3 . 3.根据权利要求2所述的一种钢筋连接装置,其特征在于:所述卡箍连接片定位结构为:在各所述卡箍连接片(7)的内侧壁(7-1)设有限位槽(7-1-2),各所述限位槽(7-1-2)沿所述钢筋抱紧固定套周向设置,并设有与所述限位槽(7-1-2)相适配的C型环(8),所述C型环(8)嵌入各所述卡箍连接片(7)的限位槽(7-1-2)内,以对其在所述钢筋固定连接腔(3)内定位,使各所述卡箍连接片(7)环所述钢筋固定连接腔(3)的内壁周向排列。3. A reinforcing bar connection device according to claim 2, characterized in that: the clamp connection piece positioning structure is: a limiter is provided on the inner side wall (7-1) of each clamp connection piece (7). Position grooves (7-1-2), each of the position limit grooves (7-1-2) is arranged along the circumferential direction of the steel bar holding sleeve, and is provided with the position limit groove (7-1-2) ) matching C-type ring (8), the C-type ring (8) is embedded in the limit groove (7-1-2) of each of the clamp connecting pieces (7), so as to The steel bar fixing connection cavity (3) is positioned in the inner wall, so that each of the clamp connecting pieces (7) is circumferentially arranged around the inner wall of the steel reinforcement fixing connection cavity (3). 4.根据权利要求2所述的一种钢筋连接装置,其特征在于:所述卡箍连接片定位结构为:包括两个直径与所述钢筋抱紧固定腔相适配的圆形金属片(9)和一个直径不大于所述圆形金属片(9)直径的圆片型磁铁(10),所述圆片型磁铁(10)位于所述两个圆形金属片(9)之间,各所述卡箍连接片(7)环列并被所述圆片型磁铁(10)吸附在两个所述圆形金属片(9)的圆边上,以对其在所述钢筋固定连接腔(3)内定位,使各所述卡箍连接片(7)环所述钢筋固定连接腔(3)的内壁周向排列。4. A reinforcing bar connecting device according to claim 2, characterized in that: the clamp connecting piece positioning structure is: comprising two circular metal pieces ( 9) and a disc magnet (10) with a diameter not larger than the diameter of the circular metal sheet (9), the disc magnet (10) being located between the two circular metal sheets (9), Each of the clamp connecting pieces (7) is arranged in a ring and is adsorbed on the round edges of the two circular metal pieces (9) by the disc-shaped magnets (10), so as to be fixedly connected to the reinforcing bars. The cavity (3) is positioned so that each of the clamp connecting pieces (7) is circumferentially arranged around the inner wall of the steel reinforcement fixing connection cavity (3). 5.根据权利要求1-4所述的任一项权利要求所述的一种钢筋连接装置,其特征在于:所述螺纹连接件(11)的右端设有外螺纹孔或内螺纹孔,用于连接其它钢筋连接装置。5. A reinforcing bar connection device according to any one of claims 1-4, characterized in that: the right end of the threaded connector (11) is provided with an externally threaded hole or an internally threaded hole, which is used for Used to connect other rebar connection devices. 6.根据权利要求5所述的任一项权利要求所述的一种钢筋连接装置,其特征在于:所述卡箍连接片(7)为四个。6. A reinforcing bar connection device according to any one of claims 5, characterized in that: the number of said clamp connecting pieces (7) is four.
CN202010161810.0A 2020-03-10 2020-03-10 A steel connecting device Pending CN111236539A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010161810.0A CN111236539A (en) 2020-03-10 2020-03-10 A steel connecting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010161810.0A CN111236539A (en) 2020-03-10 2020-03-10 A steel connecting device

Publications (1)

Publication Number Publication Date
CN111236539A true CN111236539A (en) 2020-06-05

Family

ID=70870168

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010161810.0A Pending CN111236539A (en) 2020-03-10 2020-03-10 A steel connecting device

Country Status (1)

Country Link
CN (1) CN111236539A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117403533A (en) * 2023-12-15 2024-01-16 山东大学 An assembled structural connection device and bridge

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20060122264A (en) * 2005-05-26 2006-11-30 주식회사 코스턴 One touch rebar connector
CN207905247U (en) * 2018-01-31 2018-09-25 刘振华 Reinforcing bar Quick mechanical connection structure
KR101941127B1 (en) * 2018-07-13 2019-01-22 주식회사 베스트커플러 Coupler for Connecting Reinforcing Rods
KR20190000226U (en) * 2017-07-18 2019-01-28 (주) 유니플로 One-Touch Type Coupler with the durability
CN110284657A (en) * 2019-06-25 2019-09-27 中企华群(山东)投资集团有限公司 A kind of steel bar connecting structure
CN211923240U (en) * 2020-03-10 2020-11-13 河北兆丰科源航天设备有限公司 Steel bar connecting device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20060122264A (en) * 2005-05-26 2006-11-30 주식회사 코스턴 One touch rebar connector
KR20190000226U (en) * 2017-07-18 2019-01-28 (주) 유니플로 One-Touch Type Coupler with the durability
CN207905247U (en) * 2018-01-31 2018-09-25 刘振华 Reinforcing bar Quick mechanical connection structure
KR101941127B1 (en) * 2018-07-13 2019-01-22 주식회사 베스트커플러 Coupler for Connecting Reinforcing Rods
CN110284657A (en) * 2019-06-25 2019-09-27 中企华群(山东)投资集团有限公司 A kind of steel bar connecting structure
CN211923240U (en) * 2020-03-10 2020-11-13 河北兆丰科源航天设备有限公司 Steel bar connecting device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117403533A (en) * 2023-12-15 2024-01-16 山东大学 An assembled structural connection device and bridge
CN117403533B (en) * 2023-12-15 2024-03-12 山东大学 An assembled structural connection device and bridge

Similar Documents

Publication Publication Date Title
CN201143635Y (en) Sleeve barrel grinding jigs
CN107552982B (en) A kind of multilayer thin-wall annular part laser circumference seam weld fixture and method
CN109382532A (en) A kind of thin-walled cylindrical workpiece turning clamping method, fixture and processing unit (plant)
CN111236539A (en) A steel connecting device
CN111590162A (en) A positioning device and welding method for butt welding of thin-walled pipes
JP2009072795A (en) Welding tool
CN211923240U (en) Steel bar connecting device
JP4981783B2 (en) Fluid pipe for fitting structure
CN211077802U (en) Chuck of body paper unwinding device
CN103115211B (en) Detachable pipe connector
CN211490628U (en) Differential mechanism differential side gear taper sleeve compresses tightly car adds clamping apparatus
JP5301267B2 (en) Pipe welding method, metal welded pipe and core metal fitting
CN214816565U (en) Simple centering clamping fixture
CN211779284U (en) Magnetic core seam piece is decided to solenoid valve
CN114101954A (en) Small-deformation welding method for thin conduit butt joint structure
CN210367750U (en) Device for quickly adjusting blast furnace tuyere pull rod
CN211649355U (en) Natural gas line is welded junction group and is assembled device speedily carries out rescue work
CN204867673U (en) Hydraulic motor cylinder body gear hobbing tooling
CN220623205U (en) Length-adjustable convenient rush-repair structure
CN201208687Y (en) Pairing fixture for producing pipeline
CN213702370U (en) Pull claw type pipeline butt welding guiding and clamping device
CN222176213U (en) Righting and shockproof device suitable for short section production
CN202684134U (en) Clamping jaw for lathe chuck and lathe adopting clamping jaw
CN218856200U (en) Pipe cutting machine elasticity clamping jaw hole adds clamping apparatus
CN205520939U (en) Connecting rod bolt matched nut adds clamping apparatus

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20231013

Address after: 065700 West side of Mount Taishan Road, Bazhou Economic and Technological Development Zone, Langfang City, Hebei Province (in the yard of Hebei Zhaofeng Keyuan Aerospace Equipment Co., Ltd.)

Applicant after: Hebei Wilsis Metal Products Co.,Ltd.

Address before: 065001 West of Mount Taishan Road, Bazhou Economic and Technological Development Zone, Langfang City, Hebei Province South of Langfang Taishun Power Equipment Co.,Ltd.

Applicant before: Hebei Zhaofeng Keyuan Aerospace Equipment Co.,Ltd.

TA01 Transfer of patent application right
RJ01 Rejection of invention patent application after publication

Application publication date: 20200605

RJ01 Rejection of invention patent application after publication