CN111218986A - Fixing structure and mounting method for steel beam and connecting lug plate - Google Patents

Fixing structure and mounting method for steel beam and connecting lug plate Download PDF

Info

Publication number
CN111218986A
CN111218986A CN202010126373.9A CN202010126373A CN111218986A CN 111218986 A CN111218986 A CN 111218986A CN 202010126373 A CN202010126373 A CN 202010126373A CN 111218986 A CN111218986 A CN 111218986A
Authority
CN
China
Prior art keywords
steel beam
connecting lug
fixing
plate
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010126373.9A
Other languages
Chinese (zh)
Inventor
杨泽辉
赵红阳
潘中亮
李娟�
曲鑫鑫
李建军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN202010126373.9A priority Critical patent/CN111218986A/en
Publication of CN111218986A publication Critical patent/CN111218986A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates
    • E04G21/1841Means for positioning building parts or elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2415Brackets, gussets, joining plates
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2457Beam to beam connections

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

A fixing structure and an installation method of a steel beam and a connecting lug plate comprise the following steps: vertically and symmetrically welding positioning rings at the web plate position of the hoisting steel beam, and inserting matched fixing pieces into the positioning rings; after the connecting ear plate is placed at the position to be installed, the connecting ear plate is welded and fixed with each fixing piece; before hoisting the steel beam, the connecting lug plates are rotated 180 degrees from the positions to be installed to the opposite sides, after the steel beam is hoisted in place, the connecting lug plates are rotated 180 degrees around the fixing rings in the reverse direction to the positions to be installed, and the steel beams are connected through the connecting lug plates. The invention aims to provide a fixing structure and an installation method which can realize reliable connection between a connecting lug plate and a hoisting steel beam and hoist the connecting lug plate together with the steel beam.

Description

Fixing structure and mounting method for steel beam and connecting lug plate
Technical Field
The invention relates to the technical field of steel structure installation engineering, in particular to a fixing structure and an installation method of a steel beam and a connecting lug plate.
Background
Along with the technical development in the engineering construction field, steel structure buildings are more and more applied to various building fields, and the main connection mode between steel structure members is welding and bolting.
In steel structure engineering, there are several kinds of connected modes such as welded connection, bolted weld connection in the girder steel connection mainly, and when adopting bolted connection or bolted weld to connect, the girder steel web generally adopts engaging lug board cooperation high strength bolt to connect. The connecting lug plates are changed in specification and size along with the size of the steel beam, when the steel beam is large, the connecting lug plates are generally large in self weight, high-altitude hoisting is needed to be carried out to the installation position for positioning and installation, the number of the lug plates is usually large, a hoisting device needs to be added independently in the hoisting installation, the hoisting efficiency is low, and the positioning time is long. The manual matching mechanical positioning safety coefficient is lower.
Disclosure of Invention
The invention aims to overcome the defects in the prior art and provide a fixing structure and a mounting method which can realize reliable connection between a connecting lug plate and a hoisting steel beam and can hoist the connecting lug plate together with the steel beam.
In order to achieve the purpose, the technical scheme of the invention is realized as follows:
a fixing structure of a steel beam and a connecting lug plate comprises a hoisting steel beam, wherein positioning rings are vertically and symmetrically arranged on a web plate of the hoisting steel beam; and a fixing piece with a hook is inserted into the positioning ring, and the other end of the fixing piece is fixedly connected with a connecting lug plate together.
Furthermore, the positioning ring is rotatably connected with the fixing piece through threads.
Further, the positioning ring is composed of a nut, and the fixing piece is formed by bending a reinforcing steel bar head by 90 degrees.
The method for fixedly mounting the steel beam and the connecting lug plate comprises the following steps:
(1) vertically and symmetrically welding positioning rings at the web plate position of the hoisting steel beam, and inserting matched fixing pieces into the positioning rings;
(2) after the connecting ear plate is placed at the position to be installed, the connecting ear plate is welded and fixed with each fixing piece;
(3) before hoisting the steel beam, the connecting lug plates are rotated 180 degrees from the positions to be installed to the opposite sides, after the steel beam is hoisted in place, the connecting lug plates are rotated 180 degrees around the fixing rings in the reverse direction to the positions to be installed, and the steel beams are connected through the connecting lug plates.
Compared with the prior art, the invention has the following beneficial effects:
according to the invention, the connection lug plate and the hoisting steel beam can be hoisted simultaneously, so that a new hoisting device is avoided, before the steel beam is hoisted, the connection lug plate is positioned in a mirror image mode on the ground through the rotating fit between the fixing piece bent by 90 degrees and the positioning ring, and after the steel beam is hoisted, the connection lug plate is rotated to the simulated installation position, so that the hoisting and positioning safety risks can be reduced efficiently, conveniently and simultaneously. The fixing piece can be formed by bending the waste reinforcing steel bar head by 90 degrees, so that the use cost can be saved.
Drawings
FIG. 1 is a schematic structural diagram of the present invention.
Description of reference numerals:
1-hoisting steel beam, 2-connecting ear plate, 3-fixing piece and 4-positioning ring.
Detailed Description
The present invention will be described in detail below with reference to the embodiments with reference to the attached drawings.
As shown in fig. 1, a fixing structure of a steel beam and a connecting lug plate comprises a hoisting steel beam 1, wherein positioning rings 4 are vertically and symmetrically arranged on a web plate of the hoisting steel beam 1; a fixing piece 3 with a hook is inserted in the positioning ring 4, and the other ends of the fixing pieces 3 are fixedly connected with a connecting lug plate 2 together; the positioning ring 4 is rotatably connected with the fixing part 3 through threads, so that the positioning ring 4 is conveniently matched with the fixing part 3 in a rotating manner; the positioning ring 4 is formed by a nut, and the fixing piece 3 is formed by bending a reinforcing steel bar head by 90 degrees.
The installation construction of the invention comprises the following steps:
(1) according to the specification and size of the connecting lug plate 2, positioning rings 4 formed by nuts are vertically and symmetrically welded at the web plate position of the hoisting steel beam 1, and the vertical side of the fixing piece 3 is inserted into the positioning ring 4 matched with the fixing piece;
(2) after the connecting ear plate 2 is placed at the position to be installed, the connecting ear plate 2 is welded and fixed with each fixing piece 3;
(3) before the hoisting steel beam 1 is hoisted, the connecting lug plate 2 is rotated 180 degrees from the position to be installed to the opposite side, the connecting lug plate 2 is hoisted together with the steel beam, after the hoisting steel beam 1 is hoisted in place, the connecting lug plate 2 is rotated 180 degrees in the reverse direction around the positioning ring 4 to the position to be installed, and then the steel beams are connected through the connecting lug plate 2.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the invention, and any modifications, equivalents, improvements and the like that fall within the spirit and principle of the present invention are intended to be included therein.

Claims (4)

1. The utility model provides a fixed knot of girder steel and connection otic placode constructs, includes hoist and mount girder steel, its characterized in that: positioning rings are vertically and symmetrically arranged on a web plate of the hoisting steel beam; and a fixing piece with a hook is inserted into the positioning ring, and the other end of the fixing piece is fixedly connected with a connecting lug plate together.
2. The fixing structure of the steel beam and the connecting lug plate according to claim 1, wherein: the positioning ring is rotatably connected with the fixing piece through threads.
3. The fixing structure of the steel beam and the connecting lug plate according to claim 2, wherein: the positioning ring is composed of a nut, and the fixing piece is formed by bending a reinforcing steel bar head by 90 degrees.
4. A method for fixedly mounting a steel beam and a connecting lug plate is characterized in that: the method comprises the following steps:
(1) vertically and symmetrically welding positioning rings at the web plate position of the hoisting steel beam, and inserting matched fixing pieces into the positioning rings;
(2) after the connecting ear plate is placed at the position to be installed, the connecting ear plate is welded and fixed with each fixing piece;
(3) before hoisting the steel beam, the connecting lug plates are rotated 180 degrees from the positions to be installed to the opposite sides, after the steel beam is hoisted in place, the connecting lug plates are rotated 180 degrees around the fixing rings in the reverse direction to the positions to be installed, and the steel beams are connected through the connecting lug plates.
CN202010126373.9A 2020-02-29 2020-02-29 Fixing structure and mounting method for steel beam and connecting lug plate Pending CN111218986A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010126373.9A CN111218986A (en) 2020-02-29 2020-02-29 Fixing structure and mounting method for steel beam and connecting lug plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010126373.9A CN111218986A (en) 2020-02-29 2020-02-29 Fixing structure and mounting method for steel beam and connecting lug plate

Publications (1)

Publication Number Publication Date
CN111218986A true CN111218986A (en) 2020-06-02

Family

ID=70826191

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010126373.9A Pending CN111218986A (en) 2020-02-29 2020-02-29 Fixing structure and mounting method for steel beam and connecting lug plate

Country Status (1)

Country Link
CN (1) CN111218986A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111997262A (en) * 2020-09-15 2020-11-27 中国五冶集团有限公司 Steel beam high-altitude connecting plate and connecting method thereof
CN112663498A (en) * 2020-11-19 2021-04-16 中铁二局集团有限公司 Quick installation and closure construction method for splicing plates of steel beam bolting closure section

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104047433A (en) * 2014-06-20 2014-09-17 中建五局第三建设有限公司 Installation method of section steel beam in steel structure engineering
CN108060782A (en) * 2017-10-31 2018-05-22 中建钢构有限公司 The installation method and auxiliary mounting tool of girder steel element
CN211898916U (en) * 2020-02-29 2020-11-10 中国建筑第六工程局有限公司 Fixing structure of steel beam and connecting lug plate

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104047433A (en) * 2014-06-20 2014-09-17 中建五局第三建设有限公司 Installation method of section steel beam in steel structure engineering
CN108060782A (en) * 2017-10-31 2018-05-22 中建钢构有限公司 The installation method and auxiliary mounting tool of girder steel element
CN211898916U (en) * 2020-02-29 2020-11-10 中国建筑第六工程局有限公司 Fixing structure of steel beam and connecting lug plate

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111997262A (en) * 2020-09-15 2020-11-27 中国五冶集团有限公司 Steel beam high-altitude connecting plate and connecting method thereof
CN112663498A (en) * 2020-11-19 2021-04-16 中铁二局集团有限公司 Quick installation and closure construction method for splicing plates of steel beam bolting closure section
CN112663498B (en) * 2020-11-19 2022-05-17 中铁二局集团有限公司 Quick installation and closure construction method for splicing plates of steel beam bolting closure section

Similar Documents

Publication Publication Date Title
CN111218986A (en) Fixing structure and mounting method for steel beam and connecting lug plate
CN211898916U (en) Fixing structure of steel beam and connecting lug plate
CN211368423U (en) Stay cable tower top lifting traction operation platform
CN214614568U (en) Memory alloy down tube steel truss beam column connecting part
CN212527505U (en) Baffle assemblage does not have sign indicating number and supports frock
CN210828556U (en) Reinforcing structure of angle steel component and truss iron tower
CN210164213U (en) Lifting point truss for lifting scaffold
CN209127931U (en) A kind of derrick runway girder stiffening frame
CN209601929U (en) A kind of suspender for wind power flange and tower welding group pair
CN110847011A (en) Steel trestle bailey sheet fixing device and fixing method thereof
CN218931529U (en) Lifting device for column top steel beam
CN221027329U (en) Auxiliary support for installing transformer substation engineering modularized construction wallboard
CN219529205U (en) High-strength anti-fatigue wind power truss tower
CN218952439U (en) Rod piece reinforcing device of grid structure
CN211923468U (en) Auxiliary plate mounting structure for attached lifting scaffold
CN210029824U (en) Novel tower crane is adhered to device
CN215212646U (en) Support body of rod flange joint reinforced structure
CN213114268U (en) Steel construction corridor bridge convenient to field assembly and mounting structure thereof
CN115959584B (en) Inverted triangle crane boom sail structure
CN221053342U (en) High strength angle iron tower bearing structure
CN221856316U (en) Life line cantilever bracket based on long-house purlin steel structure construction
CN214835021U (en) Single angle steel T type cross-section anchor clamps type reinforcing apparatus
CN217025100U (en) Hoisting mechanism for assembling steel structure of low-rise building
CN219156312U (en) UHPC hanging plate combined hanging device
CN111874820B (en) Tower crane attachment universal rod piece connecting assembly and mounting method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination